83_FR_24885 83 FR 24781 - Enable Mississippi River Transmission, LLC; Notice of Request Under Blanket Authorization

83 FR 24781 - Enable Mississippi River Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 104 (May 30, 2018)

Page Range24781-24781
FR Document2018-11524

Federal Register, Volume 83 Issue 104 (Wednesday, May 30, 2018)
[Federal Register Volume 83, Number 104 (Wednesday, May 30, 2018)]
[Notices]
[Page 24781]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-11524]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-484-000]


Enable Mississippi River Transmission, LLC; Notice of Request 
Under Blanket Authorization

    Take notice that on May 14, 2018, Enable Mississippi River 
Transmission, LLC (MRT), 1111 Louisiana Street, Houston, Texas 77002, 
filed a prior notice application pursuant to sections 157.205, and 
157.208(f)(2) of the Federal Energy Regulatory Commission's 
(Commission) regulations under the Natural Gas Act (NGA), and MRT's 
blanket certificate issued in Docket No. CP82-489-000. MRT requests 
authorization to decrease the maximum allowable operating pressure 
(MAOP) of its Line A-86 located in Jefferson County, Missouri. The 
decrease in the MAOP is required to maintain Department of 
Transportation compliance, all as more fully set forth in the 
application, which is open to the public for inspection. The filing may 
also be viewed on the web at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at [email protected] or call toll-free, (866) 208-3676 or 
TTY, (202) 502-8659.
    Any questions regarding this application should be directed to Lisa 
Yoho, Sr. Director Regulatory & FERC Compliance, Enable Mississippi 
River Transmission, P.O. Box 1336, Houston, Texas 77251 or phone (346) 
701-2539 or fax (346) 701-2905 or by email 
[email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenter will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.

    Dated: May 23, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-11524 Filed 5-29-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 83, No. 104 / Wednesday, May 30, 2018 / Notices                                                   24781

                                                The Commission Orders                                   NGA (18 CFR 157.205), a protest to the                Regulatory Commission, 888 First Street
                                                  The time for interested entities to                   request. If no protest is filed within the            NE, Washington, DC 20426.
                                                submit comments in this proceeding is                   time allowed therefore, the proposed                    Dated: May 23, 2018.
                                                hereby extended 30 days, as discussed                   activity shall be deemed to be                        Kimberly D. Bose,
                                                in the body of this order.                              authorized effective the day after the
                                                                                                                                                              Secretary.
                                                                                                        time allowed for filing a protest. If a
                                                  By the Commission.                                                                                          [FR Doc. 2018–11524 Filed 5–29–18; 8:45 am]
                                                                                                        protest is filed and not withdrawn
                                                  Dated: May 23, 2018.                                  within 30 days after the allowed time                 BILLING CODE 6717–01–P

                                                Kimberly D. Bose,                                       for filing a protest, the instant request
                                                Secretary.                                              shall be treated as an application for
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                [FR Doc. 2018–11527 Filed 5–29–18; 8:45 am]             authorization pursuant to section 7 of
                                                BILLING CODE 6717–01–P                                  the NGA.                                              Federal Energy Regulatory
                                                                                                           Pursuant to section 157.9 of the                   Commission
                                                                                                        Commission’s rules, 18 CFR 157.9,
                                                DEPARTMENT OF ENERGY                                    within 90 days of this Notice the                     [Docket No. ER18–1667–000]
                                                                                                        Commission staff will either: complete
                                                Federal Energy Regulatory                                                                                     Supplemental Notice That Initial
                                                                                                        its environmental assessment (EA) and
                                                Commission                                                                                                    Market-Based Rate Filing Includes
                                                                                                        place it into the Commission’s public
                                                                                                                                                              Request for Blanket Section 204
                                                [Docket No. CP18–484–000]                               record (eLibrary) for this proceeding, or
                                                                                                                                                              Authorization: Antelope Expansion 2,
                                                                                                        issue a Notice of Schedule for
                                                Enable Mississippi River                                                                                      LLC
                                                                                                        Environmental Review. If a Notice of
                                                Transmission, LLC; Notice of Request                    Schedule for Environmental Review is                     This is a supplemental notice in the
                                                Under Blanket Authorization                             issued, it will indicate, among other                 above-referenced proceeding Antelope
                                                   Take notice that on May 14, 2018,                    milestones, the anticipated date for the              Expansion 2, LLC’s application for
                                                Enable Mississippi River Transmission,                  Commission staff’s issuance of the final              market-based rate authority, with an
                                                LLC (MRT), 1111 Louisiana Street,                       environmental impact statement (FEIS)                 accompanying rate tariff, noting that
                                                Houston, Texas 77002, filed a prior                     or EA for this proposal. The filing of the            such application includes a request for
                                                notice application pursuant to sections                 EA in the Commission’s public record                  blanket authorization, under 18 CFR
                                                157.205, and 157.208(f)(2) of the Federal               for this proceeding or the issuance of a              part 34, of future issuances of securities
                                                Energy Regulatory Commission’s                          Notice of Schedule for Environmental                  and assumptions of liability.
                                                (Commission) regulations under the                      Review will serve to notify federal and                  Any person desiring to intervene or to
                                                Natural Gas Act (NGA), and MRT’s                        state agencies of the timing for the                  protest should file with the Federal
                                                blanket certificate issued in Docket No.                completion of all necessary reviews, and              Energy Regulatory Commission, 888
                                                CP82–489–000. MRT requests                              the subsequent need to complete all                   First Street NE, Washington, DC 20426,
                                                authorization to decrease the maximum                   federal authorizations within 90 days of              in accordance with Rules 211 and 214
                                                allowable operating pressure (MAOP) of                  the date of issuance of the Commission                of the Commission’s Rules of Practice
                                                its Line A–86 located in Jefferson                      staff’s FEIS or EA.                                   and Procedure (18 CFR 385.211 and
                                                County, Missouri. The decrease in the                      Persons who wish to comment only                   385.214). Anyone filing a motion to
                                                MAOP is required to maintain                            on the environmental review of this                   intervene or protest must serve a copy
                                                Department of Transportation                            project should submit an original and                 of that document on the Applicant.
                                                compliance, all as more fully set forth                 two copies of their comments to the                      Notice is hereby given that the
                                                in the application, which is open to the                Secretary of the Commission.                          deadline for filing protests with regard
                                                public for inspection. The filing may                   Environmental commenters will be                      to the applicant’s request for blanket
                                                also be viewed on the web at http://                    placed on the Commission’s                            authorization, under 18 CFR part 34, of
                                                www.ferc.gov using the ‘‘eLibrary’’ link.               environmental mailing list, will receive              future issuances of securities and
                                                Enter the docket number excluding the                   copies of the environmental documents,                assumptions of liability, is June 12,
                                                last three digits in the docket number                  and will be notified of meetings                      2018.
                                                field to access the document. For                       associated with the Commission’s                         The Commission encourages
                                                assistance, contact FERC at                             environmental review process.                         electronic submission of protests and
                                                FERCOnlineSupport@ferc.gov or call                      Environmental commenters will not be                  interventions in lieu of paper, using the
                                                toll-free, (866) 208–3676 or TTY, (202)                 required to serve copies of filed                     FERC Online links at http://
                                                502–8659.                                               documents on all other parties.                       www.ferc.gov. To facilitate electronic
                                                   Any questions regarding this                         However, the non-party commenter will                 service, persons with internet access
                                                application should be directed to Lisa                  not receive copies of all documents filed             who will eFile a document and/or be
                                                Yoho, Sr. Director Regulatory & FERC                    by other parties or issued by the                     listed as a contact for an intervenor
                                                Compliance, Enable Mississippi River                    Commission (except for the mailing of                 must create and validate an
                                                Transmission, P.O. Box 1336, Houston,                   environmental documents issued by the                 eRegistration account using the
                                                Texas 77251 or phone (346) 701–2539 or                  Commission) and will not have the right               eRegistration link. Select the eFiling
                                                fax (346) 701–2905 or by email                          to seek court review of the                           link to log on and submit the
                                                lisa.yoho@enablemidstream.com.                          Commission’s final order.                             intervention or protests.
                                                   Any person or the Commission’s staff                    The Commission strongly encourages                    Persons unable to file electronically
sradovich on DSK3GMQ082PROD with NOTICES




                                                may, within 60 days after issuance of                   electronic filings of comments, protests              should submit an original and 5 copies
                                                the instant notice by the Commission,                   and interventions in lieu of paper using              of the intervention or protest to the
                                                file pursuant to Rule 214 of the                        the ‘‘eFiling’’ link at http://                       Federal Energy Regulatory Commission,
                                                Commission’s Procedural Rules (18 CFR                   www.ferc.gov. Persons unable to file                  888 First Street NE, Washington, DC
                                                385.214) a motion to intervene or notice                electronically should submit an original              20426.
                                                of intervention and pursuant to Section                 and 5 copies of the protest or                           The filings in the above-referenced
                                                157.205 of the regulations under the                    intervention to the Federal Energy                    proceeding are accessible in the


                                           VerDate Sep<11>2014   17:04 May 29, 2018   Jkt 244001   PO 00000   Frm 00065   Fmt 4703   Sfmt 4703   E:\FR\FM\30MYN1.SGM   30MYN1



Document Created: 2018-05-30 01:01:45
Document Modified: 2018-05-30 01:01:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 24781 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR