83_FR_43051 83 FR 42886 - Notice of Petition for Declaratory Order; White Cliffs Pipeline, LLC

83 FR 42886 - Notice of Petition for Declaratory Order; White Cliffs Pipeline, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 165 (August 24, 2018)

Page Range42886-42887
FR Document2018-18322

Federal Register, Volume 83 Issue 165 (Friday, August 24, 2018)
[Federal Register Volume 83, Number 165 (Friday, August 24, 2018)]
[Notices]
[Pages 42886-42887]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-18322]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR18-35-000]


Notice of Petition for Declaratory Order; White Cliffs Pipeline, 
LLC

    Take notice that on August 16, 2018, pursuant to Rule 207(a)(2) of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.207(a)(2) (2017), White Cliffs 
Pipeline, L.L.C. (White Cliff), filed a declaratory order petition 
seeking approval of certain terms and conditions of service for White 
Cliffs' portion of a joint project to provide pipeline transportation 
of natural gas liquids (NGL) from receipt points in Weld County, 
Colorado to the NGL marketing hub of Mont Belvieu, Texas. The joint 
project is being undertaken in conjunction with DCP Wattenberg 
Pipeline, LLC and DCP Southern Hills Pipeline, LLC (the DCP Parties), 
all as more fully explained in the petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

[[Page 42887]]

    Comment Date: 5:00 p.m. Eastern time on September 20, 2018.

    Dated: August 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18322 Filed 8-23-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               42886                         Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices

                                               Regulatory Commission, 888 First Street                 for accessing information in paragraph                DEPARTMENT OF ENERGY
                                               NE, Washington, DC 20426. The first                     n. Based on all oral and written
                                               page of any filing should include docket                comments, a Scoping Document 2 (SD2)                  Federal Energy Regulatory
                                               number P–2336–094.                                      may be issued. SD2 may include a                      Commission
                                                  All filings with the Commission must                 revised process plan and schedule, as                 [Docket No. OR18–35–000]
                                               bear the appropriate heading:                           well as a list of issues, identified
                                               ‘‘Comments on Pre-Application                           through the scoping process.                          Notice of Petition for Declaratory
                                               Document,’’ ‘‘Study Requests,’’                                                                               Order; White Cliffs Pipeline, LLC
                                               ‘‘Comments on Scoping Document 1,’’                     Environmental Site Review
                                               ‘‘Request for Cooperating Agency                                                                                 Take notice that on August 16, 2018,
                                               Status,’’ or ‘‘Communications to and                       The potential applicant and                        pursuant to Rule 207(a)(2) of the Federal
                                               from Commission Staff.’’ Any                            Commission staff will conduct an                      Energy Regulatory Commission’s
                                               individual or entity interested in                      Environmental Site Review (site visit) of             (Commission) Rules of Practice and
                                               submitting study requests, commenting                   the project on Friday, September 14,                  Procedure, 18 CFR 385.207(a)(2) (2017),
                                               on the PAD or SD1, and any agency                       2018, consisting of facility tours from               White Cliffs Pipeline, L.L.C. (White
                                               requesting cooperating status must do so                9:00 a.m. to 12:00 p.m., and boat tours               Cliff), filed a declaratory order petition
                                               by November 5, 2018.                                    from 1:00 p.m. to 4:00 p.m. All                       seeking approval of certain terms and
                                                  p. We intend to prepare an                           participants should meet at the Jackson               conditions of service for White Cliffs’
                                               environmental assessment (EA).                          Land Management Office located at 180                 portion of a joint project to provide
                                               Nevertheless, the meetings listed below                 Dam Road, Jackson, Georgia 30233.                     pipeline transportation of natural gas
                                               will satisfy the NEPA scoping                                                                                 liquids (NGL) from receipt points in
                                                                                                       Participants must notify Courtenay
                                               requirements, irrespective of whether an                                                                      Weld County, Colorado to the NGL
                                                                                                       O’Mara at g2jacksonrel@
                                               EA or an Environmental Impact                                                                                 marketing hub of Mont Belvieu, Texas.
                                                                                                       southernco.com, or (404) 506–7219, on                 The joint project is being undertaken in
                                               Statement is issued by the Commission.                  or before August 29, 2018, if they plan               conjunction with DCP Wattenberg
                                               Scoping Meetings                                        to attend the environmental site review.              Pipeline, LLC and DCP Southern Hills
                                                 Commission staff will hold two                        Meeting Objectives                                    Pipeline, LLC (the DCP Parties), all as
                                               scoping meetings in the vicinity of the                                                                       more fully explained in the petition.
                                               project at the times and places noted                      At the scoping meetings, staff will: (1)              Any person desiring to intervene or to
                                               below. The daytime meeting will focus                   Initiate scoping of the issues; (2) review            protest this filing must file in
                                               on resource agency, Indian tribes, and                  and discuss existing conditions and                   accordance with Rules 211 and 214 of
                                               non-governmental organization                           resource management objectives; (3)                   the Commission’s Rules of Practice and
                                               concerns, while the evening meeting is                  review and discuss existing information               Procedure (18 CFR 385.211, 385.214).
                                               primarily for receiving input from the                  and identify preliminary information                  Protests will be considered by the
                                               public. We invite all interested                        and study needs; (4) review and discuss               Commission in determining the
                                               individuals, organizations, and agencies                the process plan and schedule for pre-                appropriate action to be taken, but will
                                               to attend one or both of the meetings,                  filing activity that incorporates the time            not serve to make protestants parties to
                                               and to assist staff in identifying                      frames provided for in Part 5 of the                  the proceeding. Any person wishing to
                                               particular study needs, as well as the                  Commission’s regulations and, to the                  become a party must file a notice of
                                               scope of environmental issues to be                                                                           intervention or motion to intervene, as
                                                                                                       extent possible, maximizes coordination
                                               addressed in the environmental                                                                                appropriate. Such notices, motions, or
                                                                                                       of federal, state, and tribal permitting
                                               document. The times and locations of                                                                          protests must be filed on or before the
                                                                                                       and certification processes; and (5)                  comment date. Anyone filing a motion
                                               these meetings are as follows:                          discuss the appropriateness of any                    to intervene or protest must serve a copy
                                               Daytime Scoping Meeting—Jackson,                        federal or state agency or Indian tribe               of that document on the Petitioner.
                                               Georgia                                                 acting as a cooperating agency for                       The Commission encourages
                                                 Date & Time: Thursday, September                      development of an environmental                       electronic submission of protests and
                                               13, 2018, at 9 a.m.                                     document.                                             interventions in lieu of paper using the
                                                 Location: Pepper Sprout Barn, 562                        Meeting participants should come                   ‘‘eFiling’’ link at http://www.ferc.gov.
                                               Old Bethel Road, Jackson, Georgia                       prepared to discuss their issues and/or               Persons unable to file electronically
                                               30233, (678) 752–1550.                                  concerns. Please review the PAD in                    should submit an original and 5 copies
                                                                                                       preparation for the scoping meetings.                 of the protest or intervention to the
                                               Evening Scoping Meeting—Jackson,                                                                              Federal Energy Regulatory Commission,
                                               Georgia                                                 Directions on how to obtain a copy of
                                                                                                       the PAD and SD1 are included in item                  888 First Street NE, Washington, DC
                                                  Date & Time: Thursday, September                     n. of this document.                                  20426.
                                               13, 2018, at 6:30 p.m.                                                                                           This filing is accessible on-line at
                                                  Location: Pepper Sprout Barn, 562                    Meeting Procedures                                    http://www.ferc.gov, using the
                                               Old Bethel Road, Jackson, Georgia                                                                             ‘‘eLibrary’’ link and is available for
                                               30233, (678) 752–1550.                                    The meetings will be recorded by a                  review in the Commission’s Public
                                                  Scoping Document 1 (SD1), which                      stenographer and will be placed in the                Reference Room in Washington, DC.
                                               outlines the subject areas to be                        public records of the project.                        There is an ‘‘eSubscription’’ link on the
                                               addressed in the environmental                            Dated: August 20, 2018.                             website that enables subscribers to
daltland on DSKBBV9HB2PROD with NOTICES




                                               document, was mailed to the                             Nathaniel J. Davis, Sr.,
                                                                                                                                                             receive email notification when a
                                               individuals and entities on the                                                                               document is added to a subscribed
                                               Commission’s mailing list. Copies of                    Deputy Secretary.                                     docket(s). For assistance with any FERC
                                               SD1 will be available at the scoping                    [FR Doc. 2018–18324 Filed 8–23–18; 8:45 am]           Online service, please email
                                               meetings, or may be viewed on the web                   BILLING CODE 6717–01–P                                FERCOnlineSupport@ferc.gov, or call
                                               at http://www.ferc.gov, using the                                                                             (866) 208–3676 (toll free). For TTY, call
                                               ‘‘eLibrary’’ link. Follow the directions                                                                      (202) 502–8659.


