83_FR_3717 83 FR 3699 - Commission Information Collection Activities (FERC-725l); Comment Request; Extension

83 FR 3699 - Commission Information Collection Activities (FERC-725l); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 18 (January 26, 2018)

Page Range3699-3701
FR Document2018-01505

In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725L, Mandatory Reliability Standards for the Bulk-Power System: MOD Reliability Standards.

Federal Register, Volume 83 Issue 18 (Friday, January 26, 2018)
[Federal Register Volume 83, Number 18 (Friday, January 26, 2018)]
[Notices]
[Pages 3699-3701]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-01505]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-7-000]


Commission Information Collection Activities (FERC-725l); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
currently approved information collection, FERC-725L, Mandatory 
Reliability Standards for the Bulk-Power System: MOD Reliability 
Standards.

DATES: Comments on the collection of information are due March 27, 
2018.

ADDRESSES: You may submit comments (identified by Docket No. IC18-7-
000) by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with

[[Page 3700]]

submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support by email at 
ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), 
or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725L, Mandatory Reliability Standards for the Bulk-
Power System: MOD Reliability Standards.
    OMB Control No.: 1902-0261.
    Type of Request: Three-year extension of the FERC-725L information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: MOD Reliability Standards ensure that generators remain 
in operation during specified voltage and frequency excursions, 
properly coordinate protective relays and generator voltage regulator 
controls, and ensure that generator models accurately reflect the 
generator's capabilities and equipment performance.
    Reliability Standards MOD-025-2, MOD-026-1, and MOD-027-1 ``address 
generator verifications needed to support Bulk-Power System reliability 
and will ensure that accurate data is verified and made available for 
planning simulations.'' NERC explains that Bulk-Power System 
reliability benefits from ``good quality simulation models of power 
system equipment,'' and that ``model validation ensures the proper 
performance of the control systems and validates the computer models 
used for stability analysis.'' \1\ NERC further states that the 
proposed Reliability Standards will enhance reliability because the 
tests performed to obtain model data may reveal latent defects that 
could cause inappropriate unit response during system disturbances.
---------------------------------------------------------------------------

    \1\ NERC Petition for Approval of Five Proposed Reliability 
Standards MOD-025-2, MOD-026-1, MOD-027-1, PRC-019-1, and PRC-024-1 
issued on 5/30/2013.
---------------------------------------------------------------------------

    Reliability Standards MOD-032-1 and MOD-033-2 are designed to 
replace, consolidate and improve upon'' existing MOD standards, in 
addressing system-level modeling data and validation requirements 
necessary for developing planning models and the Interconnection-wide 
cases that are integral to analyzing the reliability of the Bulk-Power 
System.
    Type of Respondents: NERC-registered entities including generator 
owners, transmission planners, planning authorities, balancing 
authorities, resource planners, transmission service providers, 
reliability coordinators, and transmission operators.\2\
---------------------------------------------------------------------------

    \2\ In subsequent portions of this notice, the following 
acronyms will be used: PA = Planning Authority, GO = Generator 
Owner, TP = Transmission Planner, BA = Balancing Authority, RP = 
Resource Planner, TSP = Transmission Service Provider, RC = 
Reliability Coordinator, TOP = Transmission Operator.
---------------------------------------------------------------------------

    Estimate of Annual Burden \3\: The Commission estimates the annual 
public reporting burden \4\ for the information collection as:
---------------------------------------------------------------------------

    \3\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, reference 5 Code of Federal Regulations 1320.3.
    \4\ Each of the five MOD standards in the FERC-725L information 
collection previously contained ``one-time'' components to their 
respondent burden. These one-time burden categories consisted 
primarily of activities related to establishing industry practices 
and developing data validation procedures tailored toward these 
reliability standards and their reporting requirements. None of the 
one-time burdens apply any longer, so they are being removed from 
the FERC-725L information collection.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Annual  number
                                                             of  responses   Total number     Average burden and    Total annual burden      Cost per
                                     Number of respondents        per        of responses     cost per response       hours and total     respondent ($)
                                                              respondent                                                annual cost
                                     (1)..................             (2)     (1) * (2) =  (4)..................  (3) * (4) = (5)......       (5) / (1)
                                                                                       (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
     MOD-025-2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Attachment 2.......................  933 (GO).............               1             933  6 hrs.; $448.92 \5\..  5,598 hrs.; $418,842.          448.92
Evidence Retention.................  933 (GO).............               1             933  1 hr.; $32.74 \6\....  933 hrs.; $30,546....           32.74
                                                           ---------------------------------------------------------------------------------------------
    Total..........................  .....................  ..............  ..............  .....................  6,531 hrs.; $449,388.  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
              MOD-026-1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Variance Control Functions)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Instructions for obtaining           185 (TP).............               1             185  8 hrs.; $598.56 \4\..  1,480 hrs.; $110,734.          598.56
 excitation control system or plant
 voltage/variance control function
 model.
Documentation on generator           466 (GO).............               1             466  8 hrs.; $598.56 \4\..  3,728 hrs.; $278,929.          598.56
 verification.
Evidence Retention.................  651 (GO and TOP).....               1             651  1 hr.; $32.74\5\.....  651 hrs.; $21,314....           32.74
                                                           ---------------------------------------------------------------------------------------------
    Total..........................  .....................  ..............  ..............  .....................  5,859 hrs.; $410,977.  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 3701]]

 
              MOD-027-1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Instructions for obtaining           185 (TP).............               1             185  8 hrs.; $598.56 \4\..  1,480 hrs.; $110,734.          598.56
 excitation control system or plant
 voltage/variance control function
 model.
Documentation on generator           466 (GO).............               1             466  8 hrs.; $598.56 \4\..  3,728 hrs.; $278,929.          598.56
 verification.
    Evidence Retention.............  651 (GO and TP)......               1             651  1 hr.; $32.74 \2\....  651 hrs.; $21,314....           32.74
                                                           ---------------------------------------------------------------------------------------------
    Total..........................  .....................  ..............  ..............  .....................  5,859 hrs.; $410,977.  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
              MOD-032-1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Data Submittal.....................  1,197 (BA, GO, PA,                  1           1,197  8 hrs.; $544.96\7\...  9,576 hrs.; $652,317.          544.96
                                      RP, TO, TP, and TSP).
Evidence Retention.................  1,197 (BA, GO, PA,                  1           1,197  1 hr.; $32.74\2\.....  1,197 hrs.; $39,190..           32.74
                                      RP, TO, TP, and TSP).
                                                           ---------------------------------------------------------------------------------------------
    Total..........................  .....................  ..............  ..............  .....................  10,773 hrs.; $691,507  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                              MOD-033-1 (Steady-State and Dynamics System Model Validation)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Data Submittal.....................  188 (RC and TOP).....               1             188  8 hrs.; $544.96 \6\..  1,504 hrs.; $102,452.          544.96
Evidence Retention.................  194 (PA, RC, and TOP)               1             194  1 hr.; $32.74\2\.....  194 hrs.; $6,352.....           32.74
                                                           ---------------------------------------------------------------------------------------------
    Total..........................  .....................  ..............  ..............  .....................  1,698 hrs.; $108,804.  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

    The total annual estimated burden and cost for the FERC-725L 
information collection is 27,544 hours and $2,071,653 respectively.
---------------------------------------------------------------------------

    \5\ This wage figure uses the weighted hourly average wage (plus 
benefits) for electrical engineers (Occupation Code: 17-2071) and 
managers (Occupation Code: 11-0000) obtained from the Bureau of 
Labor Statistics: $74.82/hour. The average used the following 
calculation: [$68.12/hour + $81.52/hour] / 2 = $74.82/hour. $68.12/
hour is the wage for engineers. $81.52 is the wage for manager.
    \6\ Uses the hourly average wage (plus benefits) for file clerks 
obtained from the Bureau of Labor Statistics: $32.74/hour (BLS 
Occupation Code: 43-4071).
    \7\ Uses the hourly average wage (plus benefits) for electrical 
engineers obtained from the Bureau of Labor Statistics: $68.12/hour 
(BLS Occupation Code: 17-2071).
---------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: January 22, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-01505 Filed 1-25-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 83, No. 18 / Friday, January 26, 2018 / Notices                                                    3699

                                               so indicate by writing to the Secretary                 DEPARTMENT OF ENERGY                                   all filings. Further, pursuant to section
                                               of the Commission.                                                                                             158.4, each entity’s memorandum
                                                  n. Comments, Protests, or Motions to                 Federal Energy Regulatory                              should set out the facts and argument as
                                               Intervene: Anyone may submit                            Commission                                             prescribed for briefs in Rule 706 of the
                                               comments, a protest, or a motion to                                                                            Commission’s Rules of Practice and
                                                                                                       [Docket No. FA15–16–000]
                                               intervene in accordance with the                                                                               Procedure.4 Section 158.5 also requires
                                               requirements of Rules of Practice and                   Dominion Energy Transmission, Inc.;                    that the facts stated in the memorandum
                                               Procedure, 18 CFR 385.210, .211, .214.                  Notice of Paper Hearing Procedure                      must be sworn to by persons having
                                               In determining the appropriate action to                                                                       knowledge thereof, which latter fact
                                               take, the Commission will consider all                     Take notice that on December 8, 2017,               must affirmatively appear in the
                                               protests or other comments filed, but                   Dominion Energy Transmission, Inc.                     affidavit.5
                                               only those who file a motion to                         (Dominion) filed a request for                            eFiling is encouraged. More detailed
                                               intervene in accordance with the                        Commission review of certain findings                  information relating to filing
                                               Commission’s Rules may become a                         and recommendations in the November                    requirements, interventions, protests,
                                               party to the proceeding. Any comments,                  8, 2017 audit report 1 issued in this                  service, and qualifying facilities filings
                                               protests, or motions to intervene must                  docket by the Director of the Office of                can be found at: http://www.ferc.gov/
                                               be received on or before the specified                  Enforcement under authority delegated                  docs-filing/efiling/filing-req.pdf. For
                                               comment date for the particular                         to him by section 375.311 of the                       other information, call (866) 208–3676
                                               application.                                            Commission’s regulations (Audit                        (toll free). For TTY, call (202) 502–8659.
                                                                                                       Report).2 In accordance with section                     Dated: January 22, 2018.
                                                  o. Filing and Service of Responsive                  158.3 of the Commission’s regulations,3
                                               Documents: All filings must (1) bear in                                                                        Kimberly D. Bose,
                                                                                                       Dominion notified the Commission that                  Secretary.
                                               all capital letters the title PROTEST,                  it requested review of contested issues
                                               MOTION TO INTERVENE,                                    by means of a shortened procedure.
                                                                                                                                                              [FR Doc. 2018–01504 Filed 1–25–18; 8:45 am]
                                               COMMENTS, RECOMMENDATIONS,                              Pursuant to section 158.3, we direct the               BILLING CODE 6717–01–P
                                               TERMS AND CONDITIONS, or                                commencement of a paper hearing.
                                               FISHWAY PRESCRIPTIONS; (2) set                             The Audit Report summarizes
                                               forth in the heading the name of the                                                                           DEPARTMENT OF ENERGY
                                                                                                       Enforcement’s review, first announced
                                               applicant and the project number of the                 in this docket on April 15, 2015, of
                                               application to which the filing                                                                                Federal Energy Regulatory
                                                                                                       Dominion’s compliance with the                         Commission
                                               responds; (3) furnish the name, address,                Uniform System of Accounts, the
                                               and telephone number of the person                      reporting requirements of the FERC                     [Docket No. IC18–7–000]
                                               protesting or intervening; and (4)                      Form No. 2, and Dominion’s own gas
                                               otherwise comply with the requirements                                                                         Commission Information Collection
                                                                                                       tariff. The Audit Report states that,                  Activities (FERC–725l); Comment
                                               of 18 CFR 385.2001 through 385.2005.                    while Dominion agreed not to contest
                                               All comments, recommendations, terms                                                                           Request; Extension
                                                                                                       certain of Enforcement’s findings and
                                               and conditions or prescriptions must set                recommendations in the report, it does                 AGENCY: Federal Energy Regulatory
                                               forth their evidentiary basis and                       contest the Audit Report’s findings and                Commission, DOE.
                                               otherwise comply with the requirements                  recommendations pertaining to the                      ACTION: Notice of information collection
                                               of 18 CFR 4.34(b). All comments,                        Allowance for Funds Used During                        and request for comments.
                                               recommendations, terms and                              Construction (AFUDC). The scope of the
                                               conditions, or prescriptions should                     paper hearing is limited to these                      SUMMARY:    In compliance with the
                                               relate to the proposed amendment                        challenged findings and                                requirements of the Paperwork
                                               application. Agencies may obtain copies                 recommendations.                                       Reduction Act of 1995, 44 U.S.C.
                                               of the application directly from the                       In accordance with section 158.3,                   3506(c)(2)(A), the Federal Energy
                                               applicant. A copy of any protest or                     Dominion and any other interested                      Regulatory Commission (Commission or
                                               motion to intervene must be served                      entity, including the Commission staff,                FERC) is soliciting public comment on
                                               upon each representative of the                         shall file, within 45 days of this notice,             the currently approved information
                                               applicant specified in the particular                   an initial memorandum that addresses                   collection, FERC–725L, Mandatory
                                               application. If an intervener files                     the relevant facts and applicable law                  Reliability Standards for the Bulk-Power
                                               comments or documents with the                          that support the position or positions                 System: MOD Reliability Standards.
                                               Commission relating to the merits of an                 taken regarding the matters at issue.                  DATES: Comments on the collection of
                                               issue that may affect the responsibilities              Reply memoranda may be filed by                        information are due March 27, 2018.
                                               of a particular resource agency, they                   participants who filed initial                         ADDRESSES: You may submit comments
                                               must also serve a copy of the document                  memoranda. Reply memoranda must be                     (identified by Docket No. IC18–7–000)
                                               on that resource agency. A copy of all                  filed within 20 days of the due date for               by either of the following methods:
                                               other filings in reference to this                      initial memoranda. Pursuant to section                    • eFiling at Commission’s website:
                                               application must be accompanied by                      158.3, subpart T of Part 385 of the                    http://www.ferc.gov/docs-filing/
                                               proof of service on all persons listed in               Commission’s regulations shall apply to                efiling.asp.
                                               the service list prepared by the                                                                                  • Mail/Hand Delivery/Courier:
                                               Commission in this proceeding, in                          1 Audit of Dominion Energy Transmission, Inc.’s     Federal Energy Regulatory Commission,
                                               accordance with 18 CFR 4.34(b) and                                                                             Secretary of the Commission, 888 First
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                       compliance with its FERC Gas Tariff; the
                                               385.2010.                                               accounting requirements of the Uniform System of       Street NE, Washington, DC 20426.
                                                                                                       Accounts Prescribed for Natural Gas Companies;
                                                 Dated: January 22, 2018.                              and the reporting requirements of the FERC Form
                                                                                                                                                                 Instructions: All submissions must be
                                               Kimberly D. Bose,                                       No. 2, Annual Report, Commission Office of             formatted and filed in accordance with
                                                                                                       Enforcement Division of Audits and Accounting
                                               Secretary.                                              (filed Nov. 8, 2017) (Audit Report).                     4 18 CFR 158.4 (2017) (citing 18 CFR 385.706
                                               [FR Doc. 2018–01506 Filed 1–25–18; 8:45 am]                2 18 CFR 375.311 (2017).                            (2017)).
                                               BILLING CODE 6717–01–P                                     3 18 CFR 158.3 (2017).                                5 18 CFR 158.5 (2017).




                                          VerDate Sep<11>2014   20:14 Jan 25, 2018   Jkt 244001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1


                                               3700                                 Federal Register / Vol. 83, No. 18 / Friday, January 26, 2018 / Notices

                                               submission guidelines at: http://                                     collection requirements with no changes                                       performed to obtain model data may
                                               www.ferc.gov/help/submission-                                         to the current reporting requirements.                                        reveal latent defects that could cause
                                               guide.asp. For user assistance contact                                   Abstract: MOD Reliability Standards                                        inappropriate unit response during
                                               FERC Online Support by email at                                       ensure that generators remain in                                              system disturbances.
                                               ferconlinesupport@ferc.gov, or by phone                               operation during specified voltage and                                           Reliability Standards MOD–032–1
                                               at: (866) 208–3676 (toll-free), or (202)                              frequency excursions, properly                                                and MOD–033–2 are designed to
                                               502–8659 for TTY.                                                     coordinate protective relays and                                              replace, consolidate and improve upon’’
                                                  Docket: Users interested in receiving                              generator voltage regulator controls, and                                     existing MOD standards, in addressing
                                               automatic notification of activity in this                            ensure that generator models accurately                                       system-level modeling data and
                                               docket or in viewing/downloading                                      reflect the generator’s capabilities and                                      validation requirements necessary for
                                               comments and issuances in this docket                                 equipment performance.                                                        developing planning models and the
                                                                                                                        Reliability Standards MOD–025–2,
                                               may do so at http://www.ferc.gov/docs-                                                                                                              Interconnection-wide cases that are
                                                                                                                     MOD–026–1, and MOD–027–1 ‘‘address
                                               filing/docs-filing.asp.                                                                                                                             integral to analyzing the reliability of
                                                                                                                     generator verifications needed to
                                               FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                                                   the Bulk-Power System.
                                                                                                                     support Bulk-Power System reliability
                                               Ellen Brown may be reached by email                                   and will ensure that accurate data is                                            Type of Respondents: NERC-
                                               at DataClearance@FERC.gov, telephone                                  verified and made available for planning                                      registered entities including generator
                                               at (202) 502–8663, and fax at (202) 273–                              simulations.’’ NERC explains that Bulk-                                       owners, transmission planners,
                                               0873.                                                                 Power System reliability benefits from                                        planning authorities, balancing
                                                                                                                     ‘‘good quality simulation models of                                           authorities, resource planners,
                                               SUPPLEMENTARY INFORMATION:
                                                                                                                     power system equipment,’’ and that                                            transmission service providers,
                                                 Title: FERC–725L, Mandatory                                         ‘‘model validation ensures the proper                                         reliability coordinators, and
                                               Reliability Standards for the Bulk-Power                              performance of the control systems and                                        transmission operators.2
                                               System: MOD Reliability Standards.                                    validates the computer models used for                                           Estimate of Annual Burden 3: The
                                                 OMB Control No.: 1902–0261.                                         stability analysis.’’ 1 NERC further states                                   Commission estimates the annual public
                                                 Type of Request: Three-year extension                               that the proposed Reliability Standards                                       reporting burden 4 for the information
                                               of the FERC–725L information                                          will enhance reliability because the tests                                    collection as:

                                                                                                                        Annual                                                                                   Total annual burden          Cost per
                                                                                      Number of                        number of                 Total number              Average burden and                      hours and total           respondent
                                                                                     respondents                    responses per                of responses               cost per response                        annual cost                 ($)
                                                                                                                      respondent

                                                                                             (1)                             (2)                 (1) * (2) = (3)                         (4)                         (3) * (4) = (5)            (5) ÷ (1)

                                                 MOD–025–2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive
                                                                                                        Power Capability)

                                               Attachment 2 ............       933 (GO) ..................                               1                        933      6 hrs.; $448.92 5 .......             5,598 hrs.; $418,842                   448.92
                                               Evidence Retention ..           933 (GO) ..................                               1                        933      1 hr.; $32.74 6 ...........           933 hrs.; $30,546 .....                 32.74

                                                    Total ..................   ..................................   ........................    ........................   ..................................    6,531 hrs.; $449,388      ........................

                                                    MOD–026–1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Variance Control Functions)

                                               Instructions for ob-            185 (TP) ...................                               1                       185      8 hrs.; $598.56 4 .......             1,480 hrs.; $110,734                   598.56
                                                 taining excitation
                                                 control system or
                                                 plant voltage/vari-
                                                 ance control func-
                                                 tion model.
                                               Documentation on                466 (GO) ..................                                1                       466      8 hrs.; $598.56 4 .......             3,728 hrs.; $278,929                   598.56
                                                 generator
                                                 verification.
                                               Evidence Retention ..           651 (GO and TOP) ..                                       1                        651      1 hr.; $32.745 ...........            651 hrs.; $21,314 .....                 32.74

                                                    Total ..................   ..................................   ........................    ........................   ..................................    5,859 hrs.; $410,977      ........................




                                                 1 NERC Petition for Approval of Five Proposed                          3 Burden is defined as the total time, effort, or                          primarily of activities related to establishing
                                               Reliability Standards MOD–025–2, MOD–026–1,                           financial resources expended by persons to                                    industry practices and developing data validation
daltland on DSKBBV9HB2PROD with NOTICES




                                               MOD–027–1, PRC–019–1, and PRC–024–1 issued                            generate, maintain, retain, or disclose or provide                            procedures tailored toward these reliability
                                               on 5/30/2013.                                                         information to or for a Federal agency. For further                           standards and their reporting requirements. None of
                                                 2 In subsequent portions of this notice, the                        explanation of what is included in the information
                                                                                                                                                                                                   the one-time burdens apply any longer, so they are
                                               following acronyms will be used: PA = Planning                        collection burden, reference 5 Code of Federal
                                                                                                                     Regulations 1320.3.                                                           being removed from the FERC–725L information
                                               Authority, GO = Generator Owner, TP =
                                               Transmission Planner, BA = Balancing Authority,                          4 Each of the five MOD standards in the FERC–                              collection.
                                               RP = Resource Planner, TSP = Transmission Service                     725L information collection previously contained
                                               Provider, RC = Reliability Coordinator, TOP =                         ‘‘one-time’’ components to their respondent burden.
                                               Transmission Operator.                                                These one-time burden categories consisted



                                          VerDate Sep<11>2014     20:14 Jan 25, 2018        Jkt 244001       PO 00000        Frm 00028         Fmt 4703      Sfmt 4703       E:\FR\FM\26JAN1.SGM                26JAN1


                                                                                    Federal Register / Vol. 83, No. 18 / Friday, January 26, 2018 / Notices                                                                                              3701

                                                                                                                        Annual                                                                                   Total annual burden           Cost per
                                                                                      Number of                        number of                 Total number              Average burden and                      hours and total            respondent
                                                                                     respondents                    responses per                of responses               cost per response                        annual cost                  ($)
                                                                                                                      respondent

                                                                                             (1)                             (2)                 (1) * (2) = (3)                         (4)                         (3) * (4) = (5)             (5) ÷ (1)

                                                  MOD–027–1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions)

                                               Instructions for ob-            185 (TP) ...................                               1                       185      8 hrs.; $598.56 4 .......             1,480 hrs.; $110,734                    598.56
                                                 taining excitation
                                                 control system or
                                                 plant voltage/vari-
                                                 ance control func-
                                                 tion model.
                                               Documentation on                466 (GO) ..................                                1                       466      8 hrs.; $598.56 4 .......             3,728 hrs.; $278,929                    598.56
                                                 generator
                                                 verification.
                                                    Evidence Reten-            651 (GO and TP) .....                                     1                        651      1 hr.; $32.74 2 ...........           651 hrs.; $21,314 .....                   32.74
                                                       tion.

                                                    Total ..................   ..................................   ........................    ........................   ..................................    5,859 hrs.; $410,977       ........................

                                                  MOD–032–1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions)

                                               Data Submittal ..........       1,197 (BA, GO, PA,                                         1                   1,197        8 hrs.; $544.967 .......              9,576 hrs.; $652,317                    544.96
                                                                                 RP, TO, TP, and
                                                                                 TSP).
                                               Evidence Retention ..           1,197 (BA, GO, PA,                                         1                   1,197        1 hr.; $32.742 ...........            1,197 hrs.; $39,190 ..                    32.74
                                                                                 RP, TO, TP, and
                                                                                 TSP).

                                                    Total ..................   ..................................   ........................    ........................   ..................................    10,773 hrs.;               ........................
                                                                                                                                                                                                                   $691,507.

                                                                                                   MOD–033–1 (Steady-State and Dynamics System Model Validation)

                                               Data Submittal ..........       188 (RC and TOP) ..                                       1                        188      8 hrs.; $544.96 6 .......             1,504 hrs.; $102,452                   544.96
                                               Evidence Retention ..           194 (PA, RC, and                                          1                        194      1 hr.; $32.742 ...........            194 hrs.; $6,352 .......                32.74
                                                                                 TOP).

                                                    Total ..................   ..................................   ........................    ........................   ..................................    1,698 hrs.; $108,804       ........................



                                                 The totalannual estimated burden and                                and clarity of the information collection;                                    Federal Insecticide, Fungicide, and
                                               cost for the FERC–725L information                                    and (4) ways to minimize the burden of                                        Rodenticide Act (FIFRA), EPA is hereby
                                               collection is 27,544 hours and                                        the collection of information on those                                        providing notice of receipt and
                                               $2,071,653 respectively.                                              who are to respond, including the use                                         opportunity to comment on these
                                                 Comments: Comments are invited on:                                  of automated collection techniques or                                         applications.
                                               (1) Whether the collection of                                         other forms of information technology.
                                               information is necessary for the proper                                 Dated: January 22, 2018.
                                                                                                                                                                                                   DATES: Comments must be received on
                                               performance of the functions of the                                                                                                                 or before February 26, 2018.
                                                                                                                     Kimberly D. Bose,
                                               Commission, including whether the
                                               information will have practical utility;                              Secretary.                                            Submit your comments,   ADDRESSES:
                                               (2) the accuracy of the agency’s estimate                                                                      identified by the Docket Identification
                                                                                                                     [FR Doc. 2018–01505 Filed 1–25–18; 8:45 am]
                                               of the burden and cost of the collection                              BILLING CODE 6717–01–P                   (ID) Number and the File Symbol of
                                               of information, including the validity of                                                                      interest as show in the body of this
                                               the methodology and assumptions used;                                                                          document, by one of the following
                                               (3) ways to enhance the quality, utility                              ENVIRONMENTAL PROTECTION                 methods:
                                                                                                                     AGENCY                                     • Federal eRulemaking Portal: http://
                                                  5 This wage figure uses the weighted hourly
                                                                                                                     [EPA–HQ–OPP–2017–0008; FRL–9971–42]      www.regulations.gov. Follow the online
                                               average wage (plus benefits) for electrical engineers
                                               (Occupation Code: 17–2071) and managers                                                                        instructions for submitting comments.
                                               (Occupation Code: 11–0000) obtained from the                          Pesticide Product Registration;          Do not submit electronically any
                                               Bureau of Labor Statistics: $74.82/hour. The average                  Receipt of Applications for New Uses     information you consider to be
                                               used the following calculation: [$68.12/hour +
                                               $81.52/hour] ÷ 2 = $74.82/hour. $68.12/hour is the                                                             Confidential Business Information (CBI)
                                                                                                                     AGENCY: Environmental Protection
daltland on DSKBBV9HB2PROD with NOTICES




                                               wage for engineers. $81.52 is the wage for manager.                                                            or other information whose disclosure is
                                                  6 Uses the hourly average wage (plus benefits) for                 Agency (EPA).
                                                                                                                                                              restricted by statute.
                                               file clerks obtained from the Bureau of Labor                         ACTION: Notice.
                                               Statistics: $32.74/hour (BLS Occupation Code: 43–                                                                • Mail: OPP Docket, Environmental
                                               4071).                                                                SUMMARY: EPA has received applications Protection Agency Docket Center (EPA/
                                                  7 Uses the hourly average wage (plus benefits) for

                                               electrical engineers obtained from the Bureau of
                                                                                                                     to register new uses for pesticide       DC), (28221T), 1200 Pennsylvania Ave.
                                               Labor Statistics: $68.12/hour (BLS Occupation                         products containing currently registered NW, Washington, DC 20460–0001.
                                               Code: 17–2071).                                                       active ingredients. Pursuant to the


                                          VerDate Sep<11>2014     21:20 Jan 25, 2018        Jkt 244001       PO 00000        Frm 00029         Fmt 4703      Sfmt 4703       E:\FR\FM\26JAN1.SGM                26JAN1



Document Created: 2018-10-26 10:07:40
Document Modified: 2018-10-26 10:07:40
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due March 27, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 3699 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR