83_FR_26709 83 FR 26598 - Adequacy Determination for the St. Louis Area 2008 8-Hour Ozone Redesignation Request and Maintenance State Implementation Plan, Motor Vehicle Emissions Budgets for Transportation Conformity Purposes; State of Missouri

83 FR 26598 - Adequacy Determination for the St. Louis Area 2008 8-Hour Ozone Redesignation Request and Maintenance State Implementation Plan, Motor Vehicle Emissions Budgets for Transportation Conformity Purposes; State of Missouri

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 83, Issue 111 (June 8, 2018)

Page Range26598-26599
FR Document2018-12388

In this document, the EPA is notifying the public that the St. Louis area 2008 8-hour ozone redesignation request and maintenance plan motor vehicle emission budgets (MVEBs) for volatile organic compounds (VOCs) and nitrogen oxides (NO<INF>X</INF>) are adequate for transportation conformity purposes. As a result, these budgets must be used by the State of Missouri for future transportation conformity determinations for the St. Louis area.

Federal Register, Volume 83 Issue 111 (Friday, June 8, 2018)
[Federal Register Volume 83, Number 111 (Friday, June 8, 2018)]
[Rules and Regulations]
[Pages 26598-26599]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-12388]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R07-OAR-2018-0319; FRL-9979-11--Region 7]


Adequacy Determination for the St. Louis Area 2008 8-Hour Ozone 
Redesignation Request and Maintenance State Implementation Plan, Motor 
Vehicle Emissions Budgets for Transportation Conformity Purposes; State 
of Missouri

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notification of adequacy determination.

-----------------------------------------------------------------------

SUMMARY: In this document, the EPA is notifying the public that the St. 
Louis area 2008 8-hour ozone redesignation request and maintenance plan 
motor vehicle emission budgets (MVEBs) for volatile organic compounds 
(VOCs) and nitrogen oxides (NOX) are adequate for 
transportation conformity purposes. As a result, these budgets must be 
used by the State of Missouri for future transportation conformity 
determinations for the St. Louis area.

DATES: This finding is effective June 22, 2018.

FOR FURTHER INFORMATION CONTACT: Heather Hamilton, at (913) 551-7039, 
by email at [email protected], or by mail at U.S. Environmental 
Protection Agency, Air Planning and Development Branch, 11201 Renner 
Boulevard, Lenexa, Kansas 66219.

SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' or 
``our'' refer to EPA. The word ``budget(s)'' refers to the motor 
vehicle emission budgets (MVEBs) for volatile organic compounds and 
nitrogen oxides. For the purposes of this document, ``SIP'' refers to 
the St. Louis Area 2008 8-Hour Ozone Redesignation Request and 
Maintenance State Implementation Plan, submitted by Missouri Department 
of Natural Resources to EPA as a SIP revision on September 12, 2016. 
The Plan was revised on February 16, 2018.
    This document is an announcement of a finding that EPA has already 
made. EPA Region 7 sent a letter to Missouri Department of Natural 
Resources on May 15, 2018, stating that the MVEBs contained in the 
Redesignation Request and Maintenance Plan are adequate for 
transportation conformity purposes. As a result of EPA's finding, the 
State of Missouri must use the MVEBs from the February 16, 2018, 
Redesignation Request and Maintenance Plan for

[[Page 26599]]

future transportation conformity determinations for the St. Louis area. 
The finding is available at EPA's conformity website: https://www.epa.gov/state-and-local-transportation.
    Transportation conformity is required by section 176(c) of the 
Clean Air Act, as amended in 1990. EPA's conformity rule requires that 
transportation plans, programs and projects conform to state air 
quality implementation plans and establishes the criteria and procedure 
for determining whether or not they do. Conformity to a SIP means that 
transportation activities will not produce new air quality violations, 
worsen existing violations, or delay timely attainment of the national 
ambient air quality standards.
    The criteria by which we determine whether a SIP's motor vehicle 
emission budgets are adequate for conformity purposes are outlined in 
40 CFR 93.118(e)(4). Please note that an adequacy review is separate 
from EPA's completeness review, and it should not be used to prejudge 
EPA's ultimate approval of the SIP. EPA plans to take action on the SIP 
at a later date. We have described our process for determining the 
adequacy of submitted SIP budgets in 40 CFR 93.118(f), and have 
followed this rule in making our adequacy determination.

    Authority:  42 U.S.C. 7401-7671q.

    Dated: May 25, 2018.
James B. Gulliford,
Regional Administrator, Region 7.
[FR Doc. 2018-12388 Filed 6-7-18; 8:45 am]
 BILLING CODE 6560-50-P



                                           26598                 Federal Register / Vol. 83, No. 111 / Friday, June 8, 2018 / Rules and Regulations

                                           conduct a public process and make an                    5, 2018. We received no comments in                     ENVIRONMENTAL PROTECTION
                                           affirmative decision on the adequacy of                 response to the adequacy review                         AGENCY
                                           these budgets before they can be used by                posting.
                                           metropolitan planning organizations in                     This finding will also be available at               40 CFR Part 52
                                           conformity determinations. As a result                  the EPA’s conformity website: https://                  [EPA–R07–OAR–2018–0319; FRL–9979–
                                           of this finding, upon the effective date                www.epa.gov/state-and-local-                            11—Region 7]
                                           of this notification of adequacy, the New               transportation/conformity-adequacy-
                                           York Metropolitan Transportation                        review-region-2.                                        Adequacy Determination for the St.
                                           Council must use these budgets in                          The motor vehicle emissions budgets                  Louis Area 2008 8-Hour Ozone
                                           future transportation conformity                        are provided in Table 1 below.                          Redesignation Request and
                                           determinations. The budgets are                                                                                 Maintenance State Implementation
                                           contained in New York’s November 10,                           TABLE 1—2017 MOTOR VEHICLE                       Plan, Motor Vehicle Emissions
                                           2017, state implementation plan                               EMISSIONS BUDGETS FOR NYMTC                       Budgets for Transportation Conformity
                                           submittal for the 2008 ozone NAAQS                                                                              Purposes; State of Missouri
                                                                                                                      [Tons per year]
                                           and are associated with the reasonable
                                           further progress milestone                                                                                      AGENCY: Environmental Protection
                                                                                                    Year              VOC                     NOX          Agency (EPA).
                                           demonstration.
                                           DATES: This finding is effective June 25,               2017               65.69                  117.21        ACTION: Notification of adequacy
                                           2018.                                                                                                           determination.
                                           FOR FURTHER INFORMATION CONTACT:                           Transportation conformity is required
                                                                                                                                                           SUMMARY:    In this document, the EPA is
                                           Hannah Greenberg, Environmental                         by Clean Air Act section 176(c). The
                                                                                                                                                           notifying the public that the St. Louis
                                           Protection Agency Region 2, Air                         EPA’s conformity rule requires that
                                                                                                                                                           area 2008 8-hour ozone redesignation
                                           Programs Branch, 290 Broadway, 25th                     long-range transportation plans,
                                                                                                                                                           request and maintenance plan motor
                                           Floor, New York, New York 10007–                        transportation improvement programs,
                                                                                                                                                           vehicle emission budgets (MVEBs) for
                                           1866; (212) 637–3829,                                   and transportation projects conform to a
                                                                                                                                                           volatile organic compounds (VOCs) and
                                           greenberg.hannah@epa.gov.                               state’s air quality SIP and establishes the
                                                                                                                                                           nitrogen oxides (NOX) are adequate for
                                           SUPPLEMENTARY INFORMATION:                              criteria and procedures for determining
                                                                                                                                                           transportation conformity purposes. As
                                           Throughout this document, whenever                      whether or not they conform.
                                                                                                                                                           a result, these budgets must be used by
                                           ‘‘we,’’ ‘‘us,’’ or ‘‘our’’ is used, we mean             Conformity to a SIP means that
                                                                                                                                                           the State of Missouri for future
                                           the EPA.                                                transportation activities will not
                                                                                                                                                           transportation conformity
                                              This document is simply an                           produce new air quality violations,
                                                                                                                                                           determinations for the St. Louis area.
                                           announcement of a finding that we have                  worsen existing violations, or delay
                                                                                                   timely attainment of the NAAQS.                         DATES: This finding is effective June 22,
                                           already made. EPA Region 2 sent a letter
                                                                                                      The criteria the EPA uses to                         2018.
                                           to the New York State Department of
                                           Environmental Conservation on April                     determine whether a SIP’s motor vehicle                 FOR FURTHER INFORMATION CONTACT:
                                           19, 2018, stating that the 2017 motor                   emission budgets are adequate for                       Heather Hamilton, at (913) 551–7039, by
                                           vehicle emissions budgets (‘‘budgets’’)                 conformity purposes are outlined in 40                  email at Hamilton.heather@epa.gov, or
                                           in the submitted state implementation                   CFR 93.118(e)(4). We have further                       by mail at U.S. Environmental
                                           plan (‘‘SIP’’) for the 2008 national                    described our process for determining                   Protection Agency, Air Planning and
                                           ambient air quality standard for ozone                  the adequacy of submitted SIP budgets                   Development Branch, 11201 Renner
                                           for the New York portions of the New                    in 40 CFR 93.118(f), and we followed                    Boulevard, Lenexa, Kansas 66219.
                                           York-Northern New Jersey-Long Island                    this rule in making our adequacy                        SUPPLEMENTARY INFORMATION:
                                           8-hour ozone nonattainment area are                     determination. Please note that an                      Throughout this document ‘‘we,’’ ‘‘us,’’
                                           adequate for transportation conformity                  adequacy review is separate from the                    or ‘‘our’’ refer to EPA. The word
                                           purposes. These budgets are associated                  EPA’s completeness review and should                    ‘‘budget(s)’’ refers to the motor vehicle
                                           with the SIP’s reasonable further                       not be used to prejudge the EPA’s                       emission budgets (MVEBs) for volatile
                                           progress milestone demonstration and                    ultimate action on the SIP. Even if we                  organic compounds and nitrogen
                                           must apply to future transportation                     find a budget adequate, the SIP could                   oxides. For the purposes of this
                                           conformity determinations conducted                     later be disapproved.                                   document, ‘‘SIP’’ refers to the St. Louis
                                           by the New York Metropolitan                               Pursuant to 40 CFR 93.104(e), within                 Area 2008 8-Hour Ozone Redesignation
                                           Transportation Council (‘‘NYMTC’’).                     2 years of the effective date of this                   Request and Maintenance State
                                              On November 10, 2017, the New York                   document, NYMTC and the U.S.                            Implementation Plan, submitted by
                                           State Department of Environmental                       Department of Transportation will need                  Missouri Department of Natural
                                           Conservation submitted a SIP revision                   to demonstrate conformity to the new                    Resources to EPA as a SIP revision on
                                           for the New York portion of the New                     budgets. For demonstrating conformity                   September 12, 2016. The Plan was
                                           York-Northern New Jersey-Long Island,                   to the budgets in this plan, the on-road                revised on February 16, 2018.
                                           NY–NJ–CT, 2008 8-hour ozone                             motor vehicle emissions from                               This document is an announcement of
                                           nonattainment area. This revision to the                implementation of the long-range                        a finding that EPA has already made.
                                           SIP included 2017 summer day volatile                   transportation plan should be projected                 EPA Region 7 sent a letter to Missouri
                                           organic compound (‘‘VOC’’) and                          consistently with the budgets in this                   Department of Natural Resources on
                                           nitrogen oxides (‘‘NOX’’) motor vehicle                 plan.                                                   May 15, 2018, stating that the MVEBs
                                           emissions budgets associated with the                                                                           contained in the Redesignation Request
amozie on DSK3GDR082PROD with RULES




                                                                                                     Authority: 42 U.S.C. 7401–7671 q.
                                           SIP’s reasonable further progress                                                                               and Maintenance Plan are adequate for
                                                                                                     Dated: April 30, 2018.
                                           demonstration. We announced                                                                                     transportation conformity purposes. As
                                           availability of the plan and related                    Peter D. Lopez,                                         a result of EPA’s finding, the State of
                                           budgets on the EPA’s transportation                     Regional Administrator, Region 2.                       Missouri must use the MVEBs from the
                                           conformity website on December 6,                       [FR Doc. 2018–12303 Filed 6–7–18; 8:45 am]              February 16, 2018, Redesignation
                                           2017, requesting comments by January                    BILLING CODE 6560–50–P                                  Request and Maintenance Plan for


                                      VerDate Sep<11>2014   16:08 Jun 07, 2018   Jkt 244001   PO 00000    Frm 00052   Fmt 4700   Sfmt 4700   E:\FR\FM\08JNR1.SGM   08JNR1


                                                                 Federal Register / Vol. 83, No. 111 / Friday, June 8, 2018 / Rules and Regulations                                          26599

                                           future transportation conformity                        between the state and federally-                       52667. This action is a final rule based
                                           determinations for the St. Louis area.                  approved rules, and ensure Federal                     on the NPR. A detailed discussion of
                                           The finding is available at EPA’s                       enforceability of the state’s revised air              Iowa’s SIP revisions, the 111(d) plan
                                           conformity website: https://                            program rules.                                         revision, and the Operating Permits
                                           www.epa.gov/state-and-local-                            DATES: This final rule is effective on July            Program revisions were provided in the
                                           transportation.                                         9, 2018.                                               DFR and will not be restated here,
                                              Transportation conformity is required                ADDRESSES: EPA has established a
                                                                                                                                                          except to the extent relevant to our
                                           by section 176(c) of the Clean Air Act,                 docket for this action under Docket ID                 response to the public comment we
                                           as amended in 1990. EPA’s conformity                    No. EPA–R07–OAR–2017–0470. All                         received.
                                           rule requires that transportation plans,                documents in the docket are listed on                  II. What is being addressed in this
                                           programs and projects conform to state                  the https://www.regulations.gov                        document?
                                           air quality implementation plans and                    website. Although listed in the index,
                                           establishes the criteria and procedure                  some information is not publicly                         EPA is taking final action to approve
                                           for determining whether or not they do.                 available, i.e., CBI or other information              revisions to the Iowa SIP, the 111(d)
                                           Conformity to a SIP means that                          whose disclosure is restricted by statute.             plan, and the Operating Permits
                                           transportation activities will not                      Certain other material, such as                        Program. These revisions update and
                                           produce new air quality violations,                     copyrighted material, is not placed on                 clarify rules and make minor revisions
                                           worsen existing violations, or delay                    the internet and will be publicly                      and corrections. Approval of these
                                           timely attainment of the national                       available only in hard copy form.                      revisions will ensure consistency
                                           ambient air quality standards.                          Publicly available docket materials are                between the state and federally-
                                              The criteria by which we determine                   available through https://                             approved rules, and ensure Federal
                                           whether a SIP’s motor vehicle emission                  www.regulations.gov or please contact                  enforceability of the state’s revised air
                                           budgets are adequate for conformity                     the person identified in the FOR FURTHER               program rules. Chapters with revisions
                                           purposes are outlined in 40 CFR                         INFORMATION CONTACT section for                        are as follows:
                                           93.118(e)(4). Please note that an                       additional information.                                • Chapter 20—Scope of Title-
                                           adequacy review is separate from EPA’s
                                                                                                   FOR FURTHER INFORMATION CONTACT:                          Definitions
                                           completeness review, and it should not
                                           be used to prejudge EPA’s ultimate                      Heather Hamilton, Environmental                        • Chapter 21—Compliance
                                           approval of the SIP. EPA plans to take                  Protection Agency, Air Planning and                    • Chapter 22—Controlling Pollution *
                                           action on the SIP at a later date. We                   Development Branch, 11201 Renner                       • Chapter 23—Emission Standards for
                                           have described our process for                          Boulevard, Lenexa, Kansas 66219 at                        Contaminants
                                           determining the adequacy of submitted                   (913) 551–7039, or by email at                         • Chapter 25—Measurement of
                                           SIP budgets in 40 CFR 93.118(f), and                    hamilton.heather@epa.gov.                                 Emissions
                                           have followed this rule in making our                   SUPPLEMENTARY INFORMATION:
                                                                                                                                                          • Chapter 26—Prevention of Emergency
                                           adequacy determination.                                 Throughout this document ‘‘we,’’ ‘‘us,’’                  Pollution Episodes
                                                                                                   and ‘‘our’’ refer to EPA. This section
                                              Authority: 42 U.S.C. 7401–7671q.                                                                            • Chapter 27—Certificate of Acceptance
                                                                                                   provides additional information by
                                             Dated: May 25, 2018.                                  addressing the following:                              • Chapter 28—Ambient Air Quality
                                           James B. Gulliford,                                                                                               Standards
                                                                                                   I. Background
                                           Regional Administrator, Region 7.                       II. What is being addressed in this document?          • Chapter 31—Nonattainment Areas
                                           [FR Doc. 2018–12388 Filed 6–7–18; 8:45 am]              III. Have the requirements for approval of the         • Chapter 33—Special Regulations and
                                           BILLING CODE 6560–50–P                                        SIP, 111(d) Plan, and Operating Permit              Construction Permit Requirements for
                                                                                                         Plan Revisions been met?                            Major Stationary Sources—Prevention
                                                                                                   IV. EPA’s Response to Comments                            of Significant Deterioration (PSD) of
                                           ENVIRONMENTAL PROTECTION                                V. What action is EPA taking?                             Air Quality
                                           AGENCY                                                  VI. Incorporation by Reference
                                                                                                   VII. Statutory and Executive Order Reviews                * Title V Operating Permit Program
                                           40 CFR Parts 52, 62, and 70                                                                                    rules are included in chapter 22 starting
                                                                                                   I. Background                                          at 22.100.
                                           [EPA–R07–OAR–2017–0470; FRL 9979–10—                      On September 15, 2017, EPA
                                           Region 7]                                                                                                      III. Have the requirements for approval
                                                                                                   proposed to approve revisions to the                   of the SIP, 111(d) Plan, and Operating
                                                                                                   Iowa State Implementation Plan (SIP),                  Permit Plan Revisions been met?
                                           State of Iowa; Approval and
                                                                                                   the 111(d) plan, and the Operating
                                           Promulgation of the State
                                                                                                   Permits Program. See 82 FR 43315. In                     The state submittal has met the public
                                           Implementation Plan, the 111(d) Plan
                                                                                                   conjunction with the September 15,                     notice requirements for SIP submissions
                                           and the Operating Permits Program
                                                                                                   2017 notice of proposed rulemaking                     in accordance with 40 CFR 51.102. The
                                           AGENCY:  Environmental Protection                       (NPR), EPA issued a direct final rule                  submittal also satisfied the
                                           Agency (EPA).                                           (DFR) approving revisions to the Iowa                  completeness criteria of 40 CFR part 51,
                                           ACTION: Final rule.                                     SIP, the 111(d) plan, and the Operating                appendix V. In addition, as explained
                                                                                                   Permits Program. See 82 FR 43303. In                   above and in more detail in the TSD
                                           SUMMARY:   The Environmental Protection                 the DFR, EPA stated that if adverse                    which is part of this docket, these
                                           Agency (EPA) is taking final action to                  comments were submitted to EPA by                      revisions meet the substantive SIP
                                           approve revisions to the Iowa State                     October 16, 2017, the action would be                  requirements of the CAA, including
amozie on DSK3GDR082PROD with RULES




                                           Implementation Plan (SIP), the 111(d)                   withdrawn and not take effect.                         section 110 and implementing
                                           plan, and the Operating Permits                           EPA received three comments prior to                 regulations. These revisions are also
                                           Program. These revisions update and                     the close of the comment period; one in                consistent with applicable EPA
                                           clarify rules and make minor revisions                  support of the rule revisions and two of               requirements of the 111(d) plan
                                           and corrections. Approval of these                      which were adverse. EPA withdrew the                   submission and Title V of the CAA and
                                           revisions will ensure consistency                       DFR on November 14, 2017. See 82 FR                    40 CFR part 70.


                                      VerDate Sep<11>2014   16:08 Jun 07, 2018   Jkt 244001   PO 00000   Frm 00053   Fmt 4700   Sfmt 4700   E:\FR\FM\08JNR1.SGM   08JNR1



Document Created: 2018-06-08 01:22:20
Document Modified: 2018-06-08 01:22:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotification of adequacy determination.
DatesThis finding is effective June 22, 2018.
ContactHeather Hamilton, at (913) 551-7039, by email at [email protected], or by mail at U.S. Environmental Protection Agency, Air Planning and Development Branch, 11201 Renner Boulevard, Lenexa, Kansas 66219.
FR Citation83 FR 26598 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR