83_FR_46097 83 FR 45921 - Montana Department of Fish, Wildlife & Parks, Fish Hatchery Bureau; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

83 FR 45921 - Montana Department of Fish, Wildlife & Parks, Fish Hatchery Bureau; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 176 (September 11, 2018)

Page Range45921-45921
FR Document2018-19691

Federal Register, Volume 83 Issue 176 (Tuesday, September 11, 2018)
[Federal Register Volume 83, Number 176 (Tuesday, September 11, 2018)]
[Notices]
[Page 45921]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19691]



[[Page 45921]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD18-11-000]


Montana Department of Fish, Wildlife & Parks, Fish Hatchery 
Bureau; Notice of Preliminary Determination of a Qualifying Conduit 
Hydropower Facility and Soliciting Comments and Motions To Intervene

    On August 30, 2018, the Montana Department of Fish, Wildlife & 
Parks, Fish Hatchery Bureau, filed a notice of intent to construct a 
qualifying conduit hydropower facility, pursuant to section 30 of the 
Federal Power Act (FPA), as amended by section 4 of the Hydropower 
Regulatory Efficiency Act of 2013 (HREA). The proposed Bluewater Fish 
Hatchery Artesian Well Hydroelectric Project would have an installed 
capacity of 35 kilowatts (kW), and would be located on a 10-inch 
diameter pipeline that would take water from an artesian well to the 
Bluewater Spring, to be used for the fish hatchery. The project would 
be located near the Town of Bridger in Carbon County, Montana.
    Applicant Contact: Jay Pravecek, Chief, Fish Hatchery Bureau, 1420 
E 6th Avenue, Helena, MT 59620-0701.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A ten-inch PVC pipe in the pump house of 
the artesian well containing a single turbine with a total generating 
capacity of 35 kW; (2) a 37-foot-long, 10-inch-diameter PVC pipe 
connected to an existing, abandoned water line that will transport well 
water to the Bluewater Spring; and (3) appurtenant facilities. The 
proposed project would have an estimated annual generation of 306.6 
megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                               Satisfies
        Statutory provision                Description           (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by      The conduit the facility           Y
 HREA.                               uses is a tunnel, canal,
                                     pipeline, aqueduct,
                                     flume, ditch, or similar
                                     manmade water conveyance
                                     that is operated for the
                                     distribution of water
                                     for agricultural,
                                     municipal, or industrial
                                     consumption and not
                                     primarily for the
                                     generation of
                                     electricity.
FPA 30(a)(3)(C)(i), as amended by   The facility is                    Y
 HREA.                               constructed, operated,
                                     or maintained for the
                                     generation of electric
                                     power and uses for such
                                     generation only the
                                     hydroelectric potential
                                     of a non-federally owned
                                     conduit.
FPA 30(a)(3)(C)(ii), as amended by  The facility has an                Y
 HREA.                               installed capacity that
                                     does not exceed 5
                                     megawatts.
FPA 30(a)(3)(C)(iii), as amended    On or before August 9,             Y
 by HREA.                            2013, the facility is
                                     not licensed, or
                                     exempted from the
                                     licensing requirements
                                     of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed hydroelectric project will 
not interfere with the primary purpose of the conduit, which is to aid 
the Fish Hatchery Bureau's fish hatchery water supply system. 
Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the proposal satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.
    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE, Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD18-11) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: September 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19691 Filed 9-10-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 83, No. 176 / Tuesday, September 11, 2018 / Notices                                                  45921

                                               DEPARTMENT OF ENERGY                                    amended by section 4 of the                              Qualifying Conduit Hydropower
                                                                                                       Hydropower Regulatory Efficiency Act                   Facility Description: The proposed
                                               Federal Energy Regulatory                               of 2013 (HREA). The proposed                           project would consist of: (1) A ten-inch
                                               Commission                                              Bluewater Fish Hatchery Artesian Well                  PVC pipe in the pump house of the
                                               [Docket No. CD18–11–000]
                                                                                                       Hydroelectric Project would have an                    artesian well containing a single turbine
                                                                                                       installed capacity of 35 kilowatts (kW),               with a total generating capacity of 35
                                               Montana Department of Fish, Wildlife &                  and would be located on a 10-inch                      kW; (2) a 37-foot-long, 10-inch-diameter
                                               Parks, Fish Hatchery Bureau; Notice of                  diameter pipeline that would take water                PVC pipe connected to an existing,
                                               Preliminary Determination of a                          from an artesian well to the Bluewater                 abandoned water line that will transport
                                               Qualifying Conduit Hydropower                           Spring, to be used for the fish hatchery.              well water to the Bluewater Spring; and
                                               Facility and Soliciting Comments and                    The project would be located near the
                                                                                                                                                              (3) appurtenant facilities. The proposed
                                               Motions To Intervene                                    Town of Bridger in Carbon County,
                                                                                                                                                              project would have an estimated annual
                                                                                                       Montana.
                                                 On August 30, 2018, the Montana                         Applicant Contact: Jay Pravecek,                     generation of 306.6 megawatt-hours.
                                               Department of Fish, Wildlife & Parks,                   Chief, Fish Hatchery Bureau, 1420 E 6th                  A qualifying conduit hydropower
                                               Fish Hatchery Bureau, filed a notice of                 Avenue, Helena, MT 59620–0701.                         facility is one that is determined or
                                               intent to construct a qualifying conduit                  FERC Contact: Robert Bell, Phone No.                 deemed to meet all of the criteria shown
                                               hydropower facility, pursuant to section                (202) 502–6062; Email: robert.bell@                    in the table below.
                                               30 of the Federal Power Act (FPA), as                   ferc.gov.

                                                                                 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                     Satisfies
                                                            Statutory provision                                                                 Description                                           (Y/N)

                                               FPA 30(a)(3)(A), as amended by HREA .....           The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or simi-              Y
                                                                                                     lar manmade water conveyance that is operated for the distribution of water for agri-
                                                                                                     cultural, municipal, or industrial consumption and not primarily for the generation of
                                                                                                     electricity.
                                               FPA 30(a)(3)(C)(i), as amended by HREA              The facility is constructed, operated, or maintained for the generation of electric power                 Y
                                                                                                     and uses for such generation only the hydroelectric potential of a non-federally
                                                                                                     owned conduit.
                                               FPA 30(a)(3)(C)(ii), as amended by HREA             The facility has an installed capacity that does not exceed 5 megawatts .......................           Y
                                               FPA 30(a)(3)(C)(iii), as amended by HREA            On or before August 9, 2013, the facility is not licensed, or exempted from the licens-                   Y
                                                                                                     ing requirements of Part I of the FPA.



                                                  Preliminary Determination: The                       or ‘‘MOTION TO INTERVENE,’’ as                         Energy Regulatory Commission, 888
                                               proposed hydroelectric project will not                 applicable; (2) state in the heading the               First Street NE, Washington, DC 20426.
                                               interfere with the primary purpose of                   name of the applicant and the project                  A copy of all other filings in reference
                                               the conduit, which is to aid the Fish                   number of the application to which the                 to this application must be accompanied
                                               Hatchery Bureau’s fish hatchery water                   filing responds; (3) state the name,                   by proof of service on all persons listed
                                               supply system. Therefore, based upon                    address, and telephone number of the                   in the service list prepared by the
                                               the above criteria, Commission staff                    person filing; and (4) otherwise comply                Commission in this proceeding, in
                                               preliminarily determines that the                       with the requirements of sections                      accordance with 18 CFR 4.34(b) and
                                               proposal satisfies the requirements for a               385.2001 through 385.2005 of the                       385.2010.
                                               qualifying conduit hydropower facility,                 Commission’s regulations.1 All
                                               which is not required to be licensed or                 comments contesting Commission staff’s                   Locations of Notice of Intent: Copies
                                               exempted from licensing.                                preliminary determination that the                     of the notice of intent can be obtained
                                                  Comments and Motions To Intervene:                   facility meets the qualifying criteria                 directly from the applicant or such
                                               Deadline for filing comments contesting                 must set forth their evidentiary basis.                copies can be viewed and reproduced at
                                               whether the facility meets the qualifying                  The Commission strongly encourages                  the Commission in its Public Reference
                                               criteria is 45 days from the issuance                   electronic filing. Please file motions to              Room, Room 2A, 888 First Street NE,
                                               date of this notice.                                    intervene and comments using the                       Washington, DC 20426. The filing may
                                                  Deadline for filing motions to                       Commission’s eFiling system at http://                 also be viewed on the web at http://
                                               intervene is 30 days from the issuance                  www.ferc.gov/docs-filing/efiling.asp.                  www.ferc.gov/docs-filing/elibrary.asp
                                               date of this notice.                                    Commenters can submit brief comments                   using the ‘‘eLibrary’’ link. Enter the
                                                  Anyone may submit comments or a                      up to 6,000 characters, without prior                  docket number (i.e., CD18–11) in the
                                               motion to intervene in accordance with                  registration, using the eComment system                docket number field to access the
                                               the requirements of Rules of Practice                   at http://www.ferc.gov/docs-filing/                    document. For assistance, call toll-free
                                               and Procedure, 18 CFR 385.210 and                       ecomment.asp. You must include your                    1–866–208–3676 or email
                                               385.214. Any motions to intervene must                  name and contact information at the end                FERCOnlineSupport@ferc.gov. For TTY,
                                               be received on or before the specified                  of your comments. For assistance,                      call (202) 502–8659.
daltland on DSKBBV9HB2PROD with NOTICES




                                               deadline date for the particular                        please contact FERC Online Support at
                                               proceeding.                                             FERCOnlineSupport@ferc.gov, (866)                        Dated: September 5, 2018.
                                                  Filing and Service of Responsive                     208–3676 (toll free), or (202) 502–8659                Nathaniel J. Davis, Sr.,
                                               Documents: All filings must (1) bear in                 (TTY). In lieu of electronic filing, please            Deputy Secretary.
                                               all capital letters the ‘‘COMMENTS                      send a paper copy to: Secretary, Federal               [FR Doc. 2018–19691 Filed 9–10–18; 8:45 am]
                                               CONTESTING QUALIFICATION FOR A                                                                                 BILLING CODE 6717–01–P
                                               CONDUIT HYDROPOWER FACILITY’’                             1 18   CFR 385.2001–2005 (2017).



                                          VerDate Sep<11>2014   18:49 Sep 10, 2018   Jkt 244001   PO 00000   Frm 00047   Fmt 4703   Sfmt 9990   E:\FR\FM\11SEN1.SGM   11SEN1



Document Created: 2018-09-11 01:02:51
Document Modified: 2018-09-11 01:02:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 45921 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR