83_FR_40185 83 FR 40029 - City of Gonzales; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

83 FR 40029 - City of Gonzales; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 156 (August 13, 2018)

Page Range40029-40030
FR Document2018-17306

Federal Register, Volume 83 Issue 156 (Monday, August 13, 2018)
[Federal Register Volume 83, Number 156 (Monday, August 13, 2018)]
[Notices]
[Pages 40029-40030]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17306]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2960-006]


City of Gonzales; Notice of Application Tendered for Filing With 
the Commission and Establishing Procedural Schedule for Licensing and 
Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent License.
    b. Project No.: 2960-006.
    c. Date Filed: July 27, 2018.
    d. Applicant: City of Gonzales.
    e. Name of Project: Gonzales Hydroelectric Project (Gonzales 
Project).
    f. Location: The existing project is located at river mile 167 on 
the Guadalupe River in the City of Gonzales, in Gonzales County, Texas. 
The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Tim Patek, Superintendent of Public Works, 
City of Gonzales, 1920 St. Joseph Street, Gonzales, TX 78629; Telephone 
(830) 672-3192; tpatek@gonzales.texas.gov.
    i. FERC Contact: Rachel McNamara at (202) 502-8340, or at 
rachel.mcnamara@ferc.gov.
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The Gonzales Project consists of: (1) A 15-
foot-high, 258-foot-long, concrete Ambursen dam with a 178-foot-long 
ogee-type spillway; (2) a reservoir with a surface area of 300 acres 
and a storage capacity of 1,400 acre-feet; (3) an intake structure 
comprised of six wooden water control gates; (4) an 80-foot-long, 20-
foot-wide brick powerhouse containing three generating units with a 
total capacity of 1,140 kilowatts; (5) two 50-foot-long underground 5-
kilovolt cables to a step-up transformer; and (6) an above-ground 
transmission line connecting the step-up transformer to a distribution 
line near the access road to the project. The Gonzales Project is a 
conventional project generating 1,314 megawatt-hours of electricity 
annually.
    The project is operated as a run-of-river facility with no 
impoundment fluctuation. When flows exceed the minimum flow requirement 
of 200 cubic feet per second (cfs) and a minimum of 9 feet of head 
height is achieved, generation can commence. When flows exceed the 
combined capacity of all three turbines (1,161 cfs), excess flows are 
passed over the spillway dam.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field, to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, or toll free at 
(866) 208-3676, or for TTY at (202) 502-8659. A copy is also available 
for inspection and reproduction at the address in paragraph h.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

[[Page 40030]]

    m. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

------------------------------------------------------------------------
                   Milestone                           Target Date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for        October 2018.
 Environmental Analysis.
Filing of recommendations, preliminary terms    December 2018.
 and conditions, and fishway prescriptions.
Commission issues EA..........................  April 2019.
Comments on EA................................  May 2019.
Modified Terms and Conditions.................  July 2019.
------------------------------------------------------------------------

    n. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: August 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-17306 Filed 8-10-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices                                            40029

                                                result in any impact on certificated                    provide copies of their protests only to                 f. Location: The existing project is
                                                capacity on its system or in a reduction                the party or parties directly involved in             located at river mile 167 on the
                                                in firm service to existing customers of                the protest.                                          Guadalupe River in the City of
                                                Texas Eastern.                                             Persons who wish to comment only                   Gonzales, in Gonzales County, Texas.
                                                   Pursuant to section 157.9 of the                     on the environmental review of this                   The project does not affect federal lands.
                                                Commission’s rules (18 CFR 157.9),                      project should submit an original and                    g. Filed Pursuant to: Federal Power
                                                within 90 days of this Notice, the                      two copies of their comments to the                   Act, 16 U.S.C. 791 (a)–825(r).
                                                Commission staff will either: complete                  Secretary of the Commission.                             h. Applicant Contact: Tim Patek,
                                                its environmental assessment (EA) and                   Environmental commentors will be                      Superintendent of Public Works, City of
                                                place it into the Commission’s public                   placed on the Commission’s                            Gonzales, 1920 St. Joseph Street,
                                                record (eLibrary) for this proceeding or                environmental mailing list, will receive              Gonzales, TX 78629; Telephone (830)
                                                issue a Notice of Schedule for                          copies of the environmental documents,                672–3192; tpatek@gonzales.texas.gov.
                                                Environmental Review. If a Notice of                    and will be notified of meetings                         i. FERC Contact: Rachel McNamara at
                                                Schedule for Environmental Review is                    associated with the Commission’s                      (202) 502–8340, or at
                                                issued, it will indicate, among other                   environmental review process.                         rachel.mcnamara@ferc.gov.
                                                milestones, the anticipated date for the                Environmental commentors will not be                     j. This application is not ready for
                                                Commission staff’s issuance of the final                required to serve copies of filed                     environmental analysis at this time.
                                                environmental impact statement (FEIS)                   documents on all other parties.                          k. Project Description: The Gonzales
                                                or EA for this proposal. The filing of the              However, the non-party commentors                     Project consists of: (1) A 15-foot-high,
                                                EA in the Commission’s public record                    will not receive copies of all documents              258-foot-long, concrete Ambursen dam
                                                for this proceeding or the issuance of a                filed by other parties or issued by the               with a 178-foot-long ogee-type spillway;
                                                Notice of Schedule will serve to notify                 Commission (except for the mailing of                 (2) a reservoir with a surface area of 300
                                                federal and state agencies of the timing                environmental documents issued by the                 acres and a storage capacity of 1,400
                                                for the completion of all necessary                     Commission) and will not have the right               acre-feet; (3) an intake structure
                                                reviews, and the subsequent need to                     to seek court review of the                           comprised of six wooden water control
                                                complete all federal authorizations                     Commission’s final order.                             gates; (4) an 80-foot-long, 20-foot-wide
                                                within 90 days of the date of issuance                     The Commission strongly encourages                 brick powerhouse containing three
                                                of the Commission staff’s FEIS or EA.                   electronic filings of comments, protests              generating units with a total capacity of
                                                   There are two ways to become                         and interventions in lieu of paper using              1,140 kilowatts; (5) two 50-foot-long
                                                involved in the Commission’s review of                  the ‘‘eFiling’’ link at http://                       underground 5-kilovolt cables to a step-
                                                this project. First, any person wishing to              www.ferc.gov. Persons unable to file                  up transformer; and (6) an above-ground
                                                obtain legal status by becoming a party                 electronically should submit original                 transmission line connecting the step-
                                                to the proceedings for this project                     and five copies of the protest or                     up transformer to a distribution line
                                                should, on or before the comment date                   intervention to the Federal Energy                    near the access road to the project. The
                                                stated below, file with the Federal                     Regulatory Commission, 888 First Street               Gonzales Project is a conventional
                                                Energy Regulatory Commission, 888                       NE, Washington, DC 20426.                             project generating 1,314 megawatt-hours
                                                First Street, NE, Washington, DC 20426,                    Comment Date: 5:00 p.m. Eastern                    of electricity annually.
                                                a motion to intervene in accordance                     Time on August 28, 2018.                                 The project is operated as a run-of-
                                                with the requirements of the                                                                                  river facility with no impoundment
                                                                                                          Dated: August 7, 2018.
                                                Commission’s Rules of Practice and                                                                            fluctuation. When flows exceed the
                                                                                                        Kimberly D. Bose,                                     minimum flow requirement of 200 cubic
                                                Procedure (18 CFR 385.214 or 385.211)
                                                and the Regulations under the NGA (18                   Secretary.                                            feet per second (cfs) and a minimum of
                                                CFR 157.10). A person obtaining party                   [FR Doc. 2018–17289 Filed 8–10–18; 8:45 am]           9 feet of head height is achieved,
                                                status will be placed on the service list               BILLING CODE 6717–01–P                                generation can commence. When flows
                                                maintained by the Secretary of the                                                                            exceed the combined capacity of all
                                                Commission and will receive copies of                                                                         three turbines (1,161 cfs), excess flows
                                                all documents filed by the applicant and                DEPARTMENT OF ENERGY                                  are passed over the spillway dam.
                                                by all other parties. A party must submit                                                                        l. A copy of the application is
                                                                                                        Federal Energy Regulatory                             available for review at the Commission
                                                five copies of filings made with the
                                                                                                        Commission                                            in the Public Reference Room or may be
                                                Commission and must mail a copy to
                                                the applicant and to every other party in               [Project No. 2960–006]                                viewed on the Commission’s website at
                                                the proceeding. Only parties to the                                                                           http://www.ferc.gov, using the
                                                proceeding can ask for court review of                  City of Gonzales; Notice of Application               ‘‘eLibrary’’ link. Enter the docket
                                                Commission orders in the proceeding.                    Tendered for Filing With the                          number, excluding the last three digits
                                                   However, a person does not have to                   Commission and Establishing                           in the docket number field, to access the
                                                intervene in order to have comments                     Procedural Schedule for Licensing and                 document. For assistance, contact FERC
                                                considered. The second way to                           Deadline for Submission of Final                      Online Support at
                                                participate is by filing with the                       Amendments                                            FERCOnlineSupport@ferc.gov, or toll
                                                Secretary of the Commission, as soon as                   Take notice that the following                      free at (866) 208–3676, or for TTY at
                                                possible, an original and two copies of                 hydroelectric application has been filed              (202) 502–8659. A copy is also available
                                                comments in support of or in opposition                 with the Commission and is available                  for inspection and reproduction at the
                                                to this project. The Commission will
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        for public inspection.                                address in paragraph h.
                                                consider these comments in                                a. Type of Application: Subsequent                     You may also register online at http://
                                                determining the appropriate action to be                License.                                              www.ferc.gov/docs-filing/
                                                taken, but the filing of a comment alone                  b. Project No.: 2960–006.                           esubscription.asp to be notified via
                                                will not serve to make the filer a party                  c. Date Filed: July 27, 2018.                       email of new filings and issuances
                                                to the proceeding. The Commission’s                       d. Applicant: City of Gonzales.                     related to this or other pending projects.
                                                rules require that persons filing                         e. Name of Project: Gonzales                        For assistance, contact FERC Online
                                                comments in opposition to the project                   Hydroelectric Project (Gonzales Project).             Support.


                                           VerDate Sep<11>2014   20:42 Aug 10, 2018   Jkt 244001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\13AUN1.SGM   13AUN1


                                                40030                                  Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices

                                                  m. Procedural Schedule: The                                            Licensing Schedule. Revisions to the
                                                application will be processed according                                  schedule will be made as appropriate.
                                                to the following preliminary Hydro

                                                                                                                               Milestone                                                                                              Target Date

                                                Notice of Acceptance/Notice of Ready for Environmental Analysis ..................................................................................                               October 2018.
                                                Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ...............................................                                           December 2018.
                                                Commission issues EA ......................................................................................................................................................      April 2019.
                                                Comments on EA ...............................................................................................................................................................   May 2019.
                                                Modified Terms and Conditions .........................................................................................................................................          July 2019.



                                                  n. Final amendments to the                                                You may also register online at http://                               with the Commission and is available
                                                application must be filed with the                                       www.ferc.gov/docs-filing/                                                for public inspection.
                                                Commission no later than 30 days from                                    esubscription.asp to be notified via                                        a. Type of Application: Major License.
                                                the issuance date of the notice of ready                                 email of new filings and issuances                                          b. Project No.: 619–164.
                                                for environmental analysis.                                              related to this or other pending projects.                                  c. Date filed: December 12, 2016.
                                                                                                                         For assistance, contact FERC Online                                         d. Applicant: Pacific Gas and Electric
                                                  Dated: August 6, 2018.                                                                                                                          Company (PG&E) and City of Santa
                                                Kimberly D. Bose,
                                                                                                                         Support.
                                                                                                                            Any comments should be filed within                                   Clara, California.
                                                Secretary.                                                               30 days from the date of this notice.                                       e. Name of Project: Bucks Creek
                                                [FR Doc. 2018–17306 Filed 8–10–18; 8:45 am]                                 The Commission strongly encourages                                    Hydroelectric Project.
                                                BILLING CODE 6717–01–P                                                   electronic filing. Please file comments                                     f. Location: The Bucks Creek Project
                                                                                                                         using the Commission’s eFiling system                                    is located on Bucks, Grizzly, and Milk
                                                                                                                         at http://www.ferc.gov/docs-filing/                                      Ranch Creeks in Plumas County,
                                                DEPARTMENT OF ENERGY                                                     efiling.asp. Commenters can submit                                       California. Portions of the project are
                                                                                                                         brief comments up to 6,000 characters,                                   located within the Plumas National
                                                Federal Energy Regulatory                                                                                                                         Forest.
                                                                                                                         without prior registration, using the
                                                Commission                                                                                                                                           g. Filed Pursuant to: Federal Power
                                                                                                                         eComment system at http://
                                                                                                                                                                                                  Act, 16 U.S.C. 791(a)–825(r).
                                                                                                                         www.ferc.gov/docs-filing/
                                                [Project No. 1510–018]                                                                                                                               h. Applicant Contact: Alan Soneda,
                                                                                                                         ecomment.asp. You must include your                                      PG&E, Mail Code N13C, P. 0. Box
                                                City of Kaukauna, Wisconsin; Notice of                                   name and contact information at the end                                  770000, San Francisco, California
                                                Availability of Environmental                                            of your comments. For assistance,                                        94177–0001; (415) 973–4054.
                                                Assessment                                                               please contact FERC Online Support. In                                      i. FERC Contact: Alan Mitchnick at
                                                                                                                         lieu of electronic filing, please send a                                 (202) 502–6074 or alan.mitchnick@
                                                   In accordance with the National                                       paper copy to: Secretary, Federal Energy                                 ferc.gov.
                                                Environmental Policy Act of 1969 and                                     Regulatory Commission, 888 First Street                                     j. Deadline for filing motions to
                                                the Federal Energy Regulatory                                            NE, Washington, DC 20426. The first                                      intervene and protests, comments,
                                                Commission’s (Commission)                                                page of any filing should include docket                                 recommendations, preliminary terms
                                                regulations, 18 CFR part 380, the Office                                 number P–1510–018.                                                       and conditions, and preliminary
                                                of Energy Projects has reviewed the                                         For further information, contact Erin                                 prescriptions: 60 days from the issuance
                                                application for a new license for the                                    Kimsey at (202) 502–8621 or by email at                                  date of this notice; reply comments are
                                                Kaukauna Hydro Project, located on the                                   erin.kimsey@ferc.gov.                                                    due 105 days from the issuance date of
                                                Lower Fox River, in the City of                                            Dated: August 7, 2018.                                                 this notice.
                                                Kaukauna, Outagamie County,                                              Kimberly D. Bose,                                                           The Commission strongly encourages
                                                Wisconsin, and has prepared an                                                                                                                    electronic filing. Please file motions to
                                                                                                                         Secretary.
                                                Environmental Assessment (EA) for the                                                                                                             intervene, protests, comments,
                                                                                                                         [FR Doc. 2018–17290 Filed 8–10–18; 8:45 am]
                                                project.                                                                                                                                          recommendations, preliminary terms
                                                                                                                         BILLING CODE 6717–01–P
                                                   The EA contains staff’s analysis of the                                                                                                        and conditions, and preliminary
                                                potential environmental impacts of the                                                                                                            fishway prescriptions using the
                                                project and concludes that licensing the                                                                                                          Commission’s eFiling system at http://
                                                                                                                         DEPARTMENT OF ENERGY
                                                project, with appropriate environmental                                                                                                           www.ferc.gov/docs-filing/efiling.asp.
                                                protective measures, would not                                           Federal Energy Regulatory                                                Commenters can submit brief comments
                                                constitute a major federal action that                                   Commission                                                               up to 6,000 characters, without prior
                                                would significantly affect the quality of                                                                                                         registration, using the eComment system
                                                the human environment.                                                   [Project No. 619–164]
                                                                                                                                                                                                  at http://www.ferc.gov/docs-filing/
                                                   A copy of the EA is available for                                                                                                              ecomment.asp. You must include your
                                                                                                                         Pacific Gas and Electric Company and
                                                review at the Commission in the Public                                                                                                            name and contact information at the end
                                                                                                                         City of Santa Clara, California; Notice
                                                Reference Room or may be viewed on                                                                                                                of your comments. For assistance,
                                                                                                                         of Application Accepted for Filing,
                                                the Commission’s website at http://                                                                                                               please contact FERC Online Support at
                                                                                                                         Soliciting Motions To Intervene and
                                                www.ferc.gov using the ‘‘eLibrary’’ link.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                         Protests, Ready for Environmental                                        FERCOnlineSupport@ferc.gov, (866)
                                                Enter the docket number excluding the                                                                                                             208–3676 (toll free), or (202) 502–8659
                                                                                                                         Analysis, and Soliciting Comments,
                                                last three digits in the docket number                                                                                                            (TTY). In lieu of electronic filing, please
                                                                                                                         Recommendations, Preliminary Terms
                                                field to access the document. For                                                                                                                 send a paper copy to: Secretary, Federal
                                                                                                                         and Conditions, and Preliminary
                                                assistance, contact FERC Online                                                                                                                   Energy Regulatory Commission, 888
                                                                                                                         Fishway Prescriptions
                                                Support at FERCOnlineSupport@                                                                                                                     First Street NE, Washington, DC 20426.
                                                ferc.gov, (866) 208–3676 (toll free), or                                   Take notice that the following                                         The first page of any filing should
                                                (202) 502–8659 (TTY).                                                    hydroelectric application has been filed                                 include docket number P–619–164.


                                           VerDate Sep<11>2014        20:42 Aug 10, 2018         Jkt 244001      PO 00000       Frm 00050       Fmt 4703      Sfmt 4703      E:\FR\FM\13AUN1.SGM             13AUN1



Document Created: 2018-08-11 00:28:00
Document Modified: 2018-08-11 00:28:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 40029 