83_FR_38447 83 FR 38296 - Alabama Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests

83 FR 38296 - Alabama Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 151 (August 6, 2018)

Page Range38296-38298
FR Document2018-16752

Federal Register, Volume 83 Issue 151 (Monday, August 6, 2018)
[Federal Register Volume 83, Number 151 (Monday, August 6, 2018)]
[Notices]
[Pages 38296-38298]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-16752]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2628-065]


Alabama Power Company; Notice of Intent To File License 
Application, Filing of Pre-Application Document (PAD), Commencement of 
Pre-Filing Process, and Scoping; Request for Comments on the Pad and 
Scoping Document, and Identification of Issues and Associated Study 
Requests

    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Pre-filing Process.
    b. Project No.: 2628-065.
    c. Dated Filed: June 1, 2018.
    d. Submitted By: Alabama Power Company (Alabama Power).
    e. Name of Project: R.L. Harris Hydroelectric Project (Harris 
Project).
    f. Location: The project is located on the Tallapoosa River the 
City of Lineville in Randolph, Clay, and Cleburne Counties, Alabama. 
The project occupies 4.90 acres of federal land administered by the 
Bureau of Land Management.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: Angie Anderegg, Harris Relicensing 
Project Manager, Alabama Power Company, 600 18th Street, Birmingham, AL 
35203; (205) 257-2251 or [email protected].
    i. FERC Contact: Sarah Salazar at (202) 502-6863 or email at 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item o below. Cooperating agencies should note 
the Commission's

[[Page 38297]]

policy that agencies that cooperate in the preparation of the 
environmental document cannot also intervene. See 94 FERC ] 61,076 
(2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR, part 402 and (b) the State Historic 
Preservation Officer, as required by section 106, National Historic 
Preservation Act, and the implementing regulations of the Advisory 
Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Alabama Power as the 
Commission's non-federal representative for carrying out informal 
consultation, pursuant to section 7 of the Endangered Species Act and 
section 106 of the National Historic Preservation Act.
    m. Alabama Power filed with the Commission a Pre-Application 
Document (PAD; including a proposed process plan and schedule), 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Commission staff's Scoping Document 1 (SD1), as well as study requests. 
All comments on the PAD and SD1, and study requests should be sent to 
the address above in paragraph h. In addition, all comments on the PAD 
and SD1, study requests, requests for cooperating agency status, and 
all communications to and from Commission staff related to the merits 
of the potential application must be filed with the Commission.
    The Commission strongly encourages electronic filing. Please file 
all documents using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected]. In lieu of electronic filing, please send a 
paper copy to: Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2628-065.
    All filings with the Commission must bear the appropriate heading: 
``Comments on Pre-Application Document,'' ``Study Requests,'' 
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency 
Status,'' or ``Communications to and from Commission Staff.'' Any 
individual or entity interested in submitting study requests, 
commenting on the PAD or SD1, and any agency requesting cooperating 
status must do so by September 29, 2018.
    p. We intend to prepare either an environmental assessment (EA) or 
Environmental Impact Statement (EIS). The meetings listed below will 
satisfy the NEPA scoping requirements, irrespective of whether an EA or 
EIS is issued by the Commission.

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the times and places noted below. The daytime meeting 
will focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:

Evening Scoping Meeting--Lineville, Alabama

    Date & Time: Tuesday, August 28, 2018 at 6:30 p.m.
    Location: Wedowee Marine South, 9681 Highway 48, Lineville, Alabama 
36266, (770) 843-3054.

Daytime Scoping Meeting--Lineville, Alabama

    Date & Time: Wednesday, August 29, 2018 at 9 a.m.
    Location: Wedowee Marine South, 9681 Highway 48, Lineville, Alabama 
36266, (770) 843-3054.
    Please RSVP to [email protected], or call Cecile 
Jones at 205-257-1701, on or before August 15, 2018, if you plan to 
attend one of the scoping meetings in Lineville. Directions to Wedowee 
Marine South are available at www.harrisrelicensing.com and in Appendix 
C of the Commission's Scoping Document 1, described below.
    Scoping Document 1 (SD1), which outlines the subject areas to be 
addressed in the environmental document, was mailed to the individuals 
and entities on the Commission's mailing list. Copies of SD1 will be 
available at the scoping meetings, or may be viewed on the web at 
http://www.ferc.gov, using the ``eLibrary'' link. Follow the directions 
for accessing information in paragraph n. Based on all oral and written 
comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a 
revised process plan and schedule, as well as a list of issues, 
identified through the scoping process.

