83_FR_39589 83 FR 39435 - Notice of Intent To Prepare an Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line Ka1 North Launcher/Receiver Project and Request for Comments on Environmental Issues

83 FR 39435 - Notice of Intent To Prepare an Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line Ka1 North Launcher/Receiver Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 154 (August 9, 2018)

Page Range39435-39436
FR Document2018-17029

Federal Register, Volume 83 Issue 154 (Thursday, August 9, 2018)
[Federal Register Volume 83, Number 154 (Thursday, August 9, 2018)]
[Notices]
[Pages 39435-39436]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17029]



[[Page 39435]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-508-000]


Notice of Intent To Prepare an Environmental Assessment for the 
Proposed Columbia Gas Transmission, LLC Line Ka1 North Launcher/
Receiver Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the proposed Line KA1 North 
Launcher/Receiver Project involving construction and operation of 
facilities by Columbia Gas Transmission, LLC (Columbia) in Fayette and 
Madison Counties, Kentucky. The Commission will use this EA in its 
decision-making process to determine whether the project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the project. The National Environmental 
Policy Act (NEPA) requires the Commission to take into account the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. NEPA also requires the Commission to discover concerns the 
public may have about proposals. This process is referred to as 
scoping. The main goal of the scoping process is to focus the analysis 
in the EA on the important environmental issues. By this notice, the 
Commission requests public comments on the scope of the issues to 
address in the EA. To ensure that your comments are timely and properly 
recorded, please submit your comments so that the Commission receives 
them in Washington, DC on or before 5:00 p.m. Eastern Time on September 
4, 2018.
    You can make a difference by submitting your specific comments or 
concerns about the project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider and address all filed comments during the 
preparation of the EA.
    If you sent comments on this project to the Commission before the 
opening of this docket on June 20, 2018, you will need to file those 
comments in Docket No. CP18-508-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, that approval conveys with it the right of 
eminent domain. Therefore, if you and the company do not reach an 
easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Columbia provided landowners with a fact sheet prepared by the FERC 
entitled An Interstate Natural Gas Facility On My Land? What Do I Need 
To Know? This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. Using eComment is an easy 
method for submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on eRegister. You will be asked to select the type of filing you are 
making; a comment on a particular project is considered a Comment on a 
Filing; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP18-508-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    The Line KA1 North Launcher/Receiver Project involves the 
installation of two 16-inch x 12-inch bi-directional pig \1\ launcher/
receivers on Columbia's existing Line KA1 North pipeline and other 
modifications at seven discrete points along the pipeline within 
Fayette and Madison Counties, Kentucky. According to Columbia, these 
modifications are necessary to enable the use of smart pigs and 
cleaning pigs within the Line KA1 North pipeline, which would protect 
the pipeline from corrosion and provide advanced monitoring 
capabilities to maintain the pipeline's integrity between Columbia's 
existing Bybee and Muth Measurement and Regulation Stations.
---------------------------------------------------------------------------

    \1\ A pig is a tool that the pipeline company inserts into and 
pushes through the pipeline for cleaning the pipeline, conducting 
internal inspections, or other purposes.
---------------------------------------------------------------------------

    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called eLibrary or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 8.75 
acres of land. Following construction, Columbia would maintain about 
3.28 acres for permanent operation of the project's facilities. 
Approximately 0.02 acre of temporary access road, 3.42 acres of staging 
area, and 2.03 acres of temporary workspace would be allowed to revert 
to preconstruction conditions.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project under these general 
headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;

[[Page 39436]]

