83_FR_29673 83 FR 29551 - Notice of Application: Rover Pipeline LLC

83 FR 29551 - Notice of Application: Rover Pipeline LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 122 (June 25, 2018)

Page Range29551-29552
FR Document2018-13495

Federal Register, Volume 83 Issue 122 (Monday, June 25, 2018)
[Federal Register Volume 83, Number 122 (Monday, June 25, 2018)]
[Notices]
[Pages 29551-29552]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13495]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-500-000]


Notice of Application: Rover Pipeline LLC

    Take notice that on June 8, 2018, Rover Pipeline LLC (Rover), 1300 
Main Street, Houston, Texas 77002, filed in Docket No. CP18-500-000 an 
application pursuant to section 7(c) of the Natural Gas Act (NGA) and 
Part 157 of the Commission's regulations for authorization to operate a 
new receipt point consisting of an existing side tap on Rover's 
Burgettstown Lateral in Washington County, Pennsylvania (Revolution 
Receipt Point Project). Rover states that there are no associated 
construction activities or costs for the Revolution Receipt Point 
Project because its side tap was installed during the construction of 
the Burgettstown Lateral. The Revolution Receipt Point will receive up 
to 525,000 dekatherms per day from ETC Northeast Pipeline LLC, all as 
more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing is available for 
review at the Commission in the Public Reference Room or may be viewed 
on the Commission's website web at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Blair Lichtenwalter, Senior Director, Regulatory Affairs, Rover 
Pipeline LLC, 1300 Main Street, Houston, Texas 77002 at (713) 989-2605 
or by email at [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: July 9, 2018.


[[Page 29552]]


    Dated: June 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13495 Filed 6-22-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 83, No. 122 / Monday, June 25, 2018 / Notices                                               29551

                                                                               DOE/FE ORDERS GRANTING IMPORT/EXPORT AUTHORIZATIONS—Continued
                                              4192 ................         05/22/18     18–57–NG          Tourmaline Oil Marketing               Order 4192 granting blanket authority to import natural gas
                                                                                                             Corp.                                  from Canada.
                                              4193 ................         05/23/18     18–60–NG          Nexen Energy Marketing                 Order 4193 granting blanket authority to import/export nat-
                                                                                                             U.S.A. Inc.                            ural gas from/to Canada/Mexico.
                                              4194 ................         05/23/18     18–61–NG          Morgan Stanley Capital Group           Order 4194 granting blanket authority to import/export nat-
                                                                                                             Inc.                                   ural gas from/to Canada/Mexico.
                                              4080–A ...........            05/29/18     17–102–NG         Rice Energy Marketing LLC ...          Order 4080–A vacating blanket authority to import/export
                                                                                                                                                    natural gas from/to Canada.
                                              4195 ................         05/29/18     18–59–NG          Jupiter Resources Inc ............     Order 4195 granting blanket authority to import natural gas
                                                                                                                                                    from Canada.
                                              4196 ................         05/29/18     18–62–CNG;        Ferus Natural Gas Fuels                Order 4196 granting blanket authority to import/export CNG
                                                                                         16–169–NG           (CNG) LLC.                             from/to Canada by truck and vacating prior authorization.



                                              [FR Doc. 2018–13476 Filed 6–22–18; 8:45 am]                at (713) 989–2605 or by email at                          However, a person does not have to
                                              BILLING CODE 6450–01–P                                     Blair.Lictenwalter@energytransfer.com.                 intervene in order to have comments
                                                                                                            Pursuant to section 157.9 of the                    considered. The second way to
                                                                                                         Commission’s rules, 18 CFR 157.9,                      participate is by filing with the
                                              DEPARTMENT OF ENERGY                                       within 90 days of this Notice, the                     Secretary of the Commission, as soon as
                                                                                                         Commission staff will either: Complete                 possible, an original and two copies of
                                              Federal Energy Regulatory                                  its environmental assessment (EA) and                  comments in support of or in opposition
                                              Commission                                                 place it into the Commission’s public                  to this project. The Commission will
                                                                                                         record (eLibrary) for this proceeding; or              consider these comments in
                                              [Docket No. CP18–500–000]                                  issue a Notice of Schedule for                         determining the appropriate action to be
                                                                                                         Environmental Review. If a Notice of                   taken, but the filing of a comment alone
                                              Notice of Application: Rover Pipeline                      Schedule for Environmental Review is                   will not serve to make the filer a party
                                              LLC                                                        issued, it will indicate, among other                  to the proceeding. The Commission’s
                                                 Take notice that on June 8, 2018,                       milestones, the anticipated date for the               rules require that persons filing
                                              Rover Pipeline LLC (Rover), 1300 Main                      Commission staff’s issuance of the final               comments in opposition to the project
                                              Street, Houston, Texas 77002, filed in                     environmental impact statement (FEIS)                  provide copies of their protests only to
                                              Docket No. CP18–500–000 an                                 or EA for this proposal. The filing of the             the party or parties directly involved in
                                              application pursuant to section 7(c) of                    EA in the Commission’s public record                   the protest.
                                              the Natural Gas Act (NGA) and Part 157                     for this proceeding or the issuance of a                  Persons who wish to comment only
                                              of the Commission’s regulations for                        Notice of Schedule for Environmental                   on the environmental review of this
                                              authorization to operate a new receipt                     Review will serve to notify federal and                project should submit an original and
                                              point consisting of an existing side tap                   state agencies of the timing for the                   two copies of their comments to the
                                              on Rover’s Burgettstown Lateral in                         completion of all necessary reviews, and               Secretary of the Commission.
                                              Washington County, Pennsylvania                            the subsequent need to complete all                    Environmental commentors will be
                                              (Revolution Receipt Point Project).                        federal authorizations within 90 days of               placed on the Commission’s
                                              Rover states that there are no associated                  the date of issuance of the Commission                 environmental mailing list, will receive
                                              construction activities or costs for the                   staff’s FEIS or EA.                                    copies of the environmental documents,
                                              Revolution Receipt Point Project                              There are two ways to become                        and will be notified of meetings
                                              because its side tap was installed during                  involved in the Commission’s review of                 associated with the Commission’s
                                              the construction of the Burgettstown                       this project. First, any person wishing to             environmental review process.
                                              Lateral. The Revolution Receipt Point                      obtain legal status by becoming a party                Environmental commentors will not be
                                              will receive up to 525,000 dekatherms                      to the proceedings for this project                    required to serve copies of filed
                                              per day from ETC Northeast Pipeline                        should, on or before the comment date                  documents on all other parties.
                                              LLC, all as more fully set forth in the                    stated below file with the Federal                     However, the non-party commentors
                                              application which is on file with the                      Energy Regulatory Commission, 888                      will not receive copies of all documents
                                              Commission and open to public                              First Street NE, Washington, DC 20426,                 filed by other parties or issued by the
                                              inspection. The filing is available for                    a motion to intervene in accordance                    Commission (except for the mailing of
                                              review at the Commission in the Public                     with the requirements of the                           environmental documents issued by the
                                              Reference Room or may be viewed on                         Commission’s Rules of Practice and                     Commission) and will not have the right
                                              the Commission’s website web at http://                    Procedure (18 CFR 385.214 or 385.211)                  to seek court review of the
                                              www.ferc.gov using the ‘‘eLibrary’’ link.                  and the Regulations under the NGA (18                  Commission’s final order.
                                              Enter the docket number excluding the                      CFR 157.10). A person obtaining party
                                              last three digits in the docket number                     status will be placed on the service list                 The Commission strongly encourages
                                              field to access the document. For                          maintained by the Secretary of the                     electronic filings of comments, protests
                                              assistance, contact FERC at                                Commission and will receive copies of                  and interventions in lieu of paper using
                                              FERCOnlineSupport@ferc.gov or call                         all documents filed by the applicant and               the ‘‘eFiling’’ link at http://
amozie on DSK3GDR082PROD with NOTICES1




                                              toll-free, (886) 208–3676 or TYY, (202)                    by all other parties. A party must submit              www.ferc.gov. Persons unable to file
                                              502–8659.                                                  seven copies of filings made in the                    electronically should submit an original
                                                 Any questions regarding this                            proceeding with the Commission and                     and 5 copies of the protest or
                                              application should be directed to Blair                    must mail a copy to the applicant and                  intervention to the Federal Energy
                                              Lichtenwalter, Senior Director,                            to every other party. Only parties to the              regulatory Commission, 888 First Street
                                              Regulatory Affairs, Rover Pipeline LLC,                    proceeding can ask for court review of                 NE, Washington, DC 20426.
                                              1300 Main Street, Houston, Texas 77002                     Commission orders in the proceeding.                      Comment Date: July 9, 2018.


                                         VerDate Sep<11>2014      17:58 Jun 22, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\25JNN1.SGM   25JNN1


                                              29552                          Federal Register / Vol. 83, No. 122 / Monday, June 25, 2018 / Notices

                                                Dated: June 18, 2018.                     L.L.C., Indianapolis Power & Light                                    Applicants: Puget Sound Energy, Inc.
                                              Kimberly D. Bose,                           Company, Mountain View Power                                          Description: § 205(d) Rate Filing:
                                              Secretary.                                  Partners, LLC, Mountain View Power                                 Powerex PTP SA 880 to be effective
                                              [FR Doc. 2018–13495 Filed 6–22–18; 8:45 am] Partners IV, LLC, The Dayton Power and                             9/1/2018.
                                              BILLING CODE 6717–01–P
                                                                                          Light Company, 65HK 8me LLC, 67RK                                     Filed Date: 6/15/18.
                                                                                          8me LLC, 87RL 8me LLC, Antelope Big                                   Accession Number: 20180615–5166.
                                                                                          Sky Ranch LLC, Antelope DSR 1, LLC,                                   Comments Due: 5 p.m. ET 7/6/18.
                                              DEPARTMENT OF ENERGY                        Antelope DSR 2, LLC, Bayshore Solar A,                                Docket Numbers: ER18–1791–000.
                                                                                          LLC, Bayshore Solar B, LLC, Bayshore                                  Applicants: Duke Energy Florida,
                                              Federal Energy Regulatory                   Solar C, LLC, Beacon Solar 1, LLC,                                 LLC.
                                              Commission                                  Beacon Solar 3, LLC, Beacon Solar 4,                                  Description: Tariff Cancellation: DEF
                                                                                          LLC, Central Antelope Dry Ranch C                                  Notice of Termination (US EcoGen Polk,
                                              Combined Notice of Filings #1               LLC, Elevation Solar C LLC, FTS Master                             LLC LGIA SA–180) to be effective 8/15/
                                                 Take notice that the Commission          Tenant 1, LLC, Land of the Sky MT,                                 2018.
                                              received the following electric corporate LLC, Latigo Wind Park, LLC, North                                       Filed Date: 6/15/18.
                                              filings:                                    Lancaster Ranch LLC, Pioneer Wind                                     Accession Number: 20180615–5168.
                                                 Docket Numbers: EC18–63–000.             Park I LLC, Sandstone Solar LLC, Sierra                               Comments Due: 5 p.m. ET 7/6/18.
                                                 Applicants: Bayou Cove Peaking           Solar Greenworks LLC, Solverde 1, LLC,                                Docket Numbers: ER18–1792–000.
                                              Power LLC, Big Cajun I Peaking Power        Summer Solar LLC, Western Antelope                                    Applicants: PacifiCorp.
                                              LLC, CottonWood Energy Company LP,          Blue Sky Ranch A LLC, Western                                         Description: § 205(d) Rate Filing: RS
                                              Louisiana Generating LLC, NRG               Antelope Blue Sky Ranch B LLC,                                     560 Hurricane Filing to Comply With
                                              Sterlington Power LLC, NRG                  Western Antelope Dry Ranch LLC.                                    Docket No. ER18–1254–000 to be
                                              Cottonwood Tenant LLC, NRG Power               Description: Notice of Non-Material                             effective 8/15/2018.
                                              Marketing LLC, Cleco Cajun LLC, Cleco       Change   in Status of AES MBR Affiliates.                             Filed Date: 6/15/18.
                                              Corporate Holdings LLC, Cleco Group            Filed Date: 6/15/18.                                               Accession Number: 20180615–5246.
                                              LLC, Cleco Partners L.P.                       Accession Number: 20180615–5139.                                   Comments Due: 5 p.m. ET 7/6/18.
                                                 Description: Response of Bayou Cove         Comments Due: 5 p.m. ET 7/6/18.
                                                                                                                                                                Docket Numbers: ER18–1793–000.
                                              Peaking Power, LLC, et al. to May 16,          Docket Numbers: ER13–102–015.                                      Applicants: PJM Interconnection,
                                              2018 Deficiency Letter.                        Applicants: New York Independent                                L.L.C.
                                                 Filed Date: 6/15/18.                     System Operator, Inc.                                                 Description: § 205(d) Rate Filing:
                                                 Accession Number: 20180615–5249.            Description: Compliance filing:                                 Amendment to WMPA SA No. 3202;
                                                 Comments Due: 5 p.m. ET 7/6/18.          Correction of tariff record for 4/1/16                             Queue No. W3–077 to be effective 4/30/
                                                 Docket Numbers: EC18–104–000.            effective date—Order 1000 to be                                    2014.
                                                 Applicants: Vectren Corporation,         effective 4/1/2016.                                                   Filed Date: 6/18/18.
                                              CenterPoint Energy.                            Filed Date: 6/18/18.                                               Accession Number: 20180618–5053.
                                                 Description: Joint Application for          Accession Number: 20180618–5055.
                                                                                                                                                                Comments Due: 5 p.m. ET 7/9/18.
                                              Authorization Under Section 203 of the         Comments Due: 5 p.m. ET 7/9/18.
                                                                                                                                                                Docket Numbers: ER18–1794–000.
                                              Federal Power Act of Vectren                   Docket Numbers: ER18–1160–001.
                                                                                                                                                                Applicants: Southwestern Electric
                                              Corporation, et al.                            Applicants: NRG Cottonwood Tenant
                                                                                                                                                             Power Company.
                                                 Filed Date: 6/15/18.                     LLC.
                                                                                                                                                                Description: § 205(d) Rate Filing:
                                                 Accession Number: 20180615–5252.            Description: Tariff Amendment:
                                                 Comments Due: 5 p.m. ET 7/6/18.                                                                             Bentonville PSA to be effective 5/31/
                                                                                          Response to Request for Additional
                                                                                                                                                             2018.
                                                 Take notice that the Commission          Information to be effective 4/1/2018.
                                                                                             Filed Date: 6/18/18.                                               Filed Date: 6/18/18.
                                              received the following electric rate                                                                              Accession Number: 20180618–5070.
                                              filings:                                       Accession Number: 20180618–5078.
                                                                                             Comments Due: 5 p.m. ET 7/9/18.                                    Comments Due: 5 p.m. ET 7/9/18.
                                                 Docket Numbers: ER10–3145–011;
                                                                                             Docket Numbers: ER18–1260–001.                                     Take notice that the Commission
                                              ER10–3116–011; ER13–1544–008;
                                                                                             Applicants: Midcontinent                                        received the following electric securities
                                              ER10–3120–011; ER11–2036–011;
                                                                                                                                                             filings:
                                              ER16–930–005; ER10–3128–011; ER10– Independent System Operator, Inc.,
                                              1800–012; ER10–3136–011; ER11–2701– Entergy Services, Inc.                                                        Docket Numbers: ES18–40–000.
                                              013; ER10–1728–011; ER15–1582–011;             Description: Tariff Amendment:                                     Applicants: ITC Midwest LLC.
                                              ER15–1579–010; ER15–1914–012;               2018–06–18_Entergy Deficiency                                         Description: Application under
                                              ER16–1255–006; ER16–2201–005;               Response re Att O Revisions For Tax                                Section 204 of the Federal Power Act of
                                              ER16–1955–006; ER17–1864–004;               Rate Change to be effective 6/1/2018.                              ITC Midwest LLC for authorization to
                                              ER17–1871–004; ER17–1909–004;                  Filed Date: 6/18/18.                                            issue debt securities.
                                              ER17–544–005; ER17–306–005; ER16–              Accession Number: 20180618–5079.                                   Filed Date: 6/15/18.
                                              1738–006; ER16–474–007; ER16–1901–             Comments Due: 5 p.m. ET 7/9/18.                                    Accession Number: 20180615–5150.
                                              006; ER16–468–006; ER15–2668–001;              Docket Numbers: ER18–1769–001.                                     Comments Due: 5 p.m. ET 7/6/18.
                                              ER15–2679–008; ER16–2578–006;                  Applicants: PJM Interconnection,                                   Take notice that the Commission
                                              ER16–2541–005; ER15–2680–008;               L.L.C.                                                             received the following PURPA
                                              ER15–762–012; ER16–2224–005; ER16–             Description: Tariff Amendment:                                  210(m)(3) filings:
amozie on DSK3GDR082PROD with NOTICES1




                                              890–007; ER15–760–011; ER16–1973–           Supplemental Filing for First Revised                                 Docket Numbers: QM18–10–000.
                                              006; ER16–1956–006.                         ISA No. 4623, Queue No. AC1–152                                       Applicants: Cooperative Energy.
                                                 Applicants: AES Alamitos, LLC, AES       AC1–172 to be effective 5/10/2018.                                    Description: Response of Cooperative
                                              Energy Storage, LLC, AES ES Tait, LLC,         Filed Date: 6/15/18.                                            Energy to May 18, 2018 Deficiency
                                              AES Huntington Beach, L.L.C., AES              Accession Number: 20180615–5167.                                Letter.
                                              Laurel Mountain, LLC, AES Ohio                 Comments Due: 5 p.m. ET 7/6/18.                                    Filed Date: 6/18/18.
                                              Generation, LLC, AES Redondo Beach,            Docket Numbers: ER18–1790–000.                                     Accession Number: 20180618–5056.


                                         VerDate Sep<11>2014   17:58 Jun 22, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\25JNN1.SGM   25JNN1



Document Created: 2018-06-23 02:29:32
Document Modified: 2018-06-23 02:29:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesJuly 9, 2018.
FR Citation83 FR 29551 