83_FR_32289 83 FR 32156 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to the Building Gap Between the Nuclear Island and Adjacent Buildings

83 FR 32156 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to the Building Gap Between the Nuclear Island and Adjacent Buildings

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 133 (July 11, 2018)

Page Range32156-32157
FR Document2018-14746

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 127 and 126 to Combined License (COL) Nos. NPF- 91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 133 (Wednesday, July 11, 2018)
[Federal Register Volume 83, Number 133 (Wednesday, July 11, 2018)]
[Notices]
[Pages 32156-32157]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-14746]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Changes to the Building Gap Between 
the Nuclear Island and Adjacent Buildings

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment Nos. 127 and 126 to Combined License (COL) Nos. NPF-
91 and NPF-92, respectively. The COLs were issued to Southern Nuclear 
Operating Company, Inc., and Georgia Power Company, Oglethorpe Power 
Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power 
SPVP, LLC, and the City of Dalton, Georgia (the licensee); for 
construction and operation of the Vogtle Electric Generating Plant 
(VEGP) Units 3 and 4, located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on June 15, 2018.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges telephone: 301-287-9127; 
email: [email protected]. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated February 1, 2018, and is available in ADAMS under 
Accession No. ML18032A359.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 127 and 126 to COL Nos. 
NPF-91 and NPF-92, respectively, to the licensee. The exemption is 
required by paragraph A.4 of section VIII, ``Processes for Changes and 
Departures,'' appendix D, to 10 CFR part 52 to allow the licensee to 
depart from Tier 1 information. With the requested amendment, the 
licensee sought proposed changes to plant-specific DCD Tier 2 and Tier 
2* information and related changes to plant-specific Tier 1 
information, with corresponding changes to Inspections, Tests, 
Analyses, and Acceptance Criteria (ITAAC) in COL appendix C. 
Specifically, the proposed changes relax the minimum gap requirement 
above grade between the nuclear island and the annex building/turbine 
building and remove the minimum gap requirement between the nuclear 
island and the radwaste building from the ITAAC and corresponding Tier 
1 information.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in sections 50.12 and 52.7, and section VIII.A.4 of appendix D to 
10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML18120A345.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML18120A339 and 
ML18120A340, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML18120A341 and 
ML18120A343, respectively. A summary of the amendment documents is 
provided in section III of this document.

II. Exemption

    Reproduced in this notice is the exemption document issued to VEGP 
Unit Nos. 3 and 4. It makes reference to the combined safety evaluation 
that provides the reasoning for the findings made by the NRC (and 
listed under Item 1) in order to grant the exemption:
    1. In a letter dated February 1, 2018, the Southern Nuclear 
Operating Company (SNC) requested from the Commission an exemption to 
allow departures from Tier 1 information in the certified DCD 
incorporated by reference in 10 CFR part 52, appendix D, as part of 
license amendment request 18-002, ``Changes to the Building Gap

[[Page 32157]]

between the Nuclear Island and Adjacent Buildings.''
    For the reasons set forth in section 3.2 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML18120A345, the Commission finds that:
    A. the exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding changes to 
appendix C of the Facility Combined License, as described in the 
licensee's request dated February 1, 2018. This exemption is related 
to, and necessary for the granting of License Amendment No. 127 (Unit 
3) and 126 (Unit 4), which is being issued concurrently with this 
exemption.
    3. As explained in section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML18120A345), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated February 1, 2018 (ADAMS Accession No. ML18032A359), 
the licensee requested that the NRC amend the COLs for VEGP, Units 3 
and 4, COLs NPF-91 and NPF-92. The proposed amendment is described in 
section I of this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
February 27, 2018 (83 FR 8519). No comments were received during the 
30-day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemptions and issued the amendments that the 
licensee requested on February 1, 2018.
    The exemptions and amendments were issued on June 15, 2018, as part 
of a combined package to the licensee (ADAMS Accession No. 
ML18120A348).

    Dated at Rockville, Maryland, this 5th day of July 2018.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-14746 Filed 7-10-18; 8:45 am]
 BILLING CODE 7590-01-P



                                               32156                        Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices

                                               Correction                                               NRC about the availability of                         information and related changes to
                                                  In the Federal Register published July                information regarding this document.                  plant-specific Tier 1 information, with
                                               5, 2018, in FR Doc. 2018–14388 (Filed                    You may obtain publicly-available                     corresponding changes to Inspections,
                                               7–3–18), on page 31424, fourth column,                   information related to this document                  Tests, Analyses, and Acceptance
                                               Summary Section, first paragraph,                        using any of the following methods:                   Criteria (ITAAC) in COL appendix C.
                                               please add the following web link after                     • Federal Rulemaking Website: Go to                Specifically, the proposed changes relax
                                               the text ‘‘Principles for Conducting                     http://www.regulations.gov and search                 the minimum gap requirement above
                                               Research in the Arctic’’: https://                       for Docket ID NRC–2008–0252. Address                  grade between the nuclear island and
                                               www.iarpccollaborations.org/                             questions about NRC dockets to Jennifer               the annex building/turbine building and
                                               principles.html.                                         Borges telephone: 301–287–9127; email:                remove the minimum gap requirement
                                                  For Further information, please                       Jennifer.Borges@nrc.gov. For technical                between the nuclear island and the
                                               contact Renee Crain rcrain@nsf.gov or                    questions, contact the individual listed              radwaste building from the ITAAC and
                                               703–292–4482.                                            in the FOR FURTHER INFORMATION                        corresponding Tier 1 information.
                                                                                                        CONTACT section of this document.                        Part of the justification for granting
                                                 Dated: July 6, 2018.
                                                                                                           • NRC’s Agencywide Documents                       the exemption was provided by the
                                               Suzanne H. Plimpton,                                                                                           review of the amendment. Because the
                                                                                                        Access and Management System
                                               Reports Clearance Officer, National Science              (ADAMS): You may obtain publicly-                     exemption is necessary in order to issue
                                               Foundation.                                                                                                    the requested license amendment, the
                                                                                                        available documents online in the
                                               [FR Doc. 2018–14802 Filed 7–10–18; 8:45 am]              ADAMS Public Documents collection at                  NRC granted the exemption and issued
                                               BILLING CODE 7555–01–P                                   http://www.nrc.gov/reading-rm/                        the amendment concurrently, rather
                                                                                                        adams.html. To begin the search, select               than in sequence. This included issuing
                                                                                                        ‘‘ADAMS Public Documents’’ and then                   a combined safety evaluation containing
                                               NUCLEAR REGULATORY                                       select ‘‘Begin Web-based ADAMS                        the NRC staff’s review of both the
                                               COMMISSION                                               Search.’’ For problems with ADAMS,                    exemption request and the license
                                                                                                        please contact the NRC’s Public                       amendment. The exemption met all
                                               [Docket Nos. 52–025 and 52–026; NRC–
                                               2008–0252]                                               Document Room (PDR) reference staff at                applicable regulatory criteria set forth in
                                                                                                        1–800–397–4209, 301–415–4737, or by                   sections 50.12 and 52.7, and section
                                               Southern Nuclear Operating Company,                      email to pdr.resource@nrc.gov. The                    VIII.A.4 of appendix D to 10 CFR part
                                               Inc.; Vogtle Electric Generating Plant,                  ADAMS accession number for each                       52. The license amendment was found
                                               Units 3 and 4; Changes to the Building                   document referenced (if it is available in            to be acceptable as well. The combined
                                               Gap Between the Nuclear Island and                       ADAMS) is provided the first time that                safety evaluation is available in ADAMS
                                               Adjacent Buildings                                       it is mentioned in this document. The                 under Accession No. ML18120A345.
                                                                                                        request for the amendment and                            Identical exemption documents
                                               AGENCY:  Nuclear Regulatory                                                                                    (except for referenced unit numbers and
                                               Commission.                                              exemption was submitted by letter
                                                                                                        dated February 1, 2018, and is available              license numbers) were issued to the
                                               ACTION: Exemption and combined                                                                                 licensee for VEGP Units 3 and 4 (COLs
                                                                                                        in ADAMS under Accession No.
                                               license amendment; issuance.                                                                                   NPF–91 and NPF–92). The exemption
                                                                                                        ML18032A359.
                                                                                                           • NRC’s PDR: You may examine and                   documents for VEGP Units 3 and 4 can
                                               SUMMARY:    The U.S. Nuclear Regulatory
                                                                                                        purchase copies of public documents at                be found in ADAMS under Accession
                                               Commission (NRC) is granting an
                                                                                                        the NRC’s PDR, Room O1–F21, One                       Nos. ML18120A339 and ML18120A340,
                                               exemption to allow a departure from the
                                                                                                        White Flint North, 11555 Rockville                    respectively. The exemption is
                                               certification information of Tier 1 of the
                                                                                                        Pike, Rockville, Maryland 20852.                      reproduced (with the exception of
                                               generic design control document (DCD)
                                                                                                                                                              abbreviated titles and additional
                                               and is issuing License Amendment Nos.                    FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                              citations) in section II of this document.
                                               127 and 126 to Combined License (COL)                    Chandu Patel, Office of New Reactors,
                                                                                                                                                              The amendment documents for COLs
                                               Nos. NPF–91 and NPF–92, respectively.                    U.S. Nuclear Regulatory Commission,
                                                                                                                                                              NPF–91 and NPF–92 are available in
                                               The COLs were issued to Southern                         Washington, DC 20555–0001; telephone:
                                                                                                                                                              ADAMS under Accession Nos.
                                               Nuclear Operating Company, Inc., and                     301–415–3025; email: Chandu.Patel@
                                               Georgia Power Company, Oglethorpe                                                                              ML18120A341 and ML18120A343,
                                                                                                        nrc.gov.
                                               Power Corporation, MEAG Power                                                                                  respectively. A summary of the
                                                                                                        SUPPLEMENTARY INFORMATION:                            amendment documents is provided in
                                               SPVM, LLC, MEAG Power SPVJ, LLC,
                                               MEAG Power SPVP, LLC, and the City                       I. Introduction                                       section III of this document.
                                               of Dalton, Georgia (the licensee); for                      The NRC is granting an exemption                   II. Exemption
                                               construction and operation of the Vogtle                 from paragraph B of section III, ‘‘Scope                 Reproduced in this notice is the
                                               Electric Generating Plant (VEGP) Units                   and Contents,’’ of appendix D, ‘‘Design               exemption document issued to VEGP
                                               3 and 4, located in Burke County,                        Certification Rule for the AP1000,’’ to               Unit Nos. 3 and 4. It makes reference to
                                               Georgia.                                                 part 52 of title 10 of the Code of Federal            the combined safety evaluation that
                                                 The granting of the exemption allows                   Regulations (10 CFR), and issuing                     provides the reasoning for the findings
                                               the changes to Tier 1 information asked                  License Amendment Nos. 127 and 126                    made by the NRC (and listed under Item
                                               for in the amendment. Because the                        to COL Nos. NPF–91 and NPF–92,                        1) in order to grant the exemption:
                                               acceptability of the exemption was                       respectively, to the licensee. The                       1. In a letter dated February 1, 2018,
                                               determined in part by the acceptability                  exemption is required by paragraph A.4                the Southern Nuclear Operating
daltland on DSKBBV9HB2PROD with NOTICES




                                               of the amendment, the exemption and                      of section VIII, ‘‘Processes for Changes              Company (SNC) requested from the
                                               amendment are being issued                               and Departures,’’ appendix D, to 10 CFR               Commission an exemption to allow
                                               concurrently.                                            part 52 to allow the licensee to depart               departures from Tier 1 information in
                                               DATES: The exemption and amendment                       from Tier 1 information. With the                     the certified DCD incorporated by
                                               were issued on June 15, 2018.                            requested amendment, the licensee                     reference in 10 CFR part 52, appendix
                                               ADDRESSES: Please refer to Docket ID                     sought proposed changes to plant-                     D, as part of license amendment request
                                               NRC–2008–0252 when contacting the                        specific DCD Tier 2 and Tier 2*                       18–002, ‘‘Changes to the Building Gap


                                          VerDate Sep<11>2014   16:26 Jul 10, 2018   Jkt 244001   PO 00000   Frm 00085   Fmt 4703   Sfmt 4703   E:\FR\FM\11JYN1.SGM   11JYN1


                                                                            Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices                                            32157

                                               between the Nuclear Island and                              A notice of consideration of issuance              information; the accuracy of OPIC’s
                                               Adjacent Buildings.’’                                    of amendment to facility operating                    burden estimate; the quality, practical
                                                  For the reasons set forth in section 3.2              license or COL, as applicable, proposed               utility, and clarity of the information to
                                               of the NRC staff’s Safety Evaluation,                    no significant hazards consideration                  be collected; and ways to minimize
                                               which can be found in ADAMS under                        determination, and opportunity for a                  reporting the burden, including
                                               Accession No. ML18120A345, the                           hearing in connection with these                      automated collected techniques and
                                               Commission finds that:                                   actions, was published in the Federal                 uses of other forms of technology.
                                                  A. the exemption is authorized by                     Register on February 27, 2018 (83 FR                  DATES: Comments must be received
                                               law;                                                     8519). No comments were received                      within thirty (30) calendar days of
                                                  B. the exemption presents no undue                    during the 30-day comment period.                     publication of this Notice.
                                               risk to public health and safety;                           The Commission has determined that                 ADDRESSES: Mail all comments and
                                                  C. the exemption is consistent with                   these amendments satisfy the criteria for             requests for copies of the subject form
                                               the common defense and security;                         categorical exclusion in accordance                   to OPIC’s Agency Submitting Officer:
                                                  D. special circumstances are present                  with 10 CFR 51.22. Therefore, pursuant                James Bobbitt, Overseas Private
                                               in that the application of the rule in this              to 10 CFR 51.22(b), no environmental                  Investment Corporation, 1100 New York
                                               circumstance is not necessary to serve                   impact statement or environmental                     Avenue NW, Washington, DC 20527.
                                               the underlying purpose of the rule;                      assessment need be prepared for these                 See SUPPLEMENTARY INFORMATION for
                                                  E. the special circumstances outweigh                 amendments.                                           other information about filing.
                                               any decrease in safety that may result                   IV. Conclusion                                        FOR FURTHER INFORMATION CONTACT:
                                               from the reduction in standardization                                                                          OPIC Agency Submitting Officer: James
                                                                                                          Using the reasons set forth in the
                                               caused by the exemption; and                                                                                   Bobbitt, (202) 336–8558.
                                                                                                        combined safety evaluation, the staff
                                                  F. the exemption will not result in a
                                                                                                        granted the exemptions and issued the                 SUPPLEMENTARY INFORMATION: All mailed
                                               significant decrease in the level of safety
                                                                                                        amendments that the licensee requested                comments and requests for copies of the
                                               otherwise provided by the design.
                                                                                                        on February 1, 2018.                                  subject form should include form
                                                  2. Accordingly, the licensee is granted                 The exemptions and amendments                       number OPIC–129 on both the envelope
                                               an exemption from the certified DCD                      were issued on June 15, 2018, as part of              and in the subject line of the letter.
                                               Tier 1 information, with corresponding                   a combined package to the licensee                    Electronic comments and requests for
                                               changes to appendix C of the Facility                    (ADAMS Accession No. ML18120A348).                    copies of the subject form may be sent
                                               Combined License, as described in the                                                                          to James.Bobbitt@opic.gov, subject line
                                               licensee’s request dated February 1,                       Dated at Rockville, Maryland, this 5th day
                                                                                                        of July 2018.                                         OPIC–129.
                                               2018. This exemption is related to, and
                                               necessary for the granting of License                      For the Nuclear Regulatory Commission.              Summary Form Under Review
                                               Amendment No. 127 (Unit 3) and 126                       Jennifer L. Dixon-Herrity,
                                                                                                                                                                 Type of Request: Revision of currently
                                               (Unit 4), which is being issued                          Chief, Licensing Branch 4, Division of
                                                                                                        Licensing, Siting, and Environmental
                                                                                                                                                              approved information collection.
                                               concurrently with this exemption.                                                                                 Title: Sponsor Disclosure Report.
                                                  3. As explained in section 5.0 of the                 Analysis, Office of New Reactors.
                                                                                                                                                                 Form Number: OPIC–129.
                                               NRC staff’s Safety Evaluation (ADAMS                     [FR Doc. 2018–14746 Filed 7–10–18; 8:45 am]
                                                                                                                                                                 Frequency of Use: One per investor
                                               Accession No. ML18120A345), this                         BILLING CODE 7590–01–P
                                                                                                                                                              per project.
                                               exemption meets the eligibility criteria                                                                          Type of Respondents: Business or
                                               for categorical exclusion set forth in 10                                                                      other institution (except farms);
                                               CFR 51.22(c)(9). Therefore, pursuant to                  OVERSEAS PRIVATE INVESTMENT                           individuals.
                                               10 CFR 51.22(b), no environmental                        CORPORATION                                              Standard Industrial Classification
                                               impact statement or environmental                                                                              Codes: All.
                                               assessment needs to be prepared in                       Submission for OMB Review;                               Description of Affected Public: U.S.
                                               connection with the issuance of the                      Comments Request                                      companies or citizens investing
                                               exemption.                                               AGENCY: Overseas Private Investment                   overseas.
                                                  4. This exemption is effective as of the              Corporation (OPIC).                                      Reporting Hours: 500 (1 hours per
                                               date of its issuance.                                    ACTION: Notice and request for                        form).
                                                                                                        comments.                                                Number of Responses: 500 per year.
                                               III. License Amendment Request
                                                                                                                                                                 Federal Cost: $27,455 ($54.91 × 500
                                                  By letter dated February 1, 2018                      SUMMARY:   Under the provisions of the                × 1).
                                               (ADAMS Accession No. ML18032A359),                       Paperwork Reduction Act, agencies are                    Authority for Information Collection:
                                               the licensee requested that the NRC                      required to publish a Notice in the                   Sections 231, 234(a), 239(d), and 240A
                                               amend the COLs for VEGP, Units 3 and                     Federal Register notifying the public                 of the Foreign Assistance Act of 1961,
                                               4, COLs NPF–91 and NPF–92. The                           that the agency is modifying an existing              as amended.
                                               proposed amendment is described in                       previously approved information                          Abstract (Needs and Uses): The
                                               section I of this Federal Register notice.               collection for OMB review and approval                information provided in the OPIC–129
                                                  The Commission has determined for                     and requests public review and                        is used by OPIC as a part of the
                                               these amendments that the application                    comment on the submission. OPIC                       Character Risk Due Diligence/
                                               complies with the standards and                          received comments in response to the                  background check procedure (similar to
                                               requirements of the Atomic Energy Act                    sixty (60) day notice, and pursuant to                a commercial bank’s Know Your
daltland on DSKBBV9HB2PROD with NOTICES




                                               of 1954, as amended (the Act), and the                   those comments, made no changes. The                  Customer procedure) that it performs on
                                               Commission’s rules and regulations.                      60 Day Notice was published in Federal                each party that has a significant
                                               The Commission has made appropriate                      Register on May 3, 2018. The purpose                  relationship (10% or more beneficial
                                               findings as required by the Act and the                  of this notice is to allow an additional              ownership, provision of significant
                                               Commission’s rules and regulations in                    thirty (30) days for public comments to               credit support, significant managerial
                                               10 CFR chapter I, which are set forth in                 be submitted. Comments are being                      relationship) to the projects that OPIC
                                               the license amendment.                                   solicited on the need for the                         finances or insures. OPIC has a robust


                                          VerDate Sep<11>2014   16:26 Jul 10, 2018   Jkt 244001   PO 00000   Frm 00086   Fmt 4703   Sfmt 4703   E:\FR\FM\11JYN1.SGM   11JYN1



Document Created: 2018-07-10 23:53:44
Document Modified: 2018-07-10 23:53:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on June 15, 2018.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation83 FR 32156 