83_FR_25488
Page Range | 25382-25390 | |
FR Document | 2018-11757 |
[Federal Register Volume 83, Number 106 (Friday, June 1, 2018)] [Rules and Regulations] [Pages 25382-25390] From the Federal Register Online [www.thefederalregister.org] [FR Doc No: 2018-11757] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 60, 61, and 63 [EPA-R07-OAR-2018-0021; FRL-9978-80--Region 7] Delegation of Authority to the States of Iowa; Kansas; Missouri; Nebraska; Lincoln-Lancaster County, NE; and City of Omaha, NE, for New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (NESHAP) Including Maximum Achievable Control Technology (MACT) Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Delegation of authority. ----------------------------------------------------------------------- SUMMARY: The States of Iowa, Kansas, Missouri, and Nebraska and the local agencies of Lincoln-Lancaster County, Nebraska, and the city of Omaha, Nebraska, have submitted updated regulations for delegation of EPA authority for implementation and enforcement of NSPS, NESHAP, and MACT standards. The submissions cover new EPA standards and, in some instances, revisions to standards previously delegated. EPA's review of the pertinent regulations shows that they contain adequate and effective procedures for the implementation and enforcement of these Federal standards. This action informs the public of delegations to the above-mentioned agencies. All sources subject to the requirements of EPA regulations are also subject to the equivalent requirements of the above-mentioned state or local agencies. For the current, most up-to- date, status of delegations to the above-mentioned agencies, please refer to the web pages in the ``What does this action do?'' section of this document. DATES: This document is effective on June 1, 2018. The dates of delegation can be found in the SUPPLEMENTARY INFORMATION section of this document. ADDRESSES: Copies of documents relative to this action are available for public inspection during normal business hours at the Environmental Protection Agency, Air Planning and Development Branch, 11201 Renner Road, Lenexa, Kansas 66219. The interested persons wanting to examine these documents should make an appointment with the office at least 24 hours in advance. Effective immediately, all notifications, applications, reports, and other correspondence required pursuant to the newly delegated standards and revisions identified in this document must be submitted with respect to sources located in the jurisdictions identified in this document, to the following addresses: Iowa Department of Natural Resources, Air Quality Bureau, Wallace State Office Building, 502 E 9th Street, Des Moines, Iowa 50319. Kansas Department of Health and the Environment, Bureau of Air, 1000 SW Jackson Street, Suite 310, Topeka, Kansas 66612-1367. Missouri Department of Natural Resources, Air Pollution Control Program, PO Box 176, Jefferson City, Missouri 65102-0176. Nebraska Department of Environmental Quality, Air Quality Division, 1200 ``N'' Street, Suite 400, P.O. Box 98922, Lincoln, Nebraska 68509. Lincoln-Lancaster County Health Department, Division of Environmental Public Health, Air Quality Section, 3140 ``N'' Street, Lincoln, Nebraska 68510 City of Omaha, Public Works Department, Air Quality Control Division, 5600 South 10th Street, Omaha, Nebraska 68107. Duplicates of required documents must also continue to be submitted to the EPA Regional Office at the above address. FOR FURTHER INFORMATION CONTACT: Ms. Paula Higbee at (913) 551-7028, or by email at higbee.paula@epa.gov. SUPPLEMENTARY INFORMATION: The supplementary information is organized in the following order: I. What does this action do? II. What is the authority for delegation? III. What does delegation accomplish? IV. What has been delegated? V. What has not been delegated? List of Delegation Tables Table I--NSPS, 40 CFR part 60 Table II--NESHAP, 40 CFR part 61 Table III--NESHAP, 40 CFR part 63 I. What does this action do? EPA is providing notice of an update to its delegable authority for implementation and enforcement of the Federal standards shown in the tables below to the states of Iowa, Kansas, Missouri, and Nebraska. This action updates the delegation tables previously published at 80 FR 10596 (February 27, 2015). EPA has established procedures by which these agencies are automatically delegated the authority to implement the standards when they adopt regulations which are identical to the Federal standards. We then periodically provide notice of the new and revised standards for which delegation has been given. This document does not affect or alter the status of the listed standards under state or Federal law. For the current, most up-to-date, status of delegations to the above-mentioned agencies, please refer to the following web pages: Iowa https://go.usa.gov/xQ8yQ Kansas https://go.usa.gov/xQ8yE Missouri https://go.usa.gov/xQ8ym Nebraska https://go.usa.gov/xQ8yy [[Page 25383]] II. What is the authority for delegation? 1. Section 111(c)(1) of the Clean Air Act (CAA) authorizes EPA to delegate authority to any state agency which submits adequate regulatory procedures for implementation and enforcement of the NSPS program. The NSPS are codified at 40 CFR part 60. 2. Section 112(l) of the CAA and 40 CFR part 63, subpart E, authorizes EPA to delegate authority to any state or local agency which submits adequate regulatory procedures for implementation and enforcement of emission standards for hazardous air pollutants. The hazardous air pollutant standards are codified at 40 CFR parts 61 and 63, respectively. III. What does delegation accomplish? Delegation confers primary responsibility for implementation and enforcement of the listed standards to the respective state and local air agencies. However, EPA also retains the concurrent authority to enforce the standards. IV. What has been delegated? Tables I, II, and III below list the delegated standards. Each item listed in the Subpart column has two relevant dates listed in each column for each state. The first date in each block is the reference date to the CFR contained in the state rule. In general, the state or local agency has adopted the applicable standard through the date as noted in the table. The second date is the most recent effective date of the state agency rule for which the EPA has granted the delegation. This document specifically addresses revisions to the columns for Iowa, Kansas, Missouri, and Nebraska and the local agencies of Lincoln- Lancaster County, Nebraska, and the city of Omaha, Nebraska. If there are no dates listed in the delegation table, the state has not accepted delegation of the standard and implementation of those standards reside with EPA. V. What has not been delegated? 1. The EPA regulations effective after the first date specified in each block have not been delegated, and authority for implementation of these regulations is retained solely by EPA. 2. In some cases, the standards themselves specify that specific provisions cannot be delegated. In such cases, a specific section of the standard details what authorities can and cannot be delegated. You should review the applicable standard in the CFR for this information. 3. In some cases, the state rules do not adopt the Federal standard in its entirety. Each state rule (available from the respective agency) should be consulted for specific information. 4. In some cases, existing delegation agreements between the EPA and the agencies limit the scope of the delegated standards. Copies of delegation agreements are available from the state agencies, or from this office. 5. With respect to 40 CFR part 63, subpart A, General Provisions (see Table III), EPA has determined that sections 63.6(g), 63.6(h)(9), 63.7(e)(2)(ii) and (f), 63.8(f), and 63.10(f) cannot be delegated. Additional information is contained in 40 CFR 63.91(g)(2). List of Delegation Tables Table I--Delegation of Authority--Part 60 NSPS--Region 7 ---------------------------------------------------------------------------------------------------------------- State of State of State of Subpart Source category Iowa Kansas State of Missouri Nebraska ---------------------------------------------------------------------------------------------------------------- A...................... General Provisions......... 6/28/11 7/1/10 6/30/12; 12/30/13; Except 7/1/13 10/24/12 11/14/14 60.4; 60.9; and 60.10. 5/13/14 D...................... Fossil-Fuel Fired Steam 1/20/11 7/1/10 6/30/12.................. 7/1/13 Generators for Which 10/24/12 11/14/14 12/30/13................. 5/13/14 Construction is Commenced After August 17, 1971. Da..................... Electric Utility Steam 1/20/11 7/1/10 6/30/12.................. 7/1/13 Generating Units for Which 10/24/12 11/14/14 12/30/13................. 5/13/14 Construction is Commenced After September 18, 1978. Db..................... Industrial-Commercial- 1/20/11 07/01/10 6/30/12.................. 7/1/13 Institutional Steam 10/24/12 11/14/14 12/30/13................. 5/13/14 Generating Units. Dc..................... Small Industrial-Commercial- 1/20/11 07/1/10 6/30/12.................. 7/1/13 Institutional Steam 10/24/12 11/14/14 12/30/13................. 5/13/14 Generating Units. E...................... Incinerators............... 9/11/15 07/1/10 6/30/12.................. 7/1/13 4/22/17 11/14/14 12/30/13................. 5/13/14 Ea..................... Municipal Waste Combustors 6/28/11 7/1/10 6/30/12.................. 7/1/13 for Which Construction is 10/24/12 11/14/14 12/30/13................. 5/13/14 Commenced After December 20, 1989, and on or before September 20, 1994. Eb..................... Large Municipal Waste 6/28/11 7/1/10 6/30/12.................. 7/1/13 Combustors for Which 10/24/12 11/14/14 12/30/13................. 5/13/14 Construction is Commenced after September 20, 1994, or for Which Modification or Reconstruction is Commenced After June 19, 1996. Ec..................... Hospital/Medical/Infectious ......... 7/1/10 6/30/12.................. 7/1/13 Waste Incinerators for 11/14/14 12/30/13................. 5/13/14 Which Construction Commenced after June 20, 1996. F...................... Portland Cement Plants..... 9/11/15 7/1/10 6/30/12.................. 7/1/13 7/25/16 11/14/14 12/30/13................. 5/13/14 G...................... Nitric Acid Plants......... 9/11/15 7/1/10 6/30/12.................. 7/1/13 3/22/17 11/14/14 12/30/13................. 5/13/14 Ga..................... Nitric Acid Plants for 8/14/12 ......... 6/30/12.................. 7/1/13 Which Construction, 3/22/17 12/30/13................. 5/13/14 Reconstruction, or Modification Commenced After October 14, 2011. H...................... Sulfuric Acid Plants....... 9/11/15 7/1/10 6/30/12.................. 7/1/13 11/14/14 12/30/13................. 5/13/14 I...................... Hot Mix Asphalt Facilities. 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 J...................... Petroleum Refineries....... ......... 7/1/10 6/30/12.................. 7/1/13 11/14/14 12/30/13................. 5/13/14 Ja..................... Standards of Performance ......... ......... 6/30/12.................. 7/1/13 for Petroleum Refineries 12/30/13................. 5/13/14 for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007. K...................... Storage Vessels for 6/28/11 7/1/10 6/30/12.................. 7/1/13 Petroleum Liquids for 10/24/12 11/14/14 12/30/13................. 5/13/14 Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978. Ka..................... Storage Vessels for 6/28/11 7/1/10 6/30/12.................. 7/1/13 Petroleum Liquids for 10/24/12 11/14/14 12/30/13................. 5/13/14 Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984. Kb..................... Volatile Organic Liquid 6/28/11 7/1/10 6/30/12.................. 7/1/13 Storage Vessels (including 10/24/12 11/14/14 12/30/13................. 5/13/14 Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984. [[Page 25384]] L...................... Secondary Lead Smelters.... ......... 7/1/10 6/30/12.................. 7/1/13 11/14/14 12/30/13................. 5/13/14 M...................... Secondary Brass and Bronze 6/28/11 7/1/10 6/30/12.................. 7/1/13 Production Plants. 10/24/12 11/14/14 12/30/13................. 5/13/14 N...................... Basic Oxygen Process 6/28/11 7/1/10 6/30/12.................. 7/1/13 Furnaces for Which 10/24/12 11/14/14 12/30/13................. 05/13/14 Construction is Commenced After June 11, 1973. Na..................... Basic Oxygen Process 6/28/11 7/1/10 6/30/12.................. 7/1/13 Steelmaking Facilities for 10/24/12 11/14/14 12/30/13................. 5/13/14 Which Construction is Commenced After January 20, 1983. O...................... Sewage Treatment Plants.... 6/28/11 7/01/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 P...................... Primary Copper Smelters.... ......... 7/1/10 6/30/12.................. 7/1/13 11/14/14 12/30/13................. 5/13/14 Q...................... Primary Zinc Smelters...... ......... 7/1/10 6/30/12.................. 7/1/13 11/14/14 12/30/13................. 5/13/14 R...................... Primary Lead Smelters...... ......... 7/01/10 6/30/12.................. 7/1/13 11/14/14 12/30/13................. 5/13/14 S...................... Primary Aluminum Reduction ......... 7/1/10 6/30/12.................. 7/01/13 Plants. 11/14/14 12/30/13................. 5/13/14 T...................... Phosphate Fertilizer 6/28/11 7/1/10 6/30/12.................. 7/1/13 Industry: Wet Process 10/24/12 11/14/14 12/30/13................. 5/13/14 Phosphoric Acid Plants. U...................... Phosphate Fertilizer 6/28/11 7/1/10 6/30/12.................. 7/1/13 Industry: Superphosphoric 10/24/12 11/14/14 12/30/13................. 5/13/14 Acid Plants. V...................... Phosphate Fertilizer 6/28/11 7/1/10 6/30/12.................. 7/1/13 Industry: Diammonium 10/24/12 11/14/14 12/30/13................. 5/13/14 Phosphate Plants. W...................... Phosphate Fertilizer 6/28/11 7/1/10 6/30/12.................. 7/1/13 Industry: Triple 10/24/12 11/14/14 12/30/13................. 5/13/14 Superphosphate Plants. X...................... Phosphate Fertilizer 6/28/11 7/1/10 6/30/12.................. 7/01/13 Industry: Granular Triple 10/24/12 11/14/14 12/30/13................. 5/13/14 Superphosphate Storage Facilities. Y...................... Coal Preparation Plants.... 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 Z...................... Ferroalloy Production 6/28/11 7/1/10 6/30/12.................. 7/1/13 Facilities. 10/24/12 11/14/14 12/30/13................. 5/13/14 AA..................... Steel Plants: Electric Arc 6/28/11 7/1/10 6/30/12.................. 7/1/13 Furnaces Constructed After 10/24/12 11/14/14 12/30/13................. 5/13/14 October 21, 1974, and on or Before August 17, 1983. AAa.................... Steel Plants: Electric Arc 6/28/11 7/1/10 6/30/12.................. 7/1/13 Furnaces and Argon-Oxygen 10/24/12 11/14/14 12/30/13................. 5/13/14 Decarburization Vessels Constructed After August 17, 1983. BB..................... Kraft Pulp Mills........... 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 05/13/14 BBa.................... Kraft Pulp Mill Affected ......... ......... ......................... ......... Sources for Which Construction, Reconstruction, or Modification Commenced After May 23, 2013. CC..................... Glass Manufacturing Plants. 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 DD..................... Grain Elevators............ 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 EE..................... Surface Coating of Metal 6/28/11 7/1/10 6/30/12.................. 7/1/13 Furniture. 10/24/12 11/14/14 12/30/13................. 5/13/14 GG..................... Stationary Gas Turbines.... 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 HH..................... Lime Manufacturing Plants.. 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 KK..................... Lead-Acid Battery 6/28/11 7/1/10 6/30/12.................. 7/1/13 Manufacturing Plants. 10/24/12 11/14/14 12/30/13................. 5/13/14 LL..................... Metallic Mineral Processing 6/28/11 7/1/10 6/30/12.................. 7/1/13 Plants. 10/24/12 11/14/14 12/30/13................. 5/13/14 MM..................... Automobile and Light Duty 6/28/11 7/1/10 6/30/12.................. 7/1/13 Truck Surface Coating 10/24/12 11/14/14 12/30/13................. 5/13/14 Operations. NN..................... Phosphate Rock Plants...... 6/28/11 7/01/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 PP..................... Ammonium Sulfate 6/28/11 7/1/10 6/30/12.................. 7/1/13 Manufacture. 10/24/12 11/14/14 12/30/13................. 5/13/14 QQ..................... Graphic Arts Industry: 6/28/11 7/1/10 6/30/12.................. 7/1/13 Publication Rotogravure 10/24/12 11/14/14 12/30/13................. 5/13/14 Printing. RR..................... Pressure Sensitive Tape and 6/28/11 7/1/10 6/30/12.................. 7/1/13 Label Surface Coating 10/24/12 11/14/14 12/30/13................. 5/13/14 Operations. SS..................... Industrial Surface Coating: 6/28/11 7/1/10 6/30/12.................. 7/1/13 Large Appliances. 10/24/12 11/14/14 12/30/13................. 5/13/14 TT..................... Metal Coil Surface Coating. 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 UU..................... Asphalt Processing and 6/28/11 7/1/10 6/30/12.................. 7/1/13 Asphalt Roofing 10/24/12 11/14/14 12/30/13................. 5/13/14 Manufacture. VV..................... Equipment Leaks of VOC in 6/28/11 7/1/10 6/30/12.................. 7/1/13 the Synthetic Organic 10/24/12 11/14/14 12/30/13................. 5/13/14 Chemicals Manufacturing Industry. V Va................... Equipment Leaks of VOC in 6/28/11 7/1/10 6/30/12.................. 7/1/13 the Synthetic Organic 10/24/12 11/14/14 12/30/13................. 5/13/14 Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006. WW..................... Beverage Can Surface 6/28/11 7/1/10 6/30/12.................. 7/1/13 Coating Industry. 10/24/12 11/14/14 12/30/13................. 5/13/14 XX..................... Bulk Gasoline Terminals.... 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 [[Page 25385]] AAA.................... New Residential Wood ......... 7/1/10 6/30/12.................. 7/1/13 Heaters. 11/14/14 12/30/13................. 5/13/14 BBB.................... Rubber Tire Manufacturing 6/28/11 7/1/10 6/30/12.................. 7/1/13 Industry. 10/24/12 11/14/14 12/30/13................. 5/13/14 DDD.................... Volatile Organic Compound 6/28/11 7/1/10 6/30/12.................. 7/1/13 (VOC) Emissions from the 10/24/12 11/14/14 12/30/13................. 5/13/14 Polymer Manufacturing Industry. FFF.................... Flexible Vinyl and Urethane 6/28/11 7/1/10 6/30/12.................. 7/1/13 Coating and Printing. 10/24/12 11/14/14 12/30/13................. 5/13/14 GGG.................... Equipment Leaks of VOC in 6/28/11 7/1/10 6/30/12.................. 7/1/13 Petroleum Refineries. 10/24/12 11/14/14 12/30/13................. 5/13/14 GGGa................... Equipment Leaks of VOC in ......... ......... 6/30/12.................. 7/1/13 Petroleum Refineries for 12/30/13................. 5/13/14 Which Construction, Reconstruction, or Modification Commenced After November 7, 2006. HHH.................... Synthetic Fiber Production 6/28/11 7/1/10 6/30/12.................. 7/1/13 Facilities. 10/24/12 11/14/14 12/30/13................. 5/13/14 III.................... Volatile Organic Compound 6/28/11 7/1/10 6/30/12.................. 7/1/13 (VOC) Emissions From the 10/24/12 11/14/14 12/30/13................. 5/13/14 Synthetic Organic Chemical Manufacturing Industry (SOCMI) AIR Oxidation Unit Processes. JJJ.................... Petroleum Dry Cleaners..... 6/28/11 7/1/10 6/30/12.................. 7/1/13 10/24/12 11/14/14 12/30/13................. 5/13/14 KKK.................... Equipment Leaks of VOC from 6/28/11 7/1/10 6/30/12.................. 7/1/13 Onshore Natural Gas 10/24/12 11/14/14 12/30/13................. 5/13/14 Processing Plants. LLL.................... Onshore Natural Gas 6/28/11 7/1/10 6/30/12.................. 7/1/13 Processing: SO2 Emissions. 10/24/12 11/14/14 12/30/13................. 5/13/14 NNN.................... Volatile Organic Compound 6/28/11 7/1/10 6/30/12.................. 