                                          VerDate Sep<11>2014   19:17 Aug 23, 2018   Jkt 244001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\24AUN1.SGM   24AUN1


                                                                             Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices                                           42887

                                                 Comment Date: 5:00 p.m. Eastern time        Filed Date: 8/14/18.                                               Comments Due: 5 p.m. ET 9/10/18.
                                               on September 20, 2018.                        Accession Number: 20180814–5151.                                   Docket Numbers: ER18–2254–000.
                                                  Dated: August 20, 2018.                    Comments Due: 5 p.m. ET 9/4/18.                                    Applicants: MC Project Company
                                               Nathaniel J. Davis, Sr.,                      Docket Numbers: ER18–2246–000.                                  LLC.
                                               Deputy Secretary.                             Applicants: Heartland Divide Wind                                  Description: § 205(d) Rate Filing:
                                                                                           Project, LLC.                                                     Reactive Service Rate Schedule Filings
                                               [FR Doc. 2018–18322 Filed 8–23–18; 8:45 am]
                                                                                             Description: Baseline eTariff Filing:                           and Request for Waiver to be effective
                                               BILLING CODE 6717–01–P
                                                                                           Heartland Divide Wind Project, LLC                                12/31/9998.
                                                                                           Application for Market-Based Rate                                    Filed Date: 8/20/18.
                                               DEPARTMENT OF ENERGY                        Authority to be effective 10/16/2018.                                Accession Number: 20180820–5083.
                                                                                             Filed Date: 8/17/18.                                               Comments Due: 5 p.m. ET 9/10/18.
                                               Federal Energy Regulatory                     Accession Number: 20180817–5152.                                   Docket Numbers: ER18–2255–000.
                                               Commission                                    Comments Due: 5 p.m. ET 9/7/18.                                    Applicants: Arizona Public Service
                                                                                             Docket Numbers: ER18–2247–000.                                  Company.
                                               Combined Notice of Filings #1                 Applicants: Southwest Power Pool,                                  Description: § 205(d) Rate Filing: Rate
                                                                                           Inc.                                                              Schedule No. 265, Amendment No. 2—
                                                  Take notice that the Commission
                                                                                             Description: § 205(d) Rate Filing: 3473                         PV-Morgan Joint Participation to be
                                               received the following electric rate
                                                                                           Upstream   Wind Energy and Westar                                 effective 10/20/2018.
                                               filings:
                                                                                           Energy Meter Agent Agr to be effective                               Filed Date: 8/20/18.
                                                  Docket Numbers: ER10–2527–005;           8/1/2018.                                                            Accession Number: 20180820–5094.
                                               ER15–356–008; ER15–357–008; ER10–             Filed Date: 8/20/18.                                               Comments Due: 5 p.m. ET 9/10/18.
                                               2532–011; ER10–1595–009; ER10–2533–           Accession Number: 20180820–5001.                                   Take notice that the Commission
                                               005; ER10–1598–009; ER10–2535–006;            Comments Due: 5 p.m. ET 9/10/18.                                received the following electric securities
                                               ER10–1616–009; ER10–1618–009;
                                                                                             Docket Numbers: ER18–2248–000.                                  filings:
                                               ER18–1821–001.
                                                                                             Applicants: Blue Pilot Energy, LLC.                                Docket Numbers: ES18–57–000.
                                                  Applicants: Allegheny Ridge Wind
                                                                                             Description: Notice of cancellation of                             Applicants: MDU Resources Group,
                                               Farm, LLC, Chief Conemaugh Power,
                                                                                           MBR Tariff Blue Pilot Energy, LLC.                                Inc.
                                               LLC, Chief Keystone Power, LLC,
                                                                                             Filed Date: 8/17/18.                                               Description: Application for
                                               Crescent Ridge LLC, Crete Energy
                                                                                             Accession Number: 20180817–5178.                                Authorization under Section 204 of the
                                               Venture, LLC, GSG, LLC, Lincoln
                                                                                             Comments Due: 5 p.m. ET 9/7/18.                                 Federal Power Act of MDU Resources
                                               Generating Facility, LLC, Mendota Hills,
                                               LLC, New Covert Generating Company,           Docket Numbers: ER18–2250–000.                                  Group, Inc.
                                               LLC, Rolling Hills Generating, L.L.C.,        Applicants: PJM Interconnection,                                   Filed Date: 8/17/18.
                                               Walleye Power, LLC.                         L.L.C.                                                               Accession Number: 20180817–5182.
                                                  Description: Notice of Non-Material        Description: Compliance filing: Notice                             Comments Due: 5 p.m. ET 9/7/18.
                                               Change in Status of Allegheny Ridge         of Cancellation of WMPA/SA No. 2214;                                 Docket Numbers: ES18–58–000.
                                               Wind Farm, LLC, et. al.                     Queue No. U3–032 to be effective N/A.                                Applicants: Baja California Power,
                                                  Filed Date: 8/20/18.                       Filed Date: 8/20/18.                                            Inc.
                                                  Accession Number: 20180820–5085.           Accession Number: 20180820–5068.                                   Description: Application for
                                                  Comments Due: 5 p.m. ET 9/10/18.           Comments Due: 5 p.m. ET 9/10/18.                                Authorization under Section 204 of the
                                                  Docket Numbers: ER15–936–003;              Docket Numbers: ER18–2251–000.                                  Federal Power Act of Baja California
                                               ER15–960–003; ER17–1531–001; ER10–            Applicants: Midcontinent                                        Power, Inc.
                                               1514–003; ER13–343–009; ER13–342–           Independent System Operator, Inc.                                    Filed Date: 8/20/18.
                                               013; ER16–700–002; ER16–701–002.              Description: § 205(d) Rate Filing:                                 Accession Number: 20180820–5092.
                                                  Applicants: Benson Power, LLC, CPV       2018–08–20_SA 3156 ATC–CEC Project                                   Comments Due: 5 p.m. ET 9/10/18.
                                               Biomass Holdings, LLC, CPV Fairview,        Commitment Agreement (Carmeuse) to                                   Take notice that the Commission
                                               LLC, CPV Keenan II Renewable Energy         be effective 10/20/2018.                                          received the following electric
                                               Company, LLC, CPV Maryland, LLC,              Filed Date: 8/20/18.                                            reliability filings
                                               CPV Shore, LLC, CPV Towantic, LLC,            Accession Number: 20180820–5072.                                   Docket Numbers: RD18–7–000.
                                               CPV Valley, LLC.                              Comments Due: 5 p.m. ET 9/10/18.                                   Applicants: North American Electric
                                                  Description: Notice of Change in           Docket Numbers: ER18–2252–000.                                  Reliability Corporation.
                                               Status of Benson Power, LLC, et al.           Applicants: MC Project Company                                     Description: Petition of the North
                                                  Filed Date: 8/17/18.                     LLC.                                                              American Electric Reliability
                                                  Accession Number: 20180817–5175.           Description: Baseline eTariff Filing:                           Corporation for Approval of Proposed
                                                  Comments Due: 5 p.m. ET 9/7/18.          Market-Based Rate Authorization and                               Reliability Standard BAL–002–3.
                                                  Docket Numbers: ER18–2118–000;           Request for Waivers & Blanket                                        Filed Date: 8/17/18.
                                               ER18–2003–000; ER18–2182–000;               Approvals to be effective 8/21/2018.                                 Accession Number: 20180817–5177.
                                               ER18–2066–000; ER18–2067–000;                 Filed Date: 8/20/18.                                               Comments Due: 5 p.m. ET 9/10/18.
                                               ER18–1981–000; ER18–2032–000.                 Accession Number: 20180820–5074.                                   The filings are accessible in the
                                                  Applicants: Armadillo Flats Wind           Comments Due: 5 p.m. ET 9/10/18.                                Commission’s eLibrary system by
                                               Project, LLC, Lorenzo Wind, LLC, Minco        Docket Numbers: ER18–2253–000.                                  clicking on the links or querying the
daltland on DSKBBV9HB2PROD with NOTICES




                                               IV & V Interconnection, LLC, Minco            Applicants: Martins Creek, LLC.                                 docket number.
                                               Wind IV, LLC, Minco Wind V, LLC,              Description: § 205(d) Rate Filing:                                 Any person desiring to intervene or
                                               Pratt Wind, LLC, Wildcat Ranch Wind         Reactive Service Rate Schedule Filings                            protest in any of the above proceedings
                                               Project, LLC.                               and Request for Waiver to be effective                            must file in accordance with Rules 211
                                                  Description: Second Amendment to         12/31/9998.                                                       and 214 of the Commission’s
                                               July 31, 2018 et al. Armadillo Flats          Filed Date: 8/20/18.                                            Regulations (18 CFR 385.211 and
                                               Wind Project, LLC tariff filing, et al.       Accession Number: 20180820–5077.                                385.214) on or before 5:00 p.m. Eastern


                                          VerDate Sep<11>2014   19:17 Aug 23, 2018   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\24AUN1.SGM   24AUN1



Document Created: 2018-08-24 04:15:33
Document Modified: 2018-08-24 04:15:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern time on September 20, 2018.
FR Citation83 FR 42886 