83_FR_4097 83 FR 4078 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Containment Air Filtration Exhaust Rooms West Walls Removal

83 FR 4078 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Containment Air Filtration Exhaust Rooms West Walls Removal

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 19 (January 29, 2018)

Page Range4078-4079
FR Document2018-01520

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 98 and 97 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 19 (Monday, January 29, 2018)
[Federal Register Volume 83, Number 19 (Monday, January 29, 2018)]
[Notices]
[Pages 4078-4079]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-01520]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4; Containment Air Filtration Exhaust 
Rooms West Walls Removal

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment Nos. 98 and 97 to Combined Licenses (COL), NPF-91 and 
NPF-92, respectively. The COLs were issued to Southern Nuclear 
Operating Company, Inc., and Georgia Power Company, Oglethorpe Power 
Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power 
SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the 
licensee); for construction and operation of the Vogtle Electric 
Generating Plant (VEGP) Units 3 and 4, located in Burke County, 
Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on November 14, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated May 24, 2017 (ADAMS Accession No. ML17144A413), as 
supplemented by letter dated August 31, 2017 (ADAMS Accession No. 
ML17243A445).
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: Chandu.Patel@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 98 and 97 to COLs, NPF-91 
and NPF-92, respectively, to the licensee. The exemption is required by 
paragraph A.4 of section VIII, ``Processes for Changes and 
Departures,'' appendix D, to 10 CFR part 52 to allow the licensee to 
depart from Tier 1 information. With the requested amendment, the 
licensee sought proposed changes to the Updated Final Safety Analysis 
Report in the form of departures from the incorporated

[[Page 4079]]

plant-specific Design Control Document Tier 2 information and involves 
changes to COL Appendix C. The proposed changes revise the COLs to 
remove the west walls of containment air filtration exhaust rooms A and 
B in the annex building to facilitate ease of access to equipment in 
the room during installation and maintenance.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in Sec. Sec.  50.12, 52.7, and section VIII.A.4 of appendix D to 
10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML17283A313.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML17283A316 and 
ML17283A317, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML17283A314 and 
ML17283A315, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item (1) in order to grant the exemption:
    1. In a letter dated May 24, 2017, as supplemented by letter dated 
August 31, 2017, the licensee requested from the Commission an 
exemption to allow departures from Tier 1 information in the certified 
DCD incorporated by reference in 10 CFR part 52, appendix D, as part of 
license amendment request 17-017, ``Containment Air Filtration Exhaust 
Rooms West Walls Removal.''
    For the reasons set forth in Section 3.1 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML17283A313, the Commission finds that:

    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of 
the rule in this circumstance is not necessary to serve the 
underlying purpose of the rule;
    E. the special circumstances outweigh any decrease in safety 
that may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in 
the level of safety otherwise provided by the design.

    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding changes to 
Appendix C of the Facility Combined License as described in the request 
dated May 24, 2017, as supplemented by letter dated August 31, 2017. 
This exemption is related to, and necessary for the granting of License 
Amendment No. 98 (Unit 3) and 97 (Unit 4), which is being issued 
concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML17283A313), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated May 24, 2017 (ADAMS Accession No. ML17144A413), as 
supplemented by letter dated August 31, 2017 (ADAMS Accession No. 
ML17243A445), the licensee requested that the NRC amend the COLs for 
VEGP, Units 3 and 4, COLs NPF-91 and NPF-92. The proposed amendment is 
described in Section I of this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR Chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
August 8, 2017 (82 FR 37128). No comments were received during the 30-
day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemptions and issued the amendments that the 
licensee requested on May 24, 2017, as supplemented by letter dated 
August 31, 2017.
    The exemptions and amendments were issued on November 14, 2017, as 
part of a combined package to the licensee (ADAMS Accession No. 
ML17283A312).

    Dated at Rockville, Maryland, this 22nd day of January, 2018.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2018-01520 Filed 1-26-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                4078                          Federal Register / Vol. 83, No. 19 / Monday, January 29, 2018 / Notices

                                                relevant facts to support the PRB’s                     the final action of the Commission 25                  information related to this document
                                                review.                                                 days after the date of the decision unless             using any of the following methods:
                                                   The NRC sent a copy of the proposed                  the Commission, on its own motion,                        • Federal Rulemaking website: Go to
                                                director’s decision to the Petitioners and              institutes a review of the director’s                  http://www.regulations.gov and search
                                                to the licensees for comment by letters                 decision in that time.                                 for Docket ID NRC–2008–0252. Address
                                                dated September 18, 2017 (ADAMS                           Dated at Rockville, Maryland, this 23rd day          questions about NRC dockets to Carol
                                                Accession Nos. ML17156A197 and                          of January, 2018.                                      Gallagher; telephone: 301–415–3463;
                                                ML17156A214, respectively). The                           For the Nuclear Regulatory Commission.               email: Carol.Gallagher@nrc.gov. For
                                                Petitioners and the licensees were                                                                             technical questions, contact the
                                                                                                        Tanya M. Mensah,
                                                provided the opportunity to provide                                                                            individual listed in the FOR FURTHER
                                                comments on any part of the proposed                    Senior Project Manager, ROP Oversight and
                                                                                                                                                               INFORMATION CONTACT section of this
                                                                                                        Generic Communications Branch, Division of
                                                director’s decision that was considered                                                                        document.
                                                                                                        Inspection and Regional Support, Office of
                                                to be erroneous or any issues in the                    Nuclear Reactor Regulation.                               • NRC’s Agencywide Documents
                                                petition that were not addressed. The                                                                          Access and Management System
                                                                                                        [FR Doc. 2018–01514 Filed 1–26–18; 8:45 am]
                                                Petitioners provided comments by letter                                                                        (ADAMS): You may obtain publicly-
                                                                                                        BILLING CODE 7590–01–P
                                                dated October 11, 2017 (ADAMS                                                                                  available documents online in the
                                                Accession No. ML17291A040), and the                                                                            ADAMS Public Documents collection at
                                                Nuclear Energy Institute (NEI) provided                                                                        http://www.nrc.gov/reading-rm/
                                                                                                        NUCLEAR REGULATORY
                                                comments, on behalf of licensees, by                                                                           adams.html. To begin the search, select
                                                                                                        COMMISSION
                                                letter dated October 16, 2017 (ADAMS                                                                           ‘‘ADAMS Public Documents’’ and then
                                                Accession No. ML17291A846). No new                                                                             select ‘‘Begin Web-based ADAMS
                                                information was provided. To enhance                    [Docket Nos. 52–025 and 52–026; NRC–
                                                                                                        2008–0252]                                             Search.’’ For problems with ADAMS,
                                                the clarity of the director’s decision, the                                                                    please contact the NRC’s Public
                                                NRC staff revised the description of the                Southern Nuclear Operating Company,                    Document Room (PDR) reference staff at
                                                NRC’s accident sequence precursor                       Inc., Vogtle Electric Generating Plant,                1–800–397–4209, 301–415–4737, or by
                                                (ASP) program provided in Section D of                  Units 3 and 4; Containment Air                         email to pdr.resource@nrc.gov. The
                                                the director’s decision, to differentiate               Filtration Exhaust Rooms West Walls                    ADAMS accession number for each
                                                between condition and event                             Removal                                                document referenced (if it is available in
                                                assessments. The comments from the                                                                             ADAMS) is provided the first time that
                                                Petitioners and NEI, along with the NRC                 AGENCY:  Nuclear Regulatory                            it is mentioned in this document. The
                                                staff’s responses to the comments, are                  Commission.                                            request for the amendment and
                                                included as an attachment to the                        ACTION: Exemption and combined                         exemption was submitted by letter
                                                director’s decision. The attachment                     license amendment; issuance.                           dated May 24, 2017 (ADAMS Accession
                                                identifies any updates to the director’s                                                                       No. ML17144A413), as supplemented
                                                decision, as a result of comments                       SUMMARY:    The U.S. Nuclear Regulatory                by letter dated August 31, 2017
                                                received from the Petitioners and NEI.                  Commission (NRC) is granting an                        (ADAMS Accession No. ML17243A445).
                                                   On December 12, 2017, the NRC                        exemption to allow a departure from the                   • NRC’s PDR: You may examine and
                                                issued a final director’s decision                      certification information of Tier 1 of the             purchase copies of public documents at
                                                (ADAMS Accession No. ML17304A893).                      generic design control document (DCD)                  the NRC’s PDR, Room O1–F21, One
                                                Subsequently, the NRC was informed of                   and is issuing License Amendment Nos.                  White Flint North, 11555 Rockville
                                                a minor error in the final director’s                   98 and 97 to Combined Licenses (COL),                  Pike, Rockville, Maryland 20852.
                                                decision. Specifically, Section D of the                NPF–91 and NPF–92, respectively. The                   FOR FURTHER INFORMATION CONTACT:
                                                final director’s decision refers to a                   COLs were issued to Southern Nuclear
                                                December 2015 open phase condition                                                                             Chandu Patel, Office of New Reactors,
                                                                                                        Operating Company, Inc., and Georgia                   U.S. Nuclear Regulatory Commission,
                                                event at Oconee and states, ‘‘Two                       Power Company, Oglethorpe Power
                                                separate transformers required for safe                                                                        Washington, DC 20555–0001; telephone:
                                                                                                        Corporation, MEAG Power SPVM, LLC,                     301–415–3025; email: Chandu.Patel@
                                                shutdown of the three operating Oconee                  MEAG Power SPVJ, LLC, MEAG Power
                                                nuclear units were identified with open                                                                        nrc.gov.
                                                                                                        SPVP, LLC, Authority of Georgia, and
                                                phase conditions.’’ This statement is in                the City of Dalton, Georgia (the                       SUPPLEMENTARY INFORMATION:
                                                error because only one Oconee                           licensee); for construction and operation              I. Introduction
                                                transformer experienced an open phase                   of the Vogtle Electric Generating Plant
                                                condition. Although this error does not                 (VEGP) Units 3 and 4, located in Burke                    The NRC is granting an exemption
                                                change the decision in the director’s                   County, Georgia.                                       from paragraph B of section III, ‘‘Scope
                                                decision, the NRC revised it, as                           The granting of the exemption allows                and Contents,’’ of appendix D, ‘‘Design
                                                appropriate, for accuracy.                              the changes to Tier 1 information asked                Certification Rule for the AP1000,’’ to
                                                   The Director, Office of Nuclear                      for in the amendment. Because the                      part 52 of title 10 of the Code of Federal
                                                Reactor Regulation, has determined that                 acceptability of the exemption was                     Regulations (10 CFR), and issuing
                                                the request(s) to issue orders to                       determined in part by the acceptability                License Amendment Nos. 98 and 97 to
                                                operating reactor licensees regarding an                of the amendment, the exemption and                    COLs, NPF–91 and NPF–92,
                                                open phase condition be denied. The                     amendment are being issued                             respectively, to the licensee. The
                                                reasons for this decision are explained                 concurrently.                                          exemption is required by paragraph A.4
                                                                                                                                                               of section VIII, ‘‘Processes for Changes
sradovich on DSK3GMQ082PROD with NOTICES




                                                in the Director’s Decision DD–17–04,
                                                pursuant to 10 CFR 2.206.                               DATES: The exemption and amendment                     and Departures,’’ appendix D, to 10 CFR
                                                   The NRC will file a copy of the                      were issued on November 14, 2017.                      part 52 to allow the licensee to depart
                                                director’s decision with the Secretary of               ADDRESSES: Please refer to Docket ID                   from Tier 1 information. With the
                                                the Commission for the Commission’s                     NRC–2008–0252 when contacting the                      requested amendment, the licensee
                                                review in accordance with 10 CFR                        NRC about the availability of                          sought proposed changes to the Updated
                                                2.206. As provided by this regulation,                  information regarding this document.                   Final Safety Analysis Report in the form
                                                the director’s decision will constitute                 You may obtain publicly-available                      of departures from the incorporated


                                           VerDate Sep<11>2014   18:19 Jan 26, 2018   Jkt 244001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\29JAN1.SGM   29JAN1


                                                                              Federal Register / Vol. 83, No. 19 / Monday, January 29, 2018 / Notices                                                   4079

                                                plant-specific Design Control Document                  Accession No. ML17283A313, the                         determination, and opportunity for a
                                                Tier 2 information and involves changes                 Commission finds that:                                 hearing in connection with these
                                                to COL Appendix C. The proposed                           A. The exemption is authorized by law;               actions, was published in the Federal
                                                changes revise the COLs to remove the                     B. the exemption presents no undue risk to           Register on August 8, 2017 (82 FR
                                                west walls of containment air filtration                public health and safety;                              37128). No comments were received
                                                exhaust rooms A and B in the annex                        C. the exemption is consistent with the              during the 30-day comment period.
                                                building to facilitate ease of access to                common defense and security;                             The Commission has determined that
                                                equipment in the room during                              D. special circumstances are present in that         these amendments satisfy the criteria for
                                                installation and maintenance.                           the application of the rule in this
                                                                                                        circumstance is not necessary to serve the
                                                                                                                                                               categorical exclusion in accordance
                                                   Part of the justification for granting                                                                      with 10 CFR 51.22. Therefore, pursuant
                                                                                                        underlying purpose of the rule;
                                                the exemption was provided by the                         E. the special circumstances outweigh any            to 10 CFR 51.22(b), no environmental
                                                review of the amendment. Because the                    decrease in safety that may result from the            impact statement or environmental
                                                exemption is necessary in order to issue                reduction in standardization caused by the             assessment need be prepared for these
                                                the requested license amendment, the                    exemption; and                                         amendments.
                                                NRC granted the exemption and issued                      F. the exemption will not result in a
                                                the amendment concurrently, rather                      significant decrease in the level of safety            IV. Conclusion
                                                than in sequence. This included issuing                 otherwise provided by the design.
                                                                                                                                                                  Using the reasons set forth in the
                                                a combined safety evaluation containing                   2. Accordingly, the licensee is granted              combined safety evaluation, the staff
                                                the NRC staff’s review of both the                      an exemption from the certified DCD                    granted the exemptions and issued the
                                                exemption request and the license                       Tier 1 information, with corresponding                 amendments that the licensee requested
                                                amendment. The exemption met all                        changes to Appendix C of the Facility                  on May 24, 2017, as supplemented by
                                                applicable regulatory criteria set forth in             Combined License as described in the                   letter dated August 31, 2017.
                                                §§ 50.12, 52.7, and section VIII.A.4 of                 request dated May 24, 2017, as                            The exemptions and amendments
                                                appendix D to 10 CFR part 52. The                       supplemented by letter dated August 31,                were issued on November 14, 2017, as
                                                license amendment was found to be                       2017. This exemption is related to, and                part of a combined package to the
                                                acceptable as well. The combined safety                 necessary for the granting of License                  licensee (ADAMS Accession No.
                                                evaluation is available in ADAMS under                  Amendment No. 98 (Unit 3) and 97                       ML17283A312).
                                                Accession No. ML17283A313.                              (Unit 4), which is being issued
                                                   Identical exemption documents                                                                                 Dated at Rockville, Maryland, this 22nd
                                                                                                        concurrently with this exemption.                      day of January, 2018.
                                                (except for referenced unit numbers and                   3. As explained in Section 5.0 of the
                                                license numbers) were issued to the                                                                              For the Nuclear Regulatory Commission.
                                                                                                        NRC staff’s Safety Evaluation (ADAMS
                                                licensee for VEGP Units 3 and 4 (COLs                   Accession No. ML17283A313), this                       Jennifer L. Dixon-Herrity,
                                                NPF–91 and NPF–92). The exemption                       exemption meets the eligibility criteria               Chief, Licensing Branch 4, Division of New
                                                documents for VEGP Units 3 and 4 can                    for categorical exclusion set forth in 10              Reactor Licensing, Office of New Reactors.
                                                be found in ADAMS under Accession                       CFR 51.22(c)(9). Therefore, pursuant to                [FR Doc. 2018–01520 Filed 1–26–18; 8:45 am]
                                                Nos. ML17283A316 and ML17283A317,                       10 CFR 51.22(b), no environmental                      BILLING CODE 7590–01–P
                                                respectively. The exemption is                          impact statement or environmental
                                                reproduced (with the exception of                       assessment needs to be prepared in
                                                abbreviated titles and additional                       connection with the issuance of the                    NUCLEAR REGULATORY
                                                citations) in Section II of this document.              exemption.                                             COMMISSION
                                                The amendment documents for COLs                          4. This exemption is effective as of the             [Docket No. 40–9091; NRC–2011–0148]
                                                NPF–91 and NPF–92 are available in                      date of its issuance.
                                                ADAMS under Accession Nos.                                                                                     Strata Energy, Inc.; Ross Uranium In
                                                                                                        III. License Amendment Request
                                                ML17283A314 and ML17283A315,                                                                                   Situ Recovery Facility; Source and
                                                respectively. A summary of the                             By letter dated May 24, 2017 (ADAMS                 Byproduct Materials License
                                                amendment documents is provided in                      Accession No. ML17144A413), as
                                                Section III of this document.                           supplemented by letter dated August 31,                AGENCY:  Nuclear Regulatory
                                                                                                        2017 (ADAMS Accession No.                              Commission.
                                                II. Exemption                                           ML17243A445), the licensee requested                   ACTION: Final environmental assessment
                                                   Reproduced below is the exemption                    that the NRC amend the COLs for VEGP,                  and finding of no significant impact;
                                                document issued to VEGP Units 3 and                     Units 3 and 4, COLs NPF–91 and NPF–                    issuance.
                                                Unit 4. It makes reference to the                       92. The proposed amendment is
                                                combined safety evaluation that                         described in Section I of this Federal                 SUMMARY:    The U.S. Nuclear Regulatory
                                                provides the reasoning for the findings                 Register notice.                                       Commission (NRC) is considering an
                                                made by the NRC (and listed under Item                     The Commission has determined for                   amendment of Source and Byproduct
                                                (1) in order to grant the exemption:                    these amendments that the application                  Materials License SUA–1601 to modify
                                                   1. In a letter dated May 24, 2017, as                complies with the standards and                        a License Condition for the Strata
                                                supplemented by letter dated August 31,                 requirements of the Atomic Energy Act                  Energy, Inc. (Strata) Ross In Situ
                                                2017, the licensee requested from the                   of 1954, as amended (the Act), and the                 Recovery (ISR) Project. Specifically,
                                                Commission an exemption to allow                        Commission’s rules and regulations.                    Strata is requesting that NRC approve a
                                                departures from Tier 1 information in                   The Commission has made appropriate                    modification to License Condition
                                                                                                                                                               11.3(C) for Mine Units Nos. 1 and 2
sradovich on DSK3GMQ082PROD with NOTICES




                                                the certified DCD incorporated by                       findings as required by the Act and the
                                                reference in 10 CFR part 52, appendix                   Commission’s rules and regulations in                  (MU1 and MU2) that would reduce the
                                                D, as part of license amendment request                 10 CFR Chapter I, which are set forth in               number of monitoring wells placed in
                                                17–017, ‘‘Containment Air Filtration                    the license amendment.                                 the underlying aquifer. The NRC has
                                                Exhaust Rooms West Walls Removal.’’                        A notice of consideration of issuance               prepared a final environmental
                                                   For the reasons set forth in Section 3.1             of amendment to facility operating                     assessment (EA) and finding of no
                                                of the NRC staff’s Safety Evaluation,                   license or COL, as applicable, proposed                significant impact (FONSI) for this
                                                which can be found in ADAMS under                       no significant hazards consideration                   licensing action.


                                           VerDate Sep<11>2014   18:19 Jan 26, 2018   Jkt 244001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\29JAN1.SGM   29JAN1



Document Created: 2018-01-27 00:57:28
Document Modified: 2018-01-27 00:57:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on November 14, 2017.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation83 FR 4078 