83_FR_4096 83 FR 4077 - In the Matter of All Operating Reactor Licensees

83 FR 4077 - In the Matter of All Operating Reactor Licensees

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 19 (January 29, 2018)

Page Range4077-4078
FR Document2018-01514

The U.S. Nuclear Regulatory Commission (NRC) has issued a revised director's decision in response to a petition dated February 19, 2016, filed by Roy Mathew, Sheila Ray, Swagata Som, Gurcharan Singh Matharu, Tania Martinez Navedo, Thomas Koshy, and Kenneth Miller (Petitioners), requesting that the NRC take enforcement-related action with regard to all operating nuclear power plants. The petitioner's requests and the director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.

Federal Register, Volume 83 Issue 19 (Monday, January 29, 2018)
[Federal Register Volume 83, Number 19 (Monday, January 29, 2018)]
[Notices]
[Pages 4077-4078]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-01514]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2016-0061]


In the Matter of All Operating Reactor Licensees

AGENCY: Nuclear Regulatory Commission.

ACTION: Revised director's decision under 10 CFR 2.206; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued a 
revised director's decision in response to a petition dated February 
19, 2016, filed by Roy Mathew, Sheila Ray, Swagata Som, Gurcharan Singh 
Matharu, Tania Martinez Navedo, Thomas Koshy, and Kenneth Miller 
(Petitioners), requesting that the NRC take enforcement-related action 
with regard to all operating nuclear power plants. The petitioner's 
requests and the director's decision are included in the SUPPLEMENTARY 
INFORMATION section of this document.

DATES: The revised director's decision was issued on January 18, 2018.

ADDRESSES: Please refer to Docket ID NRC-2016-0061 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0061. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Tanya Mensah, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-3610, email: Tanya.Mensah@nrc.gov.

SUPPLEMENTARY INFORMATION: Notice is hereby given that the Director, 
Office of Nuclear Reactor Regulation, has issued a revised director's 
decision (ADAMS Accession No. ML18005A053) under section 2.206 of title 
10 of the Code of Federal Regulations (10 CFR), on a petition filed by 
the Petitioners on February 19, 2016 (ADAMS Accession No. ML16050A223).
    The Petitioners requested that the NRC take enforcement action 
against all operating nuclear power plants. Specifically, the 
Petitioners requested that the NRC either: (1) Issue orders to require 
immediate corrective actions including compensatory measures to address 
the operability of electric power systems in accordance with their 
plant technical specifications, and to implement plant modifications in 
accordance with current NRC regulatory requirements and staff guidance 
provided in the references within the 2.206 petition; or (2) issue 
orders to immediately shut down the nuclear power plants that are 
operating without addressing the significant design deficiency 
identified in NRC Bulletin 2012-01, ``Design Vulnerability in Electric 
Power System,'' dated July 27, 2012, (ADAMS Accession No. ML12074A115) 
since the licensees are not in compliance with their technical 
specifications (typically Section 3.8.1) related to onsite and offsite 
power systems.
    On February 24, 2016, the NRC's petition manager acknowledged 
receipt of the petition and offered the Petitioners an opportunity to 
address the Petition Review Board (PRB). The Petitioners declined an 
opportunity to address the PRB on the basis that the petition already 
contained all of the

[[Page 4078]]

relevant facts to support the PRB's review.
    The NRC sent a copy of the proposed director's decision to the 
Petitioners and to the licensees for comment by letters dated September 
18, 2017 (ADAMS Accession Nos. ML17156A197 and ML17156A214, 
respectively). The Petitioners and the licensees were provided the 
opportunity to provide comments on any part of the proposed director's 
decision that was considered to be erroneous or any issues in the 
petition that were not addressed. The Petitioners provided comments by 
letter dated October 11, 2017 (ADAMS Accession No. ML17291A040), and 
the Nuclear Energy Institute (NEI) provided comments, on behalf of 
licensees, by letter dated October 16, 2017 (ADAMS Accession No. 
ML17291A846). No new information was provided. To enhance the clarity 
of the director's decision, the NRC staff revised the description of 
the NRC's accident sequence precursor (ASP) program provided in Section 
D of the director's decision, to differentiate between condition and 
event assessments. The comments from the Petitioners and NEI, along 
with the NRC staff's responses to the comments, are included as an 
attachment to the director's decision. The attachment identifies any 
updates to the director's decision, as a result of comments received 
from the Petitioners and NEI.
    On December 12, 2017, the NRC issued a final director's decision 
(ADAMS Accession No. ML17304A893). Subsequently, the NRC was informed 
of a minor error in the final director's decision. Specifically, 
Section D of the final director's decision refers to a December 2015 
open phase condition event at Oconee and states, ``Two separate 
transformers required for safe shutdown of the three operating Oconee 
nuclear units were identified with open phase conditions.'' This 
statement is in error because only one Oconee transformer experienced 
an open phase condition. Although this error does not change the 
decision in the director's decision, the NRC revised it, as 
appropriate, for accuracy.
    The Director, Office of Nuclear Reactor Regulation, has determined 
that the request(s) to issue orders to operating reactor licensees 
regarding an open phase condition be denied. The reasons for this 
decision are explained in the Director's Decision DD-17-04, pursuant to 
10 CFR 2.206.
    The NRC will file a copy of the director's decision with the 
Secretary of the Commission for the Commission's review in accordance 
with 10 CFR 2.206. As provided by this regulation, the director's 
decision will constitute the final action of the Commission 25 days 
after the date of the decision unless the Commission, on its own 
motion, institutes a review of the director's decision in that time.

    Dated at Rockville, Maryland, this 23rd day of January, 2018.

    For the Nuclear Regulatory Commission.
Tanya M. Mensah,
Senior Project Manager, ROP Oversight and Generic Communications 
Branch, Division of Inspection and Regional Support, Office of Nuclear 
Reactor Regulation.
[FR Doc. 2018-01514 Filed 1-26-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                                              Federal Register / Vol. 83, No. 19 / Monday, January 29, 2018 / Notices                                              4077

                                                   1. The title of the information                      with the applicant and conducts a site                 adams.html. To begin the search, select
                                                collection: ‘‘10 CFR part 100, Reactor                  visit to resolve any open issues. When                 ‘‘ADAMS Public Documents’’ and then
                                                Site Criteria.’’                                        the open issues have been resolved, the                select ‘‘Begin Web-based ADAMS
                                                   2. OMB approval number: 3150–0093.                   staff writes the final safety evaluation               Search.’’ For problems with ADAMS,
                                                   3. Type of submission: Extension.                    report, which is published and used as                 please contact the NRC’s Public
                                                   4. The form number if applicable: Not                a basis for the remainder of the NRC                   Document Room (PDR) reference staff at
                                                applicable.                                             licensing process.                                     1–800–397–4209, 301–415–4737, or by
                                                   5. How often the collection is required                                                                     email to pdr.resource@nrc.gov. The
                                                or requested: As necessary in order for                   Dated at Rockville, Maryland, this 17th day
                                                                                                        of January 2018.                                       ADAMS accession number for each
                                                the NRC to assess the adequacy of                                                                              document referenced (if it is available in
                                                proposed seismic design bases and the                     For the Nuclear Regulatory Commission.
                                                                                                        David Cullison,
                                                                                                                                                               ADAMS) is provided the first time that
                                                design bases for other site hazards for                                                                        it is mentioned in this document.
                                                nuclear power and test reactors                         NRC Clearance Officer, Office of the Chief
                                                                                                        Information Officer.
                                                                                                                                                                  • NRC’s PDR: You may examine and
                                                constructed and licensed in accordance                                                                         purchase copies of public documents at
                                                with parts 50 and 52 of title 10 of the                 [FR Doc. 2018–01543 Filed 1–26–18; 8:45 am]
                                                                                                                                                               the NRC’s PDR, Room O1–F21, One
                                                Code of Federal Regulations and the                     BILLING CODE 7590–01–P
                                                                                                                                                               White Flint North, 11555 Rockville
                                                Atomic Energy Act of 1954, as amended.                                                                         Pike, Rockville, Maryland 20852.
                                                   6. Who will be required or asked to
                                                                                                        NUCLEAR REGULATORY                                     FOR FURTHER INFORMATION CONTACT:
                                                respond: Applicants who apply for an
                                                early site permit (ESP), combined                       COMMISSION                                             Tanya Mensah, Office of Nuclear
                                                license (COL) or a construction permit                                                                         Reactor Regulation, U.S. Nuclear
                                                                                                        [NRC–2016–0061]                                        Regulatory Commission, Washington,
                                                (CP) or operating license (OL) on or after
                                                January 10, 1997.                                                                                              DC 20555–0001; telephone: 301–415–
                                                                                                        In the Matter of All Operating Reactor                 3610, email: Tanya.Mensah@nrc.gov.
                                                   7. The estimated number of annual                    Licensees
                                                responses: 1.3.                                                                                                SUPPLEMENTARY INFORMATION: Notice is
                                                   8. The estimated number of annual                    AGENCY:  Nuclear Regulatory                            hereby given that the Director, Office of
                                                respondents: 1.3.                                       Commission.                                            Nuclear Reactor Regulation, has issued
                                                   9. An estimate of the total number of                ACTION: Revised director’s decision                    a revised director’s decision (ADAMS
                                                hours needed annually to comply with                    under 10 CFR 2.206; issuance.                          Accession No. ML18005A053) under
                                                the information collection requirement                                                                         section 2.206 of title 10 of the Code of
                                                or request: 94,900 hours (73,000 hours                  SUMMARY:   The U.S. Nuclear Regulatory                 Federal Regulations (10 CFR), on a
                                                per application × 1.3 applications).                    Commission (NRC) has issued a revised                  petition filed by the Petitioners on
                                                   10. Abstract: Title 10 of the Code of                director’s decision in response to a                   February 19, 2016 (ADAMS Accession
                                                Federal Regulations, Part 100, ‘‘Reactor                petition dated February 19, 2016, filed                No. ML16050A223).
                                                Site Criteria,’’ establish approval                     by Roy Mathew, Sheila Ray, Swagata                        The Petitioners requested that the
                                                requirements for proposed sites for the                 Som, Gurcharan Singh Matharu, Tania                    NRC take enforcement action against all
                                                purpose of constructing and operating                   Martinez Navedo, Thomas Koshy, and                     operating nuclear power plants.
                                                stationary power and testing reactors.                  Kenneth Miller (Petitioners), requesting               Specifically, the Petitioners requested
                                                Subpart B, ‘‘Evaluation Factors for                     that the NRC take enforcement-related                  that the NRC either: (1) Issue orders to
                                                Stationary Power Reactor Site                           action with regard to all operating                    require immediate corrective actions
                                                Applications on or After January 10,                    nuclear power plants. The petitioner’s                 including compensatory measures to
                                                1997,’’ requirements apply to applicants                requests and the director’s decision are               address the operability of electric power
                                                who apply for an early site permit (ESP),               included in the SUPPLEMENTARY                          systems in accordance with their plant
                                                combined license (COL) or a                             INFORMATION section of this document.                  technical specifications, and to
                                                construction permit (CP) or operating                   DATES: The revised director’s decision                 implement plant modifications in
                                                license (OL) on or after January 10,                    was issued on January 18, 2018.                        accordance with current NRC regulatory
                                                1997. This clearance is necessary since                 ADDRESSES: Please refer to Docket ID                   requirements and staff guidance
                                                the NRC is expecting approximately two                  NRC–2016–0061 when contacting the                      provided in the references within the
                                                COL, one CP, and one OL application                     NRC about the availability of                          2.206 petition; or (2) issue orders to
                                                over the next 3 years. The applicants                   information regarding this document.                   immediately shut down the nuclear
                                                must provide information regarding the                  You may obtain publicly-available                      power plants that are operating without
                                                physical characteristics of the site in                 information related to this document                   addressing the significant design
                                                addition to the potential for natural                   using any of the following methods:                    deficiency identified in NRC Bulletin
                                                phenomena and man-made hazards.                           • Federal Rulemaking website: Go to                  2012–01, ‘‘Design Vulnerability in
                                                This includes information on                            http://www.regulations.gov and search                  Electric Power System,’’ dated July 27,
                                                meteorological hazards (such as                         for Docket ID NRC–2016–0061. Address                   2012, (ADAMS Accession No.
                                                hurricanes, tornadoes, snowfall, and                    questions about NRC dockets to Carol                   ML12074A115) since the licensees are
                                                extreme temperatures), hydrologic                       Gallagher; telephone: 301–415–3463;                    not in compliance with their technical
                                                hazards (such as floods, tsunami, and                   email: Carol.Gallagher@nrc.gov. For                    specifications (typically Section 3.8.1)
                                                seiches) geologic hazards (such as                      technical questions, contact the                       related to onsite and offsite power
                                                faulting, seismic hazards, and the                      individual listed in the FOR FURTHER                   systems.
                                                maximum credible earthquake) and                                                                                  On February 24, 2016, the NRC’s
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        INFORMATION CONTACT section of this
                                                factors such as population density, the                 document.                                              petition manager acknowledged receipt
                                                proximity of man-related hazards, and                     • NRC’s Agencywide Documents                         of the petition and offered the
                                                site hydrological and atmospheric                       Access and Management System                           Petitioners an opportunity to address
                                                dispersion characteristics. The NRC staff               (ADAMS): You may obtain publicly-                      the Petition Review Board (PRB). The
                                                reviews the submitted information and,                  available documents online in the                      Petitioners declined an opportunity to
                                                if necessary, generates a request for                   ADAMS Public Documents collection at                   address the PRB on the basis that the
                                                additional information. The staff meets                 http://www.nrc.gov/reading-rm/                         petition already contained all of the


