NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 154 (August 9, 2018)

Page Range39474-39475
FR Document2018-16995

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic AP1000 design control document (DCD) and is issuing License Amendment Nos. 125 and 124 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 154 (Thursday, August 9, 2018)
[Federal Register Volume 83, Number 154 (Thursday, August 9, 2018)]
[Notices]
[Pages 39474-39475]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-16995]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Tier 1 and Tier 2* Editorial and 
Consistency Changes

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic AP1000 design control document (DCD) and is 
issuing License Amendment Nos. 125 and 124 to Combined Licenses (COL), 
NPF-91 and NPF-92, respectively. The COLs were issued to Southern 
Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe 
Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG 
Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for 
construction and operation of the Vogtle Electric Generating Plant 
(VEGP) Units 3 and 4, located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on May 31, 2018.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges; 301-287-9127; email: 
[email protected]. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ADAMS accession number for each 
document referenced (if it is available in ADAMS) is provided the first 
time that it is mentioned in this document. The request for the 
amendment and exemption was submitted by letters dated November 30, 
2017, and March 16, 2018, and are available in ADAMS under Accession 
Nos. ML17334B211 and ML18075A438.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Peter Hearn, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-1189; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 125 and 124 to COL Nos. 
NPF-91 and NPF-92, respectively, to the licensee. The exemption is 
required by paragraph A.4 of section VIII, ``Processes for Changes and 
Departures,'' appendix D, to 10 CFR part 52 to allow the licensee to 
depart from Tier 1 information. With the requested amendment, the 
licensee sought proposed changes to plant-specific DCD Tier 2 and Tier 
2* information and related changes to plant-specific Tier 1 
information, with corresponding changes to Inspections, Tests, 
Analyses, and Acceptance Criteria (ITAAC) in COL Appendix C. 
Specifically the changes corrected various editorial and consistency 
issues between Tier 1 and Tier 2 in Tier 1 text, tables and figures.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in 10 CFR 50.12, 10 CFR 52.7, and section VIII.A.4 of appendix D 
to 10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML18106A638.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML18106A629 and 
ML18106A631, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML18106A632 and 
ML18106A635, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated November 30, 2017, as supplemented by the 
letter

[[Page 39475]]

dated March 16, 2018, the Southern Nuclear Operating Company (SNC) 
requested from the Commission an exemption to allow departures from 
Tier 1 information in the certified DCD incorporated by reference in 10 
CFR part 52, appendix D, as part of license amendment request 17-042, 
``Tier 1 and Tier 2* Editorial and Consistency Changes.''
    For the reasons set forth in Section 3.2 of the NRC staff's Safety 
Evaluation that which can be found in ADAMS under Accession No. 
ML18106A638), the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding changes to 
appendix C of the Facility Combined License, as described in the 
licensee's request dated November 30, 2017, as supplemented by the 
letter dated March 16, 2018. This exemption is related to, and 
necessary for, the granting of License Amendment No. 125 [for Unit 3 
and No. 124 for Unit 4], which is being issued concurrently with this 
exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML18106A638), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated November 30, 2017 (ADAMS Accession No. 
ML17334B211), the licensee requested that the NRC amend the COLs for 
VEGP, Units 3 and 4, COLs NPF-91 and NPF-92. The proposed amendment is 
described in Section I of this document.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
March 30, 2018 (83 FR 13796). No comments were received during the 30-
day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on November 30, 2017.
    The exemption and amendment were issued on May 31, 2018, as part of 
a combined package to the licensee (ADAMS Accession No. ML18106A626).

    Dated at Rockville, Maryland, this 3rd day of August 2018.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
 Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis Office of New Reactors.
[FR Doc. 2018-16995 Filed 8-8-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                39474                        Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices

                                                  The Commission has determined that                       The granting of the exemption allows               License Amendment Nos. 125 and 124
                                                these amendments satisfy the criteria for               the changes to Tier 1 information asked               to COL Nos. NPF–91 and NPF–92,
                                                categorical exclusion in accordance                     for in the amendment. Because the                     respectively, to the licensee. The
                                                with 10 CFR 51.22. Therefore, pursuant                  acceptability of the exemption was                    exemption is required by paragraph A.4
                                                to 10 CFR 51.22(b), no environmental                    determined in part by the acceptability               of section VIII, ‘‘Processes for Changes
                                                impact statement or environmental                       of the amendment, the exemption and                   and Departures,’’ appendix D, to 10 CFR
                                                assessment need be prepared for these                   amendment are being issued                            part 52 to allow the licensee to depart
                                                amendments.                                             concurrently.                                         from Tier 1 information. With the
                                                                                                        DATES: The exemption and amendment                    requested amendment, the licensee
                                                IV. Conclusion                                                                                                sought proposed changes to plant-
                                                                                                        were issued on May 31, 2018.
                                                   Using the reasons set forth in the                                                                         specific DCD Tier 2 and Tier 2*
                                                                                                        ADDRESSES: Please refer to Docket ID
                                                combined safety evaluation, the staff                                                                         information and related changes to
                                                                                                        NRC–2008–0252 when contacting the
                                                granted the exemptions and issued the                                                                         plant-specific Tier 1 information, with
                                                                                                        NRC about the availability of
                                                amendments that the licensee requested                                                                        corresponding changes to Inspections,
                                                                                                        information regarding this document.
                                                on August 31, 2017, and supplemented                                                                          Tests, Analyses, and Acceptance
                                                                                                        You may obtain publicly-available
                                                by letters dated March 23, and May 18,                                                                        Criteria (ITAAC) in COL Appendix C.
                                                                                                        information related to this document
                                                2018 (ADAMS Accession No.                                                                                     Specifically the changes corrected
                                                                                                        using any of the following methods:
                                                ML17243A444, ML18082B369 and                               • Federal Rulemaking Website: Go to                various editorial and consistency issues
                                                ML18138A398, respectively).                             http://www.regulations.gov and search                 between Tier 1 and Tier 2 in Tier 1 text,
                                                   The exemption and amendment were                     for Docket ID NRC–2008–0252. Address                  tables and figures.
                                                issued to the licensee on June 28, 2018,                                                                         Part of the justification for granting
                                                                                                        questions about NRC dockets to Jennifer
                                                as part of a combined package (ADAMS                                                                          the exemption was provided by the
                                                                                                        Borges; 301–287–9127; email:
                                                Accession No. ML18152B267).                                                                                   review of the amendment. Because the
                                                                                                        Jennifer.Borges@nrc.gov. For technical
                                                                                                                                                              exemption is necessary in order to issue
                                                  Dated at Rockville, Maryland, this 3rd day            questions, contact the individual listed
                                                                                                                                                              the requested license amendment, the
                                                of August 2018.                                         in the FOR FURTHER INFORMATION
                                                                                                                                                              NRC granted the exemption and issued
                                                  For the Nuclear Regulatory Commission.                CONTACT section of this document.
                                                                                                           • NRC’s Agencywide Documents                       the amendment concurrently, rather
                                                Jennifer L. Dixon-Herrity,                                                                                    than in sequence. This included issuing
                                                Chief, Licensing Branch 4, Division of                  Access and Management System
                                                                                                        (ADAMS): You may obtain publicly-                     a combined safety evaluation containing
                                                Licensing, Siting, and Environmental                                                                          the NRC staff’s review of both the
                                                Analysis, Office of New Reactors.                       available documents online in the
                                                                                                        ADAMS Public Documents collection at                  exemption request and the license
                                                [FR Doc. 2018–16996 Filed 8–8–18; 8:45 am]                                                                    amendment. The exemption met all
                                                                                                        http://www.nrc.gov/reading-rm/
                                                BILLING CODE 7590–01–P
                                                                                                        adams.html. To begin the search, select               applicable regulatory criteria set forth in
                                                                                                        ‘‘Begin Web-based ADAMS Search.’’ For                 10 CFR 50.12, 10 CFR 52.7, and section
                                                                                                                                                              VIII.A.4 of appendix D to 10 CFR part
                                                NUCLEAR REGULATORY                                      problems with ADAMS, please contact
                                                                                                                                                              52. The license amendment was found
                                                COMMISSION                                              the NRC’s Public Document Room (PDR)
                                                                                                                                                              to be acceptable as well. The combined
                                                                                                        reference staff at 1–800–397–4209, 301–
                                                                                                                                                              safety evaluation is available in ADAMS
                                                [Docket Nos. 52–025 and 52–026; NRC–                    415–4737, or by email to pdr.resource@
                                                2008–0252]                                                                                                    under Accession No. ML18106A638.
                                                                                                        nrc.gov. The ADAMS accession number                      Identical exemption documents
                                                                                                        for each document referenced (if it is                (except for referenced unit numbers and
                                                Southern Nuclear Operating Company,                     available in ADAMS) is provided the
                                                Inc.; Vogtle Electric Generating Plant,                                                                       license numbers) were issued to the
                                                                                                        first time that it is mentioned in this               licensee for VEGP Units 3 and 4 (COLs
                                                Units 3 and 4; Tier 1 and Tier 2*                       document. The request for the
                                                Editorial and Consistency Changes                                                                             NPF–91 and NPF–92). The exemption
                                                                                                        amendment and exemption was                           documents for VEGP Units 3 and 4 can
                                                AGENCY:  Nuclear Regulatory                             submitted by letters dated November 30,               be found in ADAMS under Accession
                                                Commission.                                             2017, and March 16, 2018, and are                     Nos. ML18106A629 and ML18106A631,
                                                ACTION: Exemption and combined
                                                                                                        available in ADAMS under Accession                    respectively. The exemption is
                                                license amendment; issuance.                            Nos. ML17334B211 and ML18075A438.                     reproduced (with the exception of
                                                                                                           • NRC’s PDR: You may examine and
                                                                                                                                                              abbreviated titles and additional
                                                SUMMARY:    The U.S. Nuclear Regulatory                 purchase copies of public documents at
                                                                                                                                                              citations) in Section II of this document.
                                                Commission (NRC) is granting an                         the NRC’s PDR, Room O1–F21, One
                                                                                                                                                              The amendment documents for COLs
                                                exemption to allow a departure from the                 White Flint North, 11555 Rockville
                                                                                                                                                              NPF–91 and NPF–92 are available in
                                                certification information of Tier 1 of the              Pike, Rockville, Maryland 20852.
                                                                                                                                                              ADAMS under Accession Nos.
                                                generic AP1000 design control                           FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                              ML18106A632 and ML18106A635,
                                                document (DCD) and is issuing License                   Peter Hearn, Office of New Reactors,                  respectively. A summary of the
                                                Amendment Nos. 125 and 124 to                           U.S. Nuclear Regulatory Commission,                   amendment documents is provided in
                                                Combined Licenses (COL), NPF–91 and                     Washington, DC 20555–0001; telephone:                 Section III of this document.
                                                NPF–92, respectively. The COLs were                     301–415–1189; email: Peter.Hearn@
                                                issued to Southern Nuclear Operating                    nrc.gov.                                              II. Exemption
                                                Company, Inc., and Georgia Power                        SUPPLEMENTARY INFORMATION:                               Reproduced below is the exemption
                                                Company, Oglethorpe Power
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              document issued to VEGP Units 3 and
                                                Corporation, MEAG Power SPVM, LLC,                      I. Introduction                                       4. It makes reference to the combined
                                                MEAG Power SPVJ, LLC, MEAG Power                           The NRC is granting an exemption                   safety evaluation that provides the
                                                SPVP, LLC, and the City of Dalton,                      from paragraph B of section III, ‘‘Scope              reasoning for the findings made by the
                                                Georgia (the licensee); for construction                and Contents,’’ of appendix D, ‘‘Design               NRC (and listed under Item 1) in order
                                                and operation of the Vogtle Electric                    Certification Rule for the AP1000,’’ to               to grant the exemption:
                                                Generating Plant (VEGP) Units 3 and 4,                  part 52 of title 10 of the Code of Federal               1. In a letter dated November 30,
                                                located in Burke County, Georgia.                       Regulations (10 CFR), and issuing                     2017, as supplemented by the letter


                                           VerDate Sep<11>2014   18:11 Aug 08, 2018   Jkt 244001   PO 00000   Frm 00073   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1


                                                                             Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices                                           39475

                                                dated March 16, 2018, the Southern                      complies with the standards and                       an engineering assessment of recent
                                                Nuclear Operating Company (SNC)                         requirements of the Atomic Energy Act                 NRC-sponsored mechanical testing of
                                                requested from the Commission an                        of 1954, as amended (the Act), and the                HBU SNF, and proposes example
                                                exemption to allow departures from Tier                 Commission’s rules and regulations.                   approaches for licensing and
                                                1 information in the certified DCD                      The Commission has made appropriate                   certification of HBU SNF in
                                                incorporated by reference in 10 CFR                     findings as required by the Act and the               transportation and dry storage.
                                                part 52, appendix D, as part of license                 Commission’s rules and regulations in                 DATES: Submit comments on the draft
                                                amendment request 17–042, ‘‘Tier 1 and                  10 CFR chapter I, which are set forth in              NUREG–2224 by September 24, 2018.
                                                Tier 2* Editorial and Consistency                       the license amendment.                                Comments received after this date will
                                                Changes.’’                                                 A notice of consideration of issuance              be considered if it is practical to do so,
                                                   For the reasons set forth in Section 3.2             of amendment to facility operating                    but the NRC is able to ensure
                                                of the NRC staff’s Safety Evaluation that               license or COL, as applicable, proposed               consideration only for comments
                                                which can be found in ADAMS under                       no significant hazards consideration                  received on or before this date.
                                                Accession No. ML18106A638), the                         determination, and opportunity for a
                                                                                                                                                              ADDRESSES: You may submit comments
                                                Commission finds that:                                  hearing in connection with these
                                                                                                                                                              by any of the following methods:
                                                   A. The exemption is authorized by                    actions, was published in the Federal
                                                                                                                                                                 • Federal Rulemaking Website: Go to
                                                law;                                                    Register on March 30, 2018 (83 FR
                                                   B. the exemption presents no undue                                                                         http://www.regulations.gov and search
                                                                                                        13796). No comments were received
                                                risk to public health and safety;                                                                             for Docket ID NRC–2018–0066. Address
                                                                                                        during the 30-day comment period.
                                                   C. the exemption is consistent with                     The Commission has determined that                 questions about NRC dockets to Jennifer
                                                the common defense and security;                        these amendments satisfy the criteria for             Borges; telephone: 301–287–9127;
                                                   D. special circumstances are present                 categorical exclusion in accordance                   email: Jennifer.Borges@nrc.gov. For
                                                in that the application of the rule in this             with 10 CFR 51.22. Therefore, pursuant                technical questions, contact the
                                                circumstance is not necessary to serve                  to 10 CFR 51.22(b), no environmental                  individual listed in the FOR FURTHER
                                                the underlying purpose of the rule;                                                                           INFORMATION CONTACT section of this
                                                                                                        impact statement or environmental
                                                   E. the special circumstances outweigh                assessment need be prepared for these                 document.
                                                any decrease in safety that may result                  amendments.                                              • Mail comments to: May Ma, Office
                                                from the reduction in standardization                                                                         of Administration, Mail Stop: TWFN–7–
                                                caused by the exemption; and                            IV. Conclusion                                        A60M, U.S. Nuclear Regulatory
                                                   F. the exemption will not result in a                   Using the reasons set forth in the                 Commission, Washington, DC 20555–
                                                significant decrease in the level of safety             combined safety evaluation, the staff                 0001.
                                                otherwise provided by the design.                       granted the exemption and issued the                     For additional direction on obtaining
                                                   2. Accordingly, the licensee is granted              amendment that the licensee requested                 information and submitting comments,
                                                an exemption from the certified DCD                     on November 30, 2017.                                 see ‘‘Obtaining Information and
                                                Tier 1 information, with corresponding                     The exemption and amendment were                   Submitting Comments’’ in the
                                                changes to appendix C of the Facility                   issued on May 31, 2018, as part of a                  SUPPLEMENTARY INFORMATION section of
                                                Combined License, as described in the                   combined package to the licensee                      this document.
                                                licensee’s request dated November 30,                   (ADAMS Accession No. ML18106A626).                    FOR FURTHER INFORMATION CONTACT:
                                                2017, as supplemented by the letter                       Dated at Rockville, Maryland, this 3rd day          Wendy Reed, Office of Nuclear Material
                                                dated March 16, 2018. This exemption                    of August 2018.                                       Safety and Safeguards, telephone: 301–
                                                is related to, and necessary for, the                     For the Nuclear Regulatory Commission.              415–7213; email: Wendy.Reed@nrc.gov;
                                                granting of License Amendment No. 125                   Jennifer L. Dixon-Herrity,                            U.S. Nuclear Regulatory Commission,
                                                [for Unit 3 and No. 124 for Unit 4],                    Chief, Licensing Branch 4, Division of                Washington, DC 20555–0001.
                                                which is being issued concurrently with                 Licensing, Siting, and Environmental                  SUPPLEMENTARY INFORMATION:
                                                this exemption.                                         Analysis Office of New Reactors.
                                                   3. As explained in Section 5.0 of the                                                                      I. Obtaining Information and
                                                                                                        [FR Doc. 2018–16995 Filed 8–8–18; 8:45 am]
                                                NRC staff’s Safety Evaluation (ADAMS                                                                          Submitting Comments
                                                                                                        BILLING CODE 7590–01–P
                                                Accession No. ML18106A638), this                                                                              A. Obtaining Information
                                                exemption meets the eligibility criteria
                                                for categorical exclusion set forth in 10                                                                        Please refer to Docket ID NRC–2018–
                                                                                                        NUCLEAR REGULATORY
                                                CFR 51.22(c)(9). Therefore, pursuant to                                                                       0066 when contacting the NRC about
                                                                                                        COMMISSION
                                                10 CFR 51.22(b), no environmental                                                                             the availability of information for this
                                                impact statement or environmental                       [NRC–2018–0066]                                       action. You may obtain publicly-
                                                assessment needs to be prepared in                                                                            available information related to this
                                                                                                        Dry Storage and Transportation of                     action by any of the following methods:
                                                connection with the issuance of the
                                                                                                        High Burnup Spent Nuclear Fuel                           • Federal Rulemaking Website: Go to
                                                exemption.
                                                   4. This exemption is effective as of the             AGENCY: Nuclear Regulatory                            http://www.regulations.gov and search
                                                date of its issuance.                                   Commission.                                           for Docket ID NRC–2018–0066.
                                                                                                        ACTION: Draft NUREG; request for                         • NRC’s Agencywide Documents
                                                III. License Amendment Request                                                                                Access and Management System
                                                                                                        comment.
                                                   By letter dated November 30, 2017                                                                          (ADAMS): You may obtain publicly-
                                                                                                        SUMMARY:   The U.S. Nuclear Regulatory                available documents online in the
sradovich on DSK3GMQ082PROD with NOTICES




                                                (ADAMS Accession No. ML17334B211),
                                                the licensee requested that the NRC                     Commission (NRC) is issuing for public                ADAMS Public Documents collection at
                                                amend the COLs for VEGP, Units 3 and                    comment a draft NUREG, NUREG–2224,                    http://www.nrc.gov/reading-rm/
                                                4, COLs NPF–91 and NPF–92. The                          ‘‘Dry Storage and Transportation of High              adams.html. To begin the search, select
                                                proposed amendment is described in                      Burnup Spent Nuclear Fuel.’’ The draft                ‘‘Begin Web-based ADAMS Search.’’ For
                                                Section I of this document.                             NUREG provides technical background                   problems with ADAMS, please contact
                                                   The Commission has determined for                    information applicable to high burnup                 the NRC’s Public Document Room (PDR)
                                                these amendments that the application                   spent nuclear fuel (HBU SNF), provides                reference staff at 1–800–397–4209, 301–


                                           VerDate Sep<11>2014   18:11 Aug 08, 2018   Jkt 244001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\09AUN1.SGM   09AUN1



Document Created: 2018-08-09 01:10:50
Document Modified: 2018-08-09 01:10:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on May 31, 2018.
ContactPeter Hearn, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1189; email: [email protected]
FR Citation83 FR 39474 