Environmental Site Review

    The potential applicant and Commission staff will conduct an 
Environmental Site Review (site visit) of the project on Tuesday, 
August 28, 2018, starting at 9:00 a.m., and ending at or about 4:30 
p.m. All participants should meet at the R.L. Harris Dam located at 
2761 County Road 100, Lineville, AL 36266. Directions to the R.L. 
Harris Dam are available at www.harrisrelicensing.com and in Appendix C 
of the Commission's SD1. Participants must notify Cecile Jones at (205) 
257-1701 or www.harrisrelicensing.com, on or before August 15, 2018, if 
they plan to attend the environmental site review.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
federal, state, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for

[[Page 38298]]

development of an environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n. of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will be placed 
in the public records of the project.

    Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-16752 Filed 8-3-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                38296                         Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices

                                                DEPARTMENT OF ENERGY                                       Accession Number: 20180730–5233.                      eFiling is encouraged. More detailed
                                                                                                           Comments Due: 5 p.m. ET 8/20/18.                   information relating to filing
                                                Federal Energy Regulatory                                  Docket Numbers: ER18–2104–000.                     requirements, interventions, protests,
                                                Commission                                                 Applicants: Arizona Public Service                 service, and qualifying facilities filings
                                                                                                        Company.                                              can be found at: http://www.ferc.gov/
                                                Combined Notice of Filings #1                              Description: § 205(d) Rate Filing: Rate            docs-filing/efiling/filing-req.pdf. For
                                                   Take notice that the Commission                      Schedule No. 217, Exhibit A and Exhibit               other information, call (866) 208–3676
                                                received the following electric corporate               B Revisions to be effective 10/1/2018.                (toll free). For TTY, call (202) 502–8659.
                                                filings:                                                   Filed Date: 7/30/18.                                 Dated: July 31, 2018.
                                                                                                           Accession Number: 20180730–5227.
                                                   Docket Numbers: EC18–76–000.                                                                               Nathaniel J. Davis, Sr.,
                                                                                                           Comments Due: 5 p.m. ET 8/20/18.
                                                   Applicants: Entergy Arkansas, Inc.,                                                                        Deputy Secretary.
                                                Entergy Mississippi, Inc.                                  Docket Numbers: ER18–2105–000.
                                                                                                                                                              [FR Doc. 2018–16746 Filed 8–3–18; 8:45 am]
                                                   Description: Supplement to March 27,                    Applicants: Arizona Public Service
                                                                                                                                                              BILLING CODE 6717–01–P
                                                2018 Joint Application of Entergy                       Company.
                                                Arkansas, Inc., et al. for Approval under                  Description: § 205(d) Rate Filing:
                                                Section 203 of the Federal Power Act.                   Revisions to Service Agreement Nos.
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                   Filed Date: 7/27/18.                                 218 and 335 to be effective 7/1/2018.
                                                   Accession Number: 20180727–5212.                        Filed Date: 7/30/18.                               Federal Energy Regulatory
                                                   Comments Due: 5 p.m. ET 8/10/18.                        Accession Number: 20180730–5229.                   Commission
                                                                                                           Comments Due: 5 p.m. ET 8/20/18.
                                                   Take notice that the Commission                                                                            [Project No. 2628–065]
                                                received the following exempt                              Docket Numbers: ER18–2106–000.
                                                wholesale generator filings:                               Applicants: Duke Energy Ohio, Inc.
                                                                                                                                                              Alabama Power Company; Notice of
                                                                                                           Description: § 205(d) Rate Filing:
                                                   Docket Numbers: EG18–116–000.                                                                              Intent To File License Application,
                                                                                                        Duke-DP&L IA 205 Filing (PJM SA No.
                                                   Applicants: Live Oak Wind Project,                                                                         Filing of Pre-Application Document
                                                                                                        TBD) to be effective 6/30/2018.
                                                LLC.                                                                                                          (PAD), Commencement of Pre-Filing
                                                                                                           Filed Date: 7/30/18.
                                                   Description: Notice of Self-                            Accession Number: 20180730–5238.                   Process, and Scoping; Request for
                                                Certification of Exempt Wholesale                          Comments Due: 5 p.m. ET 8/20/18.                   Comments on the Pad and Scoping
                                                Generator Status of Live Oak Wind                                                                             Document, and Identification of Issues
                                                                                                           Docket Numbers: ER18–2107–000.                     and Associated Study Requests
                                                Project, LLC.
                                                                                                           Applicants: Duke Energy Ohio, Inc.
                                                   Filed Date: 7/31/18.
                                                                                                           Description: § 205(d) Rate Filing:                   a. Type of Filing: Notice of Intent to
                                                   Accession Number: 20180731–5034.
                                                                                                        Duke-AEP IA 205 Filing (PJM SA No.                    File License Application for a New
                                                   Comments Due: 5 p.m. ET 8/21/18.
                                                                                                        1491) to be effective 6/30/2018.                      License and Commencing Pre-filing
                                                   Take notice that the Commission                         Filed Date: 7/30/18.                               Process.
                                                received the following electric rate                       Accession Number: 20180730–5239.                     b. Project No.: 2628–065.
                                                filings:                                                   Comments Due: 5 p.m. ET 8/20/18.                     c. Dated Filed: June 1, 2018.
                                                   Docket Numbers: ER10–3279–002;                          Docket Numbers: ER18–2108–000.                       d. Submitted By: Alabama Power
                                                ER10–3275–002; ER10–3274–002;                              Applicants: Duke Energy Ohio, Inc.                 Company (Alabama Power).
                                                ER18–213–001; ER10–3278–002.                               Description: § 205(d) Rate Filing:                   e. Name of Project: R.L. Harris
                                                   Applicants: Basin Creek Equity                       Duke-EKPC IA 205 Filing (PJM SA No.                   Hydroelectric Project (Harris Project).
                                                Partners L.L.C., Capitol District Energy                3141) to be effective 6/30/2018.                        f. Location: The project is located on
                                                Center Cogeneration Associates,                            Filed Date: 7/30/18.                               the Tallapoosa River the City of
                                                Pawtucket Power Associates Limited                         Accession Number: 20180730–5240.                   Lineville in Randolph, Clay, and
                                                Partnership, Pittsfield Generating                         Comments Due: 5 p.m. ET 8/20/18.                   Cleburne Counties, Alabama. The
                                                Company, L.P., Forked River Power                          Docket Numbers: ER18–2109–000.                     project occupies 4.90 acres of federal
                                                LLC.                                                       Applicants: PJM Interconnection,                   land administered by the Bureau of
                                                   Description: Notice of Non-Material                  L.L.C.                                                Land Management.
                                                Change in Status of Basin Creek Equity                     Description: § 205(d) Rate Filing: 2nd               g. Filed Pursuant to: 18 CFR part 5 of
                                                Partners L.L.C., et. al.                                Quarter 2018 Revisions to OA, Sch. 12                 the Commission’s Regulations.
                                                   Filed Date: 7/30/18.                                 and RAA, Sch. 17 Member Lists to be                     h. Potential Applicant Contact: Angie
                                                   Accession Number: 20180730–5275.                     effective 6/30/2018.                                  Anderegg, Harris Relicensing Project
                                                   Comments Due: 5 p.m. ET 8/20/18.                        Filed Date: 7/31/18.                               Manager, Alabama Power Company, 600
                                                   Docket Numbers: ER15–794–008.                           Accession Number: 20180731–5059.                   18th Street, Birmingham, AL 35203;
                                                   Applicants: Catalyst Paper                              Comments Due: 5 p.m. ET 8/21/18.                   (205) 257–2251 or ARSEGARS@
                                                Operations, Inc.                                           The filings are accessible in the                  southernco.com.
                                                   Description: Notification of Change in               Commission’s eLibrary system by                         i. FERC Contact: Sarah Salazar at
                                                Status of Catalyst Paper Operations, Inc.               clicking on the links or querying the                 (202) 502–6863 or email at
                                                   Filed Date: 7/30/18.                                 docket number.                                        sarah.salazar@ferc.gov.
                                                   Accession Number: 20180730–5250.                        Any person desiring to intervene or                  j. Cooperating agencies: Federal, state,
                                                   Comments Due: 5 p.m. ET 8/20/18.                     protest in any of the above proceedings               local, and tribal agencies with
                                                                                                        must file in accordance with Rules 211                jurisdiction and/or special expertise
sradovich on DSK3GMQ082PROD with NOTICES




                                                   Docket Numbers: ER18–2049–001.
                                                   Applicants: Midcontinent                             and 214 of the Commission’s                           with respect to environmental issues
                                                Independent System Operator, Inc.                       Regulations (18 CFR 385.211 and                       that wish to cooperate in the
                                                   Description: Tariff Amendment:                       385.214) on or before 5:00 p.m. Eastern               preparation of the environmental
                                                2018–07–30_Amendment to Attachment                      time on the specified comment date.                   document should follow the
                                                X Revisions to Expedite Phase I of the                  Protests may be considered, but                       instructions for filing such requests
                                                DPP to be effective 9/19/2018.                          intervention is necessary to become a                 described in item o below. Cooperating
                                                   Filed Date: 7/30/18.                                 party to the proceeding.                              agencies should note the Commission’s


                                           VerDate Sep<11>2014   17:36 Aug 03, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\06AUN1.SGM   06AUN1


                                                                              Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices                                             38297

                                                policy that agencies that cooperate in                  submit brief comments up to 6,000                        Location: Wedowee Marine South,
                                                the preparation of the environmental                    characters, without prior registration,               9681 Highway 48, Lineville, Alabama
                                                document cannot also intervene. See 94                  using the eComment system at http://                  36266, (770) 843–3054.
                                                FERC ¶ 61,076 (2001).                                   www.ferc.gov/docs-filing/                                Please RSVP to harrisrelicensing@
                                                   k. With this notice, we are initiating               ecomment.asp. You must include your                   southernco.com, or call Cecile Jones at
                                                informal consultation with: (a) The U.S.                name and contact information at the end               205–257–1701, on or before August 15,
                                                Fish and Wildlife Service and/or NOAA                   of your comments. For assistance,                     2018, if you plan to attend one of the
                                                Fisheries under section 7 of the                        please contact FERC Online Support at                 scoping meetings in Lineville.
                                                Endangered Species Act and the joint                    FERCOnlineSupport@ferc.gov. In lieu of                Directions to Wedowee Marine South
                                                agency regulations thereunder at 50                     electronic filing, please send a paper                are available at
                                                CFR, part 402 and (b) the State Historic                copy to: Secretary, Federal Energy                    www.harrisrelicensing.com and in
                                                Preservation Officer, as required by                    Regulatory Commission, 888 First Street               Appendix C of the Commission’s
                                                section 106, National Historic                          NE, Washington, DC 20426. The first                   Scoping Document 1, described below.
                                                Preservation Act, and the implementing                  page of any filing should include docket                 Scoping Document 1 (SD1), which
                                                regulations of the Advisory Council on                  number P–2628–065.                                    outlines the subject areas to be
                                                Historic Preservation at 36 CFR 800.2.                                                                        addressed in the environmental
                                                                                                           All filings with the Commission must
                                                   l. With this notice, we are designating
                                                                                                        bear the appropriate heading:                         document, was mailed to the
                                                Alabama Power as the Commission’s
                                                                                                        ‘‘Comments on Pre-Application                         individuals and entities on the
                                                non-federal representative for carrying
                                                                                                        Document,’’ ‘‘Study Requests,’’                       Commission’s mailing list. Copies of
                                                out informal consultation, pursuant to
                                                                                                        ‘‘Comments on Scoping Document 1,’’                   SD1 will be available at the scoping
                                                section 7 of the Endangered Species Act
                                                                                                        ‘‘Request for Cooperating Agency                      meetings, or may be viewed on the web
                                                and section 106 of the National Historic
                                                                                                        Status,’’ or ‘‘Communications to and                  at http://www.ferc.gov, using the
                                                Preservation Act.
                                                   m. Alabama Power filed with the                      from Commission Staff.’’ Any                          ‘‘eLibrary’’ link. Follow the directions
                                                Commission a Pre-Application                            individual or entity interested in                    for accessing information in paragraph
                                                Document (PAD; including a proposed                     submitting study requests, commenting                 n. Based on all oral and written
                                                process plan and schedule), pursuant to                 on the PAD or SD1, and any agency                     comments, a Scoping Document 2 (SD2)
                                                18 CFR 5.6 of the Commission’s                          requesting cooperating status must do so              may be issued. SD2 may include a
                                                regulations.                                            by September 29, 2018.                                revised process plan and schedule, as
                                                   n. A copy of the PAD is available for                   p. We intend to prepare either an                  well as a list of issues, identified
                                                review at the Commission in the Public                  environmental assessment (EA) or                      through the scoping process.
                                                Reference Room or may be viewed on                      Environmental Impact Statement (EIS).                 Environmental Site Review
                                                the Commission’s website (http://                       The meetings listed below will satisfy
                                                www.ferc.gov), using the ‘‘eLibrary’’                   the NEPA scoping requirements,                           The potential applicant and
                                                link. Enter the docket number,                          irrespective of whether an EA or EIS is               Commission staff will conduct an