                                           VerDate Sep<11>2014   18:19 Jan 26, 2018   Jkt 244001   PO 00000   Frm 00055   Fmt 4703   Sfmt 4703   E:\FR\FM\29JAN1.SGM   29JAN1


                                                4078                          Federal Register / Vol. 83, No. 19 / Monday, January 29, 2018 / Notices

                                                relevant facts to support the PRB’s                     the final action of the Commission 25                  information related to this document
                                                review.                                                 days after the date of the decision unless             using any of the following methods:
                                                   The NRC sent a copy of the proposed                  the Commission, on its own motion,                        • Federal Rulemaking website: Go to
                                                director’s decision to the Petitioners and              institutes a review of the director’s                  http://www.regulations.gov and search
                                                to the licensees for comment by letters                 decision in that time.                                 for Docket ID NRC–2008–0252. Address
                                                dated September 18, 2017 (ADAMS                           Dated at Rockville, Maryland, this 23rd day          questions about NRC dockets to Carol
                                                Accession Nos. ML17156A197 and                          of January, 2018.                                      Gallagher; telephone: 301–415–3463;
                                                ML17156A214, respectively). The                           For the Nuclear Regulatory Commission.               email: Carol.Gallagher@nrc.gov. For
                                                Petitioners and the licensees were                                                                             technical questions, contact the
                                                                                                        Tanya M. Mensah,
                                                provided the opportunity to provide                                                                            individual listed in the FOR FURTHER
                                                comments on any part of the proposed                    Senior Project Manager, ROP Oversight and
                                                                                                                                                               INFORMATION CONTACT section of this
                                                                                                        Generic Communications Branch, Division of
                                                director’s decision that was considered                                                                        document.
                                                                                                        Inspection and Regional Support, Office of
                                                to be erroneous or any issues in the                    Nuclear Reactor Regulation.                               • NRC’s Agencywide Documents
                                                petition that were not addressed. The                                                                          Access and Management System
                                                                                                        [FR Doc. 2018–01514 Filed 1–26–18; 8:45 am]
                                                Petitioners provided comments by letter                                                                        (ADAMS): You may obtain publicly-
                                                                                                        BILLING CODE 7590–01–P
                                                dated October 11, 2017 (ADAMS                                                                                  available documents online in the
                                                Accession No. ML17291A040), and the                                                                            ADAMS Public Documents collection at
                                                Nuclear Energy Institute (NEI) provided                                                                        http://www.nrc.gov/reading-rm/
                                                                                                        NUCLEAR REGULATORY
                                                comments, on behalf of licensees, by                                                                           adams.html. To begin the search, select
                                                                                                        COMMISSION
                                                letter dated October 16, 2017 (ADAMS                                                                           ‘‘ADAMS Public Documents’’ and then
                                                Accession No. ML17291A846). No new                                                                             select ‘‘Begin Web-based ADAMS
                                                information was provided. To enhance                    [Docket Nos. 52–025 and 52–026; NRC–
                                                                                                        2008–0252]                                             Search.’’ For problems with ADAMS,
                                                the clarity of the director’s decision, the                                                                    please contact the NRC’s Public
                                                NRC staff revised the description of the                Southern Nuclear Operating Company,                    Document Room (PDR) reference staff at
                                                NRC’s accident sequence precursor                       Inc., Vogtle Electric Generating Plant,                1–800–397–4209, 301–415–4737, or by
                                                (ASP) program provided in Section D of                  Units 3 and 4; Containment Air                         email to pdr.resource@nrc.gov. The
                                                the director’s decision, to differentiate               Filtration Exhaust Rooms West Walls                    ADAMS accession number for each
                                                between condition and event                             Removal                                                document referenced (if it is available in
                                                assessments. The comments from the                                                                             ADAMS) is provided the first time that
                                                Petitioners and NEI, along with the NRC                 AGENCY:  Nuclear Regulatory                            it is mentioned in this document. The
                                                staff’s responses to the comments, are                  Commission.                                            request for the amendment and
                                                included as an attachment to the                        ACTION: Exemption and combined                         exemption was submitted by letter
                                                director’s decision. The attachment                     license amendment; issuance.                           dated May 24, 2017 (ADAMS Accession
                                                identifies any updates to the director’s                                                                       No. ML17144A413), as supplemented
                                                decision, as a result of comments                       SUMMARY:    The U.S. Nuclear Regulatory                by letter dated August 31, 2017
                                                received from the Petitioners and NEI.                  Commission (NRC) is granting an                        (ADAMS Accession No. ML17243A445).
                                                   On December 12, 2017, the NRC                        exemption to allow a departure from the                   • NRC’s PDR: You may examine and
                                                issued a final director’s decision                      certification information of Tier 1 of the             purchase copies of public documents at
                                                (ADAMS Accession No. ML17304A893).                      generic design control document (DCD)                  the NRC’s PDR, Room O1–F21, One
                                                Subsequently, the NRC was informed of                   and is issuing License Amendment Nos.                  White Flint North, 11555 Rockville
                                                a minor error in the final director’s                   98 and 97 to Combined Licenses (COL),                  Pike, Rockville, Maryland 20852.
                                                decision. Specifically, Section D of the                NPF–91 and NPF–92, respectively. The                   FOR FURTHER INFORMATION CONTACT:
                                                final director’s decision refers to a                   COLs were issued to Southern Nuclear
                                                December 2015 open phase condition                                                                             Chandu Patel, Office of New Reactors,
                                                                                                        Operating Company, Inc., and Georgia                   U.S. Nuclear Regulatory Commission,
                                                event at Oconee and states, ‘‘Two                       Power Company, Oglethorpe Power
                                                separate transformers required for safe                                                                        Washington, DC 20555–0001; telephone:
                                                                                                        Corporation, MEAG Power SPVM, LLC,                     301–415–3025; email: Chandu.Patel@
                                                shutdown of the three operating Oconee                  MEAG Power SPVJ, LLC, MEAG Power
                                                nuclear units were identified with open                                                                        nrc.gov.
                                                                                                        SPVP, LLC, Authority of Georgia, and
                                                phase conditions.’’ This statement is in                the City of Dalton, Georgia (the                       SUPPLEMENTARY INFORMATION:
                                                error because only one Oconee                           licensee); for construction and operation              I. Introduction
                                                transformer experienced an open phase                   of the Vogtle Electric Generating Plant
                                                condition. Although this error does not                 (VEGP) Units 3 and 4, located in Burke                    The NRC is granting an exemption
                                                change the decision in the director’s                   County, Georgia.                                       from paragraph B of section III, ‘‘Scope
                                                decision, the NRC revised it, as                           The granting of the exemption allows                and Contents,’’ of appendix D, ‘‘Design
                                                appropriate, for accuracy.                              the changes to Tier 1 information asked                Certification Rule for the AP1000,’’ to
                                                   The Director, Office of Nuclear                      for in the amendment. Because the                      part 52 of title 10 of the Code of Federal
                                                Reactor Regulation, has determined that                 acceptability of the exemption was                     Regulations (10 CFR), and issuing
                                                the request(s) to issue orders to                       determined in part by the acceptability                License Amendment Nos. 98 and 97 to
                                                operating reactor licensees regarding an                of the amendment, the exemption and                    COLs, NPF–91 and NPF–92,
                                                open phase condition be denied. The                     amendment are being issued                             respectively, to the licensee. The
                                                reasons for this decision are explained                 concurrently.                                          exemption is required by paragraph A.4
                                                                                                                                                               of section VIII, ‘‘Processes for Changes
sradovich on DSK3GMQ082PROD with NOTICES




                                                in the Director’s Decision DD–17–04,
                                                pursuant to 10 CFR 2.206.                               DATES: The exemption and amendment                     and Departures,’’ appendix D, to 10 CFR
                                                   The NRC will file a copy of the                      were issued on November 14, 2017.                      part 52 to allow the licensee to depart
                                                director’s decision with the Secretary of               ADDRESSES: Please refer to Docket ID                   from Tier 1 information. With the
                                                the Commission for the Commission’s                     NRC–2008–0252 when contacting the                      requested amendment, the licensee
                                                review in accordance with 10 CFR                        NRC about the availability of                          sought proposed changes to the Updated
                                                2.206. As provided by this regulation,                  information regarding this document.                   Final Safety Analysis Report in the form
                                                the director’s decision will constitute                 You may obtain publicly-available                      of departures from the incorporated


                                           VerDate Sep<11>2014   18:19 Jan 26, 2018   Jkt 244001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\29JAN1.SGM   29JAN1



Document Created: 2018-01-27 00:57:44
Document Modified: 2018-01-27 00:57:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRevised director's decision under 10 CFR 2.206; issuance.
DatesThe revised director's decision was issued on January 18, 2018.
ContactTanya Mensah, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3610, email: [email protected]
FR Citation83 FR 4077 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR