83_FR_30832 83 FR 30706 - Notice of Intent To Adopt U.S. Bureau of Reclamation's December 2015 Final Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement, Prepare Corps Record of Decision, and Reimburse the Sponsor for the Upper Truckee River and Marsh Restoration Project, City of South Lake Tahoe, El Dorado County, CA

83 FR 30706 - Notice of Intent To Adopt U.S. Bureau of Reclamation's December 2015 Final Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement, Prepare Corps Record of Decision, and Reimburse the Sponsor for the Upper Truckee River and Marsh Restoration Project, City of South Lake Tahoe, El Dorado County, CA

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 83, Issue 126 (June 29, 2018)

Page Range30706-30708
FR Document2018-13670

The U.S. Army Corps of Engineers (Corps), Sacramento District, intends to adopt the Bureau of Reclamation's (BOR) December 2015 Final Environment Impact Report (FEIR)/Final Environmental Impact Statement (FEIS)/Final Environmental Impact Statement (FEIS) for the Upper Truckee River and Marsh Restoration Project and prepare its own Record of Decision (ROD) after the public review period for this Notice of Intent ends. The Corps will use its Tahoe Section 108 program authorization for participation in the restoration activities by reimbursing the California Tahoe Conservancy (CTC), the local sponsor, for final design, construction, and other applicable activities falling under the authorization. During final design and construction, the Corps will serve as the lead Federal agency for compliance with the National Environmental Policy Act (NEPA), and CTC will serve as the lead agency for compliance with the California Environmental Quality Act (CEQA) during the final design and construction activities if designs need to be modified or the river moves from its current alignment prior to design and construction. In the December 2015 Final EIR/EIS/EIS, the analysis for this ecosystem restoration project evaluated five alternatives to restore aquatic and riparian values and functions on the Upper Truckee River's marsh area near its terminus at Lake Tahoe, South Lake Tahoe in El Dorado County, CA with selection of a preferred alternative to be constructed. The Corps has reviewed the draft and Final EIR/EIS/EIS to ensure that all NEPA requirements have been met.

Federal Register, Volume 83 Issue 126 (Friday, June 29, 2018)
[Federal Register Volume 83, Number 126 (Friday, June 29, 2018)]
[Notices]
[Pages 30706-30708]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13670]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Notice of Intent To Adopt U.S. Bureau of Reclamation's December 
2015 Final Environmental Impact Report/Environmental Impact Statement/
Environmental Impact Statement, Prepare Corps Record of Decision, and 
Reimburse the Sponsor for the Upper Truckee River and Marsh Restoration 
Project, City of South Lake Tahoe, El Dorado County, CA

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers (Corps), Sacramento District, 
intends to adopt the Bureau of Reclamation's (BOR) December 2015 Final 
Environment Impact Report (FEIR)/Final Environmental Impact Statement 
(FEIS)/Final Environmental Impact Statement (FEIS) for the Upper 
Truckee River and Marsh Restoration Project and prepare its own Record 
of Decision (ROD) after the public review period for this Notice of 
Intent ends. The Corps will use its Tahoe Section 108 program 
authorization for participation in the restoration activities by 
reimbursing the California Tahoe Conservancy (CTC), the local sponsor, 
for final design, construction, and other applicable activities falling 
under the authorization. During final design and construction, the 
Corps will serve as the lead Federal agency for compliance with the 
National Environmental Policy Act (NEPA), and CTC will serve as the 
lead agency for compliance with the California Environmental Quality 
Act (CEQA) during the final design and construction activities if 
designs need to be modified or the river moves from its current 
alignment prior to design and construction. In the December 2015 Final 
EIR/EIS/EIS, the analysis for this ecosystem restoration project 
evaluated five alternatives to restore aquatic and riparian values and 
functions on the Upper Truckee River's marsh area near its terminus at 
Lake Tahoe, South Lake Tahoe in El Dorado County, CA with selection of 
a preferred alternative to be constructed. The Corps has reviewed the 
draft and Final EIR/EIS/EIS to ensure that all NEPA requirements have 
been met.

DATES: Written comments regarding the scope of the Corps adoption of 
the BOR's FEIR/FEIS/FEIS, preparation of the Corps ROD, and 
reimbursement to CTC should be received by the Corps on or before July 
30, 2018.

ADDRESSES: Send written comments and suggestions to Mr. Mario Parker, 
Biological Sciences Study Manager, U.S. Army Corps of Engineers, 
Sacramento District, 1325 J Street, Sacramento, CA 95814, or email him 
at [email protected], or telephone (916) 557-6701, or fax 
(916) 557-7856.

SUPPLEMENTARY INFORMATION:
    1. Proposed Action. The Corps in cooperation with the non-Federal 
sponsor, the CTC, proposes to adopt the BOR's December 2015 FEIR/FEIS/
FEIS, prepare its own ROD, and reimburse CTC on the final design and 
construction of the restoration features at the Upper Truckee River and 
Marsh Restoration Project in South Lake Tahoe, in Eldorado County, CA. 
Reimbursement for the construction of the ecosystem restoration project 
is authorized by the Tahoe 108 program authority, which is Section 108 
of the Energy and Water Development Appropriations Act, 2005 (Division 
C of the Consolidated Appropriations Act, Pub. L. 108-447). The 
relevant authority from the 2005 Consolidated Appropriations Act 
excerpted is stated below:
    Sec. 108. Lake Tahoe Basin Restoration, Nevada and California. (a) 
Definition.--In this section, the term ``Lake Tahoe Basin'' means the 
entire watershed drainage of Lake Tahoe including that portion of the 
Truckee River 1,000 feet downstream from the United States Bureau of 
Reclamation dam in Tahoe City, California.
    (b) Establishment of Program.--The Secretary [of the Army] may 
establish a program for providing environmental assistance to non-
Federal interests in Lake Tahoe Basin.
    (c) Form of Assistance.--Assistance under this section may be in 
the form of planning, design, and construction assistance for water-
related environmental infrastructure and resource protection and 
development projects in Lake Tahoe Basin, which could include the 
following:
    (1) Urban stormwater conveyance, treatment and related facilities;
    (2) watershed planning, science and research;
    (3) environmental restoration; and
    (4) surface water resource protection and development.

[[Page 30707]]

    (d) Public Ownership Requirement.--The Secretary [of the Army] may 
provide assistance for a project under this section only if the project 
is publicly owned.
    (e) Local Cooperation Agreement.--(1) In general.--Before providing 
assistance under this section, the Secretary shall enter into a local 
cooperation agreement with a non-Federal interest to provide for design 
and construction of the project to be carried out with the assistance.
    (2) Requirements.--Each local cooperation agreement entered into 
under this subsection shall provide for the following:
    (A) Plan.--Development by the Secretary [of the Army], in 
consultation with appropriate Federal and State and Regional officials, 
of appropriate environmental documentation, engineering plans and 
specifications.
    (B) Legal and institutional structures.--Establishment of such 
legal and institutional structures as are necessary to ensure the 
effective long-term operation of the project by the non-Federal 
interest.
    (3) Cost sharing.--
    (A) In general.--The Federal share of project costs under each 
local cooperation agreement entered into under this subsection shall be 
75 percent. The Federal share may be in the form of grants or 
reimbursements of project costs.
    (B) Credit for design work.--The non-Federal interest shall receive 
credit for the reasonable costs of planning and design work completed 
by the non-Federal interest before entering into a local cooperation 
agreement with the Secretary for a project.
    (C) Land, easements, rights-of-way, and relocations.--The non-
Federal interest shall receive credit for land, easements, rights-of-
way, and relocations provided by the non-Federal interest toward the 
non-Federal share of project costs (including all reasonable costs 
associated with obtaining permits necessary for the construction, 
operation, and maintenance of the project on publicly owned or 
controlled land), but not to exceed 25 percent of total project costs.
    (D) Operation and maintenance.--The non-Federal share of operation 
and maintenance costs for projects constructed with assistance provided 
under this section shall be 100 percent.
    (F) Applicability of Other Federal and State Laws.--Nothing in this 
section waives, limits, or otherwise affects the applicability of any 
provision of Federal or State law that would otherwise apply to a 
project to be carried out with assistance provided under this section.
    (G) Authorization of Appropriations.--There is authorized to be 
appropriated to carry out this section for the period beginning with 
fiscal year 2005, $25,000,000, to remain available until expended.
    2. Alternatives. The study's Draft 2013 EIR/EIS/EIS evaluated five 
ecosystem restoration alternatives and selected Alternative 3, the 
Middle Marsh Corridor (Moderate Recreation Infrastructure), for the 
restoration element and recreation element of the west side of the 
Upper Truckee Marsh, as well as Alternative 5 (No Project) for the 
recreation element of the east side of the Upper Truckee Marsh, as the 
preferred alternative because it was considered the most 
environmentally superior, cost-effective, feasible, responsive to 
public comments, and resilient to potential impacts of climate change.
    The selected alternative proposes the most geomorphically 
appropriate channel configuration, allowing the pilot channel to 
strategically connect the current river alignment to historic channels 
and lagoons. The river would form its own pattern and spread over the 
expanse of the marsh, resulting in substantial benefits to habitats, 
wildlife, and long-term water quality. However, the preferred 
alternative could have a long-term, and significant unavoidable impact 
to fish passage through the project area during low flow periods if 
channel disconnectivity occurs.
    The selected alternative also includes restoration of a portion of 
a marina, removal of fill placed during development to restore wet 
meadow, stabilization of streambanks, modification and/or relocation of 
two existing stormwater discharge locations, and restoration of sand 
ridges that were graded and leveled. The selected alternative would 
provide a moderate level of recreation infrastructure along the west 
side of the Upper Truckee Marsh that would include a modified American 
with Disabilities Act (ADA)-accessible pedestrian trail to Cove East 
Beach, viewpoints, and signage.
    The preferred alternative would have short-term and interim impacts 
on water quality from increased turbidity and would have short-term 
impacts to sensitive habitats and wildlife during construction. It 
would also have short-term and interim impacts on water quality that 
could not be avoided because of the strict turbidity criteria used to 
determine a significant and unavoidable impact and to sensitive 
habitats and wildlife.
    In compliance with NEPA and CEQA, a combination of best management 
practices and conservation measures would be used and included in the 
designs to avoid, reduce, and minimize any significant adverse effects 
on environmental resources that were identified in the December 2015 
FEIR/FEIS/FEIS while meeting requirements for various Federal, State, 
and local statutes. The project is being designed to restore ecosystem 
values and riparian and fluvial functions that benefit many seasonal 
and resident fish and wildlife populations including Federally listed 
species such as the Lahontan cutthroat trout and species of concern 
such as willow flycatcher and Tahoe yellow-cress.
    3. Scoping Process.
    A. Two public scoping meetings were held on February 27, 2015, at 
the Inn by the Lake and on March 28, 2015, at the Lake Tahoe Community 
College Board Room in South Lake Tahoe, CA.
    B. CTC will obtain all Federal, State, TRPA, and all other local 
permits prior to construction.
    C. A 30-day review period will be allowed for all interested 
agencies and individuals to review and comment on the Corps' intention 
to adopt the BOR's December 2015 FEIR/FEIS/FEIS, preparation of its own 
ROD, and reimbursement for design and construction of the restoration 
project. All interested persons are encouraged to respond to this 
notice and provide a current address if they wish to be contacted about 
the adoption and reimbursement for construction activities associated 
with this ecosystem restoration project.
    D. In compliance with the Council of Environmental Quality 
regulations [46 FR 18026] and [40 CFR 1506.3(b)], the BOR's December 
2015 Final EIR/EIS/EIS document is recirculated and can be viewed in a 
link on the Corps website. This environmental document is being re-
circulated for procedural purposes. The selected plan remains a 
combination of Alternative 3, the Middle Marsh Corridor (Moderate 
Recreation Infrastructure), and Alternative 5 (No Project), as 
described in detail in the environmental document as the preferred 
plan. This Notice of Intent informs the reader on what the proposed 
Federal action is and complies with the National Environmental Policy 
Act, by allowing the public to provide comments on the Corps intention 
to adopt the BOR's December 2015 FEIR/FEIS/FEIS, preparation of the 
Record of Decision, and to reimburse CTC for those activities falling 
under the Tahoe Section 108 authority.
    4. Availability. The Corps is publishing this Notice of Intent for 
30-day public review and comment beginning on June 29, 2018. To view 
the

[[Page 30708]]

BOR's draft and final environmental documents, go to this web address: 
http://www.spk.usace.army.mil/Media/USACE-Project-Public-Notices/. No 
supplemental environmental documents for review are anticipated.

    Dated: June 14, 2018.
David G. Ray,
Colonel, U.S. Army, District Commander.
[FR Doc. 2018-13670 Filed 6-28-18; 8:45 am]
 BILLING CODE 3720-58-P



                                                30706                           Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices

                                                   In accordance with the National                      available for public review to the extent              constructed. The Corps has reviewed
                                                Environmental Policy Act of 1969                        consistent with applicable law.                        the draft and Final EIR/EIS/EIS to
                                                (NEPA), an Environmental Assessment                       Dated: June 13, 2018.                                ensure that all NEPA requirements have
                                                (EA) for this study is anticipated and                  Terry J. Birkenstock,                                  been met.
                                                will be prepared by MVP. The study                                                                             DATES: Written comments regarding the
                                                                                                        Deputy Chief, Regional Planning and
                                                will broadly evaluate two primary                       Environment Division North.                            scope of the Corps adoption of the
                                                alternatives: (1) The no action; and, (2)                                                                      BOR’s FEIR/FEIS/FEIS, preparation of
                                                                                                        [FR Doc. 2018–14070 Filed 6–28–18; 8:45 am]
                                                deauthorization by Congress of the                                                                             the Corps ROD, and reimbursement to
                                                                                                        BILLING CODE 3720–58–P
                                                Federal navigation-related missions at                                                                         CTC should be received by the Corps on
                                                the sites and disposal of the properties                                                                       or before July 30, 2018.
                                                according to Federal law.                               DEPARTMENT OF DEFENSE                                  ADDRESSES: Send written comments and
                                                Deauthorization would include portions                                                                         suggestions to Mr. Mario Parker,
                                                of the Mississippi River 9-foot                         Department of the Army, Corps of                       Biological Sciences Study Manager, U.S.
                                                navigation channel associated with each                 Engineers                                              Army Corps of Engineers, Sacramento
                                                lock and dam site. MVP is soliciting                                                                           District, 1325 J Street, Sacramento, CA
                                                public comments on the scope of the EA                  Notice of Intent To Adopt U.S. Bureau                  95814, or email him at mario.g.parker@
                                                and significant issues that should be                   of Reclamation’s December 2015 Final                   usace.army.mil, or telephone (916) 557–
                                                addressed. MVP will also accept                         Environmental Impact Report/                           6701, or fax (916) 557–7856.
                                                comments related to potential new                       Environmental Impact Statement/                        SUPPLEMENTARY INFORMATION:
                                                ownership and management measures.                      Environmental Impact Statement,                           1. Proposed Action. The Corps in
                                                   Two public scoping meetings are                      Prepare Corps Record of Decision, and                  cooperation with the non-Federal
                                                planned as discussed in the DATES                       Reimburse the Sponsor for the Upper                    sponsor, the CTC, proposes to adopt the
                                                section above. The primary purpose of                   Truckee River and Marsh Restoration                    BOR’s December 2015 FEIR/FEIS/FEIS,
                                                these meetings is to provide a general                  Project, City of South Lake Tahoe, El                  prepare its own ROD, and reimburse
                                                understanding of the background of the                  Dorado County, CA                                      CTC on the final design and
                                                proposed action and to solicit                                                                                 construction of the restoration features
                                                suggestions and information on the                      AGENCY: Department of the Army, U.S.
                                                                                                        Army Corps of Engineers, DoD.                          at the Upper Truckee River and Marsh
                                                scope of issues to consider in the EA.                                                                         Restoration Project in South Lake
                                                Written and oral comments will be                       ACTION: Notice of intent.
                                                                                                                                                               Tahoe, in Eldorado County, CA.
                                                accepted at the meetings. Comments can                                                                         Reimbursement for the construction of
                                                also be submitted by the methods listed                 SUMMARY:   The U.S. Army Corps of
                                                                                                        Engineers (Corps), Sacramento District,                the ecosystem restoration project is
                                                in the ADDRESSES section. Once the draft                                                                       authorized by the Tahoe 108 program
                                                EA is complete and made available for                   intends to adopt the Bureau of
                                                                                                        Reclamation’s (BOR) December 2015                      authority, which is Section 108 of the
                                                review, there will be additional                                                                               Energy and Water Development
                                                opportunity for public comment.                         Final Environment Impact Report
                                                                                                        (FEIR)/Final Environmental Impact                      Appropriations Act, 2005 (Division C of
                                                   Persons needing reasonable
                                                                                                        Statement (FEIS)/Final Environmental                   the Consolidated Appropriations Act,
                                                accommodations in order to attend and
                                                                                                        Impact Statement (FEIS) for the Upper                  Pub. L. 108–447). The relevant authority
                                                participate in the public scoping
                                                                                                        Truckee River and Marsh Restoration                    from the 2005 Consolidated
                                                meetings should contact the person
                                                                                                        Project and prepare its own Record of                  Appropriations Act excerpted is stated
                                                listed under the FOR FURTHER
                                                                                                        Decision (ROD) after the public review                 below:
                                                INFORMATION CONTACT section as soon as
                                                                                                        period for this Notice of Intent ends.                    Sec. 108. Lake Tahoe Basin
                                                possible. In order to allow sufficient                                                                         Restoration, Nevada and California. (a)
                                                time to process requests, please make                   The Corps will use its Tahoe Section
                                                                                                        108 program authorization for                          Definition.—In this section, the term
                                                contact no later than one week before                                                                          ‘‘Lake Tahoe Basin’’ means the entire
                                                the public meeting.                                     participation in the restoration activities
                                                                                                        by reimbursing the California Tahoe                    watershed drainage of Lake Tahoe
                                                   Written comments, including email                                                                           including that portion of the Truckee
                                                comments, should be sent to MVP at the                  Conservancy (CTC), the local sponsor,
                                                                                                        for final design, construction, and other              River 1,000 feet downstream from the
                                                address given in the ADDRESSES section                                                                         United States Bureau of Reclamation
                                                of this Notice. Comments should be                      applicable activities falling under the
                                                                                                        authorization. During final design and                 dam in Tahoe City, California.
                                                specific and pertain only to the issues                                                                           (b) Establishment of Program.—The
                                                relating to the action and the anticipated              construction, the Corps will serve as the
                                                                                                                                                               Secretary [of the Army] may establish a
                                                EA. MVP will include all comments in                    lead Federal agency for compliance with
                                                                                                                                                               program for providing environmental
                                                the project record.                                     the National Environmental Policy Act
                                                                                                                                                               assistance to non-Federal interests in
                                                   Before including your address, phone                 (NEPA), and CTC will serve as the lead
                                                                                                                                                               Lake Tahoe Basin.
                                                number, email address, or other                         agency for compliance with the                            (c) Form of Assistance.—Assistance
                                                personal identifying information in your                California Environmental Quality Act                   under this section may be in the form
                                                comment, you should be aware that                       (CEQA) during the final design and                     of planning, design, and construction
                                                your entire comment—including your                      construction activities if designs need to             assistance for water-related
                                                personal identifying information—will                   be modified or the river moves from its                environmental infrastructure and
                                                be publicly available. While you can ask                current alignment prior to design and                  resource protection and development
                                                in your comment to have your personal                   construction. In the December 2015                     projects in Lake Tahoe Basin, which
                                                                                                        Final EIR/EIS/EIS, the analysis for this
sradovich on DSK3GMQ082PROD with NOTICES




                                                identifying information withheld from                                                                          could include the following:
                                                public review, MVP cannot guarantee                     ecosystem restoration project evaluated                   (1) Urban stormwater conveyance,
                                                that we will be able to do so.                          five alternatives to restore aquatic and               treatment and related facilities;
                                                   All submissions from organizations or                riparian values and functions on the                      (2) watershed planning, science and
                                                businesses and from individuals                         Upper Truckee River’s marsh area near                  research;
                                                identifying themselves as                               its terminus at Lake Tahoe, South Lake                    (3) environmental restoration; and
                                                representatives or officials of                         Tahoe in El Dorado County, CA with                        (4) surface water resource protection
                                                organizations or businesses will be                     selection of a preferred alternative to be             and development.


                                           VerDate Sep<11>2014   17:58 Jun 28, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\29JNN1.SGM   29JNN1


                                                                                Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices                                            30707

                                                   (d) Public Ownership Requirement.—                     (G) Authorization of                                 would be used and included in the
                                                The Secretary [of the Army] may                         Appropriations.—There is authorized to                 designs to avoid, reduce, and minimize
                                                provide assistance for a project under                  be appropriated to carry out this section              any significant adverse effects on
                                                this section only if the project is                     for the period beginning with fiscal year              environmental resources that were
                                                publicly owned.                                         2005, $25,000,000, to remain available                 identified in the December 2015 FEIR/
                                                   (e) Local Cooperation Agreement.—(1)                 until expended.                                        FEIS/FEIS while meeting requirements
                                                In general.—Before providing assistance                   2. Alternatives. The study’s Draft 2013              for various Federal, State, and local
                                                under this section, the Secretary shall                 EIR/EIS/EIS evaluated five ecosystem                   statutes. The project is being designed to
                                                enter into a local cooperation agreement                restoration alternatives and selected                  restore ecosystem values and riparian
                                                with a non-Federal interest to provide                  Alternative 3, the Middle Marsh                        and fluvial functions that benefit many
                                                for design and construction of the                      Corridor (Moderate Recreation                          seasonal and resident fish and wildlife
                                                project to be carried out with the                      Infrastructure), for the restoration                   populations including Federally listed
                                                assistance.                                             element and recreation element of the                  species such as the Lahontan cutthroat
                                                   (2) Requirements.—Each local                         west side of the Upper Truckee Marsh,                  trout and species of concern such as
                                                cooperation agreement entered into                      as well as Alternative 5 (No Project) for              willow flycatcher and Tahoe yellow-
                                                under this subsection shall provide for                 the recreation element of the east side                cress.
                                                the following:                                          of the Upper Truckee Marsh, as the                        3. Scoping Process.
                                                   (A) Plan.—Development by the                         preferred alternative because it was                      A. Two public scoping meetings were
                                                Secretary [of the Army], in consultation                considered the most environmentally                    held on February 27, 2015, at the Inn by
                                                with appropriate Federal and State and                  superior, cost-effective, feasible,                    the Lake and on March 28, 2015, at the
                                                Regional officials, of appropriate                      responsive to public comments, and                     Lake Tahoe Community College Board
                                                environmental documentation,                            resilient to potential impacts of climate              Room in South Lake Tahoe, CA.
                                                engineering plans and specifications.                   change.                                                   B. CTC will obtain all Federal, State,
                                                   (B) Legal and institutional                             The selected alternative proposes the               TRPA, and all other local permits prior
                                                structures.—Establishment of such legal                 most geomorphically appropriate                        to construction.
                                                and institutional structures as are                     channel configuration, allowing the                       C. A 30-day review period will be
                                                necessary to ensure the effective long-                 pilot channel to strategically connect                 allowed for all interested agencies and
                                                term operation of the project by the non-               the current river alignment to historic                individuals to review and comment on
                                                Federal interest.                                       channels and lagoons. The river would                  the Corps’ intention to adopt the BOR’s
                                                   (3) Cost sharing.—                                   form its own pattern and spread over                   December 2015 FEIR/FEIS/FEIS,
                                                   (A) In general.—The Federal share of                 the expanse of the marsh, resulting in                 preparation of its own ROD, and
                                                project costs under each local                          substantial benefits to habitats, wildlife,            reimbursement for design and
                                                cooperation agreement entered into                      and long-term water quality. However,                  construction of the restoration project.
                                                under this subsection shall be 75                       the preferred alternative could have a                 All interested persons are encouraged to
                                                percent. The Federal share may be in                    long-term, and significant unavoidable                 respond to this notice and provide a
                                                the form of grants or reimbursements of                 impact to fish passage through the                     current address if they wish to be
                                                project costs.                                          project area during low flow periods if                contacted about the adoption and
                                                   (B) Credit for design work.—The non-                 channel disconnectivity occurs.                        reimbursement for construction
                                                Federal interest shall receive credit for                  The selected alternative also includes              activities associated with this ecosystem
                                                the reasonable costs of planning and                    restoration of a portion of a marina,                  restoration project.
                                                design work completed by the non-                       removal of fill placed during                             D. In compliance with the Council of
                                                Federal interest before entering into a                 development to restore wet meadow,                     Environmental Quality regulations [46
                                                local cooperation agreement with the                    stabilization of streambanks,                          FR 18026] and [40 CFR 1506.3(b)], the
                                                Secretary for a project.                                modification and/or relocation of two                  BOR’s December 2015 Final EIR/EIS/EIS
                                                   (C) Land, easements, rights-of-way,                  existing stormwater discharge locations,               document is recirculated and can be
                                                and relocations.—The non-Federal                        and restoration of sand ridges that were               viewed in a link on the Corps website.
                                                interest shall receive credit for land,                 graded and leveled. The selected                       This environmental document is being
                                                easements, rights-of-way, and                           alternative would provide a moderate                   re-circulated for procedural purposes.
                                                relocations provided by the non-Federal                 level of recreation infrastructure along               The selected plan remains a
                                                interest toward the non-Federal share of                the west side of the Upper Truckee                     combination of Alternative 3, the
                                                project costs (including all reasonable                 Marsh that would include a modified                    Middle Marsh Corridor (Moderate
                                                costs associated with obtaining permits                 American with Disabilities Act (ADA)-                  Recreation Infrastructure), and
                                                necessary for the construction,                         accessible pedestrian trail to Cove East               Alternative 5 (No Project), as described
                                                operation, and maintenance of the                       Beach, viewpoints, and signage.                        in detail in the environmental document
                                                project on publicly owned or controlled                    The preferred alternative would have                as the preferred plan. This Notice of
                                                land), but not to exceed 25 percent of                  short-term and interim impacts on water                Intent informs the reader on what the
                                                total project costs.                                    quality from increased turbidity and                   proposed Federal action is and complies
                                                   (D) Operation and maintenance.—The                   would have short-term impacts to                       with the National Environmental Policy
                                                non-Federal share of operation and                      sensitive habitats and wildlife during                 Act, by allowing the public to provide
                                                maintenance costs for projects                          construction. It would also have short-                comments on the Corps intention to
                                                constructed with assistance provided                    term and interim impacts on water                      adopt the BOR’s December 2015 FEIR/
sradovich on DSK3GMQ082PROD with NOTICES




                                                under this section shall be 100 percent.                quality that could not be avoided                      FEIS/FEIS, preparation of the Record of
                                                   (F) Applicability of Other Federal and               because of the strict turbidity criteria               Decision, and to reimburse CTC for
                                                State Laws.—Nothing in this section                     used to determine a significant and                    those activities falling under the Tahoe
                                                waives, limits, or otherwise affects the                unavoidable impact and to sensitive                    Section 108 authority.
                                                applicability of any provision of Federal               habitats and wildlife.                                    4. Availability. The Corps is
                                                or State law that would otherwise apply                    In compliance with NEPA and CEQA,                   publishing this Notice of Intent for 30-
                                                to a project to be carried out with                     a combination of best management                       day public review and comment
                                                assistance provided under this section.                 practices and conservation measures                    beginning on June 29, 2018. To view the


                                           VerDate Sep<11>2014   17:58 Jun 28, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\29JNN1.SGM   29JNN1


                                                30708                           Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices

                                                BOR’s draft and final environmental                     providing both organizations with a                    DEPARTMENT OF EDUCATION
                                                documents, go to this web address:                      comprehensive list of U.S. commercial
                                                http://www.spk.usace.army.mil/Media/                    shipyards and their capabilities and                   Applications for New Awards;
                                                USACE-Project-Public-Notices/. No                       capacities. These shipyards play a                     Educational Technology, Media, and
                                                supplemental environmental documents                    crucial role in national defense, the                  Materials for Individuals With
                                                for review are anticipated.                             economy and the U.S. transportation                    Disabilities—Center on Early Science,
                                                  Dated: June 14, 2018.                                 infrastructure and as such, are of                     Technology, Engineering, and Math
                                                                                                        considerable interest to the U.S.                      Learning for Young Children With
                                                David G. Ray,
                                                                                                        Government. The data collected is used                 Disabilities
                                                Colonel, U.S. Army, District Commander.
                                                [FR Doc. 2018–13670 Filed 6–28–18; 8:45 am]             to assess the capabilities and capacities              AGENCY:  Office of Special Education and
                                                BILLING CODE 3720–58–P                                  of U.S. commercial shipyards in the                    Rehabilitative Services, Department of
                                                                                                        areas of ship repair and ship                          Education.
                                                                                                        construction. The data is also used to                 ACTION: Notice.
                                                DEPARTMENT OF DEFENSE                                   monitor employment numbers for labor
                                                                                                        forecasting for future build projects as               SUMMARY:   The Department of Education
                                                Department of the Navy                                  well as providing information on the                   (Department) is issuing a notice inviting
                                                                                                        ability to raise labor to meet national                applications for a new award for fiscal
                                                [Docket ID USN–2018–HQ–0007]
                                                                                                                                                               year (FY) 2018 for Educational
                                                                                                        industrial mobilization requirements
                                                Submission for OMB Review;                                                                                     Technology, Media, and Materials for
                                                                                                        during times of national emergency. The
                                                Comment Request                                                                                                Individuals with Disabilities—Center on
                                                                                                        data collected is the main source of
                                                                                                                                                               Early Science, Technology, Engineering,
                                                AGENCY:    Department of the Navy, DoD.                 information on these shipyards and is                  and Math Learning for Young Children
                                                ACTION:   30-Day information collection                 used to these ends.                                    with Disabilities, Catalog of Federal
                                                notice.                                                   Affected Public: Business or other for-              Domestic Assistance (CFDA) number
                                                                                                        profit.                                                84.327G.
                                                SUMMARY:    The Department of Defense
                                                has submitted to OMB for clearance the                    Frequency: Annually.                                 DATES:
                                                                                                          Respondent’s Obligation: Voluntary.                     Applications Available: June 29, 2018.
                                                following proposal for collection of
                                                                                                                                                                  Deadline for Transmittal of
                                                information under the provisions of the                   OMB Desk Officer: Ms. Jasmeet                        Applications: July 30, 2018.
                                                Paperwork Reduction Act.                                Seehra.                                                ADDRESSES: For the addresses for
                                                DATES: Consideration will be given to all
                                                                                                          You may also submit comments and                     obtaining and submitting an
                                                comments received by July 30, 2018.                                                                            application, please refer to our Common
                                                                                                        recommendations, identified by Docket
                                                ADDRESSES: Comments and                                 ID number and title, by the following                  Instructions for Applicants to
                                                recommendations on the proposed                         method:                                                Department of Education Discretionary
                                                information collection should be                                                                               Grant Programs, published in the
                                                emailed to Ms. Jasmeet Seehra, DoD                        • Federal eRulemaking Portal: http://
                                                                                                                                                               Federal Register on February 12, 2018
                                                Desk Officer, at oira_submission@                       www.regulations.gov. Follow the
                                                                                                                                                               (83 FR 6003) and available at
                                                omb.eop.gov. Please identify the                        instructions for submitting comments.
                                                                                                                                                               www.gpo.gov/fdsys/pkg/FR-2018-02-12/
                                                proposed information collection by DoD                     Instructions: All submissions received              pdf/2018-02558.pdf.
                                                Desk Officer, Docket ID number, and                     must include the agency name, Docket                   FOR FURTHER INFORMATION CONTACT:
                                                title of the information collection.                    ID number, and title for this Federal                  Dawn Ellis, U.S. Department of
                                                FOR FURTHER INFORMATION CONTACT: Fred                   Register document. The general policy                  Education, 400 Maryland Avenue SW,
                                                Licari, 571–372–0493, or whs.mc-                        for comments and other submissions                     Room 5137, Potomac Center Plaza,
                                                alex.esd.mbx.dd-dod-information-                        from members of the public is to make                  Washington, DC 20202–5108.
                                                collections@mail.mil.                                   these submissions available for public                 Telephone: (202) 245–6417. Email:
                                                SUPPLEMENTARY INFORMATION:                              viewing on the internet at http://                     dawn.ellis@ed.gov.
                                                   Title; Associated Form; and OMB                      www.regulations.gov as they are                           If you use a telecommunications
                                                Number: Facilities Available for the                    received without change, including any                 device for the deaf (TDD) or a text
                                                Construction or Repair of Ships;                        personal identifiers or contact                        telephone (TTY), call the Federal Relay
                                                Standard Form 17; OMB Control                           information.                                           Service (FRS), toll free, at 1–800–877–
                                                Number 0703–0006.                                                                                              8339.
                                                   Type of Request: Extension.                            DoD Clearance Officer: Mr. Frederick
                                                                                                        Licari.                                                SUPPLEMENTARY INFORMATION:
                                                   Number of Respondents: 200.
                                                   Responses per Respondent: 1.                           Requests for copies of the information               Full Text of Announcement
                                                   Annual Responses: 200.                               collection proposal should be sent to
                                                   Average Burden per Response: 4                                                                              I. Funding Opportunity Description
                                                                                                        Mr. Licari at whs.mc-alex.esd.mbx.dd-
                                                hours.                                                  dod-information-collections@mail.mil.                     Purpose of Program: The purposes of
                                                   Annual Burden Hours: 800.                                                                                   the Educational Technology, Media, and
                                                   Needs and Uses: This information                       Dated: June 21, 2018.                                Materials for Individuals with
                                                collection is part of a joint effort                    Shelly E. Finke,                                       Disabilities Program are to: (1) Improve
                                                between the Naval Sea Systems                                                                                  results for students with disabilities by
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        Alternate OSD Federal Register, Liaison
                                                Command (NAVSEA) and the U.S.                           Officer, Department of Defense.                        promoting the development,
                                                Maritime Administration (MARAD), to                     [FR Doc. 2018–13771 Filed 6–28–18; 8:45 am]            demonstration, and use of technology;
                                                maintain a working data set on active                   BILLING CODE 5001–06–P
                                                                                                                                                               (2) support educational activities
                                                U.S. Shipyards. The information                                                                                designed to be of educational value in
                                                collected is required by the Merchant                                                                          the classroom for students with
                                                Start Printed Page 68409 Marine Act of                                                                         disabilities; (3) provide support for
                                                1936 as amended and is critical in                                                                             captioning and video description that is


                                           VerDate Sep<11>2014   17:58 Jun 28, 2018   Jkt 244001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\29JNN1.SGM   29JNN1



Document Created: 2018-06-29 01:12:45
Document Modified: 2018-06-29 01:12:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
DatesWritten comments regarding the scope of the Corps adoption of the BOR's FEIR/FEIS/FEIS, preparation of the Corps ROD, and reimbursement to CTC should be received by the Corps on or before July 30, 2018.