The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on draft NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 13.4, ``Operational Programs.'' The NRC seeks comments on the proposed draft section revision of the Standard Review Plan (SRP) concerning guidance for the review and implementation of operational programs required by the NRC's regulations for combined operating license applications.

Federal Register, Volume 83 Issue 176 (Tuesday, September 11, 2018)
[Federal Register Volume 83, Number 176 (Tuesday, September 11, 2018)]
[Notices]
[Pages 45995-45996]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19685]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2018-0196]


Proposed Revisions to Standard Review Plan Section 13.4, 
Operational Programs

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-draft section revision; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is soliciting 
public comment on draft NUREG-0800, ``Standard Review Plan for the 
Review of Safety Analysis Reports for Nuclear Power Plants: LWR 
Edition,'' Section 13.4, ``Operational Programs.'' The NRC seeks 
comments on the proposed draft section revision of the Standard Review 
Plan (SRP) concerning guidance for the review and implementation of 
operational programs required by the NRC's regulations for combined 
operating license applications.

DATES: Comments must be filed no later than November 13, 2018. Comments 
received after this date will be considered, if it is practical to do 
so, but the Commission is able to ensure consideration only for 
comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0196. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Mark D. Notich, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-3053, email: Mark.Notich@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0196 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0196.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to pdr.resource@nrc.gov. The draft revision and current 
revision to NUREG-0800, Section13.4, ``Operational Programs'' is 
available in ADAMS under Accession No. ML18131A304 and ML070470463. The 
redline-strikeout version comparing the draft revision 4 and the 
current version of revision 3 is available under Accession No. 
ML18143B713.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2018-0196 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Further Information

    The NRC seeks public comment on the proposed SRP-draft section 
revision of Section 13.4, ``Operational Programs.'' The changes made in 
this revision to this section reflect the latest NRC guidance 
concerning operational programs.
    Following NRC staff evaluation of public comments, the NRC intends 
to finalize SRP Section 13.4, ``Operational Program,'' Revision 4 in 
ADAMS and post it on the NRC's public website at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/. The SRP is guidance 
for the NRC staff. The SRP is not a substitute for the NRC regulations, 
and compliance with the SRP is not required.

III. Backfitting and Issue Finality

    Issuance of this draft SRP, if finalized, would not constitute 
backfitting as defined in section 50.109 of title 10 of the Code of 
Federal Regulations (10 CFR) (the Backfit Rule) or otherwise be 
inconsistent with the issue finality provisions in 10 CFR part 52. The 
NRC's position is based upon the following considerations:
    1. The draft SRP positions do not constitute backfitting, inasmuch 
as the SRP is guidance directed to the NRC staff with respect to its 
regulatory responsibilities.
    The SRP provides internal guidance to the NRC staff on how to 
review an application for NRC regulatory approval in the form of 
licensing. Changes in guidance intended for use by only the staff are 
not matters that constitute backfitting as that term is defined in 10 
CFR 50.109(a)(1) or involve the issue finality provisions of 10 CFR 
part 52.
    2. Backfitting and issue finality--with certain exceptions 
discussed below--do not apply to current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, the subject of either the Backfit Rule or any issue 
finality provisions under 10 CFR part 52. This is because neither the 
Backfit Rule nor the issue finality provisions under 10 CFR part 52 
were intended to apply to every NRC action that substantially changes 
the expectations of current and future applicants.
    The exceptions to the general principle are applicable whenever a 
10 CFR part 50 operating license applicant

[[Page 45996]]

references a construction permit or a 10 CFR part 52 combined license 
applicant references a license (e.g., an early site permit) and/or NRC 
regulatory approval (e.g., a design certification rule) for which 
specified issue finality provisions apply.
    The NRC staff does not, at this time, intend to impose the 
positions represented in this draft SRP section in a manner that 
constitutes backfitting or is inconsistent with any issue finality 
provision of 10 CFR part 52. If, in the future, the staff seeks to 
impose a position in this draft SRP section in a manner that would 
constitute backfitting or be inconsistent with these issue finality 
provisions, the NRC staff must make the showing as set forth in the 
Backfit rule or address the regulatory criteria set forth in the 
applicable issue finality provision, as applicable, that would allow 
the staff to impose the position.
    3. The NRC staff has no intention to impose the SRP positions on 
existing nuclear power plant licensees either now or in the future 
(absent a voluntary request for a change from the licensee, holder of a 
regulatory approval or a design certification applicant).
    The NRC staff does not intend to impose or apply the positions 
described in the draft SRP to existing (already issued) licenses (e.g., 
operating licenses and combined licenses) and regulatory approvals. 
Hence, the issuance of this SRP guidance--even if considered guidance 
subject to the Backfit Rule or the issue finality provisions in 10 CFR 
part 52--would not need to be evaluated as if it were a backfit or as 
being inconsistent with these issue finality provisions. If, in the 
future, the NRC staff seeks to impose a position in the SRP on holders 
of already issued licenses in a manner that would constitute 
backfitting or does not provide issue finality as described in the 
applicable issue finality provision, then the staff must make a showing 
as set forth in the Backfit Rule or address the criteria set forth in 
the applicable issue finality provision, as applicable, that would 
allow the staff to impose the position.

    Dated at Rockville, Maryland, this 6th day of September 2018.

    For the Nuclear Regulatory Commission.
Jennivine K. Rankin,
Acting Chief, Licensing Branch 3, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-19685 Filed 9-10-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                                         Federal Register / Vol. 83, No. 176 / Tuesday, September 11, 2018 / Notices                                             45995

                                                 For the Nuclear Regulatory Commission.                FOR FURTHER INFORMATION CONTACT:                      Your request should state that the NRC
                                               John P. Clements,                                       Mark D. Notich, Office of New Reactors,               does not routinely edit comment
                                               Acting Branch Chief, Reactor                            U.S. Nuclear Regulatory Commission,                   submissions to remove such information
                                               Decommissioning Branch, Division of                     Washington, DC 20555–0001; telephone:                 before making the comment
                                               Decommissioning, Uranium Recovery, and                  301–415–3053, email: Mark.Notich@                     submissions available to the public or
                                               Waste Programs, Office of Nuclear Material              nrc.gov.                                              entering the comment into ADAMS.
                                               Safety and Safeguards.
                                                                                                       SUPPLEMENTARY INFORMATION:                            II. Further Information
                                               [FR Doc. 2018–19602 Filed 9–10–18; 8:45 am]
                                               BILLING CODE 7590–01–P                                  I. Obtaining Information and                             The NRC seeks public comment on
                                                                                                       Submitting Comments                                   the proposed SRP-draft section revision
                                                                                                                                                             of Section 13.4, ‘‘Operational
                                               NUCLEAR REGULATORY                                      A. Obtaining Information
                                                                                                                                                             Programs.’’ The changes made in this
                                               COMMISSION                                                 Please refer to Docket ID NRC–2018–                revision to this section reflect the latest
                                                                                                       0196 when contacting the NRC about                    NRC guidance concerning operational
                                               [NRC–2018–0196]                                         the availability of information for this              programs.
                                                                                                       action. You may obtain publicly-                         Following NRC staff evaluation of
                                               Proposed Revisions to Standard                          available information related to this                 public comments, the NRC intends to
                                               Review Plan Section 13.4, Operational                   action by any of the following methods:               finalize SRP Section 13.4, ‘‘Operational
                                               Programs                                                   • Federal Rulemaking Website: Go to                Program,’’ Revision 4 in ADAMS and
                                               AGENCY:  Nuclear Regulatory                             http://www.regulations.gov and search                 post it on the NRC’s public website at
                                               Commission.                                             for Docket ID NRC–2018–0196.                          http://www.nrc.gov/reading-rm/doc-
                                                                                                          • NRC’s Agencywide Documents                       collections/nuregs/staff/sr0800/. The
                                               ACTION: Standard review plan-draft
                                                                                                       Access and Management System                          SRP is guidance for the NRC staff. The
                                               section revision; request for comment.
                                                                                                       (ADAMS): You may obtain publicly-                     SRP is not a substitute for the NRC
                                               SUMMARY:   The U.S. Nuclear Regulatory                  available documents online in the                     regulations, and compliance with the
                                               Commission (NRC) is soliciting public                   ADAMS Public Documents collection at                  SRP is not required.
                                               comment on draft NUREG–0800,                            http://www.nrc.gov/reading-rm/
                                                                                                       adams.html. To begin the search, select               III. Backfitting and Issue Finality
                                               ‘‘Standard Review Plan for the Review
                                               of Safety Analysis Reports for Nuclear                  ‘‘Begin Web-based ADAMS Search.’’ For                    Issuance of this draft SRP, if finalized,
                                               Power Plants: LWR Edition,’’ Section                    problems with ADAMS, please contact                   would not constitute backfitting as
                                               13.4, ‘‘Operational Programs.’’ The NRC                 the NRC’s Public Document Room (PDR)                  defined in section 50.109 of title 10 of
                                               seeks comments on the proposed draft                    reference staff at 1–800–397–4209, 301–               the Code of Federal Regulations (10
                                               section revision of the Standard Review                 415–4737, or by email to pdr.resource@                CFR) (the Backfit Rule) or otherwise be
                                               Plan (SRP) concerning guidance for the                  nrc.gov. The draft revision and current               inconsistent with the issue finality
                                               review and implementation of                            revision to NUREG–0800, Section13.4,                  provisions in 10 CFR part 52. The NRC’s
                                               operational programs required by the                    ‘‘Operational Programs’’ is available in              position is based upon the following
                                               NRC’s regulations for combined                          ADAMS under Accession No.                             considerations:
                                               operating license applications.                         ML18131A304 and ML070470463. The                         1. The draft SRP positions do not
                                                                                                       redline-strikeout version comparing the               constitute backfitting, inasmuch as the
                                               DATES: Comments must be filed no later
                                                                                                       draft revision 4 and the current version              SRP is guidance directed to the NRC
                                               than November 13, 2018. Comments
                                                                                                       of revision 3 is available under                      staff with respect to its regulatory
                                               received after this date will be
                                                                                                       Accession No. ML18143B713.                            responsibilities.
                                               considered, if it is practical to do so, but
                                                                                                          • NRC’s PDR: You may examine and                      The SRP provides internal guidance
                                               the Commission is able to ensure                                                                              to the NRC staff on how to review an
                                                                                                       purchase copies of public documents at
                                               consideration only for comments                                                                               application for NRC regulatory approval
                                                                                                       the NRC’s PDR, Room O1–F21, One
                                               received on or before this date.                                                                              in the form of licensing. Changes in
                                                                                                       White Flint North, 11555 Rockville
                                               ADDRESSES: You may submit comments                      Pike, Rockville, Maryland 20852.                      guidance intended for use by only the
                                               by any of the following methods:                                                                              staff are not matters that constitute
                                                  • Federal Rulemaking Website: Go to                  B. Submitting Comments                                backfitting as that term is defined in 10
                                               http://www.regulations.gov and search                     Please include Docket ID NRC–2018–                  CFR 50.109(a)(1) or involve the issue
                                               for Docket ID NRC–2018–0196. Address                    0196 in your comment submission.                      finality provisions of 10 CFR part 52.
                                               questions about NRC dockets to Jennifer                   The NRC cautions you not to include                    2. Backfitting and issue finality—with
                                               Borges; telephone: 301–287–9127;                        identifying or contact information that               certain exceptions discussed below—do
                                               email: Jennifer.Borges@nrc.gov. For                     you do not want to be publicly                        not apply to current or future
                                               technical questions, contact the                        disclosed in your comment submission.                 applicants.
                                               individual listed in the FOR FURTHER                    The NRC will post all comment                            Applicants and potential applicants
                                               INFORMATION CONTACT section of this                     submissions at http://                                are not, with certain exceptions, the
                                               document.                                               www.regulations.gov as well as enter the              subject of either the Backfit Rule or any
                                                  • Mail comments to: May Ma, Office                   comment submissions into ADAMS.                       issue finality provisions under 10 CFR
                                               of Administration, Mail Stop: TWFN–7–                   The NRC does not routinely edit                       part 52. This is because neither the
                                               A60M, U.S. Nuclear Regulatory                           comment submissions to remove                         Backfit Rule nor the issue finality
                                               Commission, Washington, DC 20555–                       identifying or contact information.                   provisions under 10 CFR part 52 were
daltland on DSKBBV9HB2PROD with NOTICES




                                               0001.                                                     If you are requesting or aggregating                intended to apply to every NRC action
                                                  For additional direction on obtaining                comments from other persons for                       that substantially changes the
                                               information and submitting comments,                    submission to the NRC, then you should                expectations of current and future
                                               see ‘‘Obtaining Information and                         inform those persons not to include                   applicants.
                                               Submitting Comments’’ in the                            identifying or contact information that                  The exceptions to the general
                                               SUPPLEMENTARY INFORMATION section of                    they do not want to be publicly                       principle are applicable whenever a 10
                                               this document.                                          disclosed in their comment submission.                CFR part 50 operating license applicant


                                          VerDate Sep<11>2014   18:49 Sep 10, 2018   Jkt 244001   PO 00000   Frm 00121   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1


                                               45996                     Federal Register / Vol. 83, No. 176 / Tuesday, September 11, 2018 / Notices

                                               references a construction permit or a 10                PENSION BENEFIT GUARANTY                              of information are described below.
                                               CFR part 52 combined license applicant                  CORPORATION                                           OMB approvals for these collections of
                                               references a license (e.g., an early site                                                                     information expire November 30, 2018.
                                               permit) and/or NRC regulatory approval                  Submission of Information Collections                 On July 6, 2018, PBGC published (at 83
                                               (e.g., a design certification rule) for                 for OMB Review; Comment Request;                      FR 31574) a notice of its intent to
                                               which specified issue finality provisions               Multiemployer Plan Regulations                        request that OMB extend approval of
                                               apply.                                                                                                        these collections of information. No
                                                                                                       AGENCY: Pension Benefit Guaranty
                                                                                                                                                             comments were received. PBGC is
                                                  The NRC staff does not, at this time,                Corporation.                                          requesting that OMB extend its approval
                                               intend to impose the positions                          ACTION: Notice of request for OMB                     of these collections of information for
                                               represented in this draft SRP section in                approval.                                             three years. An agency may not conduct
                                               a manner that constitutes backfitting or                                                                      or sponsor, and a person is not required
                                               is inconsistent with any issue finality                 SUMMARY:   The Pension Benefit Guaranty
                                                                                                                                                             to respond to, a collection of
                                               provision of 10 CFR part 52. If, in the                 Corporation (PBGC) is requesting that
                                                                                                                                                             information unless it displays a
                                               future, the staff seeks to impose a                     the Office of Management and Budget
                                                                                                                                                             currently valid OMB control number.
                                               position in this draft SRP section in a                 (OMB) extend approval, under the
                                               manner that would constitute                            Paperwork Reduction Act, of collections               1. Termination of Multiemployer Plans
                                               backfitting or be inconsistent with these               of information in PBGC’s regulations on               (29 CFR Part 4041A) (OMB Control
                                                                                                       multiemployer plans. This notice                      Number 1212–0020) (Expires November
                                               issue finality provisions, the NRC staff
                                                                                                       informs the public of PBGC’s request                  30, 2018)
                                               must make the showing as set forth in
                                                                                                       and solicits public comment on the                       Section 4041A(f)(2) of ERISA
                                               the Backfit rule or address the
                                                                                                       collections of information.                           authorizes PBGC to prescribe reporting
                                               regulatory criteria set forth in the
                                                                                                       DATES: Comments must be submitted by                  requirements and other rules and
                                               applicable issue finality provision, as
                                               applicable, that would allow the staff to               October 11, 2018.                                     standards for administering terminated
                                               impose the position.                                    ADDRESSES: Comments should be sent to                 multiemployer plans. Section 4041A(c)
                                                                                                       the Office of Information and Regulatory              and (f)(1) of ERISA prohibit the payment
                                                  3. The NRC staff has no intention to                 Affairs, Office of Management and                     by a mass-withdrawal-terminated plan
                                               impose the SRP positions on existing                    Budget, Attention: Desk Officer for                   of lump sums greater than $1,750 or of
                                               nuclear power plant licensees either                    Pension Benefit Guaranty Corporation,                 nonvested plan benefits unless
                                               now or in the future (absent a voluntary                via electronic mail at OIRA_DOCKET@                   authorized by PBGC.
                                               request for a change from the licensee,                 omb.eop.gov or by fax to (202) 395–                      The regulation requires the plan
                                               holder of a regulatory approval or a                    6974.                                                 sponsor of a terminated plan to submit
                                               design certification applicant).                          A copy of the request will be posted                a notice of termination to PBGC. It also
                                                  The NRC staff does not intend to                     on PBGC’s website at https://                         requires the plan sponsor of a mass-
                                               impose or apply the positions described                 www.pbgc.gov/prac/laws-and-                           withdrawal-terminated plan that is
                                               in the draft SRP to existing (already                   regulations/information-collections-                  closing out to give notices to
                                               issued) licenses (e.g., operating licenses              under-omb-review. It may also be                      participants regarding the election of
                                               and combined licenses) and regulatory                   obtained without charge by writing to                 alternative forms of benefit distribution
                                               approvals. Hence, the issuance of this                  the Disclosure Division of the Office of              and, if the plan is not closing out, to
                                               SRP guidance—even if considered                         the General Counsel, 1200 K Street NW,                obtain PBGC approval to pay lump sums
                                               guidance subject to the Backfit Rule or                 Washington, DC 20005–4026, faxing a                   greater than $1,750 or to pay nonvested
                                               the issue finality provisions in 10 CFR                 request to 202–326–4042, or calling                   plan benefits.
                                               part 52—would not need to be evaluated                  202–326–4040 during normal business                      PBGC uses the information in a notice
                                               as if it were a backfit or as being                     hours (TTY users may call the Federal                 of termination to assess the likelihood
                                               inconsistent with these issue finality                  relay service toll-free at 1–800–877–                 that PBGC financial assistance will be
                                                                                                       8339 and ask to be connected to 202–                  needed. Plan participants and
                                               provisions. If, in the future, the NRC
                                                                                                       326–4040). The Disclosure Division will               beneficiaries use the information on
                                               staff seeks to impose a position in the
                                                                                                       email, fax, or mail the information to                alternative forms of benefit to make
                                               SRP on holders of already issued
                                                                                                       you, as you request.                                  personal financial decisions. PBGC uses
                                               licenses in a manner that would
                                                                                                       FOR FURTHER INFORMATION CONTACT:                      the information in an application for
                                               constitute backfitting or does not
                                                                                                       Hilary Duke (duke.hilary@pbgc.gov),                   approval to pay lump sums greater than
                                               provide issue finality as described in the                                                                    $1,750 or to pay nonvested plan benefits
                                               applicable issue finality provision, then               Assistant General Counsel for
                                                                                                       Regulatory Affairs, Office of the General             to determine whether such payments
                                               the staff must make a showing as set                                                                          should be permitted.
                                               forth in the Backfit Rule or address the                Counsel, Pension Benefit Guaranty
                                                                                                       Corporation, 1200 K Street NW,                           PBGC estimates that each year plan
                                               criteria set forth in the applicable issue                                                                    sponsors submit notices of termination
                                               finality provision, as applicable, that                 Washington, DC 20005–4026, 202–326–
                                                                                                       4400, extension 3839. (TTY users may                  for ten plans, distribute election notices
                                               would allow the staff to impose the                                                                           to participants in three of those plans,
                                               position.                                               call the Federal relay service toll-free at
                                                                                                       1–800–877–8339 and ask to be                          and submit requests to pay benefits or
                                                  Dated at Rockville, Maryland, this 6th day           connected to 202–326–4400, extension                  benefit forms not otherwise permitted
                                               of September 2018.                                      3839.)                                                for one of those plans. The estimated
                                                                                                                                                             annual burden of the collection of
daltland on DSKBBV9HB2PROD with NOTICES




                                                  For the Nuclear Regulatory Commission.
                                                                                                       SUPPLEMENTARY INFORMATION:     OMB has                information is 69 hours and $50,000.
                                               Jennivine K. Rankin,                                    approved and issued control numbers
                                               Acting Chief, Licensing Branch 3, Division              for three collections of information in               2. Notice of Insolvency (29 CFR Part
                                               of Licensing, Siting, and Environmental                 PBGC’s regulations relating to                        4245) (OMB Control Number 1212–
                                               Analysis, Office of New Reactors.                       multiemployer plans under the                         0033) (Expires November 30, 2018)
                                               [FR Doc. 2018–19685 Filed 9–10–18; 8:45 am]             Employee Retirement Income Security                      Section 4245(e) of ERISA requires two
                                               BILLING CODE 7590–01–P                                  Act of 1974 (ERISA). These collections                types of notice: A ‘‘notice of


                                          VerDate Sep<11>2014   18:49 Sep 10, 2018   Jkt 244001   PO 00000   Frm 00122   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1



Document Created: 2018-09-11 01:03:03
Document Modified: 2018-09-11 01:03:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard review plan-draft section revision; request for comment.
DatesComments must be filed no later than November 13, 2018. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ContactMark D. Notich, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-3053, email: [email protected]