83_FR_31878 83 FR 31747 - San Diego County Water Authority, City of San Diego; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

83 FR 31747 - San Diego County Water Authority, City of San Diego; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 131 (July 9, 2018)

Page Range31747-31748
FR Document2018-14569

Federal Register, Volume 83 Issue 131 (Monday, July 9, 2018)
[Federal Register Volume 83, Number 131 (Monday, July 9, 2018)]
[Notices]
[Pages 31747-31748]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-14569]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14642-002]


San Diego County Water Authority, City of San Diego; Notice of 
Preliminary Permit Application Accepted for Filing and Soliciting 
Comments, Motions To Intervene, and Competing Applications

(June 28, 2018)
    On May 1, 2018, the San Diego County Water Authority and the City 
of San Diego, California, jointly filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the San Vicente Energy 
Storage Facility, to be located at San Vicente reservoir, in Lakeside, 
California. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.

[[Page 31748]]

    The proposed project would consist of an integration of existing 
facilities and the construction of new facilities:
    The lower reservoir portion of the proposed project would consist 
of the following: (1) The existing San Vicente reservoir with a storage 
capacity of 246,000 acre-feet and a surface area of 1,600 acres at a 
normal maximum operating elevation of 766 feet above mean sea level 
(msl); (2) the existing 1,430-foot-long, 337-foot-high San Vicente 
roller compacted concrete (RCC) gravity dam; (3) a lower reservoir 
inlet/outlet structure equipped with trash racks and either one or two 
slide gates; (4) a new 230-kilovolt (kV) substation containing step-up 
transformers, circuit breakers, and disconnect switches; (5) a new 
switchyard constructed at the point of interconnection at the western 
edge of San Vicente Reservoir; (6) an approximately 5-mile-long, 230-kV 
overhead or underground transmission line that would extend from the 
northern end of San Vicente reservoir to the 230-kV Sycamore substation 
and interconnect with San Diego Gas and Electric's existing 500-kV 
Sunrise Powerlink; and (7) appurtenant facilities.
    The upper reservoir portion of the proposed project would be 
constructed near Foster Canyon, approximately one-half mile northwest 
of the San Vicente reservoir and would consist of: (1) A reservoir with 
a storage capacity of 7,842 acre-feet and a surface area of 100 acres 
at a full pond elevation of 1,490 feet msl; (2) five RCC saddle dams 
impounding the reservoir and measuring, respectively: (i) 1,425 feet 
long and 230 feet high, (ii) 838 feet long and 80 feet high, (iii) 838 
feet long and 80 feet high, (iv) 1,006 feet long and 240 feet high, and 
(v) 3,100 feet long and 30 feet high; (3) an upper reservoir inlet/
outlet structure; (4) a 2,050-foot-long, 22-foot-diameter power tunnel 
transitioning into two 326-foot-long, steel-lined penstocks extending 
between the upper reservoir inlet/outlet and the pump/turbines below; 
(5) a 360-foot-long, 83-foot-wide, 119-foot-tall subsurface powerhouse 
containing four 125-megawatt vertical Francis variable speed reversible 
pump/turbine/generator units; (6) a 2,244-foot-long, 25-foot-diameter 
concrete-lined tailrace tunnel connecting the pump-turbine draft tubes 
to the lower reservoir inlet/outlet structure; (7) a 2,200-foot-long, 
230-kV, underground transmission line extending from the upper 
reservoir to the northern end of San Vicente reservoir; and (7) 
appurtenant facilities.
    The project would generate an estimated 1,300 gigawatt hours 
annually.
    Applicant Contacts: (1) Mr. Gary Bousquet, Senior Engineering 
Manager, San Diego County Water Authority, 4677 Overland Avenue, San 
Diego, California 92123, phone: (858) 522-6823; and (2) Mr. Vic Barnes, 
Director of Public Utilities, City of San Diego, 9192 Topaz Way, San 
Diego, California, phone (858) 292-6401.
    FERC Contact: John Mudre, phone: (202) 502-8902.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14642-002.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary link of 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14642) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14569 Filed 7-6-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 83, No. 131 / Monday, July 9, 2018 / Notices                                                  31747

                                                proceeding can ask for court review of                   DEPARTMENT OF ENERGY                                  Market-Based Rate Authority to be
                                                Commission orders in the proceeding.                                                                           effective 8/27/2018.
                                                                                                         Federal Energy Regulatory                                Filed Date: 6/27/18.
                                                   However, a person does not have to
                                                                                                         Commission                                               Accession Number: 20180627–5129.
                                                intervene in order to have comments
                                                considered. The second way to                                                                                     Comments Due: 5 p.m. ET 7/18/18.
                                                                                                         Combined Notice of Filings #1
                                                participate is by filing with the                                                                                 The filings are accessible in the
                                                Secretary of the Commission, as soon as                     Take notice that the Commission                    Commission’s eLibrary system by
                                                possible, an original and two copies of                  received the following electric rate                  clicking on the links or querying the
                                                comments in support of or in opposition                  filings:                                              docket number.
                                                to this project. The Commission will                        Docket Numbers: ER11–47–009;                          Any person desiring to intervene or
                                                                                                         ER12–1540–007; ER12–1541–007;                         protest in any of the above proceedings
                                                consider these comments in
                                                                                                         ER12–1542–007; ER12–1544–007;                         must file in accordance with Rules 211
                                                determining the appropriate action to be
                                                                                                         ER14–594–011; ER11–46–012; ER11–                      and 214 of the Commission’s
                                                taken, but the filing of a comment alone                                                                       Regulations (18 CFR 385.211 and
                                                will not serve to make the filer a party                 41–009; ER12–2343–007; ER13–1896–
                                                                                                         013; ER16–323–005; ER17–1930–001;                     385.214) on or before 5:00 p.m. Eastern
                                                to the proceeding. The Commission’s                                                                            time on the specified comment date.
                                                rules require that persons filing                        ER17–1931–001; ER17–1932–001.
                                                                                                            Applicants: Appalachian Power                      Protests may be considered, but
                                                comments in opposition to the project                                                                          intervention is necessary to become a
                                                                                                         Company, Indiana Michigan Power
                                                provide copies of their protests only to                                                                       party to the proceeding.
                                                                                                         Company, Kentucky Power Company,
                                                the party or parties directly involved in                                                                         eFiling is encouraged. More detailed
                                                                                                         Kingsport Power Company, Wheeling
                                                the protest.                                             Power Company, AEP Texas Inc., Public                 information relating to filing
                                                   Persons who wish to comment only                      Service Company of Oklahoma,                          requirements, interventions, protests,
                                                on the environmental review of this                      Southwestern Electric Power Company,                  service, and qualifying facilities filings
                                                project should submit an original and                    Ohio Power Company, AEP Energy                        can be found at: http://www.ferc.gov/
                                                two copies of their comments to the                      Partners, Inc., AEP Retail Energy                     docs-filing/efiling/filing-req.pdf. For
                                                Secretary of the Commission.                             Partners LLC, AEP Energy, Inc., AEP                   other information, call (866) 208–3676
                                                Environmental commentors will be                         Generation Resources Inc., Ohio Valley                (toll free). For TTY, call (202) 502–8659.
                                                placed on the Commission’s                               Electric Corporation.                                   Dated: June 28, 2018.
                                                environmental mailing list, will receive                    Description: Updated Market Power                  Kimberly D. Bose,
                                                copies of the environmental documents,                   Analysis in the Southwest Power Pool                  Secretary.
                                                and will be notified of meetings                         balancing area authority of the AEP                   [FR Doc. 2018–14567 Filed 7–6–18; 8:45 am]
                                                associated with the Commission’s                         MBR affiliates.                                       BILLING CODE 6717–01–P
                                                environmental review process.                               Filed Date: 6/26/18.
                                                Environmental commentors will not be                        Accession Number: 20180626–5244.
                                                required to serve copies of filed                           Comments Due: 5 p.m. ET 8/27/18.                   DEPARTMENT OF ENERGY
                                                documents on all other parties.                             Docket Numbers: ER11–1858–007.
                                                However, the non-party commentors                           Applicants: NorthWestern                           Federal Energy Regulatory
                                                                                                         Corporation.                                          Commission
                                                will not receive copies of all documents
                                                filed by other parties or issued by the                     Description: Triennial Market Power
                                                                                                         Analysis for the Southwest Power Pool                 [Project No. 14642–002]
                                                Commission (except for the mailing of
                                                                                                         Region of NorthWestern Corporation.
                                                environmental documents issued by the                                                                          San Diego County Water Authority,
                                                                                                            Filed Date: 6/26/18.
                                                Commission) and will not have the right                     Accession Number: 20180626–5246.                   City of San Diego; Notice of
                                                to seek court review of the                                 Comments Due: 5 p.m. ET 8/27/18.                   Preliminary Permit Application
                                                Commission’s final order.                                                                                      Accepted for Filing and Soliciting
                                                                                                            Docket Numbers: ER18–1861–000.
                                                   The Commission strongly encourages                       Applicants: New England Power                      Comments, Motions To Intervene, and
                                                electronic filings of comments, protests                 Company.                                              Competing Applications
                                                and interventions in lieu of paper using                    Description: Tariff Cancellation:                  (June 28, 2018)
                                                the eFiling link at http://www.ferc.gov.                 Notice of Cancellation of Service                        On May 1, 2018, the San Diego
                                                Persons unable to file electronically                    Agreement with Wheelabrator Millbury,                 County Water Authority and the City of
                                                should submit an original and 5 copies                   Inc. to be effective 8/27/2018.                       San Diego, California, jointly filed an
                                                of the protest or intervention to the                       Filed Date: 6/27/18.                               application for a preliminary permit,
                                                Federal Energy regulatory Commission,                       Accession Number: 20180627–5047.                   pursuant to section 4(f) of the Federal
                                                888 First Street NE, Washington, DC                         Comments Due: 5 p.m. ET 7/18/18.                   Power Act (FPA), proposing to study the
                                                20426.                                                      Docket Numbers: ER18–1862–000.                     feasibility of the San Vicente Energy
                                                   Comment Date: July 19, 2018.                             Applicants: Duke Energy Progress,                  Storage Facility, to be located at San
                                                                                                         LLC.                                                  Vicente reservoir, in Lakeside,
                                                  Dated: June 28, 2018.                                     Description: § 205(d) Rate Filing: DEP-            California. The sole purpose of a
                                                Kimberly D. Bose,                                        Five Towns Reimbursement Agreements                   preliminary permit, if issued, is to grant
                                                Secretary.                                               to be effective 9/1/2018.                             the permit holder priority to file a
sradovich on DSK3GMQ082PROD with NOTICES




                                                [FR Doc. 2018–14558 Filed 7–6–18; 8:45 am]                  Filed Date: 6/27/18.                               license application during the permit
                                                BILLING CODE 6717–01–P                                      Accession Number: 20180627–5067.                   term. A preliminary permit does not
                                                                                                            Comments Due: 5 p.m. ET 7/18/18.                   authorize the permit holder to perform
                                                                                                            Docket Numbers: ER18–1863–000.                     any land-disturbing activities or
                                                                                                            Applicants: Coolidge Solar I, LLC.                 otherwise enter upon lands or waters
                                                                                                            Description: Baseline eTariff Filing:              owned by others without the owners’
                                                                                                         Coolidge Solar I, LLC Application for                 express permission.


                                           VerDate Sep<11>2014   18:00 Jul 06, 2018   Jkt 244001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\09JYN1.SGM   09JYN1


                                                31748                            Federal Register / Vol. 83, No. 131 / Monday, July 9, 2018 / Notices

                                                   The proposed project would consist of                    Applicant Contacts: (1) Mr. Gary                   reactive supply and voltage control from
                                                an integration of existing facilities and                Bousquet, Senior Engineering Manager,                 generation or other sources service
                                                the construction of new facilities:                      San Diego County Water Authority,                     under Schedule 2 of the PJM
                                                   The lower reservoir portion of the                    4677 Overland Avenue, San Diego,                      Interconnection, L.L.C. Tariff (Meldahl,
                                                proposed project would consist of the                    California 92123, phone: (858) 522–                   Hydroelectric Facility).
                                                following: (1) The existing San Vicente                  6823; and (2) Mr. Vic Barnes, Director                   Any person desiring to intervene or to
                                                reservoir with a storage capacity of                     of Public Utilities, City of San Diego,               protest this filing must file in
                                                246,000 acre-feet and a surface area of                  9192 Topaz Way, San Diego, California,                accordance with Rules 211 and 214 of
                                                1,600 acres at a normal maximum                          phone (858) 292–6401.                                 the Commission’s Rules of Practice and
                                                operating elevation of 766 feet above                       FERC Contact: John Mudre, phone:                   Procedure (18 CFR 385.211, 385.214).
                                                mean sea level (msl); (2) the existing                   (202) 502–8902.                                       Protests will be considered by the
                                                1,430-foot-long, 337-foot-high San                          Deadline for filing comments, motions              Commission in determining the
                                                Vicente roller compacted concrete (RCC)                  to intervene, competing applications                  appropriate action to be taken, but will
                                                gravity dam; (3) a lower reservoir inlet/                (without notices of intent), or notices of            not serve to make protestants parties to
                                                outlet structure equipped with trash                     intent to file competing applications: 60             the proceeding. Any person wishing to
                                                racks and either one or two slide gates;                 days from the issuance of this notice.                become a party must file a notice of
                                                (4) a new 230-kilovolt (kV) substation                   Competing applications and notices of                 intervention or motion to intervene, as
                                                containing step-up transformers, circuit                 intent must meet the requirements of 18               appropriate. Such notices, motions, or
                                                breakers, and disconnect switches; (5) a                 CFR 4.36.                                             protests must be filed on or before the
                                                new switchyard constructed at the point                     The Commission strongly encourages                 comment date. On or before the
                                                of interconnection at the western edge                   electronic filing. Please file comments,              comment date, it is not necessary to
                                                of San Vicente Reservoir; (6) an                         motions to intervene, notices of intent,              serve motions to intervene or protests
                                                approximately 5-mile-long, 230-kV                        and competing applications using the                  on persons other than the Applicant.
                                                overhead or underground transmission                     Commission’s eFiling system at http://                   The Commission encourages
                                                line that would extend from the                          www.ferc.gov/docs-filing/efiling.asp.                 electronic submission of protests and
                                                northern end of San Vicente reservoir to                 Commenters can submit brief comments                  interventions in lieu of paper using the
                                                the 230-kV Sycamore substation and                       up to 6,000 characters, without prior                 eFiling link at http://www.ferc.gov.
                                                interconnect with San Diego Gas and                      registration, using the eComment system               Persons unable to file electronically
                                                Electric’s existing 500-kV Sunrise                       at http://www.ferc.gov/docs-filing/                   should submit an original and 5 copies
                                                Powerlink; and (7) appurtenant                           ecomment.asp. You must include your                   of the protest or intervention to the
                                                facilities.                                              name and contact information at the end               Federal Energy Regulatory Commission,
                                                   The upper reservoir portion of the                    of your comments. For assistance,                     888 First Street NE, Washington, DC
                                                proposed project would be constructed
                                                                                                         please contact FERC Online Support at                 20426.
                                                near Foster Canyon, approximately one-
                                                                                                         FERCOnlineSupport@ferc.gov, (866)                        This filing is accessible on-line at
                                                half mile northwest of the San Vicente
                                                                                                         208–3676 (toll free), or (202) 502–8659               http://www.ferc.gov, using the eLibrary
                                                reservoir and would consist of: (1) A
                                                                                                         (TTY). In lieu of electronic filing, please           link and is available for review in the
                                                reservoir with a storage capacity of
                                                                                                         send a paper copy to: Secretary, Federal              Commission’s Public Reference Room in
                                                7,842 acre-feet and a surface area of 100
                                                                                                         Energy Regulatory Commission, 888                     Washington, DC. There is an
                                                acres at a full pond elevation of 1,490
                                                                                                         First Street NE, Washington, DC 20426.                eSubscription link on the website that
                                                feet msl; (2) five RCC saddle dams
                                                                                                         The first page of any filing should                   enables subscribers to receive email
                                                impounding the reservoir and
                                                                                                         include docket number P–14642–002.                    notification when a document is added
                                                measuring, respectively: (i) 1,425 feet
                                                long and 230 feet high, (ii) 838 feet long                  More information about this project,               to a subscribed docket(s). For assistance
                                                and 80 feet high, (iii) 838 feet long and                including a copy of the application, can              with any FERC Online service, please
                                                80 feet high, (iv) 1,006 feet long and 240               be viewed or printed on the eLibrary                  email FERCOnlineSupport@ferc.gov, or
                                                feet high, and (v) 3,100 feet long and 30                link of Commission’s website at http://               call (866) 208–3676 (toll free). For TTY,
                                                feet high; (3) an upper reservoir inlet/                 www.ferc.gov/docs-filing/elibrary.asp.                call (202) 502–8659.
                                                outlet structure; (4) a 2,050-foot-long,                 Enter the docket number (P–14642) in                     Comment Date: 5:00 p.m. Eastern
                                                22-foot-diameter power tunnel                            the docket number field to access the                 Time on July 18, 2018.
                                                transitioning into two 326-foot-long,                    document. For assistance, contact FERC                  Dated: June 28, 2018.
                                                steel-lined penstocks extending between                  Online Support.                                       Kimberly D. Bose,
                                                the upper reservoir inlet/outlet and the                   Dated: June 28, 2018.                               Secretary.
                                                pump/turbines below; (5) a 360-foot-                     Kimberly D. Bose,                                     [FR Doc. 2018–14560 Filed 7–6–18; 8:45 am]
                                                long, 83-foot-wide, 119-foot-tall                        Secretary.                                            BILLING CODE 6717–01–P
                                                subsurface powerhouse containing four                    [FR Doc. 2018–14569 Filed 7–6–18; 8:45 am]
                                                125-megawatt vertical Francis variable                   BILLING CODE 6717–01–P
                                                speed reversible pump/turbine/                                                                                 DEPARTMENT OF ENERGY
                                                generator units; (6) a 2,244-foot-long, 25-
                                                foot-diameter concrete-lined tailrace                    DEPARTMENT OF ENERGY                                  Federal Energy Regulatory
                                                tunnel connecting the pump-turbine                                                                             Commission
                                                draft tubes to the lower reservoir inlet/                Federal Energy Regulatory
                                                                                                                                                               [Docket No. OR18–27–000]
sradovich on DSK3GMQ082PROD with NOTICES




                                                outlet structure; (7) a 2,200-foot-long,                 Commission
                                                230-kV, underground transmission line                                                                          Enterprise Crude Pipeline LLC; Notice
                                                                                                         [Docket No. EL18–184–000]
                                                extending from the upper reservoir to                                                                          of Petition for Declaratory Order
                                                the northern end of San Vicente                          Meldahl, LLC; Notice of Filing
                                                reservoir; and (7) appurtenant facilities.                                                                       Take notice that on June 27, 2018,
                                                   The project would generate an                           Take notice that on June 27, 2018,                  pursuant to Rule 207(a)(2) of the Federal
                                                estimated 1,300 gigawatt hours                           Meldahl, LLC submitted a filing of                    Energy Regulatory Commission’s
                                                annually.                                                proposed revenue requirement for                      (Commission) Rules of Practice and


                                           VerDate Sep<11>2014   18:00 Jul 06, 2018   Jkt 244001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\09JYN1.SGM   09JYN1



Document Created: 2018-07-07 00:42:08
Document Modified: 2018-07-07 00:42:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 31747 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR