83_FR_34977 83 FR 34836 - Notice of Availability of the Environmental Assessment for the Proposed Gateway Expansion Project, Transcontinental Gas Pipe Line Company, LLC

83 FR 34836 - Notice of Availability of the Environmental Assessment for the Proposed Gateway Expansion Project, Transcontinental Gas Pipe Line Company, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 141 (July 23, 2018)

Page Range34836-34837
FR Document2018-15697

Federal Register, Volume 83 Issue 141 (Monday, July 23, 2018)
[Federal Register Volume 83, Number 141 (Monday, July 23, 2018)]
[Notices]
[Pages 34836-34837]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15697]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-18-000]


Notice of Availability of the Environmental Assessment for the 
Proposed Gateway Expansion Project, Transcontinental Gas Pipe Line 
Company, LLC

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the 
Gateway Expansion Project, proposed by Transcontinental Gas Pipe Line 
Company, LLC (Transco) in the above-referenced docket. Transco requests 
authorization to modify certain facilities in Essex and Passaic 
Counties, New Jersey, to increase the firm transportation capacity on 
the existing pipeline to allow greater access to natural gas supplies. 
The proposed modifications would occur within existing facilities, with 
no new permanent right-of-way.
    The EA assesses the potential environmental effects of the 
construction and operation of the Gateway Expansion Project in 
accordance with the requirements of the National Environmental Policy 
Act (NEPA). The FERC staff concludes that approval of the proposed 
project, with appropriate mitigating measures, would not constitute a 
major federal action significantly affecting the quality of the human 
environment.
    The proposed Gateway Expansion Project includes the following 
facilities:

Essex County

Compressor Station 303

     Expansion of the building and installation of a 33,000 
horsepower electric-motor driven compression unit and ancillary 
equipment; and
     extension of security fencing and access to new equipment.

Roseland Meter and Regulator

     Installation of a 36-inch-diameter Main Line block valve 
with automation controls.

Roseland Electric Substation

     Installation of an electric transformer unit.

Passaic County

Paterson Meter and Regulator

     Replacing the existing 12-inch-diameter headers with two 
new 6-inch-diameter ultrasonic meter skids and associated equipment; 
and

[[Page 34837]]

     installation of ancillary equipment.
    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and newspapers and libraries in the project area. In addition, 
the EA is available for public viewing on the FERC's website 
(www.ferc.gov) using the eLibrary link. A limited number of copies of 
the EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE, Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that the Commission has the opportunity to consider your 
comments prior to making its decision on this project, it is important 
that we receive your comments in Washington, DC on or before 5:00 p.m. 
Eastern Time on August 16, 2018.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. In all instances, please reference the 
project docket number (CP18-18-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
staff available to assist you at (866) 208-3676 or 
FercOnlineSupport@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214).\1\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \1\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP18-
18). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: July 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15697 Filed 7-20-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              34836                           Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Notices

                                              pursuant to 41 CFR 102–3.150(b),                         resilient positioning, navigation and                 DEPARTMENT OF ENERGY
                                              waives the 15-calendar day notification                  timing, various undersea issues, gray
                                              requirement.                                             zone conflict, resilience of the defense              Federal Energy Regulatory
                                                 This meeting is being held under the                  industrial base, and logistics. After                 Commission
                                              provisions of the Federal Advisory                       break, the classified discussion will                 [Docket No. CP18–18–000]
                                              Committee Act (FACA) (5 U.S.C.,                          continue on the same topics. The
                                              Appendix), the Government in the                         meeting will adjourn at 3:00 p.m.                     Notice of Availability of the
                                              Sunshine Act (5 U.S.C. 552b), and 41                                                                           Environmental Assessment for the
                                              CFR 102–3.140 and 102–3.150.                                Meeting Accessibility: In accordance
                                                                                                                                                             Proposed Gateway Expansion Project,
                                                 Purpose of the Meeting: The mission                   with section 10(d) of the FACA and 41
                                                                                                                                                             Transcontinental Gas Pipe Line
                                              of the DSB is to provide independent                     CFR 102–3.155, the DoD has determined
                                                                                                                                                             Company, LLC
                                              advice and technical enterprise. The                     that the DSB meeting will be closed to
                                              objective of the meeting is to obtain,                   the public. Specifically, the Under                      The staff of the Federal Energy
                                              review, and evaluate classified                          Secretary of Defense for Research and                 Regulatory Commission (FERC or
                                              information related to the DSB’s                         Engineering, in consultation with the                 Commission) has prepared an
                                              mission. The meeting will focus on the                   DoD Office of General Counsel, has                    environmental assessment (EA) for the
                                              DSB’s 2018 Summer Study on Strategic                     determined in writing that the meeting                Gateway Expansion Project, proposed
                                              Surprise tasking, to include DoD                         will be closed to the public because it               by Transcontinental Gas Pipe Line
                                              dependence on the U.S. electric power                    will consider matters covered by 5                    Company, LLC (Transco) in the above-
                                              grid, homeland air defense, maritime                     U.S.C. 552b(c)(1). The determination is               referenced docket. Transco requests
                                              situational awareness, threats and                       based on the consideration that it is                 authorization to modify certain facilities
                                              promise of biotechnology, countering                     expected that discussions throughout                  in Essex and Passaic Counties, New
                                              autonomous systems, technical                                                                                  Jersey, to increase the firm
                                                                                                       will involve classified matters of
                                              approaches to counter-intelligence,                                                                            transportation capacity on the existing
                                                                                                       national security concern. Such
                                              resilient positioning, navigation and                                                                          pipeline to allow greater access to
                                              timing, various undersea issues, gray                    classified material is so intertwined
                                                                                                                                                             natural gas supplies. The proposed
                                              zone conflict, resilience of the defense                 with the unclassified material that it
                                                                                                                                                             modifications would occur within
                                              industrial base, and logistics.                          cannot reasonably be segregated into                  existing facilities, with no new
                                                 Agenda: The DSB meeting will begin                    separate discussions without defeating                permanent right-of-way.
                                              on Wednesday, July 18, 2018 at 8:00                      the effectiveness and meaning of the                     The EA assesses the potential
                                              a.m. with opening remarks from Mr.                       overall meetings. To permit the meeting               environmental effects of the
                                              Edward Gliot, DSB Executive Director,                    to be open to the public would preclude               construction and operation of the
                                              Dr. Craig Fields, DSB Chairman and Dr.                   discussion of such matters and would                  Gateway Expansion Project in
                                              Eric Evans, Vice Chairman. Following                     greatly diminish the ultimate utility of              accordance with the requirements of the
                                              opening remarks, DSB members will                        the DSB’s findings and                                National Environmental Policy Act
                                              hold classified small group discussions                  recommendations to the Secretary of                   (NEPA). The FERC staff concludes that
                                              covering DoD dependence on the U.S.                      Defense and to the Under Secretary of                 approval of the proposed project, with
                                              electric power grid, homeland air                        Defense for Research and Engineering.                 appropriate mitigating measures, would
                                              defense, maritime situational awareness,                                                                       not constitute a major federal action
                                              threats and promises of biotechnology,                      Written Statements: In accordance
                                                                                                       with section 10(a)(3)of the FACA and 41               significantly affecting the quality of the
                                              countering autonomous systems,                                                                                 human environment.
                                              technical approaches to counter-                         CFR 102–3.105(j) and 102–3.140,
                                                                                                                                                                The proposed Gateway Expansion
                                              intelligence, resilient positioning,                     interested persons may submit a written
                                                                                                                                                             Project includes the following facilities:
                                              navigation and timing, various undersea                  statement for consideration by the DSB
                                              issues, gray zone conflict, resilience of                at any time regarding its mission or in               Essex County
                                              the defense industrial base, and                         response to the stated agenda of a                    Compressor Station 303
                                              logistics. After break, DSB members will                 planned meeting. Individuals
                                              hold classified discussions covering                     submitting a written statement must                     • Expansion of the building and
                                              DoD dependence on the U.S. electric                      submit their statement to the DSB DFO                 installation of a 33,000 horsepower
                                              power grid, homeland air defense,                        provided above at any point; however,                 electric-motor driven compression unit
                                              maritime situational awareness, threats                  if a written statement is not received at             and ancillary equipment; and
                                              and promises of biotechnology,                                                                                   • extension of security fencing and
                                                                                                       least three calendar days prior to the
                                              countering autonomous systems,                                                                                 access to new equipment.
                                                                                                       meeting, which is the subject of this
                                              technical approaches to counter-                         notice, then it may not be provided to                Roseland Meter and Regulator
                                              intelligence, resilient positioning,                     or considered by the DSB until a later
                                              navigation and timing, various undersea                                                                          • Installation of a 36-inch-diameter
                                                                                                       date.                                                 Main Line block valve with automation
                                              issues, gray zone conflict, resilience of
                                              the defense industrial base, and                           Dated: July 18, 2018.                               controls.
                                              logistics. The meeting will adjourn at                   Shelly E. Finke,                                      Roseland Electric Substation
                                              5:00 p.m. On the second day of the                       Alternate OSD Federal Register, Liaison
                                              meeting, Thursday, July 19, 2018, the                                                                             • Installation of an electric
                                                                                                       Officer, Department of Defense.
                                              day will begin at 8:00 a.m. with a                                                                             transformer unit.
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                       [FR Doc. 2018–15674 Filed 7–20–18; 8:45 am]
                                              classified session covering DoD                          BILLING CODE 5001–06–P                                Passaic County
                                              dependence on the U.S. electric power
                                              grid, homeland air defense, maritime                                                                           Paterson Meter and Regulator
                                              situational awareness, threats and                                                                               • Replacing the existing 12-inch-
                                              promises of biotechnology, countering                                                                          diameter headers with two new 6-inch-
                                              autonomous systems, technical                                                                                  diameter ultrasonic meter skids and
                                              approaches to counter-intelligence,                                                                            associated equipment; and


                                         VerDate Sep<11>2014   17:59 Jul 20, 2018   Jkt 244001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\23JYN1.SGM   23JYN1


                                                                              Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Notices                                                  34837

                                                 • installation of ancillary equipment.                project, please select ‘‘Comment on a                 DEPARTMENT OF ENERGY
                                                 The FERC staff mailed copies of the                   Filing’’; or
                                              EA to federal, state, and local                             (3) You can file a paper copy of your              Federal Energy Regulatory
                                              government representatives and                           comments by mailing them to the                       Commission
                                              agencies; elected officials;                             following address: Kimberly D. Bose,
                                              environmental and public interest                        Secretary, Federal Energy Regulatory                  Combined Notice of Filings
                                              groups; Native American tribes;                          Commission, 888 First Street NE, Room
                                              potentially affected landowners and                      1A, Washington, DC 20426.                               Take notice that the Commission has
                                              other interested individuals and groups;                    Any person seeking to become a party               received the following Natural Gas
                                              and newspapers and libraries in the                      to the proceeding must file a motion to               Pipeline Rate and Refund Report filings:
                                              project area. In addition, the EA is                     intervene pursuant to Rule 214 of the                 Filings Instituting Proceedings
                                              available for public viewing on the                      Commission’s Rules of Practice and
                                              FERC’s website (www.ferc.gov) using the                  Procedures (18 CFR 385.214).1 Only                      Docket Number: PR18–66–000.
                                              eLibrary link. A limited number of                       intervenors have the right to seek                      Applicants: Alpine High Pipeline LP.
                                              copies of the EA are available for                       rehearing of the Commission’s decision.
                                              distribution and public inspection at:                   The Commission grants affected                          Description: Tariff filing per
                                              Federal Energy Regulatory Commission,                    landowners and others with                            284.123(b), (e)+(g): Notice of Name
                                              Public Reference Room, 888 First Street                  environmental concerns intervenor                     Change and Revision to Statement of
                                              NE, Room 2A, Washington, DC 20426,                       status upon showing good cause by                     Operating Conditions to be effective
                                              (202) 502–8371.                                          stating that they have a clear and direct             7/2/2018.
                                                 Any person wishing to comment on                      interest in this proceeding which no                    Filed Date: 7/16/18.
                                              the EA may do so. Your comments                          other party can adequately represent.                   Accession Number: 201807165056.
                                              should focus on the potential                            Simply filing environmental comments                    Comments Due: 5 p.m. ET 8/6/18.
                                              environmental effects, reasonable                        will not give you intervenor status, but
                                              alternatives, and measures to avoid or                   you do not need intervenor status to                    284.123(g) Protests Due: 5 p.m. ET
                                              lessen environmental impacts. The more                   have your comments considered.                        9/14/18.
                                              specific your comments, the more useful                     Additional information about the                     Docket Numbers: RP18–979–000.
                                              they will be. To ensure that the                         project is available from the                           Applicants: Southern Star Central Gas
                                              Commission has the opportunity to                        Commission’s Office of External Affairs,              Pipeline, Inc.
                                              consider your comments prior to                          at (866) 208–FERC, or on the FERC
                                                                                                       website (www.ferc.gov) using the                        Description: Compliance filing Tariff
                                              making its decision on this project, it is
                                                                                                       eLibrary link. Click on the eLibrary link,            Waiver—ROFR Posting.
                                              important that we receive your
                                              comments in Washington, DC on or                         click on ‘‘General Search,’’ and enter the              Filed Date: 7/16/18.
                                              before 5:00 p.m. Eastern Time on                         docket number excluding the last three                  Accession Number: 20180716–5140.
                                              August 16, 2018.                                         digits in the Docket Number field (i.e.,                Comments Due: 5 p.m. ET 7/30/18.
                                                 For your convenience, there are three                 CP18–18). Be sure you have selected an
                                              methods you can use to file your                         appropriate date range. For assistance,                  The filings are accessible in the
                                              comments to the Commission. In all                       please contact FERC Online Support at                 Commission’s eLibrary system by
                                              instances, please reference the project                  FercOnlineSupport@ferc.gov or toll free               clicking on the links or querying the
                                              docket number (CP18–18–000) with                         at (866) 208–3676, or for TTY, contact                docket number.
                                              your submission. The Commission                          (202) 502–8659. The eLibrary link also                   Any person desiring to intervene or
                                              encourages electronic filing of                          provides access to the texts of formal                protest in any of the above proceedings
                                              comments and has expert staff available                  documents issued by the Commission,                   must file in accordance with Rules 211
                                              to assist you at (866) 208–3676 or                       such as orders, notices, and                          and 214 of the Commission’s
                                              FercOnlineSupport@ferc.gov.                              rulemakings.                                          Regulations (18 CFR 385.211 and
                                                 (1) You can file your comments                           In addition, the Commission offers a               385.214) on or before 5:00 p.m. Eastern
                                              electronically using the eComment                        free service called eSubscription which               time on the specified date(s). Protests
                                              feature on the Commission’s website                      allows you to keep track of all formal                may be considered, but intervention is
                                              (www.ferc.gov) under the link to                         issuances and submittals in specific                  necessary to become a party to the
                                              Documents and Filings. This is an easy                   dockets. This can reduce the amount of                proceeding.
                                              method for submitting brief, text-only                   time you spend researching proceedings
                                                                                                                                                                eFiling is encouraged. More detailed
                                              comments on a project;                                   by automatically providing you with
                                                                                                                                                             information relating to filing
                                                 (2) You can also file your comments                   notification of these filings, document
                                                                                                                                                             requirements, interventions, protests,
                                              electronically using the eFiling feature                 summaries, and direct links to the
                                                                                                                                                             service, and qualifying facilities filings
                                              on the Commission’s website                              documents. Go to www.ferc.gov/docs-
                                                                                                                                                             can be found at: http://www.ferc.gov/
                                              (www.ferc.gov) under the link to                         filing/esubscription.asp.
                                                                                                                                                             docs-filing/efiling/filing-req.pdf. For
                                              Documents and Filings. With eFiling,                       Dated: July 17, 2018.                               other information, call (866) 208–3676
                                              you can provide comments in a variety                    Kimberly D. Bose,                                     (toll free). For TTY, call (202) 502–8659.
                                              of formats by attaching them as a file                   Secretary.                                              Dated: July 17, 2018.
                                              with your submission. New eFiling                        [FR Doc. 2018–15697 Filed 7–20–18; 8:45 am]
amozie on DSK3GDR082PROD with NOTICES1




                                              users must first create an account by                                                                          Nathaniel J. Davis, Sr.,
                                                                                                       BILLING CODE 6717–01–P
                                              clicking on ‘‘eRegister.’’ You must select                                                                     Deputy Secretary.
                                              the type of filing you are making. If you                   1 See the previous discussion on the methods for   [FR Doc. 2018–15705 Filed 7–20–18; 8:45 am]
                                              are filing a comment on a particular                     filing comments.                                      BILLING CODE 6717–01–P




                                         VerDate Sep<11>2014   17:59 Jul 20, 2018   Jkt 244001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\23JYN1.SGM   23JYN1



Document Created: 2018-07-21 00:49:06
Document Modified: 2018-07-21 00:49:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 34836 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR