83_FR_39623 83 FR 39469 - Meeting of the Advisory Committee on Reactor Safeguards (ACRS); Subcommittee on Thermal-Hydraulic Phenomena

83 FR 39469 - Meeting of the Advisory Committee on Reactor Safeguards (ACRS); Subcommittee on Thermal-Hydraulic Phenomena

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 154 (August 9, 2018)

Page Range39469-39470
FR Document2018-17009

Federal Register, Volume 83 Issue 154 (Thursday, August 9, 2018)
[Federal Register Volume 83, Number 154 (Thursday, August 9, 2018)]
[Notices]
[Pages 39469-39470]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17009]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Meeting of the Advisory Committee on Reactor Safeguards (ACRS); 
Subcommittee on Thermal-Hydraulic Phenomena

    The ACRS Subcommittee on Thermal-Hydraulic Phenomena will hold a 
meeting on August 21, 2018, at 11545

[[Page 39470]]

Rockville Pike, Room T-2B1, Rockville, Maryland 20852.
    The meeting will be open to public attendance. The agenda for the 
subject meeting shall be as follows:

Tuesday, August 21, 2018-8:30 a.m. Until 5:00 p.m.

    The Subcommittee will conduct an information briefing regarding the 
potential use of Department of Energy computer codes in risk-informed 
safety analyses of accident tolerant fuel for light-water reactors, as 
well as non-light-water reactors. The Subcommittee will hear 
presentations by and hold discussions with Department of Energy 
personnel, and other interested persons regarding this matter. The 
Subcommittee will gather information, analyze relevant issues and 
facts, and formulate proposed positions and actions, as appropriate, 
for deliberation by the Full Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated Federal Official (DFO), 
Weidong Wang (Telephone 301-415-6279 or Email: [email protected]) 
one day prior to the meeting, if possible, so that appropriate 
arrangements can be made. Thirty-five hard copies of each presentation 
or handout should be provided to the DFO thirty minutes before the 
meeting. In addition, one electronic copy of each presentation should 
be emailed to the DFO one day before the meeting. If an electronic copy 
cannot be provided within this timeframe, presenters should provide the 
DFO with a CD containing each presentation at least thirty minutes 
before the meeting. Electronic recordings will be permitted only during 
those portions of the meeting that are open to the public. The public 
bridgeline number for the meeting is 866-822-3032, passcode 8272423. 
Detailed procedures for the conduct of and participation in ACRS 
meetings were published in the Federal Register on October 4, 2017 (82 
FR 46312).
    Detailed meeting agendas and meeting transcripts are available on 
the NRC website at http://www.nrc.gov/reading-rm/doc-collections/acrs. 
Information regarding topics to be discussed, changes to the agenda, 
whether the meeting has been canceled or rescheduled, and the time 
allotted to present oral statements can be obtained from the website 
cited above or by contacting the identified DFO. Moreover, in view of 
the possibility that the schedule for ACRS meetings may be adjusted by 
the Chairman as necessary to facilitate the conduct of the meeting, 
persons planning to attend should check with these references if such 
rescheduling would result in a major inconvenience.
    If attending this meeting, please enter through the One White Flint 
North building, 11555 Rockville Pike, Rockville, Maryland 20852. After 
registering with Security, please contact Mr. Theron Brown (Telephone 
301-415-6702) to be escorted to the meeting room.

    Dated: August 2, 2018.
Mark L. Banks,
Chief, Technical Support Branch, Advisory Committee on Reactor 
Safeguards.
[FR Doc. 2018-17009 Filed 8-8-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                                             Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices                                                 39469

                                                recurrence. The SDO must consider all                   circumstance where the SDO redacts or                 conduct; the information considered by
                                                matters in the PMIO in rendering a final                withholds all or part of the                          the SDO; the reasons for debarring; the
                                                decision. A contractor’s failure to                     Administrative Record, the SDO will                   scope of ineligibility; the consequences
                                                respond to the notices sent by the SDO                  provide the reasons for doing so to the               of debarment (application across the
                                                shall be deemed an admission of the                     contractor in writing.                                Executive Branch); and the applicability
                                                existence of the cause for suspension or                   d. Final Decision. The SDO shall issue             dates of debarment. The decision shall
                                                debarment. In that case, the SDO may                    a written final decision based on the                 notify the contractor that it may request
                                                proceed to a final decision without                     Administrative Record. The SDO shall                  a copy of the Administrative Record.
                                                further proceedings.                                    issue a conviction-based debarment                    The SDO Admin will enter the debarred
                                                   A fact-finding proceeding occurs if                  within 30 working days after closing the              contractor into SAM.
                                                actions are not based upon a conviction                 Administrative Record and within 45                     iv. Enter into an Administrative
                                                or civil judgement and when, after                      working days of closing the                           Agreement. At any time during the
                                                receipt of the PMIO, the SDO                            Administrative Record for a fact-based                proceedings, the SDO may negotiate an
                                                determines there is a genuine dispute                   suspension or debarment. The SDO has                  Administrative Agreement with the
                                                over material fact(s). A fact-finding                   discretion to extend these deadlines.                 contractor. An Administrative
                                                proceeding is called to consider the                    The Administrative Record will be                     Agreement applies across the Executive
                                                fact(s). A fact-finder can be any                       deemed closed when the SDO Admin                      Branch when entered into SAM. The
                                                individual appointed by the SDO to                      submits all evidence to the SDO for a                 terms of the Administrative Agreement
                                                oversee the proceeding. The contractor                  final decision. The SDO Admin will                    and contents of the Agreement will be
                                                shall be afforded the opportunity to                    advise the contractor in writing                      determined on a case-by-case basis.
                                                appear with counsel, submit                             promptly after the Administrative                       e. Contractor’s Remedy. After a
                                                documentary evidence and confront                       Record has been closed, including the                 decision is made, a suspended or
                                                agency witnesses. The proceeding shall                  date it was closed. All correspondence                debarred contractor may seek judicial
                                                be transcribed unless otherwise                         shall be sent USPS certified mail, return             review. OGC (in coordination with the
                                                mutually agreed upon, and the                           receipt requested, by the SDO Admin.                  Department of Justice, as appropriate or
                                                contractor can obtain a transcript of                   The SDO can take the following actions                required) will work with the referring
                                                proceedings at its request and at its cost.             in a final decision:                                  office, the SDO, and OCFO to litigate
                                                The SDO shall attempt to schedule this                     i. Not Debar the Contractor. The SDO               these claims.
                                                proceeding within 60 calendar days of                   may decide not to debar the contractor.
                                                                                                        The decision shall include, if                        H. NCUA Action After a Decision
                                                the PMIO. If there are numerous
                                                grounds for suspension and debarment,                   applicable, referral to the Notice of                    If a suspension or debarment is
                                                the proceeding can be limited to the                    Proposed Debarment; a summary of                      imposed, NCUA offices must take steps
                                                grounds in dispute having a genuine                     proceedings; the identities of affiliates             to ensure the contractor does not receive
                                                issue of material fact. The disposition of              or imputed conduct; and the reasons for               any new contracts. Upon the
                                                the fact-finding proceeding will be                     not debarring (for example, an                        applicability date of SAM listing, the
                                                documented by the SDO. The standard                     Administrative Agreement; mitigating                  NCUA must not solicit offers from,
                                                of proof for determining the disputed                   factors; or remedial measures taken by                award contracts to, or consent to
                                                facts is preponderance of the evidence.                 the contractor). The decision shall                   contracts with ineligible contractors.
                                                   c. Compiling the Administrative                      notify the contractor that it may request             Suspended or debarred contractors may
                                                Record. During the process, the NCUA                    a copy of the Administrative Record and               continue performing current contracts
                                                shall maintain and document all                         give notice of the applicability date of              (unless those contracts are terminated or
                                                information considered by the SDO to                    the decision. The SDO Admin will                      voided) but cannot (a) add new work,
                                                include the ARM, the PMIO (including                    remove the contractor’s name from                     exercise options, or otherwise extend
                                                mitigating factors) and transcripts of any              SAM.                                                  the duration of the contract or order; (b)
                                                fact-finding proceedings. This is the                      ii. Terminate the Suspension. The                  issue task orders exceeding the
                                                Administrative Record. The following                    SDO may decide to terminate the                       guaranteed minimum under indefinite
                                                records, in addition to any other similar               suspension. The decision shall include,               quantity contracts; or (c) place orders
                                                materials, shall also be included if                    if applicable, referral to the Notice of              under blanket purchase agreements or
                                                considered by the SDO: Emails; notes;                   Suspension; a summary of proceedings;                 basic ordering agreements. The NCUA
                                                contract documents; newspaper articles;                 the identities of affiliates or imputed               must review any current contracts held
                                                and summaries of oral briefings and                     conduct; and the reason for terminating               by the contractor to determine whether
                                                contractor submissions. Any                             the Suspension (for example, an                       to terminate or void those contracts. A
                                                information not relied on by the SDO                    Administrative Agreement; mitigating                  decision to terminate or void a contract
                                                should not be included. Once the SDO                    factors; or remedial measures taken by                requires OGC concurrence.
                                                issues a final decision, the contractor                 the contractor). The decision shall
                                                                                                                                                              [FR Doc. 2018–17086 Filed 8–8–18; 8:45 am]
                                                may request a copy of the                               notify the contractor that it may request
                                                                                                                                                              BILLING CODE 7535–01–P
                                                Administrative Record. The SDO may                      a copy of the Administrative Record and
                                                deny the request or withhold or redact                  give notice of the applicability date of
                                                part of the Administrative Record if                    the decision. The SDO Admin will
                                                                                                        remove the contractor’s name from                     NUCLEAR REGULATORY
                                                warranted under applicable law or                                                                             COMMISSION
                                                because of parallel proceedings.17 In any               SAM.
                                                                                                           iii. Debar the Contractor. The SDO
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              Meeting of the Advisory Committee on
                                                                                                        may decide to debar the contractor. This
                                                  17 Parallelproceedings occur when two or more                                                               Reactor Safeguards (ACRS);
                                                contemporaneous legal actions are initiated by          decision must be based on the
                                                                                                                                                              Subcommittee on Thermal-Hydraulic
                                                different Government entities against the same          preponderance of the evidence. The
                                                contractor, and involving the same material facts.                                                            Phenomena
                                                                                                        decision shall include, if applicable,
                                                Often these arise when an agency has suspended or
                                                proposed a contractor for debarment and the
                                                                                                        referral to the Notice of Proposed                     The ACRS Subcommittee on Thermal-
                                                Department of Justice is investigating or prosecuting   Debarment; a summary of proceedings;                  Hydraulic Phenomena will hold a
                                                the contractor for the same misconduct.                 identities of affiliates or imputed                   meeting on August 21, 2018, at 11545


                                           VerDate Sep<11>2014   18:11 Aug 08, 2018   Jkt 244001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1


                                                39470                        Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices

                                                Rockville Pike, Room T–2B1, Rockville,                  with these references if such                         email: Jennifer.Borges@nrc.gov. For
                                                Maryland 20852.                                         rescheduling would result in a major                  technical questions, contact the
                                                   The meeting will be open to public                   inconvenience.                                        individual listed in the FOR FURTHER
                                                attendance. The agenda for the subject                    If attending this meeting, please enter             INFORMATION CONTACT section of this
                                                meeting shall be as follows:                            through the One White Flint North                     document.
                                                Tuesday, August 21, 2018–8:30 a.m.
                                                                                                        building, 11555 Rockville Pike,                          • NRC’s Agencywide Documents
                                                Until 5:00 p.m.                                         Rockville, Maryland 20852. After                      Access and Management System
                                                                                                        registering with Security, please contact             (ADAMS): You may obtain publicly-
                                                   The Subcommittee will conduct an                     Mr. Theron Brown (Telephone 301–                      available documents online in the
                                                information briefing regarding the                      415–6702) to be escorted to the meeting               ADAMS Public Documents collection at
                                                potential use of Department of Energy                   room.                                                 http://www.nrc.gov/reading-rm/
                                                computer codes in risk-informed safety                                                                        adams.html. To begin the search, select
                                                                                                          Dated: August 2, 2018.
                                                analyses of accident tolerant fuel for                                                                        ‘‘Begin Web-based ADAMS Search.’’ For
                                                light-water reactors, as well as non-                   Mark L. Banks,
                                                                                                                                                              problems with ADAMS, please contact
                                                light-water reactors. The Subcommittee                  Chief, Technical Support Branch, Advisory
                                                                                                        Committee on Reactor Safeguards.                      the NRC’s Public Document Room (PDR)
                                                will hear presentations by and hold                                                                           reference staff at 1–800–397–4209, 301–
                                                discussions with Department of Energy                   [FR Doc. 2018–17009 Filed 8–8–18; 8:45 am]
                                                                                                                                                              415–4737, or by email to pdr.resource@
                                                personnel, and other interested persons                 BILLING CODE 7590–01–P
                                                                                                                                                              nrc.gov. The ADAMS accession number
                                                regarding this matter. The                                                                                    for each document referenced (if it is
                                                Subcommittee will gather information,                                                                         available in ADAMS) is provided the
                                                analyze relevant issues and facts, and                  NUCLEAR REGULATORY
                                                                                                        COMMISSION                                            first time that it is mentioned in this
                                                formulate proposed positions and                                                                              document.
                                                actions, as appropriate, for deliberation               [Docket No. 040–08903; NRC–2018–0153]                    • NRC’s PDR: You may examine and
                                                by the Full Committee.                                                                                        purchase copies of public documents at
                                                   Members of the public desiring to                    Homestake Mining Company of                           the NRC’s PDR, Room O1–F21, One
                                                provide oral statements and/or written                  California; Grants Reclamation Project;               White Flint North, 11555 Rockville
                                                comments should notify the Designated                   Zeolite Water Treatment Systems                       Pike, Rockville, Maryland 20852.
                                                Federal Official (DFO), Weidong Wang
                                                                                                        AGENCY:  Nuclear Regulatory                           FOR FURTHER INFORMATION CONTACT:
                                                (Telephone 301–415–6279 or Email:
                                                Weidong.Wang@nrc.gov) one day prior                     Commission.                                           Jeffrey Whited, Office of Nuclear
                                                to the meeting, if possible, so that                    ACTION: License amendment application;                Material Safety and Safeguards, U.S.
                                                appropriate arrangements can be made.                   opportunity to request a hearing and to               Nuclear Regulatory Commission,
                                                Thirty-five hard copies of each                         petition for leave to intervene.                      Washington, DC 20555–0001; telephone:
                                                presentation or handout should be                                                                             301–415–4090, email: Jeffrey.Whited@
                                                                                                        SUMMARY:   The U.S. Nuclear Regulatory                nrc.gov.
                                                provided to the DFO thirty minutes
                                                                                                        Commission (NRC) has received an
                                                before the meeting. In addition, one                                                                          SUPPLEMENTARY INFORMATION:
                                                                                                        application from the Homestake Mining
                                                electronic copy of each presentation
                                                                                                        Company of California (the licensee), for             I. Introduction
                                                should be emailed to the DFO one day
                                                                                                        amendment of Materials License No.                       The NRC has received, by letter dated
                                                before the meeting. If an electronic copy
                                                                                                        SUA–1471, which authorizes the                        December 11, 2017 (ADAMS Package
                                                cannot be provided within this
                                                                                                        possession of residual uranium and                    Accession No. ML17361A006), as
                                                timeframe, presenters should provide
                                                the DFO with a CD containing each                       byproduct material in the form of                     supplemented by letter dated February
                                                presentation at least thirty minutes                    uranium waste tailings and other                      22, 2018 (ADAMS Accession No.
                                                before the meeting. Electronic                          byproduct waste generated by the                      ML18066A583), an application to
                                                recordings will be permitted only                       licensee’s past milling operations at the             amend Materials License No. SUA–1471
                                                during those portions of the meeting                    licensee’s uranium mill located in                    for the licensee’s uranium mill located
                                                that are open to the public. The public                 Cibola County, New Mexico. The                        in Cibola County, New Mexico. The
                                                bridgeline number for the meeting is                    amendment would update Materials                      license amendment included an
                                                866–822–3032, passcode 8272423.                         License No. SUA–1471 Condition 35 to                  Environmental Review. The licensee is
                                                Detailed procedures for the conduct of                  include the 300 and 1200 gallon per                   currently working on groundwater
                                                and participation in ACRS meetings                      minute (gpm) zeolite water treatment                  restoration activities to mitigate the
                                                were published in the Federal Register                  systems, which are currently being used               impacts of seepage from the unlined
                                                on October 4, 2017 (82 FR 46312).                       by the licensee for site remediation                  tailings impoundments into the
                                                   Detailed meeting agendas and meeting                 efforts.                                              underlying aquifer that has been
                                                transcripts are available on the NRC                    DATES: A request for a hearing or                     ongoing since 1977. This application
                                                website at http://www.nrc.gov/reading-                  petition for leave to intervene must be               requests to amend License Condition 35
                                                rm/doc-collections/acrs. Information                    filed by October 9, 2018.                             to include the 300 gpm and 1,200 gpm
                                                regarding topics to be discussed,                       ADDRESSES: Please refer to Docket ID                  zeolite water treatment systems as a
                                                changes to the agenda, whether the                      NRC–2018–0153 when contacting the                     method to be used for groundwater
                                                meeting has been canceled or                            NRC about the availability of                         remediation. The zeolite water
                                                rescheduled, and the time allotted to                   information regarding this document.                  treatment systems are single lined
                                                present oral statements can be obtained                                                                       facilities located on top of the large
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        You may obtain publicly-available
                                                from the website cited above or by                      information related to this document                  tailings pile at the site. Since 2012, the
                                                contacting the identified DFO.                          using any of the following methods:                   licensee had been pilot testing the 300
                                                Moreover, in view of the possibility that                  • Federal Rulemaking Website: Go to                gpm and 1,200 gpm zeolite water
                                                the schedule for ACRS meetings may be                   http://www.regulations.gov and search                 treatment systems prior to being
                                                adjusted by the Chairman as necessary                   for Docket ID NRC–2018–0153. Address                  requested they be added to the license.
                                                to facilitate the conduct of the meeting,               questions about NRC dockets to Jennifer               The zeolite system passes uranium
                                                persons planning to attend should check                 Borges; telephone: 301–287–9127;                      contaminated groundwater through a


                                           VerDate Sep<11>2014   18:11 Aug 08, 2018   Jkt 244001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1



Document Created: 2018-08-09 01:12:07
Document Modified: 2018-08-09 01:12:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 39469 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR