83_FR_40166 83 FR 40010 - Application to Export Electric Energy; TEC Energy Inc.

83 FR 40010 - Application to Export Electric Energy; TEC Energy Inc.

DEPARTMENT OF ENERGY

Federal Register Volume 83, Issue 156 (August 13, 2018)

Page Range40010-40011
FR Document2018-17313

TEC Energy Inc. (Applicant or TEC) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to the Federal Power Act.

Federal Register, Volume 83 Issue 156 (Monday, August 13, 2018)
[Federal Register Volume 83, Number 156 (Monday, August 13, 2018)]
[Notices]
[Pages 40010-40011]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17313]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-388-A]


Application to Export Electric Energy; TEC Energy Inc.

AGENCY: Office of Electricity, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: TEC Energy Inc. (Applicant or TEC) has applied to renew its 
authority to transmit electric energy from the United States to Canada 
pursuant to the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before September 12, 2018.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity, Mail 
Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW, 
Washington, DC 20585-0350. Because of delays in handling conventional 
mail, it is recommended that documents be transmitted by overnight 
mail, by electronic mail to [email protected], or by 
facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: The Department of Energy (DOE) regulates 
exports of electricity from the United States to a foreign country, 
pursuant to sections 301(b) and 402(f) of the Department of Energy 
Organization Act (42 U.S.C. Sec. Sec.  7151(b) and 7172(f)). Such 
exports require authorization under section 202(e) of the Federal Power 
Act (16 U.S.C. Sec.  824a(e)).
    On December 19, 2013, DOE issued Order No. EA-388 to TEC, which 
authorized the Applicant to transmit electric energy from the United 
States to Canada as a power marketer for a five-year term using 
existing international transmission facilities. That authority expires 
on December 19, 2018. On July 30, 2018, TEC filed an application with 
DOE for renewal of the export authority contained in Order No. EA-388 
for an additional five-year term.
    In its application, the Applicant states that it ``does not own or 
control any electric generation or transmission facilities'' and ``does 
not hold a franchise or service territory for the transmission, 
distribution or sale of electric power.'' The electric energy that the 
Applicant proposes to export to Canada would be surplus energy 
purchased from third parties such as electric utilities and Federal 
power marketing agencies pursuant to voluntary agreements. The existing 
international transmission facilities to be utilized by TEC have 
previously been authorized by Presidential permits issued pursuant to 
Executive Order 10485, as amended, and are appropriate for open access 
transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedure (18 CFR 385.211). Any person desiring to become 
a party to this proceeding should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
(5) copies of such comments, protests, or motions to intervene should 
be sent to the address provided above on or before the date listed 
above.
    Comments and other filings concerning TEC's application to export 
electric energy to Canada should be clearly marked with OE Docket No. 
EA-388-A. An additional copy is to be provided directly to both Etienne 
Lapointe, CPA, CA, MSc, TEC Energy Inc., 88 Prince St, Suite 202, 
Montreal, Quebec H3C 2M8, and Legalinc Corporate Services Inc., 35-15 
84th Street 2H Jackson Heights, New York, NY 11372.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after DOE determines that the proposed action will not have an adverse 
impact on the sufficiency of supply or reliability of the U.S. electric 
power supply system.

[[Page 40011]]

    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program website at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Signed in Washington, DC, on August 7, 2018.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity.
[FR Doc. 2018-17313 Filed 8-10-18; 8:45 am]
 BILLING CODE 6450-01-P



                                                40010                        Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices

                                                Attachment A—Brief Template                               sales is too conservative. The record                           Issue 2: The specific issue to be
                                                I. Category [all issues pertaining to a                   demonstrates that the trend in market                           addressed [for example: Whether
                                                particular category, for example: Power                   prices is upward. The Administrator                             Bonneville’s surplus power sales
                                                Rates, Transmission Rates,                                should revise the forecast for the price                        forecast is reasonable.]
                                                Transmission Terms and Conditions,                        of secondary energy upward consistent
                                                                                                                                                                          Summary of Party’s Position
                                                Joint Issues, Procedural Issues]                          with Party X’s proposal.]
                                                                                                                                                                            [For example: Bonneville’s surplus
                                                A. General Topic Area [for example:                       Party’s Position and Argument
                                                                                                                                                                          power sales forecast is flawed because it
                                                Secondary Sales]                                             Statements of argument, including                            does not account for extraregional
                                                Issue 1: The specific issue to be                         citations to the record.                                        power sales.]
                                                addressed [for example: Whether                           Requested Action or Decision                                    Party’s Position and Argument
                                                Bonneville’s forecast of energy prices
                                                should be revised upward].                                  A brief description of the requested                             Statements of argument, including
                                                                                                          action or decision the party wants the                          citations to the record.
                                                Summary of Party’s Position                               Administrator to make.
                                                                                                                                                                          Requested Action or Decision
                                                  A brief statement summarizing the                         [For example: The projection of
                                                party’s position.                                         energy prices for Bonneville’s secondary                          [For example: Bonneville’s surplus
                                                  [For example: Bonneville staff’s                        sales should be revised consistent with                         power sales forecast should be increased
                                                forecast of energy prices for secondary                   Party’s X’s proposal.]                                          to reflect extraregional power sales.]
                                                                                                              POST-HEARING LIST OF EXHIBITS
                                                             Filing code                                      Title                                       Date filed                                   Status

                                                XX–XX–E–XX–01 ..........................   Direct Testimony ...........................   mm/dd/yyyy ...................................   Admitted.
                                                XX–XX–E–XX–02 ..........................   Rebuttal Testimony .......................     mm/dd/yyyy ...................................   Rejected.



                                                End of Brief Template                                     SUPPLEMENTARY INFORMATION:      The                             for open access transmission by third
                                                                                                          Department of Energy (DOE) regulates                            parties.
                                                  Issued this 2nd day of August, 2018.                    exports of electricity from the United                            Procedural Matters: Any person
                                                Elliot E. Mainzer,                                        States to a foreign country, pursuant to                        desiring to be heard in this proceeding
                                                Administrator and Chief Executive Officer.                sections 301(b) and 402(f) of the                               should file a comment or protest to the
                                                [FR Doc. 2018–17223 Filed 8–10–18; 8:45 am]               Department of Energy Organization Act                           application at the address provided
                                                BILLING CODE 6450–01–P                                    (42 U.S.C. §§ 7151(b) and 7172(f)). Such                        above. Protests should be filed in
                                                                                                          exports require authorization under                             accordance with Rule 211 of the Federal
                                                                                                          section 202(e) of the Federal Power Act                         Energy Regulatory Commission’s (FERC)
                                                DEPARTMENT OF ENERGY                                      (16 U.S.C. § 824a(e)).                                          Rules of Practice and Procedure (18 CFR
                                                                                                             On December 19, 2013, DOE issued                             385.211). Any person desiring to
                                                                                                          Order No. EA–388 to TEC, which                                  become a party to this proceeding
                                                [OE Docket No. EA–388–A]
                                                                                                          authorized the Applicant to transmit                            should file a motion to intervene at the
                                                Application to Export Electric Energy;                    electric energy from the United States to                       above address in accordance with FERC
                                                TEC Energy Inc.                                           Canada as a power marketer for a five-                          Rule 214 (18 CFR 385.214). Five (5)
                                                                                                                                                                          copies of such comments, protests, or
                                                                                                          year term using existing international
                                                AGENCY:   Office of Electricity, DOE.                                                                                     motions to intervene should be sent to
                                                                                                          transmission facilities. That authority
                                                ACTION:   Notice of application.                                                                                          the address provided above on or before
                                                                                                          expires on December 19, 2018. On July
                                                                                                                                                                          the date listed above.
                                                                                                          30, 2018, TEC filed an application with                           Comments and other filings
                                                SUMMARY:   TEC Energy Inc. (Applicant or                  DOE for renewal of the export authority
                                                TEC) has applied to renew its authority                                                                                   concerning TEC’s application to export
                                                                                                          contained in Order No. EA–388 for an                            electric energy to Canada should be
                                                to transmit electric energy from the                      additional five-year term.
                                                United States to Canada pursuant to the                                                                                   clearly marked with OE Docket No. EA–
                                                Federal Power Act.                                           In its application, the Applicant states                     388–A. An additional copy is to be
                                                                                                          that it ‘‘does not own or control any                           provided directly to both Etienne
                                                DATES: Comments, protests, or motions                     electric generation or transmission                             Lapointe, CPA, CA, MSc, TEC Energy
                                                to intervene must be submitted on or                      facilities’’ and ‘‘does not hold a                              Inc., 88 Prince St, Suite 202, Montreal,
                                                before September 12, 2018.                                franchise or service territory for the                          Quebec H3C 2M8, and Legalinc
                                                ADDRESSES: Comments, protests,                            transmission, distribution or sale of                           Corporate Services Inc., 35–15 84th
                                                motions to intervene, or requests for                     electric power.’’ The electric energy that                      Street 2H Jackson Heights, New York,
                                                more information should be addressed                      the Applicant proposes to export to                             NY 11372.
                                                to: Office of Electricity, Mail Code: OE–                 Canada would be surplus energy                                    A final decision will be made on this
                                                20, U.S. Department of Energy, 1000                       purchased from third parties such as                            application after the environmental
                                                Independence Avenue SW, Washington,                       electric utilities and Federal power                            impacts have been evaluated pursuant
sradovich on DSK3GMQ082PROD with NOTICES




                                                DC 20585–0350. Because of delays in                       marketing agencies pursuant to                                  to DOE’s National Environmental Policy
                                                handling conventional mail, it is                         voluntary agreements. The existing                              Act Implementing Procedures (10 CFR
                                                recommended that documents be                             international transmission facilities to                        part 1021) and after DOE determines
                                                transmitted by overnight mail, by                         be utilized by TEC have previously been                         that the proposed action will not have
                                                electronic mail to Electricity.Exports@                   authorized by Presidential permits                              an adverse impact on the sufficiency of
                                                hq.doe.gov, or by facsimile to 202–586–                   issued pursuant to Executive Order                              supply or reliability of the U.S. electric
                                                8008.                                                     10485, as amended, and are appropriate                          power supply system.


                                           VerDate Sep<11>2014   20:42 Aug 10, 2018   Jkt 244001   PO 00000     Frm 00030    Fmt 4703     Sfmt 4703    E:\FR\FM\13AUN1.SGM          13AUN1


                                                                             Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices                                                      40011

                                                   Copies of this application will be                   DATES:  DOE will accept comments, data,               I. Background and Authority
                                                made available, upon request, for public                and information with respect to the JCI                  Title III, Part B 1 of the Energy Policy
                                                inspection and copying at the address                   Petition until September 12, 2018.                    and Conservation Act of 1975 (EPCA),
                                                provided above, by accessing the                                                                              Public Law 94–163 (42 U.S.C. 6291–
                                                                                                        ADDRESSES:   You may submit comments,
                                                program website at http://energy.gov/                                                                         6309, as codified) established the
                                                                                                        identified by case number ‘‘CAC–050’’
                                                node/11845, or by emailing Angela Troy                                                                        Energy Conservation Program for
                                                                                                        and Docket number ‘‘EERE–2017–BT–
                                                at Angela.Troy@hq.doe.gov.                                                                                    Consumer Products Other Than
                                                                                                        WAV–0039,’’ by any of the following
                                                  Signed in Washington, DC, on August 7,                methods:                                              Automobiles, which includes central air
                                                2018.                                                                                                         conditioners and heat pumps.2 Part B
                                                                                                           • Federal eRulemaking Portal: http://
                                                Christopher Lawrence,
                                                                                                        www.regulations.gov. Follow the                       includes definitions, test procedures,
                                                Electricity Policy Analyst, Office of Electricity.      instructions for submitting comments.                 labeling provisions, energy conservation
                                                [FR Doc. 2018–17313 Filed 8–10–18; 8:45 am]                                                                   standards, and the authority to require
                                                                                                           • Email: JCI2017WAV0042@                           information and reports from
                                                BILLING CODE 6450–01–P
                                                                                                        ee.doe.gov. Include the case number                   manufacturers. Further, Part B requires
                                                                                                        CAC–050 in the subject line of the                    the Secretary of Energy to prescribe test
                                                DEPARTMENT OF ENERGY                                    message. Submit electronic comments                   procedures that are reasonably designed
                                                                                                        in WordPerfect, Microsoft Word, PDF,                  to produce results that measure energy
                                                [Case No. CAC–050]                                      or ASCII file format, and avoid the use               efficiency, energy use, or estimated
                                                                                                        of special characters or any form of                  operating costs during a representative
                                                Notice of Petition for Waiver of                        encryption.
                                                Johnson Controls, Inc. From the                                                                               average-use cycle, and that are not
                                                Department of Energy Central Air                           • Postal Mail: U.S. Department of                  unduly burdensome to conduct. (42
                                                Conditioners and Heat Pumps Test                        Energy, Building Technologies Office,                 U.S.C. 6293(b)(3)) The test procedure for
                                                Procedure, and Notice of Grant of                       Mailstop EE–5B, Petition for Waiver                   central air conditioners and heat pumps
                                                Interim Waiver                                          Case No CAC–050, 1000 Independence                    is contained in 10 CFR part 430, subpart
                                                                                                        Avenue SW, Washington, DC 20585–                      B, appendix M (referred to in this notice
                                                AGENCY:   Office of Energy Efficiency and               0121. If possible, please submit all items            as ‘‘appendix M’’).
                                                Renewable Energy, Department of                         on a compact disc (CD), in which case                    DOE’s regulations set forth at 10 CFR
                                                Energy.                                                 it is not necessary to include printed                430.27 contain provisions that allow a
                                                ACTION: Notice of petition for waiver,                  copies.                                               person to seek a waiver from the test
                                                grant of an interim waiver, and request                    • Hand Delivery/Courier: Appliance                 procedure requirements for a particular
                                                for comments.                                           and Equipment Standards Program, U.S.                 basic model of a covered product when
                                                                                                        Department of Energy, Building                        the petitioner’s basic model for which
                                                SUMMARY:   This notice announces receipt                Technologies Office, 950 L’Enfant Plaza               the petition for waiver was submitted
                                                of and publishes a petition for waiver                  SW, 6th Floor, Washington, DC 20024.                  contains one or more design
                                                from Johnson Controls, Inc. (JCI) seeking               Telephone: (202) 287–1445. If possible,               characteristics that either (1) prevent
                                                an exemption from the U.S. Department                   please submit all items on a CD, in                   testing according to the prescribed test
                                                of Energy (DOE) test procedure for                      which case it is not necessary to include             procedure, or (2) cause the prescribed
                                                determining the efficiency of central air               printed copies.                                       test procedures to evaluate the basic
                                                conditioners and heat pumps. JCI seeks                                                                        model in a manner so unrepresentative
                                                to use an alternate test procedure to                      Docket: The docket, which includes                 of its true energy consumption
                                                address issues involved in testing                      Federal Register notices, comments,                   characteristics as to provide materially
                                                certain basic models identified in its                  and other supporting documents/                       inaccurate comparative data. 10 CFR
                                                amended petition. According to JCI,                     materials, is available for review at                 430.27(a)(1). A petitioner must include
                                                testing the basic models of the central                 http://www.regulations.gov. All                       in its petition any alternate test
                                                air conditioners listed in its amended                  documents in the docket are listed in                 procedures known to the petitioner to
                                                petition as outdoor units with no match                 the http://www.regulations.gov index.                 evaluate the basic model in a manner
                                                will overstate their energy usage as they               However, some documents listed in the                 representative of its energy
                                                will be rated using default indoor unit                 index, such as those containing                       consumption. 10 CFR 430.27(b)(1)(iii).
                                                parameters that are representative of an                information that is exempt from public                   DOE may grant a waiver subject to
                                                old, inefficient indoor unit. JCI seeks to              disclosure, may not be publicly                       conditions, including adherence to
                                                use an alternate test procedure to test                 available.                                            alternate test procedures. 10 CFR
                                                and rate the basic models listed in its                    The docket web page can be found at                430.27(f)(2). As soon as practicable after
                                                amended petition as matched systems.                    https://www.regulations.gov/                          the granting of any waiver, DOE will
                                                JCI proposes to waive the DOE test                      docket?D=EERE-2017-BT-WAV-0039.                       publish in the Federal Register a notice
                                                procedure requirement to test these                     The docket web page will contain                      of proposed rulemaking to amend its
                                                basic models as outdoor units with no                   simple instruction on how to access all               regulations so as to eliminate any need
                                                match and instead, test these basic                     documents, including public comments,                 for the continuation of such waiver. As
                                                models as matched systems. This notice                  in the docket.                                        soon thereafter as practicable, DOE will
                                                also announces that DOE grants JCI an                   FOR FURTHER INFORMATION CONTACT:   Mr.                publish in the Federal Register a final
                                                interim waiver from the DOE central air                 Pete Cochran, U.S. Department of                      rule. 10 CFR 430.27(l).
                                                conditioners and heat pumps test                                                                                 The regulations governing the waiver
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        Energy, Office of the General Counsel,
                                                procedure for its specified basic models,               Mail Stop GC–33, Forrestal Building,                  process also allow DOE to grant an
                                                subject to use of the alternative test                  1000 Independence Avenue SW,
                                                procedure as set forth in the Order. DOE                Washington, DC 20585–0103.
                                                                                                                                                                 1 For editorial reasons, upon codification in the

                                                solicits comments, data, and                                                                                  U.S. Code, Part B was redesignated as Part A.
                                                                                                        Telephone: (202) 586–9496. Email:                        2 All references to EPCA in this document refer
                                                information concerning JCI’s amended                    Peter.Cochran@hq.doe.gov.                             to the statute as amended through the EPS
                                                petition and its suggested alternate test                                                                     Improvement Act of 2017, Public Law 11–115
                                                procedure.                                              SUPPLEMENTARY INFORMATION:                            (January 12, 2018).



                                           VerDate Sep<11>2014   20:42 Aug 10, 2018   Jkt 244001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\13AUN1.SGM   13AUN1



Document Created: 2018-08-11 00:26:53
Document Modified: 2018-08-11 00:26:53
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before September 12, 2018.
FR Citation83 FR 40010 