Western Area Power Administration (WAPA) is proposing to calculate formula rates for fiscal year (FY) 2019 Boulder Canyon Project (BCP) electric service. The expiration of the FY 2018 base charge and rates on September 30, 2018, requires this action. The proposed base charge will provide sufficient revenue to recover all annual costs and repay investment obligations within the allowable period. The proposed base charge and rates are scheduled to become effective on October 1, 2018, and will remain in effect through September 30, 2019. Publication of this Federal Register notice will initiate the public process.

Federal Register, Volume 83 Issue 146 (Monday, July 30, 2018)
[Federal Register Volume 83, Number 146 (Monday, July 30, 2018)]
[Notices]
[Pages 36586-36588]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-16248]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration


Boulder Canyon Project

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of proposed fiscal year 2019 base charge and rates for 
electric service.

-----------------------------------------------------------------------

SUMMARY: Western Area Power Administration (WAPA) is proposing to 
calculate formula rates for fiscal year (FY) 2019 Boulder Canyon 
Project (BCP) electric service. The expiration of the FY 2018 base 
charge and rates on September 30, 2018, requires this action. The 
proposed base charge will provide sufficient revenue to recover all 
annual costs and repay investment obligations within the allowable 
period. The proposed base charge and rates are scheduled to become 
effective on October 1, 2018, and will remain in effect through 
September 30, 2019. Publication of this Federal Register notice will 
initiate the public process.

DATES: The consultation and comment period begins today and will end 
October 29, 2018. WAPA will present a detailed explanation of the 
proposed FY 2019 base charge and rates at a public information forum 
that will be held on August 29, 2018, from 10:00 a.m. to 12:00 p.m. 
Mountain Standard Time (MST) in Phoenix, Arizona. WAPA will also host a 
public comment forum that will be held on September 28, 2018, from 
10:00 a.m. to 12:00 p.m. MST in Phoenix, Arizona. Written comments will 
be accepted any time during the consultation and comment period.

ADDRESSES: The public information forum and public comment forum will 
be held at WAPA's Desert Southwest Customer Service Regional Office 
located at 615 South 43rd Avenue, Phoenix, Arizona 85009. Send written 
comments to Mr. Ronald E. Moulton, Regional Manager and Senior Vice 
President, Desert Southwest Customer Service Region, Western Area Power 
Administration, P.O. Box 6457, Phoenix, Arizona 85005-6457, or email 
[email protected]. WAPA will post information about the rate process 
and written comments received on its website at: http://www.wapa.gov/regions/DSW/Rates/Pages/boulder-canyon-rates.aspx. Written comments 
must be received by the end of the consultation and comment period to 
be considered by WAPA in its decision process.
    As access to federal facilities is controlled, any U.S. citizen 
wishing to attend a public forum at WAPA must

[[Page 36587]]

present an official form of picture identification (ID), such as a U.S. 
driver's license, U.S. passport, U.S. government ID, or U.S. military 
ID at the time of the meeting. Foreign nationals should contact Ms. 
Tina Ramsey, Rates Manager, Desert Southwest Customer Service Region, 
Western Area Power Administration, at (602) 605-2565 or email at 
[email protected] in advance of a forum to obtain the necessary form for 
admittance to the Desert Southwest Customer Service Regional Office.

FOR FURTHER INFORMATION CONTACT: Ms. Tina Ramsey, Rates Manager, Desert 
Southwest Customer Service Region, Western Area Power Administration, 
P.O. Box 6457, Phoenix, Arizona 85005-6457, (602) 605-2565, or email 
[email protected].

SUPPLEMENTARY INFORMATION: 
    Hoover Dam, authorized by the Boulder Canyon Project Act (45 Stat. 
1057, December 21, 1928), sits on the Colorado River along the Arizona-
Nevada border. Hoover Dam's power plant has 19 generating units (two 
for plant use) and an installed capacity of 2,078.8 megawatts (4,800 
kilowatts for plant use). High-voltage transmission lines and 
substations deliver this power to southern Nevada, Arizona, and 
southern California, where it is marketed and sold by WAPA in 
collaboration with the Bureau of Reclamation (Reclamation).
    The rate-setting methodology for BCP calculates an annual base 
charge rather than a unit rate for power. Though WAPA determines a unit 
rate for comparative purposes, BCP contractors are billed the base 
charge in proportion to their allocation of BCP power.
    Rate Schedule BCP-F10 was confirmed and approved by the Federal 
Energy Regulatory Commission (FERC) for a five-year period ending 
September 30, 2022.\1\ Rate Schedule BCP-F10 requires the base charge 
and rate formulas be calculated annually based on current financial and 
hydrology data. The base charge is designed to recover an annual 
revenue requirement that includes investment repayment, interest, 
operations, maintenance and replacements, payments to states, and 
Hoover Dam visitor services. The total costs are offset by projected 
revenue from water sales, the Hoover Dam visitor services, ancillary 
services, and late fees. The annual revenue requirement is the base 
charge for electric service divided equally between capacity and 
energy. The annual composite rate is the base charge divided by annual 
energy sales.
---------------------------------------------------------------------------

    \1\ EF18-1-000 (June 6, 2018).

                                       Comparison of Base Charge and Rates
----------------------------------------------------------------------------------------------------------------
                                                    Existing FY     Proposed FY
                                                       2018            2019        Amount change  Percent change
----------------------------------------------------------------------------------------------------------------
Base Charge ($).................................     $76,910,193     $69,741,657    - $7,168,536           - 9.3
Composite Rate (mills/kWh)......................           19.98           18.92          - 1.06           - 5.3
Energy Rate (mills/kWh).........................            9.99            9.46          - 0.53           - 5.3
Capacity Rate ($/kW-Mo).........................           $1.99           $1.88         - $0.11           - 5.4
----------------------------------------------------------------------------------------------------------------

    The Federal Register notice initiating the FY 2018 public process 
proposed a one-time $15 million working capital collection for 
Reclamation for the new 50-year marketing period beginning October 1, 
2017, which caused an increase to the base charge for FY 2018.\2\ At 
the time, WAPA anticipated a corresponding $15 million reduction to the 
base charge for FY 2019. During the FY 2018 public process, Reclamation 
and WAPA worked collaboratively with BCP customers to address customer 
concerns about the increase in the base charge resulting from the 
working capital collection. Reclamation and WAPA moderated the impact 
of the base charge increase by lowering some costs in FY 2018 and 
deferring other costs to FY 2019. The final result was a $7.2 million 
increase to the base charge rather than the $15 million increase 
originally proposed.
---------------------------------------------------------------------------

    \2\ 82 FR 27814 (September 18, 2017).
---------------------------------------------------------------------------

    The proposed FY 2019 base charge is decreasing $7.2 million from 
the FY 2018 base charge. This change is attributed to deferred costs, 
adjusted non-power revenue projections, and working capital. 
Reclamation's costs for operations, maintenance and replacements, and 
visitor services are increasing $2.7 million primarily as a result of 
deferrals from FY 2018, while WAPA's costs remain relatively flat. Non-
power revenue projections are decreasing $5.1 million due to decreased 
tourism projections while the Hoover Dam Visitor Center and elevators 
are being renovated. The $15 million working capital for the new 
marketing period was collected in FY 2018 and no further collections 
are necessary in FY 2019.
    Reclamation and WAPA will continue to review projections to further 
reduce the proposed FY 2019 base charge, thereby benefitting all BCP 
customers. A lower base charge will also help offset the impact of 
financial obligations from the previous marketing period, referred to 
as transitional items, assessed to new customers independent of the 
base charge calculation. Any resulting changes to the proposed FY 2019 
base charge will be presented at the public information forum.
    The proposed FY 2019 composite and energy rates decreased 5.3 
percent and the capacity rate decreased 5.4 percent compared to the FY 
2018 rates. The percentage decrease between the proposed base charge 
and rates differs due to energy and capacity projections.
    This proposal, to be effective October 1, 2018, is preliminary and 
subject to change based on modifications to forecasts before 
publication of the final base charge and rates.

Legal Authority

    The proposed formulas for electric service and the base charge and 
rates constitute a major rate adjustment, as defined by 10 CFR 
903.2(e); therefore WAPA will hold public information and public 
comment forums for this rate adjustment, pursuant to 10 CFR 903.15 and 
903.16. WAPA will review and consider all timely public comments and 
amend or adjust the proposal as appropriate. Proposed rates will be 
forwarded to the Deputy Secretary of Energy for approval.
    WAPA is proposing this action in accordance with section 302 of the 
Department of Energy (DOE) Organization Act (42 U.S.C. 7152). This Act 
transferred to, and vested in, the Secretary of Energy the power 
marketing functions of the Secretary of the Department of the Interior 
and Reclamation under the Reclamation Act of 1902 (ch. 1093, 32 Stat. 
388), as amended and supplemented by subsequent laws, particularly 
section

[[Page 36588]]

9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and 
other acts that specifically apply to the BCP.
    By Delegation Order No. 00-037.00B effective November 19, 2016, the 
Secretary of Energy delegated: (1) The authority to develop power and 
transmission rates to WAPA's Administrator; (2) the authority to 
confirm, approve, and place such rates into effect on an interim basis 
to the Deputy Secretary of Energy; and (3) the authority to confirm, 
approve, and place into effect on a final basis, to remand, or to 
disapprove such rates to FERC. Existing DOE procedures for public 
participation in rate adjustments (10 CFR 903) were published on 
September 18, 1985 (50 FR 37835).

Availability of Information

    All studies, comments, letters, memorandums, and other documents 
WAPA prepares or uses to develop the proposed base charge and rates 
will be available for inspection and copying at the Desert Southwest 
Customer Service Regional Office, Western Area Power Administration, 
located at 615 South 43rd Avenue, Phoenix, Arizona 85009. Many of these 
documents and supporting information are available on WAPA's website 
at: http://www.wapa.gov/regions/DSW/Rates/Pages/boulder-canyon-rates.aspx.

Ratemaking Procedure Requirements

Environmental Compliance

    In compliance with the National Environmental Policy Act (NEPA) of 
1969, 42 U.S.C. 4321-4347; the Council on Environmental Quality 
Regulations for implementing NEPA (40 CFR parts 1500-1508); and DOE 
NEPA Implementing Procedures and Guidelines (10 CFR part 1021), WAPA is 
in the process of determining whether an environmental assessment or an 
environmental impact statement should be prepared or if this action can 
be categorically excluded from those requirements.

Determination Under Executive Order 12866

    WAPA has an exemption from centralized regulatory review under 
Executive Order 12866; accordingly, no clearance of this notice by the 
Office of Management and Budget is required.

    Dated: July 20, 2018.
Mark A. Gabriel,
Administrator.
[FR Doc. 2018-16248 Filed 7-27-18; 8:45 am]
 BILLING CODE 6450-01-P



                                               36586                           Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices

                                               Regulations (18 CFR 385.211 and                          canal intake with trashracks and fish                 DEPARTMENT OF ENERGY
                                               385.214) on or before 5:00 p.m. Eastern                  screens; A 5,350-foot-long power canal;
                                               time on the specified comment date.                      four 5-foot-diameter, 280-foot-long steel             Western Area Power Administration
                                               Protests may be considered, but                          penstocks; a powerhouse with 4
                                               intervention is necessary to become a                    turbine/generators with rated capacity                Boulder Canyon Project
                                               party to the proceeding.                                 of 300 kilowatts (kW) each for a total                AGENCY:  Western Area Power
                                                  eFiling is encouraged. More detailed                  capacity of 1,200 kW; a 60-foot-wide, 20              Administration, DOE.
                                               information relating to filing                           foot-long concrete-lined tailrace; a 0.25-            ACTION: Notice of proposed fiscal year
                                               requirements, interventions, protests,                   mile-long, 12.47 kilovolt transmission                2019 base charge and rates for electric
                                               service, and qualifying facilities filings               line; and access roads.                               service.
                                               can be found at: http://www.ferc.gov/                       The estimated averaged annual
                                               docs-filing/efiling/filing-req.pdf. For                  generation of the project would be 3                  SUMMARY:   Western Area Power
                                               other information, call (866) 208–3676                   gigawatt-hours and would be conveyed                  Administration (WAPA) is proposing to
                                               (toll free). For TTY, call (202) 502–8659.               from the powerhouse to the existing                   calculate formula rates for fiscal year
                                                 Dated: July 24, 2018.                                  Pacific Power and Light Company                       (FY) 2019 Boulder Canyon Project (BCP)
                                               Nathaniel J. Davis, Sr.,                                 substation.                                           electric service. The expiration of the
                                                                                                                                                              FY 2018 base charge and rates on
                                               Deputy Secretary.                                           Applicant Contact: Mark Sigl, Go
                                                                                                                                                              September 30, 2018, requires this
                                               [FR Doc. 2018–16218 Filed 7–27–18; 8:45 am]              With the Flow Hydro Power, LLC, 8021
                                                                                                                                                              action. The proposed base charge will
                                               BILLING CODE 6717–01–P                                   Firestone Way, Antelope, CA 95843,
                                                                                                                                                              provide sufficient revenue to recover all
                                                                                                        phone (916) 812–5051.
                                                                                                                                                              annual costs and repay investment
                                                                                                           FERC Contact: Kim Nguyen, (202)                    obligations within the allowable period.
                                               DEPARTMENT OF ENERGY                                     502–6105.                                             The proposed base charge and rates are
                                               Federal Energy Regulatory                                   Deadline for filing comments, motions              scheduled to become effective on
                                               Commission                                               to intervene, competing applications                  October 1, 2018, and will remain in
                                                                                                        (without notices of intent), or notices of            effect through September 30, 2019.
                                               [Project No. 14879–000]                                  intent to file competing applications: 60             Publication of this Federal Register
                                                                                                        days from the issuance of this notice.                notice will initiate the public process.
                                               Notice of Preliminary Permit                             Competing applications and notices of                 DATES: The consultation and comment
                                               Application Accepted for Filing and                      intent must meet the requirements of 18               period begins today and will end
                                               Soliciting Comments, Motions To                          CFR 4.36.                                             October 29, 2018. WAPA will present a
                                               Intervene, and Competing
                                                                                                           The Commission strongly encourages                 detailed explanation of the proposed FY
                                               Applications: Go With the Flow Hydro
                                                                                                        electronic filing. Please file comments,              2019 base charge and rates at a public
                                               Power, LLC
                                                                                                        motions to intervene, notices of intent,              information forum that will be held on
                                                  On June 8, 2018, Go With the Flow                     and competing applications using the                  August 29, 2018, from 10:00 a.m. to
                                               Hydro Power, LLC (Go With the Flow)                      Commission’s eFiling system at http://                12:00 p.m. Mountain Standard Time
                                               filed an application for a preliminary                   www.ferc.gov/docs-filing/efiling.asp.                 (MST) in Phoenix, Arizona. WAPA will
                                               permit, pursuant to section 4(f) of the                  Commenters can submit brief comments                  also host a public comment forum that
                                               Federal Power Act, proposing to study                    up to 6,000 characters, without prior                 will be held on September 28, 2018,
                                               the feasibility of the Go With the Flow                  registration, using the eComment system               from 10:00 a.m. to 12:00 p.m. MST in
                                               Hydroelectric Project (project) to be                    at http://www.ferc.gov/docs-filing/                   Phoenix, Arizona. Written comments
                                               located on the Umatilla River about 8.7                  ecomment.asp. You must include your                   will be accepted any time during the
                                               river miles upstream from the                            name and contact information at the end               consultation and comment period.
                                               confluence with the Columbia River,                      of your comments. For assistance,                     ADDRESSES: The public information
                                               and 2.1 miles west southwest of                          please contact FERC Online Support at                 forum and public comment forum will
                                               Hermiston in Umatilla county, Oregon.                    FERCOnlineSupport@ferc.gov, (866)                     be held at WAPA’s Desert Southwest
                                               On July 11, 2018, the applicant filed an                 208–3676 (toll free), or (202) 502–8659               Customer Service Regional Office
                                               amended permit application for the                       (TTY). In lieu of electronic filing, please           located at 615 South 43rd Avenue,
                                               project. The sole purpose of a                           send a paper copy to: Secretary, Federal              Phoenix, Arizona 85009. Send written
                                               preliminary permit, if issued, is to grant               Energy Regulatory Commission, 888                     comments to Mr. Ronald E. Moulton,
                                               the permit holder priority to file a                     First Street NE, Washington, DC 20426.                Regional Manager and Senior Vice
                                               license application during the permit                    The first page of any filing should                   President, Desert Southwest Customer
                                               term. A preliminary permit does not                      include docket number P–14879–000.                    Service Region, Western Area Power
                                               authorize the permit holder to perform                      More information about this project,               Administration, P.O. Box 6457,
                                               any land-disturbing activities or                        including a copy of the application, can              Phoenix, Arizona 85005–6457, or email
                                               otherwise enter upon lands or waters                     be viewed or printed on the ‘‘eLibrary’’              dswpwrmrk@wapa.gov. WAPA will post
                                               owned by others without the owners’                      link of Commission’s website at http://               information about the rate process and
                                               express permission.                                      www.ferc.gov/docs-filing/elibary.asp.                 written comments received on its
                                                  The proposed project will be at the                   Enter the docket number (P–14879) in                  website at: http://www.wapa.gov/
                                               site of the existing, abandoned Jim Boyd                 the docket number field to access the                 regions/DSW/Rates/Pages/boulder-
                                               Hydroelectric Project (P–7269). The                      document. For assistance, contact FERC                canyon-rates.aspx. Written comments
daltland on DSKBBV9HB2PROD with NOTICES




                                               license for the Jim Boyd Project was                     Online Support.                                       must be received by the end of the
                                               terminated in 2011, and Go With the                                                                            consultation and comment period to be
                                               Flow has purchased these facilities. The                   Dated: July 24, 2018.
                                                                                                                                                              considered by WAPA in its decision
                                               proposed run-of-river project will                       Kimberly D. Bose,                                     process.
                                               involve rehabilitation and upgrade of                    Secretary.                                               As access to federal facilities is
                                               the following existing facilities: A 3.5-                [FR Doc. 2018–16232 Filed 7–27–18; 8:45 am]           controlled, any U.S. citizen wishing to
                                               foot-high concrete diversion weir; a                     BILLING CODE 6717–01–P                                attend a public forum at WAPA must


                                          VerDate Sep<11>2014   20:33 Jul 27, 2018   Jkt 244001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\30JYN1.SGM   30JYN1


                                                                                       Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices                                                         36587

                                               present an official form of picture                                    1057, December 21, 1928), sits on the                        for a five-year period ending September
                                               identification (ID), such as a U.S.                                    Colorado River along the Arizona-                            30, 2022.1 Rate Schedule BCP–F10
                                               driver’s license, U.S. passport, U.S.                                  Nevada border. Hoover Dam’s power                            requires the base charge and rate
                                               government ID, or U.S. military ID at the                              plant has 19 generating units (two for                       formulas be calculated annually based
                                               time of the meeting. Foreign nationals                                 plant use) and an installed capacity of                      on current financial and hydrology data.
                                               should contact Ms. Tina Ramsey, Rates                                  2,078.8 megawatts (4,800 kilowatts for                       The base charge is designed to recover
                                               Manager, Desert Southwest Customer                                     plant use). High-voltage transmission                        an annual revenue requirement that
                                               Service Region, Western Area Power                                     lines and substations deliver this power                     includes investment repayment,
                                               Administration, at (602) 605–2565 or                                   to southern Nevada, Arizona, and                             interest, operations, maintenance and
                                               email at ramsey@wapa.gov in advance                                    southern California, where it is                             replacements, payments to states, and
                                               of a forum to obtain the necessary form                                marketed and sold by WAPA in                                 Hoover Dam visitor services. The total
                                               for admittance to the Desert Southwest                                 collaboration with the Bureau of
                                               Customer Service Regional Office.                                                                                                   costs are offset by projected revenue
                                                                                                                      Reclamation (Reclamation).
                                                                                                                                                                                   from water sales, the Hoover Dam
                                               FOR FURTHER INFORMATION CONTACT: Ms.                                      The rate-setting methodology for BCP
                                                                                                                                                                                   visitor services, ancillary services, and
                                               Tina Ramsey, Rates Manager, Desert                                     calculates an annual base charge rather
                                               Southwest Customer Service Region,                                     than a unit rate for power. Though                           late fees. The annual revenue
                                               Western Area Power Administration,                                     WAPA determines a unit rate for                              requirement is the base charge for
                                               P.O. Box 6457, Phoenix, Arizona 85005–                                 comparative purposes, BCP contractors                        electric service divided equally between
                                               6457, (602) 605–2565, or email ramsey@                                 are billed the base charge in proportion                     capacity and energy. The annual
                                               wapa.gov.                                                              to their allocation of BCP power.                            composite rate is the base charge
                                               SUPPLEMENTARY INFORMATION:                                                Rate Schedule BCP–F10 was                                 divided by annual energy sales.
                                                 Hoover Dam, authorized by the                                        confirmed and approved by the Federal
                                               Boulder Canyon Project Act (45 Stat.                                   Energy Regulatory Commission (FERC)

                                                                                                                  COMPARISON OF BASE CHARGE AND RATES
                                                                                                                                                                 Existing          Proposed           Amount       Percent
                                                                                                                                                                 FY 2018           FY 2019            change       change

                                               Base Charge ($) ..............................................................................................    $76,910,193       $69,741,657      ¥ $7,168,536       ¥     9.3
                                               Composite Rate (mills/kWh) ............................................................................                 19.98             18.92            ¥ 1.06       ¥     5.3
                                               Energy Rate (mills/kWh) ..................................................................................               9.99              9.46            ¥ 0.53       ¥     5.3
                                               Capacity Rate ($/kW-Mo) ................................................................................                $1.99             $1.88          ¥ $0.11        ¥     5.4



                                                  The Federal Register notice initiating                              result of deferrals from FY 2018, while                         This proposal, to be effective October
                                               the FY 2018 public process proposed a                                  WAPA’s costs remain relatively flat.                         1, 2018, is preliminary and subject to
                                               one-time $15 million working capital                                   Non-power revenue projections are                            change based on modifications to
                                               collection for Reclamation for the new                                 decreasing $5.1 million due to                               forecasts before publication of the final
                                               50-year marketing period beginning                                     decreased tourism projections while the                      base charge and rates.
                                               October 1, 2017, which caused an                                       Hoover Dam Visitor Center and                                Legal Authority
                                               increase to the base charge for FY 2018.2                              elevators are being renovated. The $15
                                               At the time, WAPA anticipated a                                        million working capital for the new                            The proposed formulas for electric
                                               corresponding $15 million reduction to                                 marketing period was collected in FY                         service and the base charge and rates
                                               the base charge for FY 2019. During the                                2018 and no further collections are                          constitute a major rate adjustment, as
                                               FY 2018 public process, Reclamation                                    necessary in FY 2019.                                        defined by 10 CFR 903.2(e); therefore
                                               and WAPA worked collaboratively with                                                                                                WAPA will hold public information and
                                                                                                                        Reclamation and WAPA will continue
                                               BCP customers to address customer                                                                                                   public comment forums for this rate
                                                                                                                      to review projections to further reduce                      adjustment, pursuant to 10 CFR 903.15
                                               concerns about the increase in the base
                                               charge resulting from the working                                      the proposed FY 2019 base charge,                            and 903.16. WAPA will review and
                                               capital collection. Reclamation and                                    thereby benefitting all BCP customers. A                     consider all timely public comments
                                               WAPA moderated the impact of the base                                  lower base charge will also help offset                      and amend or adjust the proposal as
                                               charge increase by lowering some costs                                 the impact of financial obligations from                     appropriate. Proposed rates will be
                                               in FY 2018 and deferring other costs to                                the previous marketing period, referred                      forwarded to the Deputy Secretary of
                                               FY 2019. The final result was a $7.2                                   to as transitional items, assessed to new                    Energy for approval.
                                               million increase to the base charge                                    customers independent of the base                              WAPA is proposing this action in
                                               rather than the $15 million increase                                   charge calculation. Any resulting                            accordance with section 302 of the
                                               originally proposed.                                                   changes to the proposed FY 2019 base                         Department of Energy (DOE)
                                                  The proposed FY 2019 base charge is                                 charge will be presented at the public                       Organization Act (42 U.S.C. 7152). This
                                               decreasing $7.2 million from the FY                                    information forum.                                           Act transferred to, and vested in, the
                                               2018 base charge. This change is                                         The proposed FY 2019 composite and                         Secretary of Energy the power marketing
                                               attributed to deferred costs, adjusted                                 energy rates decreased 5.3 percent and                       functions of the Secretary of the
daltland on DSKBBV9HB2PROD with NOTICES




                                               non-power revenue projections, and                                     the capacity rate decreased 5.4 percent                      Department of the Interior and
                                               working capital. Reclamation’s costs for                               compared to the FY 2018 rates. The                           Reclamation under the Reclamation Act
                                               operations, maintenance and                                            percentage decrease between the                              of 1902 (ch. 1093, 32 Stat. 388), as
                                               replacements, and visitor services are                                 proposed base charge and rates differs                       amended and supplemented by
                                               increasing $2.7 million primarily as a                                 due to energy and capacity projections.                      subsequent laws, particularly section
                                                 1 EF18–1–000       (June 6, 2018).                                     2 82   FR 27814 (September 18, 2017).



                                          VerDate Sep<11>2014        20:33 Jul 27, 2018      Jkt 244001      PO 00000      Frm 00075       Fmt 4703      Sfmt 4703   E:\FR\FM\30JYN1.SGM   30JYN1


                                               36588                           Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices

                                               9(c) of the Reclamation Project Act of                   FEDERAL COMMUNICATIONS                                   Title: Section 76.916, Petition for
                                               1939 (43 U.S.C. 485h(c)); and other acts                 COMMISSION                                            Recertification.
                                               that specifically apply to the BCP.                                                                               Form Number: Not applicable.
                                                  By Delegation Order No. 00–037.00B                    [OMB 3060–0562]                                          Type of Review: Extension of a
                                               effective November 19, 2016, the                                                                               currently approved collection.
                                                                                                        Information Collection Being Reviewed                    Respondents: Business or other for-
                                               Secretary of Energy delegated: (1) The
                                                                                                        by the Federal Communications                         profit entities; State, local or tribal
                                               authority to develop power and
                                                                                                        Commission Under Delegated                            government.
                                               transmission rates to WAPA’s
                                                                                                        Authority                                                Number of Respondents and
                                               Administrator; (2) the authority to
                                               confirm, approve, and place such rates                   AGENCY: Federal Communications                        Responses: 10 respondents; 15
                                               into effect on an interim basis to the                   Commission.                                           responses.
                                               Deputy Secretary of Energy; and (3) the                  ACTION: Notice and request for                           Estimated Time per Response: 10
                                               authority to confirm, approve, and place                 comments.                                             hours.
                                               into effect on a final basis, to remand,                                                                          Frequency of Response: On occasion
                                               or to disapprove such rates to FERC.                     SUMMARY:    As part of its continuing effort          reporting requirement; Third party
                                               Existing DOE procedures for public                       to reduce paperwork burdens, and as                   disclosure requirement.
                                               participation in rate adjustments (10                    required by the Paperwork Reduction                      Obligation to Respond: Required to
                                               CFR 903) were published on September                     Act of 1995 (PRA), the Federal                        obtain or retain benefits. The statutory
                                               18, 1985 (50 FR 37835).                                  Communications Commission (FCC or                     authority for this information collection
                                                                                                        Commission) invites the general public                is contained in Sections 4(i) and 623 of
                                               Availability of Information                              and other Federal agencies to take this               the Communications Act of 1934, as
                                                 All studies, comments, letters,                        opportunity to comment on the                         amended.
                                               memorandums, and other documents                         following information collections.                       Total Annual Burden: 150 hours.
                                               WAPA prepares or uses to develop the                     Comments are requested concerning:                       Total Annual Cost: None.
                                               proposed base charge and rates will be                   Whether the proposed collection of                       Privacy Act Impact Assessment: No
                                               available for inspection and copying at                  information is necessary for the proper               impact(s).
                                               the Desert Southwest Customer Service                    performance of the functions of the
                                                                                                                                                                 Nature and Extent of Confidentiality:
                                               Regional Office, Western Area Power                      Commission, including whether the
                                                                                                                                                              There is no need for confidentiality with
                                                                                                        information shall have practical utility;
                                               Administration, located at 615 South                                                                           this collection of information.
                                                                                                        the accuracy of the Commission’s
                                               43rd Avenue, Phoenix, Arizona 85009.                                                                              Needs and Uses: 47 CFR 76.916
                                                                                                        burden estimate; ways to enhance the
                                               Many of these documents and                                                                                    provides that a franchising authority
                                                                                                        quality, utility, and clarity of the
                                               supporting information are available on                                                                        wishing to assume jurisdiction to
                                                                                                        information collected; ways to minimize
                                               WAPA’s website at: http://                                                                                     regulate basic cable service and
                                                                                                        the burden of the collection of
                                               www.wapa.gov/regions/DSW/Rates/                                                                                associated rates after its request for
                                                                                                        information on the respondents,
                                               Pages/boulder-canyon-rates.aspx.                                                                               certification has been denied or
                                                                                                        including the use of automated
                                                                                                                                                              revoked, may file a petition for
                                               Ratemaking Procedure Requirements                        collection techniques or other forms of
                                                                                                                                                              recertification with the Commission.
                                                                                                        information technology; and ways to
                                               Environmental Compliance                                                                                       The petition must be served on the cable
                                                                                                        further reduce the information
                                                                                                                                                              operator and on any interested party
                                                  In compliance with the National                       collection burden on small business
                                                                                                                                                              that participated in the proceeding
                                               Environmental Policy Act (NEPA) of                       concerns with fewer than 25 employees.
                                                                                                                                                              denying or revoking the original
                                               1969, 42 U.S.C. 4321–4347; the Council                     The FCC may not conduct or sponsor
                                                                                                                                                              certification. Oppositions to petitions
                                               on Environmental Quality Regulations                     a collection of information unless it
                                                                                                                                                              may be filed within 15 days after the
                                               for implementing NEPA (40 CFR parts                      displays a currently valid Office of
                                                                                                                                                              petition is filed. Replies may be filed
                                               1500–1508); and DOE NEPA                                 Management and Budget (OMB) control
                                                                                                                                                              within seven days of filing of
                                                                                                        number. No person shall be subject to
                                               Implementing Procedures and                                                                                    oppositions.
                                                                                                        any penalty for failing to comply with
                                               Guidelines (10 CFR part 1021), WAPA                                                                            Federal Communications Commission.
                                                                                                        a collection of information subject to the
                                               is in the process of determining whether
                                                                                                        PRA that does not display a valid OMB                 Marlene Dortch,
                                               an environmental assessment or an
                                                                                                        control number.                                       Secretary, Office of the Secretary.
                                               environmental impact statement should
                                               be prepared or if this action can be                     DATES: Written PRA comments should                    [FR Doc. 2018–16199 Filed 7–27–18; 8:45 am]
                                               categorically excluded from those                        be submitted on or before September 28,               BILLING CODE 6712–01–P

                                               requirements.                                            2018. If you anticipate that you will be
                                                                                                        submitting comments, but find it
                                               Determination Under Executive Order                      difficult to do so within the period of               FEDERAL COMMUNICATIONS
                                               12866                                                    time allowed by this notice, you should               COMMISSION
                                                                                                        advise the contact listed below as soon
                                                 WAPA has an exemption from                             as possible.                                          Radio Broadcasting Services; AM or
                                               centralized regulatory review under                                                                            FM Proposals To Change the
                                                                                                        ADDRESSES: Direct all PRA comments to
                                               Executive Order 12866; accordingly, no                                                                         Community of License
                                               clearance of this notice by the Office of                Cathy Williams, FCC, via email to PRA@
daltland on DSKBBV9HB2PROD with NOTICES




                                               Management and Budget is required.                       fcc.gov and to Cathy.Williams@fcc.gov.                AGENCY: Federal Communications
                                                                                                        FOR FURTHER INFORMATION CONTACT: For                  Commission.
                                                Dated: July 20, 2018.
                                                                                                        additional information about the                      ACTION: Notice.
                                               Mark A. Gabriel,                                         information collection, contact Cathy
                                               Administrator.                                           Williams at (202) 418–2918.                           DATES:The agency must receive
                                               [FR Doc. 2018–16248 Filed 7–27–18; 8:45 am]              SUPPLEMENTARY INFORMATION:                            comments on or before September 28,
                                               BILLING CODE 6450–01–P                                     OMB Control Number: 3060–0562.                      2018.


                                          VerDate Sep<11>2014   20:33 Jul 27, 2018   Jkt 244001   PO 00000   Frm 00076   Fmt 4703   Sfmt 4703   E:\FR\FM\30JYN1.SGM   30JYN1



Document Created: 2018-07-28 01:43:34
Document Modified: 2018-07-28 01:43:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of proposed fiscal year 2019 base charge and rates for electric service.
DatesThe consultation and comment period begins today and will end October 29, 2018. WAPA will present a detailed explanation of the proposed FY 2019 base charge and rates at a public information forum that will be held on August 29, 2018, from 10:00 a.m. to 12:00 p.m. Mountain Standard Time (MST) in Phoenix, Arizona. WAPA will also host a public comment forum that will be held on September 28, 2018, from 10:00 a.m. to 12:00 p.m. MST in Phoenix, Arizona. Written comments will be accepted any time during the consultation and comment period.
ContactMs. Tina Ramsey, Rates Manager, Desert Southwest Customer Service Region, Western Area Power Administration, P.O. Box 6457, Phoenix, Arizona 85005-6457, (602) 605-2565, or email [email protected]