The Coast Guard is reopening the comment period to solicit additional comments concerning its Notice of Temporary Deviation from the operating schedule that governs the DELAIR Memorial Railroad Bridge across the Delaware River, mile 104.6, at Pennsauken Township, NJ. This document is to provide additional opportunity for public comment.

Federal Register, Volume 83 Issue 14 (Monday, January 22, 2018)
[Federal Register Volume 83, Number 14 (Monday, January 22, 2018)]
[Rules and Regulations]
[Pages 2909-2910]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00894]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0257]


Drawbridge Operation Regulation; Delaware River, Pennsauken 
Township, NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations; reopening 
comment period.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is reopening the comment period to solicit 
additional comments concerning its Notice of Temporary Deviation from 
the operating schedule that governs the DELAIR Memorial Railroad Bridge 
across the Delaware River, mile 104.6, at Pennsauken Township, NJ. This 
document is to provide additional opportunity for public comment.

DATES: The comment period for the deviation published October 18, 2017, 
at 82 FR 48419, is reopened. Comments and related material must reach 
the Coast Guard on or before March 2, 2018.

ADDRESSES: You may submit comments identified by docket number USCG-
2016-0257 using Federal eRulemaking Portal at http://www.regulations.gov. See the ``Public Participation and Request for 
Comments'' portion of the SUPPLEMENTARY INFORMATION section below for 
instructions on submitting comments.

FOR FURTHER INFORMATION CONTACT: If you have questions on this test 
deviation, call or email Mr. Hal R. Pitts, Fifth Coast Guard District 
(dpb); telephone (757) 398-6222, email [email protected].

SUPPLEMENTARY INFORMATION: 

I. Background, Purpose and Legal Basis

    On April 12, 2017, we published a document in the Federal Register 
entitled, ``Drawbridge Operation Regulation; Delaware River, Pennsauken 
Township, NJ'' announcing a temporary deviation from the regulations, 
with request for comments (see 82 FR 17562). The purpose of the 
deviation was to test the newly installed remote operational 
capabilities of the DELAIR Memorial Railroad Bridge across the Delaware 
River, mile 104.6, at Pennsauken Township, NJ, owned and operated by 
Conrail Shared Assets. The installation of the remote operation system 
capabilities did not change the operational schedule of the bridge.\1\
---------------------------------------------------------------------------

    \1\ A full description of the remote operational system is 
outlined in the aforementioned publication, which can be found at 
http://regulations.gov. (See ADDRESSES for more information).
---------------------------------------------------------------------------

    On June 30, 2017, we published a notice of proposed rulemaking 
(NPRM) entitled, ``Drawbridge Operation Regulation; Delaware River, 
Pennsauken Township, NJ'' (see 82 FR 29800). The original comment 
period closed on August 18, 2017.
    On October 18, 2017, we published a document in the Federal 
Register entitled, ``Drawbridge Operation Regulation; Delaware River, 
Pennsauken Township, NJ'' announcing a temporary deviation from the 
regulations, with request for comments (see 82 FR 48419). This test 
deviation commenced at 8 a.m. on October 21, 2017, and will conclude at 
7:59 a.m. on April 19, 2018. This notice included a request for 
comments and related material to reach the Coast Guard on or before 
January 15, 2018.\2\
---------------------------------------------------------------------------

    \2\ Detailed information concerning this second test deviation 
is contained in the Background, Purpose and Legal Basis paragraphs 
of the aforementioned publication, which can be found at http://regulations.gov, (see ADDRESSES for more information).
---------------------------------------------------------------------------

    On December 6, 2017, we published a notice of proposed rulemaking; 
reopening of comment period (NPRM); entitled ``Drawbridge Operation 
Regulation; Delaware River, Pennsauken Township, NJ'' in the Federal 
Register (see 82 FR 57561). It included a request for comments and 
related material to reach the Coast Guard on or before January 15, 
2018.
    This document reopening the comment period ensures notice and 
opportunity to comment on the temporary deviation before we decide 
whether to make any changes to it. This

[[Page 2910]]

document is issued under authority of 33 U.S.C. 1223 and 5 U.S.C. 552.

II. Public Participation and Request for Comments

    We view public participation as essential to effective rulemaking, 
and will consider all comments and material received during the comment 
period. Your comment can help shape the outcome of this rulemaking. If 
you submit a comment, please include the docket number for this 
rulemaking, indicate the specific section of this document to which 
each comment applies, and provide a reason for each suggestion or 
recommendation.
    We encourage you to submit comments through the Federal eRulemaking 
Portal at http://www.regulations.gov. If your material cannot be 
submitted using http://www.regulations.gov, contact the person in the 
FOR FURTHER INFORMATION CONTACT section of this document for alternate 
instructions.
    We accept anonymous comments. All comments received will be posted 
without change to http://www.regulations.gov and will include any 
personal information you have provided. For more about privacy and the 
docket, visit http://www.regulations.gov/privacynotice.
    All previously published documents mentioned in this document along 
with all public comments will be in our online docket at http://www.regulations.gov and can be viewed by following that website's 
instructions. Additionally, if you go to the online docket and sign up 
for email alerts, you will be notified when comments are posted or a 
final rule is published.

    Dated: January 12, 2018.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2018-00894 Filed 1-19-18; 8:45 am]
 BILLING CODE 9110-04-P



                                                               Federal Register / Vol. 83, No. 14 / Monday, January 22, 2018 / Rules and Regulations                                                    2909

                                             annual adjustments as a direct final rule                  Authority: 25 U.S.C. 396 et seq., 396a et           deviation, call or email Mr. Hal R. Pitts,
                                             without prior notice or an opportunity                  seq., 2101 et seq.; 30 U.S.C. 181 et seq., 351         Fifth Coast Guard District (dpb);
                                             for comment and with an effective date                  et seq., 1001 et seq., 1701 et seq.; 43 U.S.C.         telephone (757) 398–6222, email
                                                                                                     1301 et seq., 1331 et seq., 1801 et seq.
                                             immediately upon publication in the                                                                            Hal.R.Pitts@uscg.mil.
                                             Federal Register.                                       § 1241.52    [Amended]                                 SUPPLEMENTARY INFORMATION:
                                                Section 553(b) of the Administrative
                                             Procedure Act (APA) provides that,                      ■  2. Amend § 1241.52 by:                              I. Background, Purpose and Legal Basis
                                                                                                     ■  a. In paragraph (a)(2), removing
                                             when an agency for good cause finds                                                                               On April 12, 2017, we published a
                                                                                                     ‘‘$1,196’’ and adding in its place
                                             that ‘‘notice and public procedure . . .                                                                       document in the Federal Register
                                                                                                     ‘‘$1,220.’’
                                             are impracticable, unnecessary, or                      ■ b. In paragraph (b) introductory text,
                                                                                                                                                            entitled, ‘‘Drawbridge Operation
                                             contrary to the public interest,’’ the                                                                         Regulation; Delaware River, Pennsauken
                                                                                                     removing ‘‘$11,967’’ and adding in its
                                             agency may issue a rule without                                                                                Township, NJ’’ announcing a temporary
                                                                                                     place ‘‘$12,211.’’
                                             providing notice and an opportunity for                                                                        deviation from the regulations, with
                                             prior public comment. Under section                     § 1241.60    [Amended]                                 request for comments (see 82 FR 17562).
                                             553(b), ONRR finds that there is good                   ■  3. Amend § 1241.60 by:                              The purpose of the deviation was to test
                                             cause to promulgate this rule without                   ■  a. In paragraph (b)(1) introductory                 the newly installed remote operational
                                             first providing for public comment.                     text, removing ‘‘$23,933’’ and adding in               capabilities of the DELAIR Memorial
                                             ONRR is promulgating this final rule to                 its place ‘‘$24,421.’’                                 Railroad Bridge across the Delaware
                                             implement the statutory directive in the                ■ b. In paragraph (b)(2), removing                     River, mile 104.6, at Pennsauken
                                             Act, which requires agencies to publish                 ‘‘$59,834’’ and adding in its place                    Township, NJ, owned and operated by
                                             a final rule and to update the civil                    ‘‘$61,055.’’                                           Conrail Shared Assets. The installation
                                             penalty amounts by applying a specified                                                                        of the remote operation system
                                                                                                     [FR Doc. 2018–00969 Filed 1–19–18; 8:45 am]
                                             formula. We have no discretion to vary                                                                         capabilities did not change the
                                                                                                     BILLING CODE 4335–30–P
                                             the amount of the adjustment to reflect                                                                        operational schedule of the bridge.1
                                             any views or suggestions provided by                                                                              On June 30, 2017, we published a
                                             commenters. Accordingly, it would                                                                              notice of proposed rulemaking (NPRM)
                                             serve no purpose to provide an                          DEPARTMENT OF HOMELAND                                 entitled, ‘‘Drawbridge Operation
                                             opportunity for public comment on this                  SECURITY                                               Regulation; Delaware River, Pennsauken
                                             rule prior to promulgation. Thus,                                                                              Township, NJ’’ (see 82 FR 29800). The
                                                                                                     Coast Guard                                            original comment period closed on
                                             providing for notice and public
                                             comment is unnecessary.                                                                                        August 18, 2017.
                                                                                                     33 CFR Part 117                                           On October 18, 2017, we published a
                                                Furthermore, ONRR finds under
                                             section 553(d)(3) of the APA that good                  [Docket No. USCG–2016–0257]                            document in the Federal Register
                                             cause exists to make this direct final                                                                         entitled, ‘‘Drawbridge Operation
                                             rule effective immediately upon                         Drawbridge Operation Regulation;                       Regulation; Delaware River, Pennsauken
                                             publication in the Federal Register. In                 Delaware River, Pennsauken                             Township, NJ’’ announcing a temporary
                                             the Act, Congress expressly required                    Township, NJ                                           deviation from the regulations, with
                                             Federal agencies to publish annual                      AGENCY: Coast Guard, DHS.                              request for comments (see 82 FR 48419).
                                             inflation adjustments to civil penalties                                                                       This test deviation commenced at 8 a.m.
                                                                                                     ACTION: Notice of temporary deviation                  on October 21, 2017, and will conclude
                                             in the Federal Register no later than                   from regulations; reopening comment
                                             January 15 of every year,                                                                                      at 7:59 a.m. on April 19, 2018. This
                                                                                                     period.                                                notice included a request for comments
                                             notwithstanding section 553 of the APA.
                                             Under the statutory framework and                       SUMMARY:   The Coast Guard is reopening                and related material to reach the Coast
                                             OMB guidance, the new penalty levels                    the comment period to solicit additional               Guard on or before January 15, 2018.2
                                             are to take effect immediately upon                     comments concerning its Notice of                         On December 6, 2017, we published
                                             publication. Moreover, an effective date                Temporary Deviation from the operating                 a notice of proposed rulemaking;
                                             after January 15 would delay                            schedule that governs the DELAIR                       reopening of comment period (NPRM);
                                             application of the new penalty levels,                  Memorial Railroad Bridge across the                    entitled ‘‘Drawbridge Operation
                                             contrary to Congress’s intent.                          Delaware River, mile 104.6, at                         Regulation; Delaware River, Pennsauken
                                                                                                     Pennsauken Township, NJ. This                          Township, NJ’’ in the Federal Register
                                             List of Subjects in 30 CFR Part 1241                                                                           (see 82 FR 57561). It included a request
                                                                                                     document is to provide additional
                                               Administrative practice and                           opportunity for public comment.                        for comments and related material to
                                             procedure, Civil penalties, Coal,                                                                              reach the Coast Guard on or before
                                                                                                     DATES: The comment period for the
                                             Geothermal, Inflation, Mineral                                                                                 January 15, 2018.
                                                                                                     deviation published October 18, 2017, at                  This document reopening the
                                             resources, Natural gas, Notices of non-                 82 FR 48419, is reopened. Comments
                                             compliance, Oil.                                                                                               comment period ensures notice and
                                                                                                     and related material must reach the                    opportunity to comment on the
                                             Gregory J. Gould,                                       Coast Guard on or before March 2, 2018.                temporary deviation before we decide
                                             Director for Office of Natural Resources                ADDRESSES: You may submit comments                     whether to make any changes to it. This
                                             Revenue.                                                identified by docket number USCG–
                                                                                                     2016–0257 using Federal eRulemaking                      1 A full description of the remote operational
                                             Authority and Issuance
                                                                                                     Portal at http://www.regulations.gov.                  system is outlined in the aforementioned
                                               For the reasons discussed in the                      See the ‘‘Public Participation and                     publication, which can be found at http://
ethrower on DSK3G9T082PROD with RULES




                                             preamble, ONRR amends 30 CFR part                                                                              regulations.gov. (See ADDRESSES for more
                                                                                                     Request for Comments’’ portion of the                  information).
                                             1241 as set forth below:                                SUPPLEMENTARY INFORMATION section                        2 Detailed information concerning this second test
                                                                                                     below for instructions on submitting                   deviation is contained in the Background, Purpose
                                             PART 1241—PENALTIES                                     comments.                                              and Legal Basis paragraphs of the aforementioned
                                                                                                                                                            publication, which can be found at http://
                                             ■ 1. The authority citation for part 1241               FOR FURTHER INFORMATION CONTACT: If                    regulations.gov, (see ADDRESSES for more
                                             continues to read as follows:                           you have questions on this test                        information).



                                        VerDate Sep<11>2014   15:52 Jan 19, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4700   Sfmt 4700   E:\FR\FM\22JAR1.SGM   22JAR1


                                             2910              Federal Register / Vol. 83, No. 14 / Monday, January 22, 2018 / Rules and Regulations

                                             document is issued under authority of                   the navigable waters of Oregon Inlet in                days after publication in the Federal
                                             33 U.S.C. 1223 and 5 U.S.C. 552.                        Dare County, North Carolina in support                 Register. Delaying the effective date of
                                                                                                     of construction of the new Herbert C.                  this rule would be impracticable
                                             II. Public Participation and Request for
                                                                                                     Bonner Bridge. This temporary safety                   because immediate action is needed
                                             Comments
                                                                                                     zone is intended to protect mariners,                  protect persons, vessels, and the marine
                                                We view public participation as                      vessels, and construction crews from the               environment on the navigable waters in
                                             essential to effective rulemaking, and                  hazards associated with installing the                 Oregon Inlet during this construction
                                             will consider all comments and material                 navigation span, and will restrict vessel              phase. A Notice of Proposed
                                             received during the comment period.                     traffic from the bridge’s navigation span              Rulemaking was published in order to
                                             Your comment can help shape the                         as it is under construction by preventing              inform the public and solicit comments.
                                             outcome of this rulemaking. If you                      vessel traffic on a portion of Oregon
                                             submit a comment, please include the                    Inlet. Entry of vessels or persons into                III. Legal Authority and Need for Rule
                                             docket number for this rulemaking,                      this safety zone is prohibited.                          The Coast Guard is issuing this rule
                                             indicate the specific section of this                   DATES: This rule is effective from                     under authority in 33 U.S.C. 1231. The
                                             document to which each comment                          January 29, 2018, through March 24,                    COTP North Carolina has determined
                                             applies, and provide a reason for each                  2018, with alternate dates of March 25,                that potential safety hazards associated
                                             suggestion or recommendation.                           2018, through May 6, 2018.                             with the construction would be a
                                                We encourage you to submit                                                                                  concern for anyone transiting the
                                                                                                     ADDRESSES: To view documents
                                             comments through the Federal                                                                                   Oregon Inlet navigation channel. The
                                                                                                     mentioned in this preamble as being
                                             eRulemaking Portal at http://                                                                                  purpose of this rule is to protect
                                                                                                     available in the docket, go to http://
                                             www.regulations.gov. If your material                                                                          persons, vessels, and the marine
                                                                                                     www.regulations.gov, type USCG–2017–
                                             cannot be submitted using http://                                                                              environment on the navigable waters in
                                             www.regulations.gov, contact the person                 0964 in the ‘‘SEARCH’’ box and click
                                                                                                     ‘‘SEARCH.’’ Click on Open Docket                       Oregon Inlet during this construction
                                             in the FOR FURTHER INFORMATION
                                                                                                     Folder on the line associated with this                phase.
                                             CONTACT section of this document for
                                             alternate instructions.                                 rule.                                                  IV. Discussion of Comments, Changes,
                                                We accept anonymous comments. All                    FOR FURTHER INFORMATION CONTACT: If                    and the Rule
                                             comments received will be posted                        you have questions on this rule, call or
                                             without change to http://                               email Petty Officer Matthew Tyson,                       As noted above, we received 5
                                             www.regulations.gov and will include                    Waterways Management Division, U.S.                    comments on our NPRM published
                                             any personal information you have                       Coast Guard Sector North Carolina,                     December 5, 2017. Most of the
                                             provided. For more about privacy and                    Wilmington, NC; telephone: (910) 772–                  submissions were not relevant to this
                                             the docket, visit http://                               2221, email: Matthew.I.Tyson@uscg.mil.                 rulemaking.
                                             www.regulations.gov/privacynotice.                      SUPPLEMENTARY INFORMATION:                               The first comment inquired about the
                                                All previously published documents                                                                          benefits of the new bridge construction
                                                                                                     I. Table of Abbreviations                              and its impact on the human
                                             mentioned in this document along with
                                             all public comments will be in our                      CFR Code of Federal Regulations                        environment. This rule pertains only to
                                             online docket at http://                                DHS Department of Homeland Security                    the creation of a safety zone for the
                                             www.regulations.gov and can be viewed                   FR Federal Register                                    navigation span construction phase and
                                             by following that website’s instructions.               NPRM Notice of proposed rulemaking                     not the entire bridge construction
                                                                                                     § Section                                              project. The environmental impact
                                             Additionally, if you go to the online                   U.S.C. United States Code
                                             docket and sign up for email alerts, you                COTP Captain of the Port                               analysis and other regulatory analyses
                                             will be notified when comments are                                                                             for this rule are based only on the
                                             posted or a final rule is published.                    II. Background Information and                         creation of this safety zone. This safety
                                                                                                     Regulatory History                                     zone is necessary to protect persons,
                                               Dated: January 12, 2018.
                                                                                                        On October 10, 2017, the North                      vessels, and the marine environment on
                                             Hal R. Pitts,
                                                                                                     Carolina Department of Transportation                  the navigable waters in Oregon Inlet
                                             Bridge Program Manager, Fifth Coast Guard
                                             District.                                               notified the Coast Guard that they will                during this construction phase. The
                                                                                                     be installing the navigation span of the               impact on the human environment is
                                             [FR Doc. 2018–00894 Filed 1–19–18; 8:45 am]
                                                                                                     new Herbert C. Bonner Bridge in Oregon                 considered not significant because the
                                             BILLING CODE 9110–04–P
                                                                                                     Inlet in Dare County, North Carolina on                closure is only for a two hour period on
                                                                                                     January 29 through March 24, 2018,                     each construction day and the safety
                                             DEPARTMENT OF HOMELAND                                  with alternate dates of March 25                       zone will not be active until after the
                                             SECURITY                                                through May 6, 2018. The construction                  normal morning traffic typically transits
                                                                                                     will take place over an estimated 33                   and will end before the evening traffic
                                             Coast Guard                                             days during this period. In response, on               typically transits.
                                                                                                     December 5, 2017, the Coast Guard                        The second comment mentioned
                                             33 CFR Part 165                                         published a notice of proposed                         bridge safety and its obstruction to the
                                                                                                     rulemaking (NPRM) titled Safety Zone;                  waterway. This comment is outside the
                                             [Docket Number USCG–2017–0964]
                                                                                                     Oregon Inlet, Dare County, NC (82 FR                   scope of this rulemaking dealing with
                                             RIN 1625–AA00                                           57413). There we stated why we issued                  the establishment of a safety zone.
                                                                                                     the NPRM, and invited comments on                      However, the Coast Guard would like to
                                             Safety Zone; Oregon Inlet, Dare                                                                                take this opportunity to state that this
ethrower on DSK3G9T082PROD with RULES




                                                                                                     our proposed regulatory action related
                                             County, NC                                              to this fireworks display. During the                  bridge will have the same horizontal
                                             AGENCY:    Coast Guard, DHS.                            comment period that ended December                     clearance of the original Bonner Bridge.
                                             ACTION:   Temporary final rule.                         20, 2017, we received 5 comments.                      The new bridge is also designed with
                                                                                                        Under 5 U.S.C. 553(d)(3), the Coast                 multiple spans that can be used if the
                                             SUMMARY:   The Coast Guard is                           Guard finds that good cause exists for                 waterway conditions change due to
                                             establishing a temporary safety zone on                 making this rule effective less than 30                shoaling.


                                        VerDate Sep<11>2014   15:52 Jan 19, 2018   Jkt 244001   PO 00000   Frm 00026   Fmt 4700   Sfmt 4700   E:\FR\FM\22JAR1.SGM   22JAR1



Document Created: 2018-01-23 21:36:02
Document Modified: 2018-01-23 21:36:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of temporary deviation from regulations; reopening comment period.
DatesThe comment period for the deviation published October 18, 2017, at 82 FR 48419, is reopened. Comments and related material must reach the Coast Guard on or before March 2, 2018.