     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project, and make recommendations 
on how to lessen or avoid impacts on the various resource areas.
    The EA will present Commission staff's independent analysis of the 
issues. The EA will be available in the public record through 
eLibrary.\3\ Depending on the comments received during the scoping 
process, the Commission may also publish and distribute the EA to the 
public for an allotted comment period. Commission staff will consider 
and address all comments on the EA before making recommendations to the 
Commission. To ensure Commission staff has the opportunity to address 
your comments, please carefully follow the instructions in the Public 
Participation section, beginning on page 2.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\4\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. Commission staff will update the environmental 
mailing list as the analysis proceeds to ensure that information 
related to this environmental review is sent to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project.
    If the Commission publishes and distributes the EA, copies of the 
EA will be sent to the environmental mailing list for public review and 
comment. If you would prefer to receive a paper copy of the document 
instead of a CD version or would like to remove your name from the 
mailing list, please return the attached ``Mailing List Update Form'' 
(appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on General Search and enter the docket number in 
the Docket Number field, excluding the last three digits (i.e., CP18-
508). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: August 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17029 Filed 8-8-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices                                                    39435

                                                DEPARTMENT OF ENERGY                                    need to file those comments in Docket                 first create an account by clicking on
                                                                                                        No. CP18–508–000 to ensure they are                   eRegister. You will be asked to select the
                                                Federal Energy Regulatory                               considered as part of this proceeding.                type of filing you are making; a
                                                Commission                                                 This notice is being sent to the                   comment on a particular project is
                                                [Docket No. CP18–508–000]
                                                                                                        Commission’s current environmental                    considered a Comment on a Filing; or
                                                                                                        mailing list for this project. State and                 (3) You can file a paper copy of your
                                                Notice of Intent To Prepare an                          local government representatives should               comments by mailing them to the
                                                Environmental Assessment for the                        notify their constituents of this                     following address. Be sure to reference
                                                Proposed Columbia Gas Transmission,                     proposed project and encourage them to                the project docket number (CP18–508–
                                                LLC Line Ka1 North Launcher/Receiver                    comment on their areas of concern.                    000) with your submission: Kimberly D.
                                                Project and Request for Comments on                        If you are a landowner receiving this              Bose, Secretary, Federal Energy
                                                Environmental Issues                                    notice, a pipeline company                            Regulatory Commission, 888 First Street
                                                                                                        representative may contact you about                  NE, Room 1A, Washington, DC 20426.
                                                   The staff of the Federal Energy                      the acquisition of an easement to
                                                Regulatory Commission (FERC or                          construct, operate, and maintain the                  Summary of the Proposed Project
                                                Commission) will prepare an                             proposed facilities. The company would                  The Line KA1 North Launcher/
                                                environmental assessment (EA) that will                 seek to negotiate a mutually acceptable               Receiver Project involves the
                                                discuss the environmental impacts of                    easement agreement. You are not                       installation of two 16-inch × 12-inch bi-
                                                the proposed Line KA1 North Launcher/                   required to enter into an agreement.                  directional pig 1 launcher/receivers on
                                                Receiver Project involving construction                 However, if the Commission approves                   Columbia’s existing Line KA1 North
                                                and operation of facilities by Columbia                 the project, that approval conveys with               pipeline and other modifications at
                                                Gas Transmission, LLC (Columbia) in                     it the right of eminent domain.                       seven discrete points along the pipeline
                                                Fayette and Madison Counties,                           Therefore, if you and the company do                  within Fayette and Madison Counties,
                                                Kentucky. The Commission will use this                  not reach an easement agreement, the                  Kentucky. According to Columbia, these
                                                EA in its decision-making process to                    pipeline company could initiate                       modifications are necessary to enable
                                                determine whether the project is in the                 condemnation proceedings in court. In                 the use of smart pigs and cleaning pigs
                                                public convenience and necessity.                       such instances, compensation would be                 within the Line KA1 North pipeline,
                                                   This notice announces the opening of                 determined by a judge in accordance                   which would protect the pipeline from
                                                the scoping process the Commission                      with state law.                                       corrosion and provide advanced
                                                will use to gather input from the public                   Columbia provided landowners with                  monitoring capabilities to maintain the
                                                and interested agencies about issues                    a fact sheet prepared by the FERC                     pipeline’s integrity between Columbia’s
                                                regarding the project. The National                     entitled An Interstate Natural Gas                    existing Bybee and Muth Measurement
                                                Environmental Policy Act (NEPA)                         Facility On My Land? What Do I Need                   and Regulation Stations.
                                                requires the Commission to take into                    To Know? This fact sheet addresses a                    The general location of the project
                                                account the environmental impacts that                  number of typically asked questions,                  facilities is shown in appendix 1.2
                                                could result from its action whenever it                including the use of eminent domain                   Land Requirements for Construction
                                                considers the issuance of a Certificate of              and how to participate in the
                                                Public Convenience and Necessity.                       Commission’s proceedings. It is also                    Construction of the proposed facilities
                                                NEPA also requires the Commission to                    available for viewing on the FERC                     would disturb about 8.75 acres of land.
                                                discover concerns the public may have                   website (www.ferc.gov).                               Following construction, Columbia
                                                about proposals. This process is referred                                                                     would maintain about 3.28 acres for
                                                to as scoping. The main goal of the                     Public Participation                                  permanent operation of the project’s
                                                scoping process is to focus the analysis                   For your convenience, there are three              facilities. Approximately 0.02 acre of
                                                in the EA on the important                              methods you can use to submit your                    temporary access road, 3.42 acres of
                                                environmental issues. By this notice, the               comments to the Commission. The                       staging area, and 2.03 acres of temporary
                                                Commission requests public comments                     Commission encourages electronic filing               workspace would be allowed to revert to
                                                on the scope of the issues to address in                of comments and has staff available to                preconstruction conditions.
                                                the EA. To ensure that your comments                    assist you at (866) 208–3676 or                       The EA Process
                                                are timely and properly recorded, please                FercOnlineSupport@ferc.gov. Please
                                                                                                                                                                The EA will discuss impacts that
                                                submit your comments so that the                        carefully follow these instructions so
                                                                                                                                                              could occur as a result of the
                                                Commission receives them in                             that your comments are properly
                                                                                                                                                              construction and operation of the
                                                Washington, DC on or before 5:00 p.m.                   recorded.
                                                                                                           (1) You can file your comments                     proposed project under these general
                                                Eastern Time on September 4, 2018.
                                                                                                                                                              headings:
                                                   You can make a difference by                         electronically using the eComment
                                                                                                                                                                • Geology and soils;
                                                submitting your specific comments or                    feature, which is located on the                        • land use;
                                                concerns about the project. Your                        Commission’s website (www.ferc.gov)                     • water resources, fisheries, and
                                                comments should focus on the potential                  under the link to Documents and                       wetlands;
                                                environmental effects, reasonable                       Filings. Using eComment is an easy
                                                alternatives, and measures to avoid or                  method for submitting brief, text-only                  1 A pig is a tool that the pipeline company inserts

                                                lessen environmental impacts. Your                      comments on a project;                                into and pushes through the pipeline for cleaning
                                                input will help the Commission staff                       (2) You can file your comments                     the pipeline, conducting internal inspections, or
                                                                                                        electronically by using the eFiling                   other purposes.
sradovich on DSK3GMQ082PROD with NOTICES




                                                determine what issues they need to                                                                              2 The appendices referenced in this notice will
                                                evaluate in the EA. Commission staff                    feature, which is located on the                      not appear in the Federal Register. Copies of
                                                will consider and address all filed                     Commission’s website (www.ferc.gov)                   appendices were sent to all those receiving this
                                                comments during the preparation of the                  under the link to Documents and                       notice in the mail and are available at www.ferc.gov
                                                EA.                                                     Filings. With eFiling, you can provide                using the link called eLibrary or from the
                                                                                                                                                              Commission’s Public Reference Room, 888 First
                                                   If you sent comments on this project                 comments in a variety of formats by                   Street NE, Washington, DC 20426, or call (202) 502–
                                                to the Commission before the opening of                 attaching them as a file with your                    8371. For instructions on connecting to eLibrary,
                                                this docket on June 20, 2018, you will                  submission. New eFiling users must                    refer to the last page of this notice.



                                           VerDate Sep<11>2014   18:11 Aug 08, 2018   Jkt 244001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1


                                                39436                         Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices

                                                   • cultural resources;                                potentially affected by the proposed                  SUMMARY:    This notice announces the
                                                   • vegetation and wildlife;                           project.                                              availability of EPA’s interim registration
                                                   • air quality and noise;                                If the Commission publishes and                    review decisions for the chemicals
                                                   • endangered and threatened species;                 distributes the EA, copies of the EA will             listed in the Table in Unit IV of this
                                                   • public safety; and                                 be sent to the environmental mailing list             Notice.
                                                   • cumulative impacts.                                for public review and comment. If you
                                                   Commission staff will also evaluate                                                                        SUPPLEMENTARY INFORMATION:
                                                                                                        would prefer to receive a paper copy of
                                                reasonable alternatives to the proposed                                                                       I. General Information
                                                                                                        the document instead of a CD version or
                                                project or portions of the project, and
                                                                                                        would like to remove your name from                   A. Does this action apply to me?
                                                make recommendations on how to
                                                                                                        the mailing list, please return the
                                                lessen or avoid impacts on the various                                                                           This action is directed to the public
                                                                                                        attached ‘‘Mailing List Update Form’’
                                                resource areas.                                                                                               in general, and may be of interest to a
                                                   The EA will present Commission                       (appendix 2).
                                                                                                                                                              wide range of stakeholders including
                                                staff’s independent analysis of the                     Additional Information                                environmental, human health, farm
                                                issues. The EA will be available in the                    Additional information about the                   worker, and agricultural advocates; the
                                                public record through eLibrary.3                        project is available from the                         chemical industry; pesticide users; and
                                                Depending on the comments received                      Commission’s Office of External Affairs,              members of the public interested in the
                                                during the scoping process, the                         at (866) 208–FERC, or on the FERC                     sale, distribution, or use of pesticides.
                                                Commission may also publish and                         website at www.ferc.gov using the                     Since others also may be interested, the
                                                distribute the EA to the public for an                  eLibrary link. Click on the eLibrary link,            Agency has not attempted to describe all
                                                allotted comment period. Commission                     click on General Search and enter the                 the specific entities that may be affected
                                                staff will consider and address all                     docket number in the Docket Number                    by this action. If you have any questions
                                                comments on the EA before making                        field, excluding the last three digits (i.e.,         regarding the applicability of this action
                                                recommendations to the Commission.                      CP18–508). Be sure you have selected                  to a particular entity, consult the
                                                To ensure Commission staff has the                      an appropriate date range. For                        pesticide specific contact person listed
                                                opportunity to address your comments,                   assistance, please contact FERC Online                under FOR FURTHER INFORMATION
                                                please carefully follow the instructions                Support at FercOnlineSupport@ferc.gov                 CONTACT: For pesticide specific
                                                in the Public Participation section,                    or (866) 208–3676, or for TTY, contact                information, contact: The Chemical
                                                beginning on page 2.                                    (202) 502–8659. The eLibrary link also                Review Manager for the pesticide of
                                                   With this notice, the Commission is                                                                        interest identified in the Table in Unit
                                                                                                        provides access to the texts of all formal
                                                asking agencies with jurisdiction by law                                                                      IV.
                                                                                                        documents issued by the Commission,
                                                and/or special expertise with respect to                                                                         For general information on the
                                                                                                        such as orders, notices, and
                                                the environmental issues of this project                                                                      registration review program, contact:
                                                                                                        rulemakings.
                                                to formally cooperate in the preparation                                                                      Dana Friedman, Pesticide Re-Evaluation
                                                                                                           In addition, the Commission offers a
                                                of the EA.4 Agencies that would like to                                                                       Division (7508P), Office of Pesticide
                                                                                                        free service called eSubscription which
                                                request cooperating agency status                                                                             Programs, Environmental Protection
                                                                                                        allows you to keep track of all formal
                                                should follow the instructions for filing                                                                     Agency, 1200 Pennsylvania Ave. NW,
                                                                                                        issuances and submittals in specific
                                                comments provided under the Public                                                                            Washington, DC 20460–0001; telephone
                                                                                                        dockets. This can reduce the amount of
                                                Participation section of this notice.                                                                         number: (703) 347–8827; email address:
                                                                                                        time you spend researching proceedings
                                                Environmental Mailing List                              by automatically providing you with                   friedman.dana@epa.gov.
                                                   The environmental mailing list                       notification of these filings, document               II. Background
                                                includes federal, state, and local                      summaries, and direct links to the
                                                                                                                                                                 Registration review is EPA’s periodic
                                                government representatives and                          documents. Go to www.ferc.gov/docs-
                                                                                                                                                              review of pesticide registrations to
                                                agencies; elected officials;                            filing/esubscription.asp.
                                                                                                                                                              ensure that each pesticide continues to
                                                environmental and public interest                          Finally, public sessions or site visits
                                                                                                                                                              satisfy the statutory standard for
                                                groups; Native American Tribes; other                   will be posted on the Commission’s
                                                                                                                                                              registration, that is, the pesticide can
                                                interested parties; and local libraries                 calendar located at www.ferc.gov/
                                                                                                                                                              perform its intended function without
                                                and newspapers. This list also includes                 EventCalendar/EventsList.aspx along
                                                                                                                                                              unreasonable adverse effects on human
                                                all affected landowners (as defined in                  with other related information.
                                                                                                                                                              health or the environment. As part of
                                                the Commission’s regulations) who are                     Dated: August 3, 2018.                              the registration review process, the
                                                potential right-of-way grantors, whose                  Nathaniel J. Davis, Sr.,                              Agency has completed interim decisions
                                                property may be used temporarily for                    Deputy Secretary.                                     for all pesticides listed in the Table in
                                                project purposes, or who own homes                      [FR Doc. 2018–17029 Filed 8–8–18; 8:45 am]            Unit IV. Through this program, EPA is
                                                within certain distances of aboveground                 BILLING CODE 6717–01–P                                ensuring that each pesticide’s
                                                facilities, and anyone who submits                                                                            registration is based on current
                                                comments on the project. Commission                                                                           scientific and other knowledge,
                                                staff will update the environmental                                                                           including its effects on human health
                                                                                                        ENVIRONMENTAL PROTECTION
                                                mailing list as the analysis proceeds to                                                                      and the environment.
                                                                                                        AGENCY
                                                ensure that information related to this
                                                environmental review is sent to all                     [EPA–HQ–OPP–2017–0751; FRL–9981–15]                   III. Authority
                                                individuals, organizations, and                                                                                  EPA is conducting its registration
sradovich on DSK3GMQ082PROD with NOTICES




                                                government entities interested in and/or                Interim Registration Review Decisions                 review of the chemicals listed in the
                                                                                                        for Several Pesticides; Notice of                     Table in Unit IV pursuant to section 3(g)
                                                  3 For instructions on connecting to eLibrary, refer   Availability                                          of the Federal Insecticide, Fungicide,
                                                to the last page of this notice.                                                                              and Rodenticide Act (FIFRA) and the
                                                  4 The Council on Environmental Quality                AGENCY: Environmental Protection
                                                regulations addressing cooperating agency               Agency (EPA).                                         Procedural Regulations for Registration
                                                responsibilities are at Title 40, Code of Federal                                                             Review at 40 CFR part 155, subpart C.
                                                                                                        ACTION: Notice.
                                                Regulations, Part 1501.6.                                                                                     Section 3(g) of FIFRA provides, among


                                           VerDate Sep<11>2014   18:11 Aug 08, 2018   Jkt 244001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1



Document Created: 2018-08-09 01:10:36
Document Modified: 2018-08-09 01:10:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 39435 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR