DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 113 (June 12, 2018)

Page Range27319-27320
FR Document2018-12581

Federal Register, Volume 83 Issue 113 (Tuesday, June 12, 2018)
[Federal Register Volume 83, Number 113 (Tuesday, June 12, 2018)]
[Notices]
[Pages 27319-27320]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-12581]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG18-96-000.
    Applicants: Rush Springs Energy Storage, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Rush Springs Energy Storage, LLC.
    Filed Date: 6/6/18.
    Accession Number: 20180606-5035.
    Comments Due: 5 p.m. ET 6/27/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-1222-002.
    Applicants: PSEG Energy Resources & Trade LLC.
    Description: Tariff Amendment: Amendment to Filing in Docket ER18-
1222 to be effective 6/7/2018.
    Filed Date: 6/6/18.
    Accession Number: 20180606-5002.
    Comments Due: 5 p.m. ET 6/27/18.

    Docket Numbers: ER18-1594-001.
    Applicants: Public Service Company of Colorado.
    Description: Compliance filing: OATT_LGIA-SGIA Order 842 Compl-Att 
N-P to be effective 5/15/2018.
    Filed Date: 6/6/18.
    Accession Number: 20180606-5030.
    Comments Due: 5 p.m. ET 6/27/18.

    Docket Numbers: ER18-1747-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1518R15 Arkansas Electric 
Cooperative Corp NITSA NOA to be effective 7/1/2018.
    Filed Date: 6/5/18.
    Accession Number: 20180605-5132.
    Comments Due: 5 p.m. ET 6/26/18.

    Docket Numbers: ER18-1748-000.
    Applicants: Elk City II Wind, LLC.
    Description: Tariff Cancellation: Elk City II Wind, LLC Notice of 
Cancellation of Market-Based Rate Tariff to be effective 6/6/2018.
    Filed Date: 6/5/18.
    Accession Number: 20180605-5149.
    Comments Due: 5 p.m. ET 6/26/18.

    Docket Numbers: ER18-1749-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of Service 
Agreement No. 4772; Queue No. AC1-013 to be effective 7/2/2018.
    Filed Date: 6/6/18.
    Accession Number: 20180606-5092.
    Comments Due: 5 p.m. ET 6/27/18.

    Docket Numbers: ER18-1750-000.
    Applicants: ITC Midwest LLC.
    Description: Sec.  205(d) Rate Filing: Filing of a Master JUA for 
Distribution Underbuild with Midland Power Coop to be effective 8/6/
2018.
    Filed Date: 6/6/18.
    Accession Number: 20180606-5093.
    Comments Due: 5 p.m. ET 6/27/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211

[[Page 27320]]

and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on 
or before 5:00 p.m. Eastern time on the specified comment date. 
Protests may be considered, but intervention is necessary to become a 
party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-12581 Filed 6-11-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                         Federal Register / Vol. 83, No. 113 / Tuesday, June 12, 2018 / Notices                                                                                      27319

                                                for a complete analysis of the                                           coordination with tribal, state, and                                     powerhouse; a steel powerhouse with a
                                                application on its merit, the resource                                   federal agencies during the preparation                                  75-kilowatt Pelton turbine; a short
                                                agency, Indian Tribe, or person must file                                of the application, and the lack of                                      transmission line; and appurtenant
                                                a request for a study with the                                           interest during pre-filing consultation,                                 facilities. The annual generation is 3,000
                                                Commission not later than 60 days from                                   we intend to accept the consultation                                     megawatt-hours.
                                                the date of filing of the application, and                               that has occurred on this project during                                    p. A copy of the application is
                                                serve a copy of the request on the                                       the pre-filing period as satisfying our                                  available for review at the Commission
                                                applicant.                                                               requirements for the standard 3-stage                                    in the Public Reference Room or may be
                                                   l. Deadline for filing additional study                               consultation process under 18 CFR 4.38.                                  viewed on the Commission’s website at
                                                requests and requests for cooperating                                       n. The application is not ready for                                   http://www.ferc.gov using the
                                                agency status: July 30, 2018.                                            environmental analysis at this time.                                     ‘‘eLibrary’’ link. Enter the docket
                                                   The Commission strongly encourages                                       o. The hydroelectric project includes:                                number excluding the last three digits in
                                                electronic filing. Please file additional                                A 920-foot-long, 50-foot-wide ditch                                      the docket number field to access the
                                                study requests and requests for                                          diverting water from an unnamed                                          document. For assistance, contact FERC
                                                cooperating agency status using the                                      stream to an upper pond; a 12.59-acre                                    Online Support. A copy is also available
                                                Commission’s eFiling system at http://                                   upper pond created by A 200-foot-long,                                   for inspection and reproduction at the
                                                www.ferc.gov/docs-filing/efiling.asp. For                                50-foot-wide, 5-foot-high earthen dam                                    address in item h above.
                                                assistance, please contact FERC Online                                   with a spillway and a 200-foot-long                                         You may also register online at http://
                                                Support at FERCOnlineSupport@                                            overflow ditch; a short metal flume and                                  www.ferc.gov/docs-filing/
                                                ferc.gov, (866) 208–3676 (toll free), or                                 a 275-foot-long, 12-inch-diameter wood                                   esubscription.asp to be notified via
                                                (202) 502–8659 (TTY). In lieu of                                         stave pipe conveying water from the                                      email of new filings and issuances
                                                electronic filing, please send a paper                                   upper pond to the lower pond; a 1000-                                    related to this or other pending projects.
                                                copy to: Secretary, Federal Energy                                       foot-long, 50-foot-wide ditch diverting                                  For assistance, contact FERC Online
                                                Regulatory Commission, 888 First Street                                  water from an unnamed stream to the                                      Support.
                                                NE, Washington, DC 20426. The first                                      lower pond; a 2.2-acre lower pond                                           q. Procedural schedule: The
                                                page of any filing should include docket                                 created by a 200-foot-long, 50-foot-wide,                                application will be processed according
                                                number P–14795–002.                                                      5-foot-high earthen dam; a 6,772-foot-                                   to the following preliminary Hydro
                                                   m. Due to the small size and remote                                   long PVC and steel penstock conveying                                    Licensing Schedule. Revisions to the
                                                location of this project, the applicant’s                                water from the lower pond to the                                         schedule will be made as appropriate.

                                                Issue Notice of Acceptance ...........................................................................................................................................................       August 2018.
                                                Issue Scoping Document 1 for comment ......................................................................................................................................                  September 2018.
                                                Comments on Scoping Document 1due .......................................................................................................................................                    October 2018.
                                                Issue notice of ready for environmental analysis ........................................................................................................................                    December 2018.
                                                Commission issues EA ..................................................................................................................................................................      April 2019.
                                                Comments on EA ...........................................................................................................................................................................   May 2019.


                                                  Dated: June 6, 2018.                                                     Applicants: PSEG Energy Resources &                                    of Market-Based Rate Tariff to be
                                                Nathaniel J. Davis, Sr.,                                                 Trade LLC.                                                               effective 6/6/2018.
                                                Deputy Secretary.                                                          Description: Tariff Amendment:                                            Filed Date: 6/5/18.
                                                [FR Doc. 2018–12583 Filed 6–11–18; 8:45 am]                              Amendment to Filing in Docket ER18–                                         Accession Number: 20180605–5149.
                                                BILLING CODE 6717–01–P
                                                                                                                         1222 to be effective 6/7/2018.                                              Comments Due: 5 p.m. ET 6/26/18.
                                                                                                                           Filed Date: 6/6/18.                                                       Docket Numbers: ER18–1749–000.
                                                                                                                           Accession Number: 20180606–5002.                                          Applicants: PJM Interconnection,
                                                DEPARTMENT OF ENERGY                                                       Comments Due: 5 p.m. ET 6/27/18.                                       L.L.C.
                                                                                                                           Docket Numbers: ER18–1594–001.                                            Description: Tariff Cancellation:
                                                Federal Energy Regulatory                                                  Applicants: Public Service Company                                     Notice of Cancellation of Service
                                                Commission                                                               of Colorado.                                                             Agreement No. 4772; Queue No. AC1–
                                                                                                                           Description: Compliance filing:                                        013 to be effective 7/2/2018.
                                                Combined Notice of Filings #1                                            OATT_LGIA–SGIA Order 842 Compl-                                             Filed Date: 6/6/18.
                                                   Take notice that the Commission                                       Att N–P to be effective 5/15/2018.                                          Accession Number: 20180606–5092.
                                                received the following exempt                                              Filed Date: 6/6/18.                                                       Comments Due: 5 p.m. ET 6/27/18.
                                                wholesale generator filings:                                               Accession Number: 20180606–5030.                                          Docket Numbers: ER18–1750–000.
                                                                                                                           Comments Due: 5 p.m. ET 6/27/18.                                          Applicants: ITC Midwest LLC.
                                                   Docket Numbers: EG18–96–000.                                                                                                                      Description: § 205(d) Rate Filing:
                                                                                                                           Docket Numbers: ER18–1747–000.
                                                   Applicants: Rush Springs Energy                                         Applicants: Southwest Power Pool,                                      Filing of a Master JUA for Distribution
                                                Storage, LLC.                                                            Inc.                                                                     Underbuild with Midland Power Coop
                                                   Description: Notice of Self-                                            Description: § 205(d) Rate Filing:                                     to be effective 8/6/2018.
                                                Certification of Exempt Wholesale                                        1518R15 Arkansas Electric Cooperative                                       Filed Date: 6/6/18.
                                                Generator Status of Rush Springs Energy                                  Corp NITSA NOA to be effective 7/1/                                         Accession Number: 20180606–5093.
                                                Storage, LLC.                                                            2018.                                                                       Comments Due: 5 p.m. ET 6/27/18.
sradovich on DSK3GMQ082PROD with NOTICES




                                                   Filed Date: 6/6/18.                                                     Filed Date: 6/5/18.                                                       The filings are accessible in the
                                                   Accession Number: 20180606–5035.                                        Accession Number: 20180605–5132.                                       Commission’s eLibrary system by
                                                   Comments Due: 5 p.m. ET 6/27/18.                                        Comments Due: 5 p.m. ET 6/26/18.                                       clicking on the links or querying the
                                                   Take notice that the Commission                                         Docket Numbers: ER18–1748–000.                                         docket number.
                                                received the following electric rate                                       Applicants: Elk City II Wind, LLC.                                        Any person desiring to intervene or
                                                filings:                                                                   Description: Tariff Cancellation: Elk                                  protest in any of the above proceedings
                                                   Docket Numbers: ER18–1222–002.                                        City II Wind, LLC Notice of Cancellation                                 must file in accordance with Rules 211


                                           VerDate Sep<11>2014        16:21 Jun 11, 2018        Jkt 244001      PO 00000       Frm 00013       Fmt 4703      Sfmt 4703       E:\FR\FM\12JNN1.SGM            12JNN1


                                                27320                            Federal Register / Vol. 83, No. 113 / Tuesday, June 12, 2018 / Notices

                                                and 214 of the Commission’s                                and interested agencies on the project.                  participate in the Commission’s
                                                Regulations (18 CFR 385.211 and                            You can make a difference by providing                   proceedings. It is also available for
                                                385.214) on or before 5:00 p.m. Eastern                    us with your specific comments or                        viewing on the FERC website
                                                time on the specified comment date.                        concerns about the project. Your                         (www.ferc.gov).
                                                Protests may be considered, but                            comments should focus on the potential
                                                                                                                                                                    Public Participation
                                                intervention is necessary to become a                      environmental effects, reasonable
                                                party to the proceeding.                                   alternatives, and measures to avoid or                      For your convenience, there are four
                                                   eFiling is encouraged. More detailed                    lessen environmental impacts. Your                       methods you can use to submit your
                                                information relating to filing                             input will help the Commission staff                     comments to the Commission. The
                                                requirements, interventions, protests,                     determine what issues they need to                       Commission will provide equal
                                                service, and qualifying facilities filings                 evaluate in the EA. To ensure that your                  consideration to all comments received,
                                                can be found at: http://www.ferc.gov/                      comments are timely and properly                         whether filed in written form or
                                                docs-filing/efiling/filing-req.pdf. For                    recorded, please send your comments so                   provided verbally. The Commission
                                                other information, call (866) 208–3676                     that the Commission receives them in                     encourages electronic filing of
                                                (toll free). For TTY, call (202) 502–8659.                 Washington, DC on or before 5:00 p.m.                    comments and has expert staff available
                                                  Dated: June 6, 2018.                                     Eastern Daylight Time on July 2, 2018.                   to assist you at (202) 502–8258 or
                                                Nathaniel J. Davis, Sr.,                                      If you sent comments on this project                  FercOnlineSupport@ferc.gov. Please
                                                                                                           to the Commission before the opening of                  carefully follow these instructions so
                                                Deputy Secretary.
                                                                                                           this docket on April 11, 2018, you will                  that your comments are properly
                                                [FR Doc. 2018–12581 Filed 6–11–18; 8:45 am]
                                                                                                           need to file those comments in Docket                    recorded.
                                                BILLING CODE 6717–01–P
                                                                                                           No. CP18–186–000 to ensure they are                         (1) You can file your comments
                                                                                                           considered as part of this proceeding.                   electronically using the eComment
                                                                                                              This notice is being sent to the                      feature on the Commission’s website
                                                DEPARTMENT OF ENERGY
                                                                                                           Commission’s current environmental                       (www.ferc.gov) under the link to
                                                Federal Energy Regulatory                                  mailing list for this project. State and                 Documents and Filings. This is an easy
                                                Commission                                                 local government representatives should                  method for submitting brief, text-only
                                                                                                           notify their constituents of this                        comments on a project;
                                                [Docket No. CP18–186–000]                                  proposed project and encourage them to                      (2) You can file your comments
                                                                                                           comment on their areas of concern.                       electronically by using the eFiling
                                                Notice of Intent To Prepare an
                                                                                                              If you are a landowner receiving this                 feature on the Commission’s website
                                                Environmental Assessment for the
                                                                                                           notice, a pipeline company                               (www.ferc.gov) under the link to
                                                Proposed Transcontinental Gas Pipe
                                                                                                           representative may contact you about                     Documents and Filings. With eFiling,
                                                Line Company, LLC Southeastern Trail
                                                                                                           the acquisition of an easement to                        you can provide comments in a variety
                                                Project, Request for Comments on
                                                                                                           construct, operate, and maintain the                     of formats by attaching them as a file
                                                Environmental Issues, and Notice of
                                                                                                           proposed facilities. The company would                   with your submission. New eFiling
                                                Public Scoping Sessions
                                                                                                           seek to negotiate a mutually acceptable                  users must first create an account by
                                                  The staff of the Federal Energy                          agreement. However, if the Commission                    clicking on ‘‘eRegister.’’ If you are filing
                                                Regulatory Commission (FERC or                             approves the project, that approval                      a comment on a particular project,
                                                Commission) will prepare an                                conveys with it the right of eminent                     please select ‘‘Comment on a Filing’’ as
                                                environmental assessment (EA) that will                    domain. Therefore, if easement                           the filing type; or
                                                discuss the environmental impacts of                       negotiations fail to produce an                             (3) You can file a paper copy of your
                                                the Southeastern Trail Project involving                   agreement, the pipeline company could                    comments by mailing them to the
                                                construction and operation of facilities                   initiate condemnation proceedings                        following address. Be sure to reference
                                                by Transcontinental Gas Pipe Line                          where compensation would be                              the project docket number (CP18–186–
                                                Company, LLC (Transco) across                              determined in accordance with state                      000) with your submission: Kimberly D.
                                                Virginia, South Carolina, Georgia, and                     law.                                                     Bose, Secretary, Federal Energy
                                                Louisiana. The Commission will use                            Transco provided landowners with a                    Regulatory Commission, 888 First Street
                                                this EA in its decision-making process                     fact sheet prepared by the FERC entitled                 NE, Room 1A, Washington, DC 20426.
                                                to determine whether the project is in                     ‘‘An Interstate Natural Gas Facility On                     (4) In lieu of sending written or
                                                the public convenience and necessity.                      My Land? What Do I Need To Know?’’                       electronic comments, the Commission
                                                  This notice announces the opening of                     This fact sheet addresses a number of                    invites you to attend one of the public
                                                the scoping process the Commission                         typically asked questions, including the                 scoping sessions its staff will conduct in
                                                will use to gather input from the public                   use of eminent domain and how to                         the project area, scheduled as follows:

                                                                                  Date and time                                                                             Location

                                                Monday, June 18, 2018, 4:30–8:00 p.m ..................................................   Brentsville High School, 12109 Aden Rd., Nokesville, VA 20181, (703)
                                                                                                                                            594–2161.
                                                Tuesday, June 19, 2018, 4:30–8:00 p.m .................................................   Scottsville Public Library, 330 Bird Street, Scottsville, VA 24590–0759,
                                                                                                                                            (434) 286–3541.
                                                Wednesday, June 20, 2018, 4:30–8:00 p.m ............................................      Old Dominion Education Center, 19783 U.S. Hwy. 29 South, Chatham,
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                            VA 24531, (434) 432–8026.



                                                  The primary goal of these scoping                        the EA to be prepared for this Project.                  receive the maximum amount of verbal
                                                sessions is to have you identify the                       Individual verbal comments will be                       comments, in a convenient way during
                                                specific environmental issues and                          taken on a one-on-one basis with a court                 the timeframe allotted.
                                                concerns that should be considered in                      reporter. This format is designed to



                                           VerDate Sep<11>2014    16:21 Jun 11, 2018   Jkt 244001   PO 00000     Frm 00014    Fmt 4703    Sfmt 4703   E:\FR\FM\12JNN1.SGM   12JNN1



Document Created: 2018-06-12 00:47:26
Document Modified: 2018-06-12 00:47:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates6/6/18.
FR Citation83 FR 27319 