7/1/13 (VOC) Emissions from 10/24/12 11/14/14 12/30/13................. 5/13/14 Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation Operations. OOO.................... Nonmetallic Mineral 6/28/11 7/1/10 6/30/12.................. 7/1/13 Processing Plants. 10/24/12 11/14/14 12/30/13................. 5/13/14 PPP.................... Wool Fiberglass Insulation 6/28/11 7/1/10 6/30/12.................. 7/1/13 Manufacturing Plants. 10/24/12 11/14/14 12/30/13................. 5/13/14 QQQ.................... VOC Emissions from 6/28/11 7/1/10 6/30/12.................. 7/1/13 Petroleum Refinery 10/24/12 11/14/14 12/30/13................. 5/13/14 Wastewater Systems. RRR.................... Volatile Organic Compound 6/28/11 7/1/10 6/30/12.................. 7/1/13 Emissions from Synthetic 10/24/12 11/14/14 12/30/13................. 5/13/14 Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes. SSS.................... Magnetic Tape Coating 6/28/11 7/1/10 6/30/12.................. 7/1/13 Facilities. 10/24/12 11/14/14 12/30/13................. 5/13/14 TTT.................... Industrial Surface Coating: 6/28/11 7/1/10 6/30/12.................. 7/1/13 Surface Coating of Plastic 10/24/12 11/14/14 12/30/13................. 5/13/14 Parts for Business Machines. UUU.................... Calciners and Dryers in 6/28/11 7/1/10 6/30/12.................. 7/1/13 Mineral Industries. 10/24/12 11/14/14 12/30/13................. 5/13/14 VVV.................... Polymeric Coating of 6/28/11 7/1/10 6/30/12.................. 7/1/13 Supporting Substrates 10/24/12 11/14/14 12/30/13................. 5/13/14 Facilities. WWW.................... Municipal Solid Waste 6/28/11 7/1/10 6/30/12.................. 7/1/13 Landfills. 10/24/12 11/14/14 12/30/13................. 5/13/14 AAAA................... Small Municipal Waste 6/28/11 7/1/10 6/30/12.................. 7/1/13 Combustion Units for Which 10/24/12 11/14/14 12/30/13................. 5/13/14 Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commenced After June 6, 2001. CCCC................... Commercial and Industrial ......... ......... 6/30/12.................. 7/1/13 Solid Waste Incineration 12/30/13................. 5/13/14 Units for Which Construction is Commenced After November 30, 1999 or for Which Modification or Reconstruction is Commenced on or After June 1, 2001. DDDD................... Commercial and Industrial ......... 7/1/10 ......................... 7/1/13 Solid Waste Incineration 11/14/14 5/13/14 Units that Commenced Construction On or Before November 30, 1999. EEEE................... Other Solid Waste 6/28/11 7/1/10 6/30/12.................. 7/1/13 Incineration Units for 10/24/12 11/14/14 12/30/13................. 5/13/14 Which Construction Commenced After December 9, 2004 or Modification or Reconstruction Commenced On or After June 16, 2006. FFFF................... Other Solid Waste ......... 7/1/10 ......................... 7/1/13 Incineration Units that 11/14/14 5/13/14 Commenced Construction On or Before December 9, 2004. IIII................... Stationary Compression 6/28/11 7/1/10 6/30/12.................. 7/1/13 Ignition Internal 10/24/12 11/14/14 12/30/13................. 5/13/14 Combustion Engines. JJJJ................... Stationary Spark Ignition 6/28/11 7/1/10 6/30/12.................. 7/1/13 Internal Combustion 10/24/12 11/14/14 12/30/13................. 5/13/14 Engines. KKKK................... Stationary Combustion 6/28/11 7/1/10 6/30/12.................. 7/1/13 Turbines. 10/24/12 11/14/14 12/30/13................. 5/13/14 LLLL................... New Sewage Sludge ......... ......... 6/30/12.................. 7/1/13 Incinerator Units. 12/30/13................. 5/13/14 OOOO................... Crude Oil and Natural Gas ......... ......... 6/30/12.................. 7/1/13 Production, Transmission 12/30/13................. 5/13/14 and Distribution. OOOOa.................. Crude Oil and Natural Gas ......... ......... ......................... ......... Production, Transmission and Distribution for which Construction, Reconstruction, or Modification Commenced After September 18, 2015. QQQQ................... New Residential Hydronic ......... ......... ......................... ......... Heaters and Forced Air Furnaces. TTTT................... Greenhouse Gas Emissions ......... ......... ......................... ......... for Electric Generating Units. ---------------------------------------------------------------------------------------------------------------- [[Page 25386]] Table II--Delegation of Authority Part 61--NESHAP--Region 7 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Lincoln[dash]Lancaster Subpart Source category State of Iowa State of Kansas State of Missouri State of Nebraska County City of Omaha ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ A................. General Provisions.. 9/19/11................ 701/10; 12/28/12; Except 6/30/12; 12/30/13; 7/1/01................ 7/1/13.................... 7/1/09 10/24/12............... 61.04; 61.16; and 61.17. Except 61.04; 61.16; 7/21/10............... 12/10/13.................. 12/22/12 and 61.17. B................. Radon Emissions from Not delegable.......... Not delegable........... Not delegable.......... Not delegable......... Not delegable............. Not delegable. Underground Uranium Mines. C................. Beryllium........... ....................... 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 D................. Beryllium Rocket ....................... 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 Motor Firing. 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 E................. Mercury............. 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 F................. Vinyl Chloride...... 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 J................. Equipment Leaks 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 (Fugitive Emission 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Sources) of Benzene. L................. Benzene Emissions 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 from Coke By- 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Product Recovery Plants. M................. Asbestos............ 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 N................. Inorganic Arsenic 9/19/12................ 7/1/10.................. 7/1/15................. 7/1/01................ 07/1/13................... 7/1/09 Emissions from 3/22/17................ 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Glass Manufacturing Plants. O................. Inorganic Arsenic ....................... 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 Emissions From 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Primary Copper Smelters. P................. Inorganic Arsenic ....................... 7/1/10.................. 7/1/15................. 7/1/01................ 07/1/13................... 7/1/09 Emissions From 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Arsenic Trioxide and Metallic Arsenic Production Facilities. Q................. Radon Emissions From Not delegable.......... Not delegable........... Not delegable.......... Not delegable......... Not delegable............. Not delegable. Department of Energy Facilities. R................. Radon Emissions From Not delegable.......... Not delegable........... Not delegable.......... Not delegable......... Not delegable............. Not delegable. Phosphogypsum Stacks. T................. Radon Emissions From Not delegable.......... Not delegable........... Not delegable.......... Not delegable......... Not delegable............. Not delegable. the Disposal of Uranium Mill Tailings. V................. Equipment Leaks ....................... 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 (Fugitive Emission 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Sources). W................. Radon Emissions From Not delegable.......... Not delegable........... Not delegable.......... Not delegable......... Not delegable............. Not delegable. Operating Mill Tailings. Y................. Benzene Emissions 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 From Benzene 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Storage Vessels. BB................ Benzene Emissions 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 From Benzene 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 Transfer Operations. FF................ Benzene Waste 9/19/11................ 7/1/10.................. 7/1/15................. 7/1/01................ 7/1/13.................... 7/1/09 Operations. 10/24/12............... 12/28/12................ 7/30/17................ 7/21/10............... 12/10/13.................. 12/22/12 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Table III--Delegation of Authority--Part 63 NESHAP--Region 7 -------------------------------------------------------------------------------------------------------------------------------------------------------- Lincoln[dash] Subpart Source category State of State of Kansas State of Missouri State of Lancaster City of Iowa Nebraska County Omaha -------------------------------------------------------------------------------------------------------------------------------------------------------- A....................... General Provisions.......... 9/19/11 7/1/10; 12/28/12; 6/30/12; 12/30/13; 7/1/13 7/1/13 7/1/11 7/25/16 Except 63.6(f)(1), Except 63.13 & 5/13/14 12/10/13 12/22/12 (g), (h)(1) and 63.15(a)(2). (h)(9); 63.7(e)(2)(ii) and (f); 63.8(f); 63.10(f); 63.12; 63.13; 63.14(b)(27) and phrase ``and table 5 to subpart DDDDD of this part''; 63.14(b)(35); (39) through (53); and (55) through (62); in 63.14(i)(1), the phrase ``table 5 to subpart DDDDD of this part''; and 63.15. F....................... Organic Hazardous Air 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Pollutants From the 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Synthetic Organic Chemical Manufacturing Industry. [[Page 25387]] G....................... Organic Hazardous Air 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Pollutants From the 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater. H....................... Organic Hazardous Air 9/19/11 0/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Pollutants for Equipment 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Leaks. I....................... Organic Hazardous Air 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Pollutants for Certain 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Processes Subject to the Negotiated Regulation for Equipment Leaks. J....................... Polyvinyl Chloride and ......... 7/1/10; 11/14/14; ....................... ......... ............. ......... Copolymers Production. Except 63.15. L....................... Coke Oven Batteries......... 9/19/11 7/1/10................. 7/1/15................. ......... ............. ......... 10/24/12 12/28/12............... 7/30/17................ ......... ............. ......... M....................... National Perchloroethylene 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Air Emission Standards for 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Dry Cleaning Facilities. N....................... Chromium Emissions From Hard 9/19/12 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 and Decorative Chromium 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Electroplating and Chromium Anodizing Tanks. O....................... Ethylene Oxide Emissions 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Standards for Sterilization 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Facilities. Q....................... Industrial Process Cooling 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Towers. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 R....................... Gasoline Distribution 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Facilities (Bulk Gasoline 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Terminals and Pipeline Breakout Stations). S....................... Pulp and Paper Industry..... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 T....................... Halogenated Solvent Cleaning 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 0/13/14 12/10/13 12/22/12 U....................... Polymers and Resins Group I. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 W....................... Epoxy Resins Production and 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Non-Nylon Polyamides 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Production. X....................... Secondary Lead Smelting..... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Y....................... Marine Tank Vessel Loading 9/19/11 7/1/10................. 7/1/15................. ......... ............. ......... Operations. 10/24/12 12/28/12............... 7/30/17................ AA/BB................... Phosphoric Acid 9/19/11 7/1/10................. 12/9/16................ 7/1/13 7/1/13 7/1/11 Manufacturing Plants/ 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Phosphate Fertilizers Production Plants. CC...................... Petroleum Refineries........ ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 DD...................... Off-Site Waste and Recovery 3/18/15 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Operations. 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 EE...................... Magnetic Tape Manufacturing 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Operations. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 GG...................... Aerospace Industry Surface 9/19/11 7/1/10................. 12/7/15................ 7/1/13 7/1/13 7/1/11 Coating Manufacturing and 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Rework Facilities. HH...................... Oil and Natural Gas 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Production Facilities. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 II...................... Shipbuilding and Ship Repair ......... 7/1/10................. 7/1/15................. ......... ............. ......... (Surface Coating). 12/28/12............... 7/30/17................ JJ...................... Wood Furniture Manufacturing 11/21/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Operations. 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 KK...................... Printing and Publishing 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Industry. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 LL...................... Primary Aluminum Reduction ......... 7/1/10................. 10/15/15............... 7/1/13 7/1/13 7/1/11 Plants. 12/28/12............... 7/30/17................ 05/13/14 12/10/13 12/22/12 MM...................... Chemical Recovery Combustion 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Sources at Kraft, Soda, 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Sulfite, and Stand-Along Semichemical Pulp Mills. NN...................... Wool Fiberglass Mfg (area ......... ....................... ....................... ......... ............. ......... sources). OO...................... Tanks--Level 1.............. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 PP...................... Containers.................. 9/19/11 7/1/10................. 7/1/15................. 07/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 05/13/14 12/10/13 12/22/12 QQ...................... Surface Impoundments........ 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 RR...................... Individual Drain Systems.... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 SS...................... Closed Vent Systems, Control 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Devices, Recovery Devices 10/24/12 12/28/12............... 7/30/17................ 05/13/14 12/10/13 12/22/12 and Routing to a Fuel Gas System or a Process. TT...................... Equipment Leaks--Control 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Level 1 Standards. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 UU...................... Equipment Leaks--Control 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Level 2 Standards. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 VV...................... Oil-Water Separators and 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Organic-Water Separators. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 WW...................... Storage Vessel (Tanks)-- 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Control Level 2. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 [[Page 25388]] XX...................... Ethylene Manufacturing 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Process Units: Heat 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Exchange Systems and Waste Operations. YY...................... Generic Maximum Achievable 10/8/14 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Control Technology 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Standards. CCC..................... Steel Pickling-HCL Process ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Facilities and Hydrochloric 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Acid Regeneration Plants. DDD..................... Mineral Wool Production..... 7/29/15 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 EEE..................... Hazardous Waste Combustors.. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 GGG..................... Pharmaceutical Production... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 HHH..................... Natural Gas Transmission and 8/16/12 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Storage Facilities. 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 III..................... Flexible Polyurethane Foam 8/15/14 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Production. 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 JJJ..................... Polymers and Resins Group IV 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 LLL..................... Portland Cement 7/25/16 7/1/10................. 9/11/15................ 7/1/13 7/1/13 7/1/11 Manufacturing Industry. 3/22/17 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 MMM..................... Pesticide Active Ingredient 3/27/14 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Production. 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 NNN..................... Wool Fiberglass 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Manufacturing. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 OOO..................... Manufacture of Amino/ 10/8/14 07/01/10............... 7/1/15................. 7/1/13 7/1/13 7/1/11 Phenolic Resins. 7/25/16 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 PPP..................... Polyether Polyols Production 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 QQQ..................... Primary Copper Smelting..... ......... 7/1/10................. 7/1/15................. ......... ............. ......... 12/28/12............... 7/30/17................ RRR..................... Secondary Aluminum ......... 7/1/10................. 6/13/16................ 7/1/13 7/1/13 7/1/11 Production. 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 TTT..................... Primary Lead Smelting....... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 UUU..................... Petroleum Refineries........ ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 VVV..................... Publicly Owned Treatment 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Works. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 XXX..................... Ferroalloys Production...... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 AAAA.................... Municipal Solid Waste 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Landfills. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 CCCC.................... Manufacturing of Nutritional ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Yeast. 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 DDDD.................... Plywood and Composite Wood 9/19/11 7/1/10................. 7/1/15................. ......... ............. ......... Products. 10/24/12 12/28/12............... 7/30/17................ EEEE.................... Organic Liquids Distribution 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 (Non-Gasoline). 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 FFFF.................... Misc. Organic Chemical 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Manufacturing. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 GGGG.................... Solvent Extraction for 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Vegetable Oil Production. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 HHHH.................... Wet Formed Fiberglass Mat 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Production. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 IIII.................... Surface Coating of 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Automobiles and Light-Duty 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Trucks. JJJJ.................... Paper and Other Web Coating. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 KKKK.................... Surface Coating of Metal 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Cans. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 MMMM.................... Surface Coating of Misc. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Metal Parts and Products. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 NNNN.................... Surface Coating of Large 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Appliances. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 OOOO.................... Printing, Coating and Dyeing 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 of Fabrics and Other 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Textiles. PPPP.................... Surface Coating of Plastic 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Parts and Products. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 QQQQ.................... Surface Coating of Wood 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Building Products. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 RRRR.................... Surface Coating of Metal 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Furniture. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 SSSS.................... Surface Coating of Metal 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Coil. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 TTTT.................... Leather Finishing Operations 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 UUUU.................... Cellulose Products 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Manufacturing. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 VVVV.................... Boat Manufacturing.......... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 [[Page 25389]] WWWW.................... Reinforced Plastic 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Composites Production. 10/24/12 12/28/12............... 7/30/17................ 05/13/14 12/10/13 12/22/12 XXXX.................... Rubber Tire Manufacturing... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 YYYY.................... Stationary Combustion 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Turbines. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 ZZZZ.................... Stationary Reciprocating 3/6/13 3/6/13................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Internal Combustion Engines. 10/23/13 11/14/14............... 7/30/17 *only major 5/13/14 12/10/13 12/22/12 sources. AAAAA................... Lime Manufacturing Plants... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 BBBBB................... Semiconductor Manufacturing. 9/19/11 7/1/10................. 7/1/15................. ......... ............. ......... 10/24/12 12/28/12............... 7/30/17................ CCCCC................... Coke Ovens: Pushing, 9/19/11 7/1/10................. 7/1/15................. ......... ............. ......... Quenching, and Battery 10/24/12 12/28/12............... 7/30/17................ Stacks. DDDDD................... Industrial, Commercial and ......... ....................... 11/20/15............... 7/1/13 7/1/13 ......... Institutional Boilers and 7/30/17................ 5/13/14 12/10/13 Process Heaters. EEEEE................... Iron and Steel Foundries.... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 FFFFF................... Integrated Iron and Steel 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Manufacturing Facilities. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 GGGGG................... Site Remediation............ 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 HHHHH................... Misc. Coating Manufacturing. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 IIIII................... Mercury Cell Chlor-Alkali 9/19/11 7/1/10................. 7/1/15................. ......... ............. ......... Plants. 10/24/12 12/28/12............... 7/30/17................ JJJJJ................... Brick and Structural Clay ......... ....................... 12/4/15................ ......... ............. ......... Products Manufacturing. 7/30/17................ KKKKK................... Clay Ceramics Manufacturing. ......... ....................... 7/1/15................. ......... ............. ......... 7/30/17................ LLLLL................... Asphalt Processing and 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 07/1/11 Asphalt Roofing 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 Manufacturing. MMMMM................... Flexible Poly-urethane Foam 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Fabrication Operation. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 NNNNN................... Hydrochloric Acid Production 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 PPPPP................... Engine Test Cells/Stands.... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 QQQQQ................... Friction Materials 9/19/11 07/01/10............... 7/1/15................. ......... ............. ......... Manufacturing Facilities. 10/24/12 12/28/12............... 7/30/17................ RRRRR................... Taconite Iron Ore Processing ......... 7/1/10................. 7/1/15................. ......... ............. ......... 12/28/12............... 7/30/17................ SSSSS................... Refractory Products 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Manufacturing. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 12/22/12 TTTTT................... Primary Magnesium Refining.. ......... 071/10................. 7/1/15................. ......... ............. ......... 12/28/12............... 7/30/17................ UUUUU................... Coal and Oil-fired Electric ......... ....................... 7/1/15................. 7/1/13 7/1/13 ......... Utility Steam Generating 7/30/17................ 5/13/14 12/10/13 Units. WWWWW................... Hospital Ethylene Oxide 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Sterilizer. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 YYYYY................... Electric Arc Furnace 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Steelmaking Facilities or 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 Stainless and Non-stainless Steel Manufacturing (EAFs). ZZZZZ................... Iron and Steel Foundries 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Area Sources. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 BBBBBB.................. Gasoline Distribution Bulk 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Terminal, Bulk Plant and 10/24/12 12/28/12............... 7/30/17 *.............. 05/13/14 12/10/13 12/22/12 Pipeline Facilities. CCCCCC.................. Gasoline Distribution, 1/24/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Gasoline Dispensing 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 Facilities. DDDDDD.................. PVC & Copolymer Production.. ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 EEEEEE.................. Primary Copper Smelting..... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 FFFFFF.................. Secondary Copper Smelting... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 GGGGGG.................. Primary Nonferrous Metal.... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 12/28/12............... 7/30/17 *.............. 05/13/14 12/10/13 12/22/12 HHHHHH.................. Paint Stripping Operations, 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Misc. Surface Coating, 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 Autobody Refinishing. JJJJJJ.................. Industrial, Commercial, and ......... ....................... 7/1/15................. 7/1/13 7/1/13 ......... Institutional Boilers. 7/30/17 *.............. 5/13/14 12/10/13 LLLLLL.................. Acrylic/Modacrylic Fibers 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Production. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 MMMMMM.................. Carbon Black Production..... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... 10/24/12 12/28/12............... 7/30/17 *.............. 05/13/14 12/10/13 NNNNNN.................. Chromium Compounds.......... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 OOOOOO.................. Flexible Polyurethane Foam 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Fabrication and Production. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 [[Page 25390]] PPPPPP.................. Lead Acid Battery 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Manufacturing. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 QQQQQQ.................. Wood Preserving............. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 RRRRRR.................. Clay Ceramics Manufacturing. 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 SSSSSS.................. Pressed & Blown Glass 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 Manufacturing. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 TTTTTT.................. Secondary Non-Ferrous Metals 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 7/1/11 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 12/22/12 VVVVVV.................. Chemical Manufacturing Area 12/21/12 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Sources. 9/10/14 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 WWWWWW.................. Plating and Polishing....... 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 XXXXXX.................. Metal Fabrication and 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Finishing. 10/24/12 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 YYYYYY.................. Ferroalloys Production...... ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... 12/28/12............... 7/30/17 *.............. 5/13/14 12/10/13 ZZZZZZ.................. Area Source Standards for ......... 071/10................. 7/1/15................. 7/1/13 7/1/13 ......... Aluminum, Copper and Other 12/28/12............... 7/30/17................ 5/13/14 12/10/13 Nonferrous Foundries. AAAAAAA................. Asphalt Processing and ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Asphalt Roofing 12/28/12............... 7/30/17................ 5/13/14 12/10/13 Manufacturing. BBBBBBB................. Chemical Preparations ......... 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Industry. 12/28/12............... 7/30/17................ 5/13/14 12/10/13 CCCCCCC................. Paints and Allied Products 9/19/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... Manufacturing. 10/24/12 12/28/12............... 7/30/17................ 5/13/14 12/10/13 DDDDDDD................. Prepared Foods Manufacturing 12/23/11 7/1/10................. 7/1/15................. 7/1/13 7/1/13 ......... 9/10/14 12/28/12............... 7/30/17................ 5/13/14 12/10/13 EEEEEEE................. Gold Mine Ore Processing and ......... ....................... 7/1/15................. 7/1/13 7/1/13 ......... Production Area Source 7/30/17................ 5/13/14 12/10/13 Category. HHHHHHH................. Polyvinyl Chloride and ......... ....................... 7/1/15................. 7/1/13 7/1/13 ......... Copolymers Production. 7/30/17................ 5/13/14 12/10/13 -------------------------------------------------------------------------------------------------------------------------------------------------------- * At this time, Missouri is temporarily not accepting delegation for area source NESHAP requirements (40 CFR part 63, subparts WWWWW-YYYYYY) within the State of Missouri as described in an August 24, 2010 letter from MDNR to the U.S. EPA, Region 7. Summary of This Action All sources subject to the requirements of 40 CFR parts 60, 61, and 63 are also subject to the equivalent requirements of the above- mentioned state or local agencies. This document informs the public of delegations to the above- mentioned agencies of the above-referenced Federal regulations. Authority This document is issued under the authority of sections 101, 110, 112, and 301 of the CAA, as amended (42 U.S.C. 7401, 7410, 7412, and 7601). Dated: May 21, 2018. Karen A. Flournoy, Acting Regional Administrator, Region 7. [FR Doc. 2018-11757 Filed 5-31-18; 8:45 am] BILLING CODE 6560-50-P
Category | Regulatory Information | |
Collection | Federal Register | |
sudoc Class | AE 2.7: GS 4.107: AE 2.106: | |
Publisher | Office of the Federal Register, National Archives and Records Administration | |
Section | Rules and Regulations | |
Action | Delegation of authority. | |
Dates | This document is effective on June 1, 2018. The dates of delegation can be found in the SUPPLEMENTARY INFORMATION section of this document. | |
Contact | Ms. Paula Higbee at (913) 551-7028, or by email at [email protected] | |
FR Citation | 83 FR 25382 | |
CFR Citation | 40
CFR
60 40 CFR 61 40 CFR 63 |