83_FR_34698 83 FR 34558 - Availability of the Final Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado

83 FR 34558 - Availability of the Final Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 83, Issue 140 (July 20, 2018)

Page Range34558-34559
FR Document2018-15427

The U.S. Army Corps of Engineers (Corps) Omaha District has prepared a Final Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of a water supply project called the Northern Integrated Supply Project (NISP or Project) in Larimer and Weld Counties, CO. The purpose of NISP is to provide the Participants, a group of 15 water providers and communities, with approximately 40,000 acre-feet (AF) per year of new, reliable municipal water supply through a regional project coordinated by the Northern Colorado Water Conservancy District (Northern Water). NISP would result in direct impacts to jurisdictional waters of the U.S., including wetlands. The placement of fill material into waters of the U.S. requires authorization from the Corps under Section 404 of the Clean Water Act. Northern Water is the applicant for the Section 404 permit, acting on behalf of the Participants. In accordance with Section 176 of the Clean Air Act a Draft General Conformity Determination has been prepared for the Project.

Federal Register, Volume 83 Issue 140 (Friday, July 20, 2018)
[Federal Register Volume 83, Number 140 (Friday, July 20, 2018)]
[Notices]
[Pages 34558-34559]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15427]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Availability of the Final Environmental Impact Statement for the 
Northern Integrated Supply Project, Larimer and Weld Counties, Colorado

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers (Corps) Omaha District has 
prepared a Final Environmental Impact Statement (EIS) to analyze the 
direct, indirect, and cumulative effects of a water supply project 
called the Northern Integrated Supply Project (NISP or Project) in 
Larimer and Weld Counties, CO. The purpose of NISP is to provide the 
Participants, a group of 15 water providers and communities, with 
approximately 40,000 acre-feet (AF) per year of new, reliable municipal 
water supply through a regional project coordinated by the Northern 
Colorado Water Conservancy District (Northern Water). NISP would result 
in direct impacts to jurisdictional waters of the U.S., including 
wetlands. The placement of fill material into waters of the U.S. 
requires authorization from the Corps under Section 404 of the Clean 
Water Act. Northern Water is the applicant for the Section 404 permit, 
acting on behalf of the Participants. In accordance with Section 176 of 
the Clean Air Act a Draft General Conformity Determination has been 
prepared for the Project.

DATES: Written comments on the Final EIS and the Draft General 
Conformity Determination will be accepted on or before September 4, 
2018.

ADDRESSES: Send written comments regarding NISP, the Final EIS, and the 
Draft General Conformity Determination to John Urbanic, NISP EIS 
Project Manager, U.S. Army Corps of Engineers, Omaha District, Denver 
Regulatory Office, 9307 South Wadsworth Boulevard, Littleton, CO 80128, 
or by email to [email protected]. Requests to be placed on or be 
removed from the NISP mailing list should also be sent to this address.

FOR FURTHER INFORMATION CONTACT: John Urbanic, NISP EIS Project 
Manager, telephone 303-979-4120, fax at 303-979-0602, or email at 
[email protected].

SUPPLEMENTARY INFORMATION: The Final EIS was prepared in accordance 
with the National Environmental Policy Act of 1969, as amended (NEPA), 
and the Corps' regulations for NEPA implementation (33 Code of Federal 
Regulations [CFR] Parts 230 and 325, Appendix B). The Corps, Omaha 
District, Denver Regulatory Office is the lead federal agency 
responsible for the Final EIS. Information contained in the EIS serves 
as the basis for a decision regarding issuance of a Section 404 Permit. 
It also provides information for local and state agencies that have 
jurisdictional responsibility for affected resources.
    The Corps released a Draft EIS for NISP on April 30, 2008 and a 
Supplemental Draft EIS on June 19, 2015. The Corps has considered the 
comments received on the Draft and Supplemental Draft EIS in the 
development of the Final EIS. The purpose of the Final EIS is to 
provide decision-makers and the public with information pertaining to 
the Project, disclose environmental impacts of the alternatives, and 
identify mitigation measures to reduce impacts. In NISP, Northern Water 
proposes to construct Glade Reservoir with a total storage capacity of 
approximately 170,000 AF. The Project would also involve rehabilitating 
the existing diversion and intake structure in the Cache la Poudre 
River as well as constructing a new diversion and intake structure, 
forebay, pumping facility, and outlet channel. Glade Reservoir would 
inundate approximately 7 miles of U.S. Highway 287 and a section of the 
Munroe (North Poudre Supply) Canal, requiring a relocation of the 
highway and the canal. Northern Water also proposes to construct the 
South Platte Water Conservation Project (SPWCP) which includes Upper 
Galeton Reservoir with a total storage capacity of approximately 45,624 
AF. The SPWCP includes the construction of a new diversion and intake 
structure in the South Platte River, pumping facilities, and new 
pipelines for Upper Galeton Reservoir.
    This FEIS evaluates the effects of the following alternatives to 
NISP: Alternative 1--No Action Alternative; Alternative 2M--Glade 
Reservoir with modified conveyance and the South Platte Water 
Conservation Project (Applicant's Preferred Alternative); Alternative 
2--Glade Reservoir and the South Platte Water Conservation Project; 
Alternative 3--Cactus Hill Reservoir, Poudre Valley Canal Diversion, 
and the South Platte Water Conservation Project; and Alternative 4--
Cactus Hill Reservoir, with multiple diversion locations, and the South 
Platte Water Conservation Project.
    In accordance with Section 176 of the Clean Air Act and the 
Environmental Protection Agency's general conformity regulations (40 
CFR part 93, subpart B), a Draft General Conformity Determination has 
been prepared for the Project. Section 176 of the Clean Air Act 
requires federal agencies to ensure that their actions conform to 
applicable implementation plans for achieving and maintaining the 
National Ambient Air Quality Standards for criteria air pollutants. The 
Corps has prepared a Draft Conformity Determination for the Project and 
has included it in Chapter 4.14.7 of the Final EIS. The Draft General 
Conformity Determination finds that all alternatives of the Project 
conform with the State Implementation Plan.
    The U.S. Environmental Protection Agency Region VIII, U.S. Fish and 
Wildlife Service, Bureau of Land Management, Colorado Department of 
Transportation, Colorado Department of Natural Resources, Colorado 
Department of Public Health and Environment, and Larimer County 
participated as cooperating agencies in the development of the Final 
EIS.
    Copies of the Final EIS will be available for review at:

[[Page 34559]]

    1. Colorado State University Morgan Library, 1201 Center Avenue, 
Fort Collins, CO 80521.
    2. Poudre River Public Library District--Old Town Library, 201 
Peterson Street, Fort Collins, CO 80524.
    3. Poudre River Public Library--Harmony Library, 4616 S. Shields 
Street, Fort Collins, CO 80526.
    4. University of Northern Colorado, James A. Michener Library, 14th 
Avenue and 20th Street, Greeley, CO 80639.
    5. Fort Morgan Public Library, 414 Main Street, Fort Morgan, CO 
80701.
    6. Windsor Recreation Center, 250 11th Street, Windsor, CO 80550.
    7. Northern Colorado Water Conservancy District, 220 Water Avenue, 
Berthoud, CO 80513.
    8. U.S. Army Corps of Engineers, Denver Regulatory Office, 9307 S. 
Wadsworth Boulevard, Littleton, CO 80128.
    Electronic copies of the Final EIS and supporting documents may be 
obtained from the Denver Regulatory Office or its website at: http://www.nwo.usace.army.mil/Missions/Regulatory-Program/Colorado/EIS-NISP.

    Dated: July 2, 2018.
Kiel Downing,
State Regulatory Program Manager, U.S. Army Corps of Engineers, Omaha 
District, Denver Regulatory Office.
[FR Doc. 2018-15427 Filed 7-19-18; 8:45 am]
 BILLING CODE 3720-58-P



                                               34558                            Federal Register / Vol. 83, No. 140 / Friday, July 20, 2018 / Notices

                                               proceeding or to defense strategy, a                     Water). NISP would result in direct                   rehabilitating the existing diversion and
                                               privilege team shall be designated by                    impacts to jurisdictional waters of the               intake structure in the Cache la Poudre
                                               the Judge Advocate General, consisting                   U.S., including wetlands. The                         River as well as constructing a new
                                               of individuals not involved in the                       placement of fill material into waters of             diversion and intake structure, forebay,
                                               underlying investigation or judicial                     the U.S. requires authorization from the              pumping facility, and outlet channel.
                                               proceeding. The monitoring shall be                      Corps under Section 404 of the Clean                  Glade Reservoir would inundate
                                               conducted pursuant to procedures                         Water Act. Northern Water is the                      approximately 7 miles of U.S. Highway
                                               designed to minimize the intrusion into                  applicant for the Section 404 permit,                 287 and a section of the Munroe (North
                                               privileged material or conversations.                    acting on behalf of the Participants. In              Poudre Supply) Canal, requiring a
                                               Except in cases where the person in                      accordance with Section 176 of the                    relocation of the highway and the canal.
                                               charge of the privilege team determines                  Clean Air Act a Draft General                         Northern Water also proposes to
                                               that the acts of terrorism are imminent,                 Conformity Determination has been                     construct the South Platte Water
                                               the privilege team shall not disclose any                prepared for the Project.                             Conservation Project (SPWCP) which
                                               information unless and until such                        DATES: Written comments on the Final                  includes Upper Galeton Reservoir with
                                               disclosure has been approved by a                        EIS and the Draft General Conformity                  a total storage capacity of approximately
                                               federal or military judge presiding over                 Determination will be accepted on or                  45,624 AF. The SPWCP includes the
                                               the legal matter for which attorneys or                  before September 4, 2018.                             construction of a new diversion and
                                               their agents represent the particular                    ADDRESSES: Send written comments                      intake structure in the South Platte
                                               prisoner.                                                regarding NISP, the Final EIS, and the                River, pumping facilities, and new
                                                 (e) The affected prisoner may seek                     Draft General Conformity Determination                pipelines for Upper Galeton Reservoir.
                                               review of any specific limitation on                     to John Urbanic, NISP EIS Project                        This FEIS evaluates the effects of the
                                               communications or contacts imposed                       Manager, U.S. Army Corps of Engineers,                following alternatives to NISP:
                                               pursuant to this directive in accordance                 Omaha District, Denver Regulatory                     Alternative 1—No Action Alternative;
                                               with AR 190–47, paragraph 10–14. The                     Office, 9307 South Wadsworth                          Alternative 2M—Glade Reservoir with
                                               Commander, ACC will act on any                           Boulevard, Littleton, CO 80128, or by                 modified conveyance and the South
                                               request for review.                                      email to nisp.eis@usace.army.mil.                     Platte Water Conservation Project
                                                 The Provost Marshal General is the                     Requests to be placed on or be removed                (Applicant’s Preferred Alternative);
                                               proponent for this policy and will                       from the NISP mailing list should also                Alternative 2—Glade Reservoir and the
                                               incorporate the provisions of this                       be sent to this address.                              South Platte Water Conservation Project;
                                               directive into AR 190–47 as soon as                      FOR FURTHER INFORMATION CONTACT: John                 Alternative 3—Cactus Hill Reservoir,
                                               possible. This directive will be                         Urbanic, NISP EIS Project Manager,                    Poudre Valley Canal Diversion, and the
                                               rescinded upon publication of the                        telephone 303–979–4120, fax at 303–                   South Platte Water Conservation Project;
                                               revised regulation.                                      979–0602, or email at nisp.eis@                       and Alternative 4—Cactus Hill
                                               Brenda S. Bowen,                                         usace.army.mil.                                       Reservoir, with multiple diversion
                                               Army Federal Register Liaison Officer.                   SUPPLEMENTARY INFORMATION: The Final                  locations, and the South Platte Water
                                               [FR Doc. 2018–15425 Filed 7–19–18; 8:45 am]              EIS was prepared in accordance with                   Conservation Project.
                                                                                                        the National Environmental Policy Act                    In accordance with Section 176 of the
                                               BILLING CODE 5001–03–P
                                                                                                        of 1969, as amended (NEPA), and the                   Clean Air Act and the Environmental
                                                                                                        Corps’ regulations for NEPA                           Protection Agency’s general conformity
                                               DEPARTMENT OF DEFENSE                                    implementation (33 Code of Federal                    regulations (40 CFR part 93, subpart B),
                                                                                                        Regulations [CFR] Parts 230 and 325,                  a Draft General Conformity
                                               Department of the Army, Corps of                         Appendix B). The Corps, Omaha                         Determination has been prepared for the
                                               Engineers                                                District, Denver Regulatory Office is the             Project. Section 176 of the Clean Air Act
                                                                                                        lead federal agency responsible for the               requires federal agencies to ensure that
                                               Availability of the Final Environmental                  Final EIS. Information contained in the               their actions conform to applicable
                                               Impact Statement for the Northern                        EIS serves as the basis for a decision                implementation plans for achieving and
                                               Integrated Supply Project, Larimer and                   regarding issuance of a Section 404                   maintaining the National Ambient Air
                                               Weld Counties, Colorado                                  Permit. It also provides information for              Quality Standards for criteria air
                                               AGENCY: Department of the Army, U.S.                     local and state agencies that have                    pollutants. The Corps has prepared a
                                               Army Corps of Engineers, DoD.                            jurisdictional responsibility for affected            Draft Conformity Determination for the
                                                                                                        resources.                                            Project and has included it in Chapter
                                               ACTION: Notice of availability.
                                                                                                           The Corps released a Draft EIS for                 4.14.7 of the Final EIS. The Draft
                                               SUMMARY:   The U.S. Army Corps of                        NISP on April 30, 2008 and a                          General Conformity Determination finds
                                               Engineers (Corps) Omaha District has                     Supplemental Draft EIS on June 19,                    that all alternatives of the Project
                                               prepared a Final Environmental Impact                    2015. The Corps has considered the                    conform with the State Implementation
                                               Statement (EIS) to analyze the direct,                   comments received on the Draft and                    Plan.
                                               indirect, and cumulative effects of a                    Supplemental Draft EIS in the                            The U.S. Environmental Protection
                                               water supply project called the Northern                 development of the Final EIS. The                     Agency Region VIII, U.S. Fish and
                                               Integrated Supply Project (NISP or                       purpose of the Final EIS is to provide                Wildlife Service, Bureau of Land
                                               Project) in Larimer and Weld Counties,                   decision-makers and the public with                   Management, Colorado Department of
                                               CO. The purpose of NISP is to provide                    information pertaining to the Project,                Transportation, Colorado Department of
daltland on DSKBBV9HB2PROD with NOTICES




                                               the Participants, a group of 15 water                    disclose environmental impacts of the                 Natural Resources, Colorado
                                               providers and communities, with                          alternatives, and identify mitigation                 Department of Public Health and
                                               approximately 40,000 acre-feet (AF) per                  measures to reduce impacts. In NISP,                  Environment, and Larimer County
                                               year of new, reliable municipal water                    Northern Water proposes to construct                  participated as cooperating agencies in
                                               supply through a regional project                        Glade Reservoir with a total storage                  the development of the Final EIS.
                                               coordinated by the Northern Colorado                     capacity of approximately 170,000 AF.                    Copies of the Final EIS will be
                                               Water Conservancy District (Northern                     The Project would also involve                        available for review at:


                                          VerDate Sep<11>2014   18:06 Jul 19, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\20JYN1.SGM   20JYN1


                                                                                Federal Register / Vol. 83, No. 140 / Friday, July 20, 2018 / Notices                                           34559

                                                  1. Colorado State University Morgan                   FOR FURTHER INFORMATION CONTACT:   Mr.                Washington, DC 20024. Telephone:
                                               Library, 1201 Center Avenue, Fort                        Jeffrey Bohlken, U.S. Army Corps of                   (202) 287–1445. If possible, please
                                               Collins, CO 80521.                                       Engineers at (402) 995–2671 or by email               submit all items on a CD, in which case
                                                  2. Poudre River Public Library                        at Jeffrey.C.Bohlken@usace.army.mil.                  it is not necessary to include printed
                                               District—Old Town Library, 201                           SUPPLEMENTARY INFORMATION: The Draft                  copies. No telefacsimiles (faxes) will be
                                               Peterson Street, Fort Collins, CO 80524.                 EIS can be downloaded from                            accepted.
                                                  3. Poudre River Public Library—                       www.nwo.usace.army.mil/Missions/                         It is recommended that nominations
                                               Harmony Library, 4616 S. Shields                         Civil-Works/Planning/Project-Reports/.                be submitted in electronic format via
                                               Street, Fort Collins, CO 80526.                                                                                email to ASRAC@ee.doe.gov.
                                                  4. University of Northern Colorado,                   Brenda S. Bowen,                                      Submissions submitted by mail are
                                               James A. Michener Library, 14th                          Army Federal Register Liaison Officer.                welcome, but may be delayed in
                                               Avenue and 20th Street, Greeley, CO                      [FR Doc. 2018–15429 Filed 7–19–18; 8:45 am]           delivery due to the DOE mail vetting
                                               80639.                                                   BILLING CODE 3720–58–P                                procedures in place. For submission by
                                                  5. Fort Morgan Public Library, 414                                                                          mail, please send to Ms. Naeema
                                               Main Street, Fort Morgan, CO 80701.                                                                            Conway, U.S. Department of Energy,
                                                  6. Windsor Recreation Center, 250                     DEPARTMENT OF ENERGY                                  Building Technologies Office, Mailstop
                                               11th Street, Windsor, CO 80550.                                                                                EE–5B, 1000 Independence Avenue SW,
                                                  7. Northern Colorado Water                            [EERE–2013–BT–NOC–0005]
                                                                                                                                                              Washington, DC 20585–0121. If
                                               Conservancy District, 220 Water                                                                                possible, please submit all items on a
                                                                                                        Solicitation of Nominations for
                                               Avenue, Berthoud, CO 80513.                                                                                    compact disc (CD), in which case it is
                                                                                                        Membership on the Appliance
                                                  8. U.S. Army Corps of Engineers,                                                                            not necessary to include printed copies.
                                                                                                        Standards and Rulemaking Federal
                                               Denver Regulatory Office, 9307 S.                                                                              FOR FURTHER INFORMATION CONTACT: John
                                                                                                        Advisory Committee
                                               Wadsworth Boulevard, Littleton, CO                                                                             Cymbalsky by telephone at (202) 287–
                                               80128.                                                   AGENCY:  Office of Energy Efficiency and              1692 or by email at asrac@ee.doe.gov.
                                                  Electronic copies of the Final EIS and                Renewable Energy, Department of                       SUPPLEMENTARY INFORMATION: The
                                               supporting documents may be obtained                     Energy.                                               Committee will provide advice and
                                               from the Denver Regulatory Office or its                 ACTION: Solicitation of nominations for               recommendations to the Secretary of
                                               website at: http://www.nwo.usace.army.                   membership.                                           Energy on the DOE’s Appliance and
                                               mil/Missions/Regulatory-Program/
                                                                                                                                                              Equipment Standards Program’s test
                                               Colorado/EIS-NISP.                                       SUMMARY:   To ensure a wide range of
                                                                                                                                                              procedures and rulemaking
                                                 Dated: July 2, 2018.                                   candidates and a balanced committee,
                                                                                                                                                              determinations. The Committee’s scope
                                               Kiel Downing,                                            the U.S. Department of Energy (DOE)
                                                                                                                                                              is to review and make recommendations
                                                                                                        announces the solicitation of
                                               State Regulatory Program Manager, U.S.                                                                         on the: (1) Development of minimum
                                               Army Corps of Engineers, Omaha District,                 nominations to fill upcoming vacancies
                                                                                                                                                              efficiency standards for residential
                                               Denver Regulatory Office.                                on the Appliance Standards and
                                                                                                                                                              appliances and commercial equipment,
                                                                                                        Rulemaking Federal Advisory
                                               [FR Doc. 2018–15427 Filed 7–19–18; 8:45 am]                                                                    (2) development of product test
                                                                                                        Committee (Committee).
                                               BILLING CODE 3720–58–P                                                                                         procedures, (3) certification and
                                                                                                        DATES: All nomination information                     enforcement of standards, (4) labeling
                                                                                                        should be provided in a single,                       for various residential products and
                                               DEPARTMENT OF DEFENSE                                    complete package submitted                            commercial equipment, and (5) specific
                                                                                                        electronically or postmarked by August                issues of concern to DOE as requested
                                               Department of the Army, Army Corps                       20, 2018.                                             by the Secretary of Energy, the Assistant
                                               of Engineers                                             ADDRESSES: Nominations packages                       Secretary for Energy Efficiency and
                                                                                                        should be submitted either                            Renewable Energy, and the Buildings
                                               Notice of Availability of the Draft
                                                                                                        electronically or by mail, but not by                 Technologies Office’s Director.
                                               Feasibility Report and Integrated
                                                                                                        both methods. Complete nomination                        To facilitate the functioning of the
                                               Environmental Impact Statement for
                                                                                                        packages identified by docket number                  Committee, working groups (i.e.,
                                               the Adams and Denver Counties,
                                                                                                        ‘‘EERE–2013–BT–NOC–0005’’ may be                      subcommittees) may be formed with the
                                               Colorado General Investigation Study,
                                                                                                        submitted by any of the following                     approval of the Department of Energy.
                                               Adams and Denver County, Colorado
                                                                                                        methods:                                              The objectives of the working groups are
                                               AGENCY: Department of the Army, U.S.                        1. Federal eRulemaking Portal: http://             to make recommendations to the
                                               Army Corps of Engineers, DoD.                            www.regulations.gov. Follow the                       Committee with respect to particular
                                               ACTION: Notice; extension of public                      instructions for submitting comments.                 matters related to the responsibilities of
                                               comment deadline.                                           2. Email: ASRAC@ee.doe.gov. Include                the parent committee. Such working
                                                                                                        docket number ‘‘EERE–2013–BT–NOC–                     groups may not work independently of
                                               SUMMARY:   The comment period for the                    0005’’ in the subject line of the message.            the Committee and must report their
                                               Notice of Availability of the Draft                         3. Postal Mail: Ms. Naeema Conway,                 recommendations and advice to the
                                               Feasibility Report and Integrated                        U.S. Department of Energy, Building                   Committee for full deliberation and
                                               Environmental Impact Statement for the                   Technologies Office, Mailstop EE–5B,                  discussion. Working group members are
                                               Adams and Denver Counties, Colorado                      1000 Independence Avenue SW,                          appointed with DOE approval.
                                               General Investigation Study, Adams and                   Washington, DC 20585–0121. If                            DOE is hereby soliciting nominations
daltland on DSKBBV9HB2PROD with NOTICES




                                               Denver County, Colorado published in                     possible, please submit all items on a                for members of the Appliance Standards
                                               the Federal Register on Monday, July 2,                  compact disc (CD), in which case it is                and Rulemaking Federal Advisory
                                               2018, and required comments be                           not necessary to include printed copies.              Committee. The Committee is expected
                                               postmarked on or before August 16,                          4. Hand Delivery/Courier: Ms.                      to be continuing in nature. Members
                                               2018. The Corps is extending the                         Naeema Conway, U.S. Department of                     will be selected with a view toward
                                               deadline for submitting public                           Energy, Building Technologies Office,                 achieving a balanced committee of
                                               comments to August 28, 2018.                             950 L’Enfant Plaza SW, Suite 600,                     experts in fields relevant to energy


                                          VerDate Sep<11>2014   18:06 Jul 19, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\20JYN1.SGM   20JYN1



Document Created: 2018-07-20 01:18:18
Document Modified: 2018-07-20 01:18:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability.
DatesWritten comments on the Final EIS and the Draft General Conformity Determination will be accepted on or before September 4, 2018.
ContactJohn Urbanic, NISP EIS Project Manager, telephone 303-979-4120, fax at 303-979-0602, or email at [email protected]
FR Citation83 FR 34558 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR