83_FR_44205 83 FR 44037 - Application to Export Electric Energy; Enel Trading North America, LLC

83 FR 44037 - Application to Export Electric Energy; Enel Trading North America, LLC

DEPARTMENT OF ENERGY

Federal Register Volume 83, Issue 168 (August 29, 2018)

Page Range44037-44038
FR Document2018-18744

Enel Trading North America, LLC (ETNA or Applicant) has applied for authority to transmit electric energy from the United States to Mexico pursuant to the Federal Power Act.

Federal Register, Volume 83 Issue 168 (Wednesday, August 29, 2018)
[Federal Register Volume 83, Number 168 (Wednesday, August 29, 2018)]
[Notices]
[Pages 44037-44038]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-18744]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-460]


Application to Export Electric Energy; Enel Trading North 
America, LLC

AGENCY: Office of Electricity, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Enel Trading North America, LLC (ETNA or Applicant) has 
applied for authority to transmit electric energy from the United 
States to Mexico pursuant to the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before September 28, 2018.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity, Mail 
Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW, 
Washington, DC 20585-0350. Because of delays in handling conventional 
mail, it is recommended that documents be transmitted by overnight 
mail, by electronic mail to [email protected], or by 
facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the United States 
Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of 
the Department of Energy Organization Act (42 U.S.C. 7151(b) and 
7172(f)) and require authorization under section 202(e) of the Federal 
Power Act (16 U.S.C. 824a(e)).
    On August 3, 2018, DOE received an application from ETNA for 
authority to transmit electric energy from the United States to Mexico 
as a power marketer for a five-year term using existing international 
transmission facilities.
    In its application, the Applicant states that it ``is not a 
franchised public utility with a transmission or distribution system, 
and does not have captive customers.'' The electric energy that ETNA 
proposes to export to Mexico would be surplus energy purchased from 
third parties such as electric utilities and Federal power marketing 
agencies pursuant to voluntary agreements. The existing international 
transmission facilities to be utilized by the Applicant have previously 
been authorized by Presidential Permits issued pursuant to Executive 
Order 10485, as amended, and are appropriate for open access 
transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's

[[Page 44038]]

(FERC's) Rules of Practice and Procedure (18 CFR 385.211). Any person 
desiring to become a party to these proceedings should file a motion to 
intervene at the above address in accordance with FERC Rule 214 (18 CFR 
385.214). Five (5) copies of such comments, protests, or motions to 
intervene should be sent to the address provided above on or before the 
date listed above.
    Comments and other filings concerning ETNA's application to export 
electric energy to Mexico should be clearly marked with OE Docket No. 
EA-460. An additional copy is to be provided to Margaret M. Bateman, 
Esq., Enel Green Power North America, Inc., 100 Brickstone Square, 
Suite 300, Andover, MA 01810.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program website at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Signed in Washington, DC, on August 23, 2018.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity.
[FR Doc. 2018-18744 Filed 8-28-18; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                    Federal Register / Vol. 83, No. 168 / Wednesday, August 29, 2018 / Notices                                                                   44037

                                                Regulation, Office of Regulation and                              4:30 p.m., Monday through Friday,                                       Issued in Washington, DC, on August 23,
                                                International Engagement, Office of                               except Federal holidays.                                              2018.
                                                Fossil Energy, Docket Room 3E–033,                                                                                                      Amy Sweeney,
                                                Forrestal Building, 1000 Independence                                                                                                   Director, Division of Natural Gas Regulation.
                                                Avenue SW, Washington, DC 20585,
                                                (202) 586–9478. The Docket Room is                                                                                                      Appendix
                                                open between the hours of 8:00 a.m. and
                                                                                                 DOE/FE ORDERS GRANTING IMPORT/EXPORT AUTHORIZATIONS
                                                4206 ..................          07/6/18   18–15–LNG          Southern LNG Company, L.L.C                        Order 4206 granting blanket authorization to export LNG by vessel from the
                                                                                                                                                                   Elba Island Terminal located in Chatham County, Georgia, to Free Trade
                                                                                                                                                                   Agreement and Non-free Trade Agreement Nations.
                                                3041–A ..............           07/20/18   11–127–LNG         Jordan Cove Energy Project L.P                     Order 3041–A amending long-term Multi-Contract Authority to export LNG by
                                                                                                                                                                   vessel from the Proposed Jordan Cove LNG Terminal to Free Trade Agree-
                                                                                                                                                                   ment Nations.
                                                3699–A ..............           07/20/18   15–97–LNG          Corpus Christi Liquefaction, LLC                   Order 3699–A granting Request to Vacate long-term Multi-Contract Authority
                                                                                                                                                                   to export LNG by vessel to Free Trade Agreement Nations and to Withdraw
                                                                                                                                                                   Application to export LNG by vessel to Non-free Trade Agreement Nations.
                                                4207; 4064–A ....               07/20/18   18–73–NG;          Uniper Global Commodities                          Order 4207 granting blanket authority to import/export natural gas from/to
                                                                                           17–83–NG             North America LLC.                                 Canada and Vacating prior authority Order 4064.
                                                4208 ..................         07/20/18   18–74–LNG          Chevron U.S.A. Inc ....................            Order 4208 granting blanket authority to import LNG from various inter-
                                                                                                                                                                   national sources by vessel.
                                                4209 ..................         07/20/18   18–75–NG           ETC Marketing, Ltd ....................            Order 4209 granting blanket authority to import/export natural gas from/to
                                                                                                                                                                   Mexico.
                                                4210 ..................         07/20/18   18–76–NG           Sacramento Municipal Utility                       Order 4210 granting blanket authority to import natural gas from Canada.
                                                                                                                 District.
                                                4211 ..................         07/20/18   18–77–NG           J. Aron & Company LLC ...........                  Order 4211 granting blanket authority to import/export natural gas from/to
                                                                                                                                                                   Canada/Mexico.
                                                4212 ..................         07/24/18   18–47–NG           S.D. Sunnyland Enterprises, Inc                    Order 4212 granting blanket authority to import LNG from various inter-
                                                                                                                                                                   national sources by vessel and to export LNG to Canada by vessel.
                                                4213 ..................         07/24/18   18–79–NG           Twin Eagle Resource Manage-                        Order 4213 granting blanket authority to import/export natural gas from/to
                                                                                                                ment, LLC.                                         Canada/Mexico.
                                                4214 ..................         07/24/18   18–81–NG           Vista Energy Marketing, L.P ......                 Order 4214 granting blanket authority to import natural gas from Canada.
                                                4215 ..................         07/24/18   18–80–NG           Vitol Inc ......................................   Order 4215 granting blanket authority to import/export natural gas from/to
                                                                                                                                                                   Mexico.
                                                4216 ..................         07/24/18   18–83–NG           Atlantic Power Energy Services                     Order 4216 granting blanket authority to import/export natural gas from/to
                                                                                                                (US) LLC.                                          Canada.
                                                4217; 4119–A ....               07/24/18   18–84–NG;          Gunvor US LLC .........................            Order 4217 granting blanket authority to import/export natural gas from/to
                                                                                           17–139–NG                                                               Canada/Mexico and vacating prior authority Order 4119.
                                                4218 ..................         07/24/18   18–85–NG           Sabine Pass Liquefaction, LLC                      Order 4218 granting blanket authority to import LNG from various inter-
                                                                                                                                                                   national sources by vessel.
                                                4219 ..................         07/24/18   18–40–LNG          LYZ Solutions LLC .....................            Order 4219 granting blanket authority to import LNG from various inter-
                                                                                                                                                                   national sources by vessel and to export LNG to Canada/Mexico by vessel.
                                                4220 ..................         07/31/18   18–71–NG           Union Gas Limited .....................            Order 4220 granting blanket authority to import/export natural gas from/to
                                                                                                                                                                   Canada.
                                                4221 ..................         07/31/18   18–88–NG           Certarus (USA) Ltd ....................            Order 4221 granting blanket authority to import/export natural gas from/to
                                                                                                                                                                   Canada/Mexico.
                                                4222 ..................         07/31/18   18–86–NG           Energia Azteca X, S.A. de C.V                      Order 4222 granting blanket authority to export natural gas to Mexico.



                                                [FR Doc. 2018–18729 Filed 8–28–18; 8:45 am]                       20, U.S. Department of Energy, 1000                                      In its application, the Applicant states
                                                BILLING CODE 6450–01–P                                            Independence Avenue SW, Washington,                                   that it ‘‘is not a franchised public utility
                                                                                                                  DC 20585–0350. Because of delays in                                   with a transmission or distribution
                                                                                                                  handling conventional mail, it is                                     system, and does not have captive
                                                DEPARTMENT OF ENERGY                                              recommended that documents be                                         customers.’’ The electric energy that
                                                [OE Docket No. EA–460]                                            transmitted by overnight mail, by                                     ETNA proposes to export to Mexico
                                                                                                                  electronic mail to Electricity.Exports@                               would be surplus energy purchased
                                                Application to Export Electric Energy;                            hq.doe.gov, or by facsimile to 202–586–                               from third parties such as electric
                                                Enel Trading North America, LLC                                   8008.                                                                 utilities and Federal power marketing
                                                                                                                  SUPPLEMENTARY INFORMATION: Exports of                                 agencies pursuant to voluntary
                                                AGENCY:      Office of Electricity, DOE.                          electricity from the United States to a                               agreements. The existing international
                                                ACTION:      Notice of application.                               foreign country are regulated by the                                  transmission facilities to be utilized by
                                                                                                                  United States Department of Energy                                    the Applicant have previously been
                                                SUMMARY:   Enel Trading North America,                            (DOE) pursuant to sections 301(b) and                                 authorized by Presidential Permits
                                                LLC (ETNA or Applicant) has applied                               402(f) of the Department of Energy                                    issued pursuant to Executive Order
                                                for authority to transmit electric energy                         Organization Act (42 U.S.C. 7151(b) and                               10485, as amended, and are appropriate
                                                from the United States to Mexico                                  7172(f)) and require authorization under                              for open access transmission by third
                                                pursuant to the Federal Power Act.                                                                                                      parties.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                  section 202(e) of the Federal Power Act
                                                DATES: Comments, protests, or motions                             (16 U.S.C. 824a(e)).                                                     Procedural Matters: Any person
                                                to intervene must be submitted on or                                 On August 3, 2018, DOE received an                                 desiring to be heard in this proceeding
                                                before September 28, 2018.                                        application from ETNA for authority to                                should file a comment or protest to the
                                                ADDRESSES: Comments, protests,                                    transmit electric energy from the United                              application at the address provided
                                                motions to intervene, or requests for                             States to Mexico as a power marketer for                              above. Protests should be filed in
                                                more information should be addressed                              a five-year term using existing                                       accordance with Rule 211 of the Federal
                                                to: Office of Electricity, Mail Code: OE–                         international transmission facilities.                                Energy Regulatory Commission’s


                                           VerDate Sep<11>2014            17:04 Aug 28, 2018   Jkt 244001   PO 00000      Frm 00023         Fmt 4703        Sfmt 4703    E:\FR\FM\29AUN1.SGM    29AUN1


                                                44038                      Federal Register / Vol. 83, No. 168 / Wednesday, August 29, 2018 / Notices

                                                (FERC’s) Rules of Practice and                          Room 8G–024, Forrestal Building, 1000                 DEPARTMENT OF ENERGY
                                                Procedure (18 CFR 385.211). Any                         Independence Avenue SW, Washington,
                                                person desiring to become a party to                    DC 20585.                                             Agency Information Collection
                                                these proceedings should file a motion                                                                        Extension
                                                to intervene at the above address in                    FOR FURTHER INFORMATION CONTACT:
                                                                                                        Christopher Lawrence at (202) 586–                    AGENCY:  National Nuclear Security
                                                accordance with FERC Rule 214 (18 CFR                                                                         Administration, U.S. Department of
                                                385.214). Five (5) copies of such                       5260.
                                                                                                                                                              Energy.
                                                comments, protests, or motions to                       SUPPLEMENTARY INFORMATION:      On July               ACTION: Submission for Office of
                                                intervene should be sent to the address
                                                                                                        27, 2018, Panda Hummel Station LLC,                   Management and Budget (OMB) review;
                                                provided above on or before the date
                                                                                                        as owner and operator of a new baseload               comment request.
                                                listed above.
                                                   Comments and other filings                           electric generating powerplant,
                                                                                                                                                              SUMMARY:    The Department of Energy
                                                concerning ETNA’s application to                        submitted a coal capability self-
                                                                                                                                                              (DOE) has submitted an information
                                                export electric energy to Mexico should                 certification to the Department of
                                                                                                                                                              collection request to the OMB for
                                                be clearly marked with OE Docket No.                    Energy (DOE) pursuant to § 201(d) of the              extension under the provisions of the
                                                EA–460. An additional copy is to be                     Powerplant and Industrial Fuel Use Act                Paperwork Reduction Act of 1995. The
                                                provided to Margaret M. Bateman, Esq.,                  of 1978 (FUA), as amended, and DOE                    information collection requests a three-
                                                Enel Green Power North America, Inc.,                   regulations in 10 CFR 501.60, 61. The                 year extension of Assistance to Foreign
                                                100 Brickstone Square, Suite 300,                       FUA and regulations thereunder require                Atomic Energy Activities, OMB Control
                                                Andover, MA 01810.                                      DOE to publish a notice of filing of self-            Number 1901–0263. The proposed
                                                   A final decision will be made on this                certification in the Federal Register. 42             collection will implement the regulatory
                                                application after the environmental                     U.S.C. 8311(d)(1) and 10 CFR 501.61(c).               requirements for U.S. persons engaged
                                                impacts have been evaluated pursuant                    Title II of FUA, as amended (42 U.S.C.                in the export of unclassified nuclear
                                                to DOE’s National Environmental Policy                  8301 et seq.), provides that no new                   technology and assistance to submit
                                                Act Implementing Procedures (10 CFR                     baseload powerplant may be                            reports and applications to DOE. This
                                                part 1021) and after a determination is                 constructed or operated without the                   information collection is necessary for
                                                made by DOE that the proposed action                    capability to use coal or another                     the Secretary of Energy to execute his
                                                will not have an adverse impact on the                  alternate fuel as a primary energy                    legal and regulatory responsibilities
                                                sufficiency of supply or reliability of the             source. Pursuant to the FUA, in order to              pursuant to the Atomic Energy Act of
                                                U.S. electric power supply system.                      meet the requirement of coal capability,              1954, as amended (AEA).
                                                   Copies of this application will be                                                                         DATES: Comments regarding this
                                                made available, upon request, for public                the owner or operator of such a facility
                                                                                                        proposing to use natural gas or                       collection must be received on or before
                                                inspection and copying at the address                                                                         September 28, 2018. If you anticipate
                                                provided above, by accessing the                        petroleum as its primary energy source
                                                                                                        shall certify to the Secretary of Energy              that you will be submitting comments,
                                                program website at http://energy.gov/                                                                         but find it difficult to do so within the
                                                node/11845, or by emailing Angela Troy                  (Secretary), prior to construction or
                                                                                                        prior to operation as a baseload                      period of time allowed by this notice,
                                                at Angela.Troy@hq.doe.gov.                                                                                    please advise the OMB Desk Officer of
                                                                                                        powerplant, that such powerplant has
                                                  Signed in Washington, DC, on August 23,                                                                     your intention to make a submission as
                                                2018.                                                   the capability to use coal or another
                                                                                                                                                              soon as possible. The Desk Officer may
                                                Christopher Lawrence,                                   alternate fuel. Such certification
                                                                                                                                                              be telephoned at (202) 395–4718.
                                                Electricity Policy Analyst, Office of Electricity.      establishes compliance with FUA
                                                                                                                                                              ADDRESSES: Written comments should
                                                                                                        section 201(a) as of the date it is filed
                                                [FR Doc. 2018–18744 Filed 8–28–18; 8:45 am]                                                                   be sent to the DOE Desk Officer, Office
                                                                                                        with the Secretary. 42 U.S.C. 8311.
                                                BILLING CODE 6450–01–P                                                                                        of Information and Regulatory Affairs,
                                                                                                           The following owner of a proposed                  Office of Management and Budget, New
                                                                                                        new baseload electric generating                      Executive Office Building, Room 10102,
                                                DEPARTMENT OF ENERGY                                    powerplant has filed a self-certification             735 17th Street NW, Washington, DC
                                                                                                        of coal-capability with DOE pursuant to               20503; and
                                                Certification Notice—254; Notice of                     FUA section 201(d) and in accordance                    Katie Strangis, Policy Advisor, Office
                                                Filing of Self-Certification of Coal                    with DOE regulations in 10 CFR 501.60,                of Nonproliferation and Arms Control,
                                                Capability Under the Powerplant and                                                                           NA–24, National Nuclear Security
                                                                                                        61:
                                                Industrial Fuel Use Act                                                                                       Administration, Department of Energy,
                                                                                                        Owner: Panda Hummel Station LLC.                      1000 Independence Avenue SW, Room
                                                AGENCY:    Office of Electricity Delivery,
                                                DOE.                                                    Capacity: 1,124 megawatts (MW).                       7F–075, Washington, DC 20585, Fax:
                                                ACTION:   Notice of filing.                             Plant Location: Shamokin Dam, PA                      (202) 586–6789, Email: part810@
                                                                                                          17876.                                              nnsa.doe.gov (Include ‘‘Paperwork
                                                SUMMARY:    On July 27, 2018, Panda                                                                           Reduction Act’’ in the subject line).
                                                Hummel Station LLC, as owner and                        In-Service Date: June 2018.                             Due to potential delays in DOE’s
                                                operator of a new baseload electric                       Signed in Washington, DC, on August 23,             receipt and processing of mail sent
                                                generating powerplant, submitted a coal                 2018.                                                 through the U.S. Postal Service, DOE
                                                capability self-certification to the                    Christopher Lawrence,                                 encourages responders to submit
                                                Department of Energy (DOE). The FUA                                                                           comments electronically to ensure
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        Program Management Analyst, Office of
                                                and regulations thereunder require DOE                  Electricity.                                          timely receipt.
                                                to publish a notice of filing of self-                                                                        FOR FURTHER INFORMATION CONTACT:
                                                                                                        [FR Doc. 2018–18745 Filed 8–28–18; 8:45 am]
                                                certification in the Federal Register.                                                                        Katie Strangis, Policy Advisor, Office of
                                                                                                        BILLING CODE 6450–01–P
                                                ADDRESSES: Copies of coal capability                                                                          Nonproliferation and Arms Control,
                                                self-certification filings are available for                                                                  NA–24, National Nuclear Security
                                                public inspection, upon request, in the                                                                       Administration, Department of Energy,
                                                Office of Electricity, Mail Code OE–20,                                                                       1000 Independence Avenue SW, Room


                                           VerDate Sep<11>2014   17:04 Aug 28, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\29AUN1.SGM   29AUN1



Document Created: 2018-08-29 00:12:18
Document Modified: 2018-08-29 00:12:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before September 28, 2018.
FR Citation83 FR 44037 

2025 Federal Register | Disclaimer | Privacy Policy