83_FR_41205 83 FR 41045 - Humboldt-Toiyabe National Forest; Clark Counties, Nevada; Lee Canyon Notice of Availability

83 FR 41045 - Humboldt-Toiyabe National Forest; Clark Counties, Nevada; Lee Canyon Notice of Availability

DEPARTMENT OF AGRICULTURE
Forest Service

Federal Register Volume 83, Issue 160 (August 17, 2018)

Page Range41045-41046
FR Document2018-17730

The Humboldt-Toiyabe National Forest is issuing this notice to advise the public of the 45-day public comment period for the Draft Environmental Impact Statement (EIS) for the Lee Canyon Ski Area Master Development Plan Phase I (Lee Canyon Project) and the addition of a proposed project-specific amendment to the Toiyabe National Forest Land and Resource Management Plan (Forest Plan) for the Proposed Action and alternatives other than the No Action alternative. The Notice of Intent for the Lee Canyon Project was published in the Federal Register on March 23, 2017 (82 FR 14865). Today's notice has been published to ensure all persons and entities interested in the Lee Canyon Project are aware of the addition of the proposed amendment and to identify the Forest Service planning rule provisions likely to be directly related and, therefore, applicable to the Forest Plan amendment. The public is advised that during the 45 day comment period for the Lee Canyon Project Draft EIS, comments may also be submitted regarding the substantive requirements that are likely to be directly related to the amendment and the scope and scale to which the substantive requirements would apply. Comments will be considered in the preparation of the Final EIS and Draft Record of Decision for the Lee Canyon Project.

Federal Register, Volume 83 Issue 160 (Friday, August 17, 2018)
[Federal Register Volume 83, Number 160 (Friday, August 17, 2018)]
[Notices]
[Pages 41045-41046]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17730]


-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Forest Service


Humboldt-Toiyabe National Forest; Clark Counties, Nevada; Lee 
Canyon Notice of Availability

AGENCY: Forest Service, USDA.

ACTION: Notice of Availability of the Draft Environmental Impact 
Statement for the Lee Canyon Ski Area Master Development Plan Phase I 
and Public Comment Period for the Associated Forest Plan Amendment.

-----------------------------------------------------------------------

SUMMARY: The Humboldt-Toiyabe National Forest is issuing this notice to 
advise the public of the 45-day public comment period for the Draft 
Environmental Impact Statement (EIS) for the Lee Canyon Ski Area Master 
Development Plan Phase I (Lee Canyon Project) and the addition of a 
proposed project-specific amendment to the Toiyabe National Forest Land 
and Resource Management Plan (Forest Plan) for the Proposed Action and 
alternatives other than the No Action alternative. The Notice of Intent 
for the Lee Canyon Project was published in the Federal Register on 
March 23, 2017 (82 FR 14865). Today's notice has been published to 
ensure all persons and entities interested in the Lee Canyon Project 
are aware of the addition of the proposed amendment and to identify the 
Forest Service planning rule provisions likely to be directly related 
and, therefore, applicable to the Forest Plan amendment. The public is 
advised that during the 45 day comment period for the Lee Canyon 
Project Draft EIS, comments may also be submitted regarding the 
substantive requirements that are likely to be directly related to the 
amendment and the scope and scale to which the substantive requirements 
would apply. Comments will be considered in the preparation of the 
Final EIS and Draft Record of Decision for the Lee Canyon Project.

DATES: The comment period ends 45 days after today's Notice of 
Availability or 45 days after the Environmental Protection Agency's 
Notice of Availability is published in the Federal Register, whichever 
is later. All relevant comments received during the public comment 
period related to the substantive requirements that would likely be 
directly related to the proposed Forest Plan amendment and the scope 
and scale of the proposed Forest Plan amendment will be considered in 
the preparation of the Final EIS and Draft Record of Decision (ROD).

ADDRESSES: Comments may be submitted by any one of the following 
methods:
     Electronic Submissions: Comments can be filed 
electronically at: [email protected]. Electronic comments must be 
submitted as part of the email message or as an attachment in plain 
text (.txt), Microsoft Word (.doc), rich text format (.rtf), or 
portable document format (.pdf). Emails submitted to addresses other 
than the one listed above, or in formats other than those listed or 
containing viruses, will be rejected.
     Mail: Written, specific comments must be submitted to Donn 
Christiansen, Area Manager, Spring Mountains National Recreation Area, 
701 Torrey Pines Dr., Las Vegas, NV 89130.
    Instructions: Comments sent by any other method, to any other 
address or individual, or received after the end of the comment period 
may not be considered by the Forest. All comments received are part of 
the public record and will generally be posted for public viewing 
without change. All personal identifying information (e.g., name, 
address, etc.), confidential business information, or otherwise 
sensitive information submitted voluntarily by the sender will be 
publicly accessible.

FOR FURTHER INFORMATION CONTACT: Chris Linehan, Interdisciplinary Team 
Leader, at (702) 515-5401, or via email at [email protected]. 
Individuals who use telecommunication devices for the deaf (TDD) may 
call the Federal Information Relay Service (FIRS) at 1-800-877-8339 
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday. 
Information about the Lee Canyon Project may be found on the Forest 
Service website at http://www.fs.usda.gov/project/?project=50649.

SUPPLEMENTARY INFORMATION: The purpose and need for the proposed Lee 
Canyon Project, as described in the Notice of Intent, is to address the 
length of time since the resort's facilities have been upgraded and 
emerging trends in winter recreation. Specific details of these needs 
are described in Draft EIS. The purpose and need for the proposed plan 
amendment is to ensure consistency between the Forest Plan and the 
proposed Lee Canyon Project. As described in the Draft EIS, the need 
was identified for exempting the Lee Canyon Project from the following 
Standards of the 1996 Spring Mountains National Recreation Area (SMNRA) 
General

[[Page 41046]]

Management Plan (GMP) (Amendment five of the Forest Plan):
    SMNRA-wide Standards and Guidelines: (GMP Standard 0.31) New roads, 
administrative facilities, and developed recreation sites other than 
low-impact facilities (trails, trailhead parking, signs, restrooms, 
etc.) will be outside a 100-yard buffer zone around known Clokey's 
eggvetch and rough angelica populations or potential habitat, and 
outside biodiversity hotspots (defined as areas of particular diversity 
or sensitivity).
    The need for this Forest Plan amendment is that in the Lee Canyon 
Proposed Action new service roads, and ski area facilities would occur 
within the 100-yard buffer zone established around known Clokey's 
eggvetch and rough angelica populations or potential habitat. These 
areas have been thoroughly inventoried for these species and none were 
found within the project foot print. This project-specific Forest Plan 
amendment will allow development within the 100-yard buffer zones for 
these two-species established in the Standard GMP 0.31 (p. 18) to allow 
for construction of service roads and ski area facilities.
    Under the Proposed Action and other action alternatives, Standard 
GMP 0.31 would be amended to allow new service roads and developed 
recreation sites to be placed within the 100-yard buffer zone around 
known Clokey's eggvetch and rough angelica populations or potential 
habitat, and within biodiversity hotspots in the Lee Canyon Special Use 
Permit Boundary.
    Management Area 11: (11.57) Allow limited expansion of ski area in 
Lee Canyon and enhancement of skiing opportunities and facilities 
within the scope of an approved master development plan and under the 
following constraints:
    1. Expansion occurs within the existing sub-basin.
    2. Does not impact any threatened, endangered, or sensitive species 
or species of concern or its habitat.
    3. Expansion is commensurate with development of additional parking 
in the lower Lee Canyon area and shuttle services.
    4. Expansion incorporates defensible space design and fire safe 
facilities.
    5. Where consistent with other standards and guidelines.
    The need for this Forest Plan amendment is that the Proposed Action 
and other action alternatives include development of ski runs, mountain 
coasters, zip lines, mountain bike trails, parking areas, and access 
roads within the Lee Canyon Ski Area permitted boundary. As the Mount 
Charleston Blue Butterfly was listed as a endangered species in 2015 
and the designated critical habitat for the butterfly includes portions 
of the Lee Canyon Ski Area, Constraint #2 from the standard cannot be 
met. The Proposed Action and other action alternatives also include the 
addition of a 500 vehicle parking lot at the ski area to accommodate 
increased visitor use without the development of additional parking in 
lower Lee Canyon or shuttle services. The project-specifc Forest Plan 
Amendment would exempt the project from the requirements under 
Constraint #2 and Constraint #3.
    The substantive requirements of the 2012 Planning Rule (36 CFR part 
219) likely to be directly related and, therefore, applicable to the 
Forest Plan amendment for the Lee Canyon Project are in 36 CFR 219.9(b) 
regarding threatened and endangered species and 36 CFR 219.10(a)(1), 
(3), and (7) regarding integrated resource management for multiple use. 
The scope and scale to which these substantive requirements would apply 
are the scope and scale of the Lee Canyon Project. The amendment would 
not apply to any other projects or activities.

Responsible Official

    The Responsible Official for the Lee Canyon Project and the Forest 
Plan amendment is William A. Dunkelberger, Forest Supervisor, Humboldt-
Toiyabe National Forest Supervisor's Office, 1200 Franklin Way, Sparks, 
Nevada 89431, phone (775) 355-5310.

Decision To Be Made

    In consideration of the stated purpose and need and the analysis of 
environmental effects documented in this EIS, the Responsible Official 
will review the proposed action and alternatives in order to make the 
following decisions:
     Whether to authorize the proposed action or an 
alternative, including the required no-action alternative, all or in 
part;
     What design criteria and mitigation measures to require as 
a condition of the authorization;
     What evaluation methods and documentation to require for 
monitoring project implementation and mitigation effectiveness; and
     Whether to amend the Forest Plan to exempt the project 
from Standard GMP 0.31 and from Constraints #2 and #3 of Standard GMP 
Management Area 11.57.

Administrative Review

    The Lee Canyon Project and the Forest Plan amendment will be 
subject to objection under 36 CFR part 218.

    Dated: May 7, 2018.
Chris French,
Associate Deputy Chief, National Forest System.
[FR Doc. 2018-17730 Filed 8-16-18; 8:45 am]
 BILLING CODE 3411-15-P



                                                                                       Federal Register / Vol. 83, No. 160 / Friday, August 17, 2018 / Notices                                                                        41045

                                                                                                 TABLE A—REPORTING ESTIMATE OF HOUR BURDEN—Continued
                                                                                                                                 [Summary of burden—#0584–0008]

                                                                                                                         (a)                            (b)                     (c)          (d)            (e)          (f)            (g)

                                                  Affected public              Respondent type                  Description of                      Form No.                 Number of    Number of         Total     Hours per        Total
                                                                                                               collection activity                                          respondents    responses       annual     response        burden
                                                                                                                                                                                              per        responses                     (exf)
                                                                                                                                                                                          respondent        (cxd)

                                                   Sub-Total For Farm & Business ........................................................................................      143,351              1       143,351   0.1534873       22,002.56

                                              Federal ....................   Military Com-                  Applications Re-                252–E ......................              3             1             3      0.3167               0.95
                                                                               missaries.                     ceived.
                                                                                                            Reauthorization .......         252–R ......................              0             1             0            0.25             0

                                                   Sub-Total For Federal Respondents .................................................................................                3             1             3       0.3167              0.95

                                                         Grand Total Reporting Burden ...................................................................................      143,354              1       143,354   0.1534907       22,003.51

                                              SUMMARY OF BURDEN FOR THIS COLLECTION ...............................................................                            143,354              1       143,354   0.1534941         22,004
                                                * Note: The respondents for the 252–E and the 252–FE are the same respondents for e-Authentication and therefore not double counted in the total number of
                                              respondents.


                                                 Attachment A: Draft FNS–252.                                            Plan amendment. The public is advised                              701 Torrey Pines Dr., Las Vegas, NV
                                                Dated: August 8, 2018.                                                   that during the 45 day comment period                              89130.
                                              Brandon Lipps,
                                                                                                                         for the Lee Canyon Project Draft EIS,                                Instructions: Comments sent by any
                                                                                                                         comments may also be submitted                                     other method, to any other address or
                                              Administrator, Food and Nutrition Service.
                                                                                                                         regarding the substantive requirements                             individual, or received after the end of
                                              [FR Doc. 2018–17722 Filed 8–16–18; 8:45 am]
                                                                                                                         that are likely to be directly related to                          the comment period may not be
                                              BILLING CODE 3410–30–P                                                     the amendment and the scope and scale                              considered by the Forest. All comments
                                                                                                                         to which the substantive requirements                              received are part of the public record
                                                                                                                         would apply. Comments will be                                      and will generally be posted for public
                                              DEPARTMENT OF AGRICULTURE
                                                                                                                         considered in the preparation of the                               viewing without change. All personal
                                              Forest Service                                                             Final EIS and Draft Record of Decision                             identifying information (e.g., name,
                                                                                                                         for the Lee Canyon Project.                                        address, etc.), confidential business
                                              Humboldt-Toiyabe National Forest;                                          DATES:  The comment period ends 45                                 information, or otherwise sensitive
                                              Clark Counties, Nevada; Lee Canyon                                         days after today’s Notice of Availability                          information submitted voluntarily by
                                              Notice of Availability                                                     or 45 days after the Environmental                                 the sender will be publicly accessible.
                                              AGENCY:  Forest Service, USDA.                                             Protection Agency’s Notice of                                      FOR FURTHER INFORMATION CONTACT:
                                              ACTION:  Notice of Availability of the                                     Availability is published in the Federal                           Chris Linehan, Interdisciplinary Team
                                              Draft Environmental Impact Statement                                       Register, whichever is later. All relevant                         Leader, at (702) 515–5401, or via email
                                              for the Lee Canyon Ski Area Master                                         comments received during the public                                at clinehan@fs.fed.us. Individuals who
                                              Development Plan Phase I and Public                                        comment period related to the                                      use telecommunication devices for the
                                              Comment Period for the Associated                                          substantive requirements that would                                deaf (TDD) may call the Federal
                                              Forest Plan Amendment.                                                     likely be directly related to the proposed                         Information Relay Service (FIRS) at 1–
                                                                                                                         Forest Plan amendment and the scope                                800–877–8339 between 8 a.m. and 8
                                              SUMMARY:   The Humboldt-Toiyabe                                            and scale of the proposed Forest Plan                              p.m., Eastern Time, Monday through
                                              National Forest is issuing this notice to                                  amendment will be considered in the                                Friday. Information about the Lee
                                              advise the public of the 45-day public                                     preparation of the Final EIS and Draft                             Canyon Project may be found on the
                                              comment period for the Draft                                               Record of Decision (ROD).                                          Forest Service website at http://
                                              Environmental Impact Statement (EIS)                                       ADDRESSES:    Comments may be                                      www.fs.usda.gov/project/?project
                                              for the Lee Canyon Ski Area Master                                         submitted by any one of the following                              =50649.
                                              Development Plan Phase I (Lee Canyon                                       methods:
                                              Project) and the addition of a proposed                                                                                                       SUPPLEMENTARY INFORMATION:       The
                                              project-specific amendment to the                                             • Electronic Submissions: Comments                              purpose and need for the proposed Lee
                                              Toiyabe National Forest Land and                                           can be filed electronically at:                                    Canyon Project, as described in the
                                              Resource Management Plan (Forest                                           leecanyoneis@fs.fed.us. Electronic                                 Notice of Intent, is to address the length
                                              Plan) for the Proposed Action and                                          comments must be submitted as part of                              of time since the resort’s facilities have
                                              alternatives other than the No Action                                      the email message or as an attachment                              been upgraded and emerging trends in
                                              alternative. The Notice of Intent for the                                  in plain text (.txt), Microsoft Word                               winter recreation. Specific details of
                                              Lee Canyon Project was published in                                        (.doc), rich text format (.rtf), or portable                       these needs are described in Draft EIS.
                                              the Federal Register on March 23, 2017                                     document format (.pdf). Emails                                     The purpose and need for the proposed
                                              (82 FR 14865). Today’s notice has been                                     submitted to addresses other than the                              plan amendment is to ensure
amozie on DSK3GDR082PROD with NOTICES1




                                              published to ensure all persons and                                        one listed above, or in formats other                              consistency between the Forest Plan and
                                              entities interested in the Lee Canyon                                      than those listed or containing viruses,                           the proposed Lee Canyon Project. As
                                              Project are aware of the addition of the                                   will be rejected.                                                  described in the Draft EIS, the need was
                                              proposed amendment and to identify                                            • Mail: Written, specific comments                              identified for exempting the Lee Canyon
                                              the Forest Service planning rule                                           must be submitted to Donn                                          Project from the following Standards of
                                              provisions likely to be directly related                                   Christiansen, Area Manager, Spring                                 the 1996 Spring Mountains National
                                              and, therefore, applicable to the Forest                                   Mountains National Recreation Area,                                Recreation Area (SMNRA) General


                                         VerDate Sep<11>2014         17:17 Aug 16, 2018         Jkt 244001      PO 00000        Frm 00004       Fmt 4703       Sfmt 4703      E:\FR\FM\17AUN1.SGM      17AUN1


                                              41046                         Federal Register / Vol. 83, No. 160 / Friday, August 17, 2018 / Notices

                                              Management Plan (GMP) (Amendment                        Blue Butterfly was listed as a                        Administrative Review
                                              five of the Forest Plan):                               endangered species in 2015 and the                      The Lee Canyon Project and the
                                                 SMNRA-wide Standards and                             designated critical habitat for the                   Forest Plan amendment will be subject
                                              Guidelines: (GMP Standard 0.31) New                     butterfly includes portions of the Lee                to objection under 36 CFR part 218.
                                              roads, administrative facilities, and                   Canyon Ski Area, Constraint #2 from the
                                              developed recreation sites other than                                                                           Dated: May 7, 2018.
                                                                                                      standard cannot be met. The Proposed
                                              low-impact facilities (trails, trailhead                                                                      Chris French,
                                                                                                      Action and other action alternatives also
                                              parking, signs, restrooms, etc.) will be                include the addition of a 500 vehicle                 Associate Deputy Chief, National Forest
                                              outside a 100-yard buffer zone around                                                                         System.
                                                                                                      parking lot at the ski area to
                                              known Clokey’s eggvetch and rough                                                                             [FR Doc. 2018–17730 Filed 8–16–18; 8:45 am]
                                                                                                      accommodate increased visitor use
                                              angelica populations or potential                       without the development of additional                 BILLING CODE 3411–15–P
                                              habitat, and outside biodiversity                       parking in lower Lee Canyon or shuttle
                                              hotspots (defined as areas of particular                services. The project-specifc Forest Plan
                                              diversity or sensitivity).                                                                                    DEPARTMENT OF AGRICULTURE
                                                                                                      Amendment would exempt the project
                                                 The need for this Forest Plan                        from the requirements under Constraint
                                              amendment is that in the Lee Canyon                                                                           Rural Business-Cooperative Service
                                                                                                      #2 and Constraint #3.
                                              Proposed Action new service roads, and
                                                                                                         The substantive requirements of the                Rural Housing Service
                                              ski area facilities would occur within
                                              the 100-yard buffer zone established                    2012 Planning Rule (36 CFR part 219)
                                                                                                      likely to be directly related and,                    Rural Utilities Service
                                              around known Clokey’s eggvetch and
                                              rough angelica populations or potential                 therefore, applicable to the Forest Plan
                                                                                                                                                            Rural Development Cooperative
                                              habitat. These areas have been                          amendment for the Lee Canyon Project                  Agreement Program
                                              thoroughly inventoried for these species                are in 36 CFR 219.9(b) regarding
                                              and none were found within the project                  threatened and endangered species and                 AGENCY:   Rural Development USDA.
                                              foot print. This project-specific Forest                36 CFR 219.10(a)(1), (3), and (7)                     ACTION:   Notice.
                                              Plan amendment will allow                               regarding integrated resource
                                              development within the 100-yard buffer                  management for multiple use. The scope                SUMMARY:   The Assistant to the Secretary
                                              zones for these two-species established                 and scale to which these substantive                  for Rural Development (Agency) is
                                                                                                      requirements would apply are the scope                seeking applications to support regional
                                              in the Standard GMP 0.31 (p. 18) to
                                                                                                                                                            economic development planning efforts
                                              allow for construction of service roads                 and scale of the Lee Canyon Project. The
                                                                                                                                                            in rural communities under the Rural
                                              and ski area facilities.                                amendment would not apply to any
                                                 Under the Proposed Action and other                                                                        Economic Development Innovation
                                                                                                      other projects or activities.
                                              action alternatives, Standard GMP 0.31                                                                        (REDI) initiative. This funding
                                              would be amended to allow new service                   Responsible Official                                  opportunity will be administered by the
                                              roads and developed recreation sites to                                                                       Rural Development Innovation Center,
                                                                                                        The Responsible Official for the Lee                in partnership with the Rural Business-
                                              be placed within the 100-yard buffer                    Canyon Project and the Forest Plan                    Cooperative Service. The Agency is
                                              zone around known Clokey’s eggvetch
                                                                                                      amendment is William A. Dunkelberger,                 announcing up to $750,000 in
                                              and rough angelica populations or
                                                                                                      Forest Supervisor, Humboldt-Toiyabe                   competitive cooperative agreement
                                              potential habitat, and within
                                                                                                      National Forest Supervisor’s Office,                  funds in fiscal year (FY) 2018. Rural
                                              biodiversity hotspots in the Lee Canyon
                                                                                                      1200 Franklin Way, Sparks, Nevada                     Development Agency may select one,
                                              Special Use Permit Boundary.
                                                 Management Area 11: (11.57) Allow                    89431, phone (775) 355–5310.                          multiple, or no award recipients. The
                                              limited expansion of ski area in Lee                                                                          Agency reserves the right to withhold
                                                                                                      Decision To Be Made                                   the awarding of any funds if no
                                              Canyon and enhancement of skiing
                                                                                                         In consideration of the stated purpose             application receives a score of at least
                                              opportunities and facilities within the
                                                                                                      and need and the analysis of                          60 points.
                                              scope of an approved master
                                                                                                                                                               This Notice lists the information
                                              development plan and under the                          environmental effects documented in
                                                                                                                                                            needed to submit an application for
                                              following constraints:                                  this EIS, the Responsible Official will               these funds. This Notice announces that
                                                 1. Expansion occurs within the                       review the proposed action and                        the Agency is accepting FY 2018
                                              existing sub-basin.                                     alternatives in order to make the
                                                 2. Does not impact any threatened,                                                                         applications to support REDI.
                                                                                                      following decisions:
                                              endangered, or sensitive species or                                                                           DATES: The deadline for receipt of a
                                                                                                         • Whether to authorize the proposed                complete application is midnight
                                              species of concern or its habitat.
                                                 3. Expansion is commensurate with                    action or an alternative, including the               Eastern Standard Time on Wednesday,
                                              development of additional parking in                    required no-action alternative, all or in             September 5, via www.grants.gov. The
                                              the lower Lee Canyon area and shuttle                   part;                                                 Agency will not consider any
                                              services.                                                  • What design criteria and mitigation              application received after the deadline.
                                                 4. Expansion incorporates defensible                 measures to require as a condition of the             After an applicant submits an
                                              space design and fire safe facilities.                  authorization;                                        application via grants.gov, all applicants
                                                 5. Where consistent with other                                                                             must email RD.Innovation@
                                                                                                         • What evaluation methods and                      osec.usda.gov to confirm application
                                              standards and guidelines.
                                                 The need for this Forest Plan                        documentation to require for monitoring               and receipt of the application package.
amozie on DSK3GDR082PROD with NOTICES1




                                              amendment is that the Proposed Action                   project implementation and mitigation                 Applicants who have been selected for
                                              and other action alternatives include                   effectiveness; and                                    funding will receive a letter of official
                                              development of ski runs, mountain                          • Whether to amend the Forest Plan                 notification and will be awarded a
                                              coasters, zip lines, mountain bike trails,              to exempt the project from Standard                   cooperative agreement authorized under
                                              parking areas, and access roads within                  GMP 0.31 and from Constraints #2 and                  7 U.S.C. 2204b(b)(4). Pending funding
                                              the Lee Canyon Ski Area permitted                       #3 of Standard GMP Management Area                    availability, all awards will be made no
                                              boundary. As the Mount Charleston                       11.57.                                                later than September 30, 2018.


                                         VerDate Sep<11>2014   17:17 Aug 16, 2018   Jkt 244001   PO 00000   Frm 00005   Fmt 4703   Sfmt 4703   E:\FR\FM\17AUN1.SGM   17AUN1



Document Created: 2018-08-17 03:24:26
Document Modified: 2018-08-17 03:24:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Availability of the Draft Environmental Impact Statement for the Lee Canyon Ski Area Master Development Plan Phase I and Public Comment Period for the Associated Forest Plan Amendment.
DatesThe comment period ends 45 days after today's Notice of Availability or 45 days after the Environmental Protection Agency's Notice of Availability is published in the Federal Register, whichever is later. All relevant comments received during the public comment period related to the substantive requirements that would likely be directly related to the proposed Forest Plan amendment and the scope and scale of the proposed Forest Plan amendment will be considered in the preparation of the Final EIS and Draft Record of Decision (ROD).
ContactChris Linehan, Interdisciplinary Team Leader, at (702) 515-5401, or via email at [email protected] Individuals who use telecommunication devices for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1-800-877-8339 between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday. Information about the Lee Canyon Project may be found on the Forest Service website at http://www.fs.usda.gov/project/?project=50649.
FR Citation83 FR 41045 