83_FR_31873 83 FR 31742 - Combined Notice of Filings

83 FR 31742 - Combined Notice of Filings

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 131 (July 9, 2018)

Page Range31742-31742
FR Document2018-14555

Federal Register, Volume 83 Issue 131 (Monday, July 9, 2018)
[Federal Register Volume 83, Number 131 (Monday, July 9, 2018)]
[Notices]
[Page 31742]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-14555]



[[Page 31742]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Number: PR18-62-000.
    Applicants: Rocky Mountain Natural Gas LLC.
    Description: Tariff filing per 284.123(b),(e)/: Rocky Mountain 
Natural Gas LLC SOC Filing to be effective 6/1/2018.
    Filed Date: 6/26/18.
    Accession Number: 20180626-5073.
    Comments/Protests Due: 5 p.m. ET 7/17/18.

    Docket Numbers: RP18-909-000.
    Applicants: Transcontinental Gas Pipe Line Company.
    Description: Sec.  4(d) Rate Filing: Negotiated Rates--Cherokee 
AGL--Replacement Shippers--Jul 2018 to be effective 7/1/2018.
    Filed Date: 6/27/18.
    Accession Number: 20180627-5033.
    Comments Due: 5 p.m. ET 7/9/18.

    Docket Numbers: RP18-910-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate--Boston Gas to 
BBPC 796772 to be effective 7/1/2018.
    Filed Date: 6/27/18.
    Accession Number: 20180627-5073.
    Comments Due: 5 p.m. ET 7/9/18.

    Docket Numbers: RP18-911-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate--Noble Energy 
#8951606 eff 7-1-18 to be effective 7/1/2018.
    Filed Date: 6/27/18.
    Accession Number: 20180627-5114.
    Comments Due: 5 p.m. ET 7/9/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14555 Filed 7-6-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                31742                            Federal Register / Vol. 83, No. 131 / Monday, July 9, 2018 / Notices

                                                DEPARTMENT OF ENERGY                                         Filed Date: 6/27/18.                               qualifying conduit hydropower facility,
                                                                                                             Accession Number: 20180627–5114.                   pursuant to section 30 of the Federal
                                                Federal Energy Regulatory                                    Comments Due: 5 p.m. ET 7/9/18.                    Power Act (FPA), as amended by section
                                                Commission                                                   The filings are accessible in the                  4 of the Hydropower Regulatory
                                                                                                          Commission’s eLibrary system by                       Efficiency Act of 2013 (HREA). The
                                                Combined Notice of Filings                                clicking on the links or querying the                 proposed Big Dry Creek Hydropower
                                                  Take notice that the Commission has                     docket number.                                        Station Project would have an installed
                                                received the following Natural Gas                           Any person desiring to intervene or                capacity of 5 kilowatts (kW), and would
                                                Pipeline Rate and Refund Report filings:                  protest in any of the above proceedings               be located along a diversion pipeline
                                                                                                          must file in accordance with Rules 211                that would route poor-quality water
                                                Filings Instituting Proceedings                           and 214 of the Commission’s                           around Englewood’s primary municipal
                                                   Docket Number: PR18–62–000.                            Regulations (18 CFR 385.211 and                       water intake facility. The project would
                                                   Applicants: Rocky Mountain Natural                     385.214) on or before 5:00 p.m. Eastern
                                                                                                                                                                be located near the City of Englewood
                                                Gas LLC.                                                  time on the specified comment date.
                                                                                                                                                                in Arapahoe County, Colorado.
                                                   Description: Tariff filing per                         Protests may be considered, but
                                                284.123(b),(e)/: Rocky Mountain Natural                   intervention is necessary to become a                    Applicant Contact: Aliina Fowler,
                                                Gas LLC SOC Filing to be effective                        party to the proceeding.                              ERO Resources Corp., 1842 Clarkson
                                                6/1/2018.                                                    eFiling is encouraged. More detailed               Street, Denver, CO 80218; Phone No.
                                                   Filed Date: 6/26/18.                                   information relating to filing                        (303)-830–1188; email: afowler@
                                                   Accession Number: 20180626–5073.                       requirements, interventions, protests,                eroresources.com.
                                                   Comments/Protests Due: 5 p.m. ET                       service, and qualifying facilities filings
                                                7/17/18.                                                                                                           FERC Contact: Robert Bell, Phone No.
                                                                                                          can be found at: http://www.ferc.gov/                 (202) 502–6062; Email: robert.bell@
                                                   Docket Numbers: RP18–909–000.                          docs-filing/efiling/filing-req.pdf. For
                                                   Applicants: Transcontinental Gas                                                                             ferc.gov.
                                                                                                          other information, call (866) 208–3676
                                                Pipe Line Company.                                        (toll free). For TTY, call (202) 502–8659.               Qualifying Conduit Hydropower
                                                   Description: § 4(d) Rate Filing:                                                                             Facility Description: The proposed
                                                Negotiated Rates—Cherokee AGL—                              Dated: June 28, 2018.
                                                                                                                                                                project would consist of: (1) A nine-foot,
                                                Replacement Shippers—Jul 2018 to be                       Kimberly D. Bose,
                                                                                                                                                                six-inch cylindrical vault containing a
                                                effective 7/1/2018.                                       Secretary.
                                                                                                                                                                single turbine with a total generating
                                                   Filed Date: 6/27/18.                                   [FR Doc. 2018–14555 Filed 7–6–18; 8:45 am]
                                                                                                                                                                capacity of 5 kW; (2) a 20-inch-wide,
                                                   Accession Number: 20180627–5033.                       BILLING CODE 6717–01–P
                                                   Comments Due: 5 p.m. ET 7/9/18.                                                                              900-foot-long pipeline that diverts water
                                                                                                                                                                from the Big Dry Creek around
                                                   Docket Numbers: RP18–910–000.
                                                   Applicants: Algonquin Gas                              DEPARTMENT OF ENERGY                                  Englewood’s municipal water intake; (3)
                                                Transmission, LLC.                                                                                              a 24-inch-wide, 65-foot-long discharge
                                                   Description: § 4(d) Rate Filing:                       Federal Energy Regulatory                             pipeline returning water to the South
                                                Negotiated Rate—Boston Gas to BBPC                        Commission                                            Platte River; and (4) appurtenant
                                                796772 to be effective 7/1/2018.                                                                                facilities. The proposed project would
                                                                                                          [Docket No. CD18–10–000]
                                                   Filed Date: 6/27/18.                                                                                         have an estimated annual generation of
                                                   Accession Number: 20180627–5073.                       City of Englewood, Colorado; Notice of                43.8 megawatt-hours.
                                                   Comments Due: 5 p.m. ET 7/9/18.                        Preliminary Determination of a                           A qualifying conduit hydropower
                                                   Docket Numbers: RP18–911–000.                          Qualifying Conduit Hydropower                         facility is one that is determined or
                                                   Applicants: Texas Eastern                              Facility and Soliciting Comments and                  deemed to meet all of the criteria shown
                                                Transmission, LP.                                         Motions To Intervene
                                                   Description: § 4(d) Rate Filing:                                                                             in the table below.
                                                Negotiated Rate—Noble Energy                                On June 15, 2018, the City Of
                                                #8951606 eff 7–1–18 to be effective                       Englewood, Colorado (Englewood) filed
                                                7/1/2018.                                                 a notice of intent to construct a

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                  Satisfies
                                                            Statutory provision                                                              Description                                           (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ..               The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                       similar manmade water conveyance that is operated for the distribution of water
                                                                                                       for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                       eration of electricity.
                                                FPA 30(a)(3)(C)(i), as amended by HREA               The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                       power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                       erally owned conduit.
                                                FPA 30(a)(3)(C)(ii), as amended                by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                  HREA.
sradovich on DSK3GMQ082PROD with NOTICES




                                                FPA 30(a)(3)(C)(iii), as amended               by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                  HREA.                                               censing requirements of Part I of the FPA.



                                                  Preliminary Determination:                              purpose of the conduit, which is to aid               upon the above criteria, Commission
                                                  The proposed hydroelectric project                      the City of Englewood’s municipal                     staff preliminarily determines that the
                                                will not interfere with the primary                       water supply system. Therefore, based                 proposal satisfies the requirements for a



                                           VerDate Sep<11>2014   18:00 Jul 06, 2018    Jkt 244001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\09JYN1.SGM   09JYN1



Document Created: 2018-07-07 00:41:42
Document Modified: 2018-07-07 00:41:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates6/26/18.
FR Citation83 FR 31742 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR