83_FR_44210 83 FR 44042 - Maritimes & Northeast Pipeline, L.L.C.; Notice of Application

83 FR 44042 - Maritimes & Northeast Pipeline, L.L.C.; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 168 (August 29, 2018)

Page Range44042-44043
FR Document2018-18711

Federal Register, Volume 83 Issue 168 (Wednesday, August 29, 2018)
[Federal Register Volume 83, Number 168 (Wednesday, August 29, 2018)]
[Notices]
[Pages 44042-44043]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-18711]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-539-000]


Maritimes & Northeast Pipeline, L.L.C.; Notice of Application

    Take notice that on August 10, 2018, Maritimes & Northeast 
Pipeline, L.L.C. (Maritimes), 5400 Westheimer Court, Houston, Texas 
77056-5310, filed an application under section 7(b) and 7(c) of the 
Natural Gas Act (NGA) and Subpart A of Part 157 of the Commission's 
rules and regulations to reacquire 7,214 Dth/d of firm capacity on its 
jointly-owned system from Westbrook, Maine to Dracut, Massachusetts 
upon the in-service date of Phase III of Portland Natural Gas 
Transmission System's (Portland) Portland Xpress Project (PXP Project 
Phase III) and the termination of the Capacity Lease Agreement (Lease 
Agreement) between Maritimes and Portland, as described in Docket No. 
CP18-516-000, filed June 29, 2018. Upon the in-service date of the PXP 
Project Phase III, Maritimes seeks to abandon a portion of its 
ownership interest in a compressor unit at the Westbrook Compressor 
Station to Portland, all as more fully described in the application 
which is on file with the Commission and open to public inspection. The 
filing may also be

[[Page 44043]]

viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to Lisa 
A. Connolly, Director, Rates and Certificates, Maritimes & Northeast 
Management Company, LLC, 5400 Westheimer Court, Houston, Texas 77056-
5310, or call (713) 627-4102, or email: [email protected].
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: September 13, 2018.

    Dated: August 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18711 Filed 8-28-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                44042                      Federal Register / Vol. 83, No. 168 / Wednesday, August 29, 2018 / Notices

                                                  Dated: August 23, 2018.                                  Filed Date: 8/23/18.                                  Comments Due: 5 p.m. ET 9/12/18.
                                                Nathaniel J. Davis, Sr.,                                   Accession Number: 20180823–5060.                      The filings are accessible in the
                                                Deputy Secretary.                                          Comments Due: 5 p.m. ET 9/13/18.                   Commission’s eLibrary system by
                                                [FR Doc. 2018–18708 Filed 8–28–18; 8:45 am]                Docket Numbers: ER18–2283–000.                     clicking on the links or querying the
                                                BILLING CODE 6717–01–P                                     Applicants: Midcontinent                           docket number.
                                                                                                        Independent System Operator, Inc.                        Any person desiring to intervene or
                                                                                                           Description: § 205(d) Rate Filing:                 protest in any of the above proceedings
                                                DEPARTMENT OF ENERGY                                    2018–08–23_SA 3161 ATC–WPL Project                    must file in accordance with Rules 211
                                                                                                        Commitment Agreement (Edgerton) to                    and 214 of the Commission’s
                                                Federal Energy Regulatory                               be effective 10/23/2018.                              Regulations (18 CFR 385.211 and
                                                Commission                                                 Filed Date: 8/23/18.                               385.214) on or before 5:00 p.m. Eastern
                                                                                                           Accession Number: 20180823–5072.                   time on the specified comment date.
                                                Combined Notice of Filings #1                                                                                 Protests may be considered, but
                                                                                                           Comments Due: 5 p.m. ET 9/13/18.
                                                   Take notice that the Commission                         Docket Numbers: ER18–2284–000.                     intervention is necessary to become a
                                                received the following electric rate                       Applicants: Midcontinent                           party to the proceeding.
                                                filings:                                                Independent System Operator, Inc.                        eFiling is encouraged. More detailed
                                                   Docket Numbers: ER10–3193–013.                          Description: § 205(d) Rate Filing:                 information relating to filing
                                                   Applicants: Brooklyn Navy Yard                       2018–08–23_SA 3162 ATC–WPL Project                    requirements, interventions, protests,
                                                Cogeneration Partners, L.P.                             Commitment Agreement (EPIC) to be                     service, and qualifying facilities filings
                                                   Description: Notice of Non-Material                  effective 10/23/2018.                                 can be found at: http://www.ferc.gov/
                                                Change in Status of Brooklyn Navy Yard                     Filed Date: 8/23/18.                               docs-filing/efiling/filing-req.pdf. For
                                                Cogeneration Partners, L.P.                                Accession Number: 20180823–5074.                   other information, call (866) 208–3676
                                                   Filed Date: 8/23/18.                                    Comments Due: 5 p.m. ET 9/13/18.                   (toll free). For TTY, call (202) 502–8659.
                                                   Accession Number: 20180823–5080.                        Docket Numbers: ER18–2285–000.                       Dated: August 23, 2018.
                                                   Comments Due: 5 p.m. ET 9/13/18.                        Applicants: Midcontinent                           Nathaniel J. Davis, Sr.,
                                                   Docket Numbers: ER14–1818–016.                       Independent System Operator, Inc.                     Deputy Secretary.
                                                   Applicants: Boston Energy Trading                       Description: § 205(d) Rate Filing:                 [FR Doc. 2018–18710 Filed 8–28–18; 8:45 am]
                                                and Marketing LLC.                                      2018–08–23_SA 3163 ATC–WPS Project                    BILLING CODE 6717–01–P
                                                   Description: Notice of Non-Material                  Commitment Agreement (Plover) to be
                                                Change in Status of Boston Energy                       effective 10/23/2018.
                                                Trading and Marketing LLC.                                 Filed Date: 8/23/18.                               DEPARTMENT OF ENERGY
                                                   Filed Date: 8/22/18.                                    Accession Number: 20180823–5079.
                                                   Accession Number: 20180822–5114.                        Comments Due: 5 p.m. ET 9/13/18.                   Federal Energy Regulatory
                                                   Comments Due: 5 p.m. ET 9/12/18.                                                                           Commission
                                                                                                           Docket Numbers: ER18–2286–000.
                                                   Docket Numbers: ER18–1445–001.                          Applicants: The United Illuminating                [Docket No. CP18–539–000]
                                                   Applicants: Idaho Power Company.                     Company.
                                                   Description: Compliance filing:                         Description: § 205(d) Rate Filing:                 Maritimes & Northeast Pipeline, L.L.C.;
                                                Amendment to LGIA, LGIP, SGIA, and                      Schedule 20A Service Agreement with                   Notice of Application
                                                SGIP Modifications (Per Order No. 842)                  H.Q. Energy Services (U.S.) Inc. to be
                                                Filing to be effective 6/25/2018.                                                                               Take notice that on August 10, 2018,
                                                                                                        effective 1/1/2018.                                   Maritimes & Northeast Pipeline, L.L.C.
                                                   Filed Date: 8/23/18.                                    Filed Date: 8/23/18.
                                                   Accession Number: 20180823–5053.                                                                           (Maritimes), 5400 Westheimer Court,
                                                                                                           Accession Number: 20180823–5085.                   Houston, Texas 77056–5310, filed an
                                                   Comments Due: 5 p.m. ET 9/13/18.                        Comments Due: 5 p.m. ET 9/13/18.                   application under section 7(b) and 7(c)
                                                   Docket Numbers: ER18–2158–000;                          Docket Numbers: ER18–2287–000.                     of the Natural Gas Act (NGA) and
                                                ER18–2159–000.                                             Applicants: Mid-Atlantic Interstate                Subpart A of Part 157 of the
                                                   Applicants: Stillwater Wind, LLC,                    Transmission, LLC, PJM                                Commission’s rules and regulations to
                                                Crazy Mountain Wind LLC.                                Interconnection, L.L.C.                               reacquire 7,214 Dth/d of firm capacity
                                                   Description: Supplement to August 3,                    Description: § 205(d) Rate Filing:                 on its jointly-owned system from
                                                2018 Stillwater Wind, LLC, et al. tariff                MAIT submits four ECSAs, Service                      Westbrook, Maine to Dracut,
                                                filings (revised Appendix B–1).                         Agreement Nos. 5013, 5014, 5015, and                  Massachusetts upon the in-service date
                                                   Filed Date: 8/21/18.                                 5016 to be effective 10/23/2018.                      of Phase III of Portland Natural Gas
                                                   Accession Number: 20180821–5090.                        Filed Date: 8/23/18.                               Transmission System’s (Portland)
                                                   Comments Due: 5 p.m. ET 8/31/18.                        Accession Number: 20180823–5086.                   Portland Xpress Project (PXP Project
                                                   Docket Numbers: ER18–2281–000.                          Comments Due: 5 p.m. ET 9/13/18.                   Phase III) and the termination of the
                                                   Applicants: BFE Scheduling, LLC.                        Take notice that the Commission                    Capacity Lease Agreement (Lease
                                                   Description: Notice of cancellation of               received the following electric securities            Agreement) between Maritimes and
                                                MBR Tariff of BFE Scheduling, LLC.                      filings:                                              Portland, as described in Docket No.
                                                   Filed Date: 8/22/18.                                    Docket Numbers: ES18–59–000.                       CP18–516–000, filed June 29, 2018.
                                                   Accession Number: 20180822–5125.                        Applicants: South Carolina Electric &              Upon the in-service date of the PXP
                                                   Comments Due: 5 p.m. ET 9/12/18.                     Gas Company, South Carolina                           Project Phase III, Maritimes seeks to
sradovich on DSK3GMQ082PROD with NOTICES




                                                   Docket Numbers: ER18–2282–000.                       Generating Company, Inc.                              abandon a portion of its ownership
                                                   Applicants: Midcontinent                                Description: Application for                       interest in a compressor unit at the
                                                Independent System Operator, Inc.                       Authorization Under Federal Power Act                 Westbrook Compressor Station to
                                                   Description: § 205(d) Rate Filing:                   Section 204 of South Carolina Electric &              Portland, all as more fully described in
                                                2018–08–23_SA 2426 Montana Dakota-                      Gas Company, et al.                                   the application which is on file with the
                                                Montana Dakota 3rd Rev GIA (G752) to                       Filed Date: 8/22/18.                               Commission and open to public
                                                be effective 8/9/2018.                                     Accession Number: 20180822–5117.                   inspection. The filing may also be


                                           VerDate Sep<11>2014   17:04 Aug 28, 2018   Jkt 244001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\29AUN1.SGM   29AUN1


                                                                           Federal Register / Vol. 83, No. 168 / Wednesday, August 29, 2018 / Notices                                                 44043

                                                viewed on the web at http://                               However, a person does not have to                 DEPARTMENT OF ENERGY
                                                www.ferc.gov using the ‘‘eLibrary’’ link.               intervene in order to have comments
                                                Enter the docket number excluding the                   considered. The second way to                         Federal Energy Regulatory
                                                last three digits in the docket number                  participate is by filing with the                     Commission
                                                field to access the document. For                       Secretary of the Commission, as soon as               [Docket No. RP18–923–000]
                                                assistance, contact FERC at                             possible, an original and two copies of
                                                FERCOnlineSupport@ferc.gov or call                      comments in support of or in opposition               Enable Mississippi River
                                                toll-free, (866) 208–3676 or TTY, (202)                 to this project. The Commission will                  Transmission, LLC; Notice of
                                                502–8659.                                               consider these comments in                            Technical Conference
                                                   Any questions regarding this                         determining the appropriate action to be
                                                application should be directed to Lisa                                                                           Take notice that a technical
                                                                                                        taken, but the filing of a comment alone
                                                A. Connolly, Director, Rates and                                                                              conference will be held on Wednesday,
                                                                                                        will not serve to make the filer a party              September 19, 2018 at 10:00 a.m.
                                                Certificates, Maritimes & Northeast                     to the proceeding. The Commission’s
                                                Management Company, LLC, 5400                                                                                 (Eastern Daylight Time), in Hearing
                                                                                                        rules require that persons filing                     Room 7, at the offices of the Federal
                                                Westheimer Court, Houston, Texas
                                                                                                        comments in opposition to the project                 Energy Regulatory Commission, 888
                                                77056–5310, or call (713) 627–4102, or
                                                                                                        provide copies of their protests only to              First Street NE, Washington, DC 20426.
                                                email: Lisa.Connolly@enbridge.com.
                                                                                                        the party or parties directly involved in                At the technical conference, the
                                                   Pursuant to section 157.9 of the
                                                                                                        the protest.                                          Commission Staff and the parties to the
                                                Commission’s rules (18 CFR 157.9),
                                                within 90 days of this Notice, the                         Persons who wish to comment only                   proceeding should be prepared to
                                                Commission staff will either: Complete                  on the environmental review of this                   discuss all issues set for technical
                                                its environmental assessment (EA) and                   project should submit an original and                 conference as established in the July 31,
                                                place it into the Commission’s public                   two copies of their comments to the                   2018 Order, Enable Mississippi River
                                                record (eLibrary) for this proceeding; or               Secretary of the Commission.                          Transmission, LLC, 164 FERC ¶ 61,075.
                                                issue a Notice of Schedule for                          Environmental commentors will be                      All interested persons are permitted to
                                                Environmental Review. If a Notice of                    placed on the Commission’s                            attend.
                                                Schedule for Environmental Review is                    environmental mailing list, will receive                 Commission conferences are
                                                issued, it will indicate, among other                   copies of the environmental documents,                accessible under section 508 of the
                                                milestones, the anticipated date for the                                                                      Rehabilitation Act of 1973. For
                                                                                                        and will be notified of meetings
                                                Commission staff’s issuance of the final                                                                      accessibility accommodations please
                                                                                                        associated with the Commission’s
                                                environmental impact statement (FEIS)                                                                         send an email to accessibility@ferc.gov
                                                                                                        environmental review process.                         or call toll free 1–866–208–3372 (voice)
                                                or EA for this proposal. The filing of the              Environmental commentors will not be
                                                EA in the Commission’s public record                                                                          or 202–502–8659 (TTY); or send a fax to
                                                                                                        required to serve copies of filed                     202–208–2106 with the required
                                                for this proceeding or the issuance of a                documents on all other parties.
                                                Notice of Schedule for Environmental                                                                          accommodations.
                                                                                                        However, the non-party commentors                        For more information about this
                                                Review will serve to notify federal and
                                                                                                        will not receive copies of all documents              technical conference please contact
                                                state agencies of the timing for the
                                                completion of all necessary reviews, and                filed by other parties or issued by the               Brandon Henke at (202) 502–8386 or
                                                the subsequent need to complete all                     Commission (except for the mailing of                 brandon.henke@ferc.gov.
                                                federal authorizations within 90 days of                environmental documents issued by the                   Dated: August 23, 2018.
                                                the date of issuance of the Commission                  Commission) and will not have the right
                                                                                                                                                              Nathaniel J. Davis, Sr.,
                                                staff’s FEIS or EA.                                     to seek court review of the
                                                                                                                                                              Deputy Secretary.
                                                   There are two ways to become                         Commission’s final order.
                                                                                                                                                              [FR Doc. 2018–18709 Filed 8–28–18; 8:45 am]
                                                involved in the Commission’s review of                     The Commission strongly encourages                 BILLING CODE 6717–01–P
                                                this project. First, any person wishing to              electronic filings of comments, protests
                                                obtain legal status by becoming a party                 and interventions in lieu of paper using
                                                to the proceedings for this project                     the ‘‘eFiling’’ link at http://                       DEPARTMENT OF ENERGY
                                                should, on or before the comment date                   www.ferc.gov. Persons unable to file
                                                stated below file with the Federal                      electronically should submit an original              Federal Energy Regulatory
                                                Energy Regulatory Commission, 888                       and 5 copies of the protest or                        Commission
                                                First Street NE, Washington, DC 20426,                  intervention to the Federal Energy
                                                a motion to intervene in accordance                                                                           [Docket No. AC18–59–000]
                                                                                                        Regulatory Commission, 888 First Street
                                                with the requirements of the                            NE, Washington, DC 20426.                             Edison Electric Institute; Notice of
                                                Commission’s Rules of Practice and                                                                            Amendment Filing
                                                Procedure (18 CFR 385.214 or 385.211)                      Comment Date: September 13, 2018.
                                                and the Regulations under the NGA (18                     Dated: August 23, 2018.                               Take notice that on August 14, 2018,
                                                CFR 157.10). A person obtaining party                   Nathaniel J. Davis, Sr.,                              Edison Electric Institute filed an
                                                status will be placed on the service list               Deputy Secretary.
                                                                                                                                                              amendment to its March 19, 2018 filed
                                                maintained by the Secretary of the                                                                            request for approval for electric
                                                                                                        [FR Doc. 2018–18711 Filed 8–28–18; 8:45 am]
                                                Commission and will receive copies of                                                                         companies to use Account 439, recently
                                                all documents filed by the applicant and                BILLING CODE 6717–01–P                                authorized by the Financial Accounting
sradovich on DSK3GMQ082PROD with NOTICES




                                                by all other parties. A party must submit                                                                     Standards Board.
                                                7 copies of filings made in the                                                                                 Any person desiring to intervene or to
                                                proceeding with the Commission and                                                                            protest this filing must file in
                                                must mail a copy to the applicant and                                                                         accordance with Rules 211 and 214 of
                                                to every other party. Only parties to the                                                                     the Commission’s Rules of Practice and
                                                proceeding can ask for court review of                                                                        Procedure (18 CFR 385.211, 385.214).
                                                Commission orders in the proceeding.                                                                          Protests will be considered by the


                                           VerDate Sep<11>2014   17:04 Aug 28, 2018   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\29AUN1.SGM   29AUN1



Document Created: 2018-08-29 00:13:58
Document Modified: 2018-08-29 00:13:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesSeptember 13, 2018.
FR Citation83 FR 44042 

2025 Federal Register | Disclaimer | Privacy Policy