                                                excluding the last three digits in the                  issued by the Commission.                             Environmental Site Review (site visit) of
                                                docket number field to access the                                                                             the project on Tuesday, August 28,
                                                document. For assistance, contact FERC                  Scoping Meetings                                      2018, starting at 9:00 a.m., and ending
                                                Online Support at                                                                                             at or about 4:30 p.m. All participants
                                                                                                          Commission staff will hold two
                                                FERCOnlineSupport@ferc.gov, (866)                                                                             should meet at the R.L. Harris Dam
                                                                                                        scoping meetings in the vicinity of the
                                                208–3676 (toll free), or (202) 502–8659                                                                       located at 2761 County Road 100,
                                                                                                        project at the times and places noted
                                                (TTY). A copy is also available for                                                                           Lineville, AL 36266. Directions to the
                                                                                                        below. The daytime meeting will focus
                                                inspection and reproduction at the                                                                            R.L. Harris Dam are available at
                                                                                                        on resource agency, Indian tribes, and
                                                address in paragraph h.                                                                                       www.harrisrelicensing.com and in
                                                                                                        non-governmental organization
                                                   Register online at http://                                                                                 Appendix C of the Commission’s SD1.
                                                                                                        concerns, while the evening meeting is
                                                www.ferc.gov/docs-filing/                                                                                     Participants must notify Cecile Jones at
                                                                                                        primarily for receiving input from the
                                                esubscription.asp to be notified via                                                                          (205) 257–1701 or
                                                                                                        public. We invite all interested
                                                email of new filing and issuances                                                                             www.harrisrelicensing.com, on or before
                                                                                                        individuals, organizations, and agencies
                                                related to this or other pending projects.                                                                    August 15, 2018, if they plan to attend
                                                                                                        to attend one or both of the meetings,
                                                For assistance, contact FERC Online                                                                           the environmental site review.
                                                                                                        and to assist staff in identifying
                                                Support.                                                particular study needs, as well as the                Meeting Objectives
                                                   o. With this notice, we are soliciting               scope of environmental issues to be
                                                comments on the PAD and Commission                                                                               At the scoping meetings, staff will: (1)
                                                                                                        addressed in the environmental
                                                staff’s Scoping Document 1 (SD1), as                                                                          Initiate scoping of the issues; (2) review
                                                                                                        document. The times and locations of
                                                well as study requests. All comments on                                                                       and discuss existing conditions and
                                                                                                        these meetings are as follows:
                                                the PAD and SD1, and study requests                                                                           resource management objectives; (3)
                                                should be sent to the address above in                  Evening Scoping Meeting—Lineville,                    review and discuss existing information
                                                paragraph h. In addition, all comments                  Alabama                                               and identify preliminary information
                                                on the PAD and SD1, study requests,                                                                           and study needs; (4) review and discuss
                                                                                                          Date & Time: Tuesday, August 28,                    the process plan and schedule for pre-
                                                requests for cooperating agency status,
                                                                                                        2018 at 6:30 p.m.                                     filing activity that incorporates the time
                                                and all communications to and from
                                                                                                          Location: Wedowee Marine South,                     frames provided for in Part 5 of the
sradovich on DSK3GMQ082PROD with NOTICES




                                                Commission staff related to the merits of
                                                the potential application must be filed                 9681 Highway 48, Lineville, Alabama                   Commission’s regulations and, to the
                                                with the Commission.                                    36266, (770) 843–3054.                                extent possible, maximizes coordination
                                                   The Commission strongly encourages                   Daytime Scoping Meeting—Lineville,                    of federal, state, and tribal permitting
                                                electronic filing. Please file all                      Alabama                                               and certification processes; and (5)
                                                documents using the Commission’s                                                                              discuss the appropriateness of any
                                                eFiling system at http://www.ferc.gov/                    Date & Time: Wednesday, August 29,                  federal or state agency or Indian tribe
                                                docs-filing/efiling.asp. Commenters can                 2018 at 9 a.m.                                        acting as a cooperating agency for


                                           VerDate Sep<11>2014   17:36 Aug 03, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\06AUN1.SGM   06AUN1


                                                38298                         Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices

                                                development of an environmental                         eRegistration link. Select the eFiling     Calpine Bethlehem, LLC, Calpine
                                                document.                                               link to log on and submit the              Construction Finance Company, L.P.,
                                                  Meeting participants should come                      intervention or protests.                  Calpine Energy Solutions, LLC, Calpine
                                                prepared to discuss their issues and/or                    Persons unable to file electronically   Fore River Energy Center, LLC, Calpine
                                                concerns. Please review the PAD in                      should submit an original and 5 copies     Gilroy Cogen, L.P., Calpine Mid-Atlantic
                                                preparation for the scoping meetings.                   of the intervention or protest to the      Generation, LLC, Calpine Mid-Atlantic
                                                Directions on how to obtain a copy of                   Federal Energy Regulatory Commission,      Marketing, LLC, Calpine Mid Merit,
                                                the PAD and SD1 are included in item                    888 First Street NE, Washington, DC        LLC, Calpine Mid-Merit II, LLC, Calpine
                                                n. of this document.                                    20426.                                     New Jersey Generation, LLC, Calpine
                                                                                                           The filings in the above-referenced     Power America—CA, LLC, Calpine
                                                Meeting Procedures                                      proceeding are accessible in the           Vineland Solar, LLC, CCFC Sutter
                                                  The meetings will be recorded by a                    Commission’s eLibrary system by            Energy, LLC, CES Marketing IX, LLC,
                                                stenographer and will be placed in the                  clicking on the appropriate link in the    CES Marketing X, LLC, Champion
                                                public records of the project.                          above list. They are also available for    Energy, LLC, Champion Energy
                                                                                                        electronic review in the Commission’s      Marketing LLC, Champion Energy
                                                  Dated: July 31, 2018.
                                                                                                        Public Reference Room in Washington,       Services, LLC, CPN Bethpage 3rd
                                                Nathaniel J. Davis, Sr.,                                DC. There is an eSubscription link on
                                                Deputy Secretary.
                                                                                                                                                   Turbine, Inc., Creed Energy Center, LLC,
                                                                                                        the website that enables subscribers to    Delta Energy Center, LLC, Geysers
                                                [FR Doc. 2018–16752 Filed 8–3–18; 8:45 am]              receive email notification when a          Power Company, LLC, Gilroy Energy
                                                BILLING CODE 6717–01–P                                  document is added to a subscribed          Center, LLC, Goose Haven Energy
                                                                                                        docket(s). For assistance with any FERC    Center, LLC, Granite Ridge Energy, LLC,
                                                                                                        Online service, please email               Hermiston Power, LLC, KIAC Partners,
                                                DEPARTMENT OF ENERGY                                    FERCOnlineSupport@ferc.gov. or call        Los Esteros Critical Energy Facility LLC,
                                                                                                        (866) 208–3676 (toll free). For TTY, call  Los Medanos Energy Center, LLC,
                                                Federal Energy Regulatory                               (202) 502–8659.
                                                Commission                                                                                         Metcalf Energy Center, LLC, Morgan
                                                                                                           Dated: July 31, 2018.                   Energy Center, LLC, Nissequogue Cogen
                                                [Docket No. ER18–1978–000]                              Nathaniel J. Davis, Sr.,                   Partners, North American Power and
                                                                                                        Deputy Secretary.                          Gas, LLC, North American Power
                                                Casa Mesa Wind, LLC; Supplemental                                                                  Business, LLC, O.L.S. Energy-Agnews,
                                                                                                        [FR Doc. 2018–16749 Filed 8–3–18; 8:45 am]
                                                Notice That Initial Market-Based Rate                                                              Inc., Otay Mesa Energy Center, LLC,
                                                                                                        BILLING CODE 6717–01–P
                                                Filing Includes Request for Blanket                                                                Pastoria Energy Facility L.L.C., Pine
                                                Section 204 Authorization                                                                          Bluff Energy, LLC, RockGen Energy,
                                                   This is a supplemental notice in the                 DEPARTMENT OF ENERGY                       LLC, Power Contract Financing, L.L.C.,
                                                above-referenced proceeding of Casa                                                                Russell City Energy Company, LLC,
                                                Mesa Wind, LLC’s application for                        Federal Energy Regulatory                  South Point Energy Center, LLC,
                                                market-based rate authority, with an                    Commission                                 Westbrook Energy Center, LLC, Zion
                                                accompanying rate tariff, noting that                                                              Energy LLC, TBG Cogen Partners,
                                                                                                        Combined Notice of Filings #2              Garrison Energy Center LLC.
                                                such application includes a request for
                                                blanket authorization, under 18 CFR                        Take notice that the Commission           Description: Notification of Change in
                                                part 34, of future issuances of securities              received the following electric rate       Status of the Calpine MBR Sellers.
                                                and assumptions of liability.                           filings:                                     Filed Date: 7/31/18.
                                                   Any person desiring to intervene or to                  Docket Numbers: ER10–2042–028;            Accession Number: 20180731–5112.
                                                protest should file with the Federal                    ER10–1945–008; ER10–1944–006;                Comments Due: 5 p.m. ET 8/21/18.
                                                Energy Regulatory Commission, 888                       ER10–2051–008; ER10–1942–020;                Docket Numbers: ER18–614–003.
                                                First Street NE, Washington, DC 20426,                  ER17–696–008; ER14–2931–006; ER10–           Applicants: PJM Interconnection,
                                                in accordance with Rules 211 and 214                    1941–010; ER10–2043–008; ER10–2029– L.L.C.
                                                of the Commission’s Rules of Practice                   010; ER10–2041–008; ER18–1321–001;           Description: Compliance filing:
                                                and Procedure (18 CFR 385.211 and                       ER10–2040–008; ER10–1938–023;              Compliance Filing—OATT, Sch. 12—
                                                385.214). Anyone filing a motion to                     ER10–2036–009; ER13–1407–007;              Appendix A re: RTEP to be effective 4/
                                                intervene or protest must serve a copy                  ER10–1934–022; ER10–1893–022;              5/2018.
                                                of that document on the Applicant.                      ER10–3051–027; ER10–2985–026;                Filed Date: 7/31/18.
                                                   Notice is hereby given that the                      ER10–3049–027; ER10–1889–006;                Accession Number: 20180731–5110.
                                                deadline for filing protests with regard                ER10–1888–010; ER10–1885–010;                Comments Due: 5 p.m. ET 8/21/18.
                                                to the applicant’s request for blanket                  ER15–748–004; ER10–1884–010; ER10–           Docket Numbers: ER18–1737–001.
                                                authorization, under 18 CFR part 34, of                 1883–010; ER10–1878–010; ER10–3260–          Applicants: Northern Indiana Public
                                                future issuances of securities and                      008; ER10–1877–005; ER10–1895–006;         Service Company.
                                                assumptions of liability, is August 20,                 ER10–1876–010; ER10–1875–010;                Description: Tariff Amendment:
                                                2018.                                                   ER10–1873–010; ER10–1871–007;              Amendment to Reactive Power Rate
                                                   The Commission encourages                            ER10–1870–006; ER11–4369–007;              Filing of NIPSCO to be effective 10/1/
                                                electronic submission of protests and                   ER16–2218–007; ER12–1987–008;              2018.
                                                interventions in lieu of paper, using the                                                            Filed Date: 7/31/18.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        ER10–1947–010; ER12–2645–003;
                                                FERC Online links at http://                            ER10–1863–006; ER10–1862–022;                Accession Number: 20180731–5107.
                                                www.ferc.gov. To facilitate electronic                  ER10–1933–005; ER12–2261–009;                Comments Due: 5 p.m. ET 8/21/18.
                                                service, persons with internet access                   ER10–1865–009; ER10–1858–006;                Docket Numbers: ER18–2110–000.
                                                who will eFile a document and/or be                     ER13–1401–006; ER10–2044–008.                Applicants: Buckeye Power, Inc., PJM
                                                listed as a contact for an intervenor                      Applicants: Calpine Energy Services,    Interconnection, L.L.C.
                                                must create and validate an                             L.P., Auburndale Peaker Energy Center,       Description: § 205(d) Rate Filing:
                                                eRegistration account using the                         LLC, Bethpage Energy Center 3, LLC,        Revised SA No. 4753—NITSA among


                                           VerDate Sep<11>2014   17:36 Aug 03, 2018   Jkt 244001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\06AUN1.SGM   06AUN1



Document Created: 2018-11-06 10:37:01
Document Modified: 2018-11-06 10:37:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 38296 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR