[Federal Register Volume 83, Number 177 (Wednesday, September 12, 2018)]
[Notices]
[Pages 46154-46155]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19814]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14884-000]


Midwest Energy Recycling, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On July 17, 2018, Midwest Energy Recycling, LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Yellow Medicine County Pumped Storage Project to be located near the 
Minnesota River and the City of Granite Falls, in Yellow Medicine 
County, Minnesota. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following all new 
facilities: (1) A circular 100-acre rockfill embankment (upper 
reservoir) having a total storage capacity of 3,300 acre-feet with a 
maximum pond elevation level of 1089 feet mean sea level (msl); (2) a 
2,400-foot by 1,425-foot rectangular lower reservoir with a total 
storage capacity of 3,300 acre-feet and water surface elevation between 
minus (-) 1,320 and minus 1,420 feet msl; (3) a 100-foot outside 
diameter, 18-foot inside diameter ``morning glory'' in configuration 
reinforced concrete intake located in the upper reservoir; (4) a 
vertical 2,500-foot-long, 18-foot-diameter steel penstock connected to 
the intake at the upper reservoir and ending in a bifurcation before 
the powerhouse located at the lower reservoir; (5) a 200-foot-long, 70-
foot-wide, 130-foot-high reinforced concrete powerhouse containing two 
333-megawatt (MW) reversible pump turbine units with a total plant 
rating of 666 MW; (6) a 240-foot-long, 50-foot-wide, 40-foot-high 
transformer gallery; (7); a 200 to 1,000-foot-long, 345-kilovolt 
transmission line extending from the transformer gallery to an existing 
substation (the point of interconnection); and (8) appurtenant 
facilities. The estimated annual generation of the Yellow Medicine 
County Pumped Storage Project would be 1,450 gigawatt-hours.
    Applicant Contact: Mr. Douglas A. Spaulding, P.E., Nelson Energy, 
8441 Wayzata Boulevard, Suite 101 Golden Valley, MN 55426; phone: (952) 
544-8133.
    FERC Contact: Sergiu Serban; phone: (202) 502-6211.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 Days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14884-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14884) in the docket number field to access 
the document. For assistance, contact FERC Online Support.


[[Page 46155]]


    Dated: September 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19814 Filed 9-11-18; 8:45 am]
BILLING CODE 6717-01-P



                                               46154                    Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices

                                               agencies are kept informed of the                          This filing is accessible on-line at               configuration reinforced concrete intake
                                               Project’s progress.                                     http://www.ferc.gov, using the                        located in the upper reservoir; (4) a
                                                 Dated: September 6, 2018.                             ‘‘eLibrary’’ link and is available for                vertical 2,500-foot-long, 18-foot-
                                               Nathaniel J. Davis, Sr.,
                                                                                                       review in the Commission’s Public                     diameter steel penstock connected to
                                                                                                       Reference Room in Washington, DC.                     the intake at the upper reservoir and
                                               Deputy Secretary.
                                                                                                       There is an ‘‘eSubscription’’ link on the             ending in a bifurcation before the
                                               [FR Doc. 2018–19813 Filed 9–11–18; 8:45 am]                                                                   powerhouse located at the lower
                                                                                                       website that enables subscribers to
                                               BILLING CODE 6717–01–P                                  receive email notification when a                     reservoir; (5) a 200-foot-long, 70-foot-
                                                                                                       document is added to a subscribed                     wide, 130-foot-high reinforced concrete
                                                                                                       docket(s). For assistance with any FERC               powerhouse containing two 333-
                                               DEPARTMENT OF ENERGY                                                                                          megawatt (MW) reversible pump turbine
                                                                                                       Online service, please email
                                               Federal Energy Regulatory                               FERCOnlineSupport@ferc.gov, or call                   units with a total plant rating of 666
                                                                                                       (866) 208–3676 (toll free). For TTY, call             MW; (6) a 240-foot-long, 50-foot-wide,
                                               Commission
                                                                                                       (202) 502–8659.                                       40-foot-high transformer gallery; (7); a
                                               [Docket No. EL18–197–000]                                  Comment Date: 5 p.m. Eastern Time                  200 to 1,000-foot-long, 345-kilovolt
                                                                                                       on September 25, 2018.                                transmission line extending from the
                                               City of Oakland, California v. Pacific                                                                        transformer gallery to an existing
                                               Gas and Electric Company; Notice of                       Dated: September 6, 2018.
                                                                                                                                                             substation (the point of
                                               Complaint                                               Nathaniel J. Davis, Sr.,
                                                                                                                                                             interconnection); and (8) appurtenant
                                                                                                       Deputy Secretary.                                     facilities. The estimated annual
                                                  Take notice that on September 5,                     [FR Doc. 2018–19809 Filed 9–11–18; 8:45 am]
                                               2018, pursuant to sections 206 and 306                                                                        generation of the Yellow Medicine
                                               of the Federal Power Act, 16 U.S.C. 824e
                                                                                                       BILLING CODE 6717–01–P                                County Pumped Storage Project would
                                               and 825e, and Rules 206 and 207 of the                                                                        be 1,450 gigawatt-hours.
                                                                                                                                                                Applicant Contact: Mr. Douglas A.
                                               Federal Energy Regulatory                               DEPARTMENT OF ENERGY                                  Spaulding, P.E., Nelson Energy, 8441
                                               Commission’s (Commission) Rules of
                                                                                                                                                             Wayzata Boulevard, Suite 101 Golden
                                               Practice and Procedure, 18 CFR 385.206                  Federal Energy Regulatory                             Valley, MN 55426; phone: (952) 544–
                                               and 385.207, City of Oakland, California                Commission                                            8133.
                                               (Complainant) filed a formal complaint                                                                           FERC Contact: Sergiu Serban; phone:
                                               against Pacific Gas and Electric                        [Project No. 14884–000]
                                                                                                                                                             (202) 502–6211.
                                               Company (Respondent) alleging that the                  Midwest Energy Recycling, LLC;                           Deadline for filing comments, motions
                                               Respondent’s provision of power and                     Notice of Preliminary Permit                          to intervene, competing applications
                                               transmission service to the Complainant                 Application Accepted for Filing and                   (without notices of intent), or notices of
                                               failed to comply with the requirements                  Soliciting Comments, Motions To                       intent to file competing applications: 60
                                               of the Federal Power Act, as more fully                 Intervene, and Competing Applications                 Days from the issuance of this notice.
                                               explained in the complaint.                                                                                   Competing applications and notices of
                                                  The Complainant certifies that copies                   On July 17, 2018, Midwest Energy                   intent must meet the requirements of 18
                                               of the complaint were served on the                     Recycling, LLC filed an application for               CFR 4.36.
                                               contacts for the Respondent as listed on                a preliminary permit, pursuant to                        The Commission strongly encourages
                                               the Commission’s list of Corporate                      section 4(f) of the Federal Power Act                 electronic filing. Please file comments,
                                               Officials.                                              (FPA), proposing to study the feasibility             motions to intervene, notices of intent,
                                                  Any person desiring to intervene or to               of the Yellow Medicine County Pumped                  and competing applications using the
                                               protest this filing must file in                        Storage Project to be located near the                Commission’s eFiling system at http://
                                               accordance with Rules 211 and 214 of                    Minnesota River and the City of Granite               www.ferc.gov/docs-filing/efiling.asp.
                                               the Commission’s Rules of Practice and                  Falls, in Yellow Medicine County,                     Commenters can submit brief comments
                                               Procedure (18 CFR 385.211 and                           Minnesota. The sole purpose of a                      up to 6,000 characters, without prior
                                               385.214). Protests will be considered by                preliminary permit, if issued, is to grant            registration, using the eComment system
                                               the Commission in determining the                       the permit holder priority to file a                  at http://www.ferc.gov/docs-filing/
                                               appropriate action to be taken, but will                license application during the permit                 ecomment.asp. You must include your
                                               not serve to make protestants parties to                term. A preliminary permit does not                   name and contact information at the end
                                               the proceeding. Any person wishing to                   authorize the permit holder to perform                of your comments. For assistance,
                                               become a party must file a notice of                    any land-disturbing activities or                     please contact FERC Online Support at
                                               intervention or motion to intervene, as                 otherwise enter upon lands or waters                  FERCOnlineSupport@ferc.gov, (866)
                                               appropriate. The Respondent’s answer                    owned by others without the owners’                   208–3676 (toll free), or (202) 502–8659
                                               and all interventions, or protests must                 express permission.                                   (TTY). In lieu of electronic filing, please
                                               be filed on or before the comment date.                    The proposed project would consist of              send a paper copy to: Secretary, Federal
                                               The Respondent’s answer, motions to                     the following all new facilities: (1) A               Energy Regulatory Commission, 888
                                               intervene, and protests must be served                  circular 100-acre rockfill embankment                 First Street NE, Washington, DC 20426.
                                               on the Complainant.                                     (upper reservoir) having a total storage              The first page of any filing should
                                                  The Commission encourages                            capacity of 3,300 acre-feet with a                    include docket number P–14884–000.
                                               electronic submission of protests and                   maximum pond elevation level of 1089                     More information about this project,
                                               interventions in lieu of paper using the                feet mean sea level (msl); (2) a 2,400-               including a copy of the application, can
daltland on DSKBBV9HB2PROD with NOTICES




                                               ‘‘eFiling’’ link at http://www.ferc.gov.                foot by 1,425-foot rectangular lower                  be viewed or printed on the ‘‘eLibrary’’
                                               Persons unable to file electronically                   reservoir with a total storage capacity of            link of Commission’s website at http://
                                               should submit an original and 5 copies                  3,300 acre-feet and water surface                     www.ferc.gov/docs-filing/elibrary.asp.
                                               of the protest or intervention to the                   elevation between minus (¥) 1,320 and                 Enter the docket number (P–14884) in
                                               Federal Energy Regulatory Commission,                   minus 1,420 feet msl; (3) a 100-foot                  the docket number field to access the
                                               888 First Street NE, Washington, DC                     outside diameter, 18-foot inside                      document. For assistance, contact FERC
                                               20426.                                                  diameter ‘‘morning glory’’ in                         Online Support.


                                          VerDate Sep<11>2014   18:41 Sep 11, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\12SEN1.SGM   12SEN1


                                                                        Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices                                                  46155

                                                 Dated: September 6, 2018.                             comments during the preparation of the                under the link to Documents and
                                               Nathaniel J. Davis, Sr.,                                EA.                                                   Filings. With eFiling, you can provide
                                               Deputy Secretary.                                          If you sent comments on this project               comments in a variety of formats by
                                               [FR Doc. 2018–19814 Filed 9–11–18; 8:45 am]             to the Commission before the opening of               attaching them as a file with your
                                               BILLING CODE 6717–01–P
                                                                                                       this docket on July 24, 2018, you will                submission. New eFiling users must
                                                                                                       need to file those comments in Docket                 first create an account by clicking on
                                                                                                       No. CP18–533–000 to ensure they are                   ‘‘eRegister.’’ You will be asked to select
                                               DEPARTMENT OF ENERGY                                    considered as part of this proceeding.                the type of filing you are making; a
                                                                                                          This notice is being sent to the                   comment on a particular project is
                                               Federal Energy Regulatory                               Commission’s current environmental                    considered a ‘‘Comment on a Filing’’; or
                                               Commission                                              mailing list for this project. State and                 (3) You can file a paper copy of your
                                                                                                       local government representatives should               comments by mailing them to the
                                               [Docket No. CP18–533–000]
                                                                                                       notify their constituents of this                     following address. Be sure to reference
                                               Texas Eastern Transmission, LP;                         proposed project and encourage them to                the project docket number (CP18–533–
                                               Notice of Intent To Prepare an                          comment on their areas of concern.                    000) with your submission: Kimberly D.
                                               Environmental Assessment for the                           If you are a landowner receiving this              Bose, Secretary, Federal Energy
                                               Proposed Line 1–N Abandonment                           notice, a pipeline company                            Regulatory Commission, 888 First Street
                                               Project and Request for Comments on                     representative may contact you about                  NE, Room 1A, Washington, DC 20426.
                                               Environmental Issues                                    the acquisition of an easement to
                                                                                                       construct, operate, and maintain the                  Summary of the Proposed Project
                                                  The staff of the Federal Energy                      proposed facilities. The company would                  Texas Eastern proposes to abandon a
                                               Regulatory Commission (FERC or                          seek to negotiate a mutually acceptable               portion of its lateral Line 1–N and
                                               Commission) will prepare an                             easement agreement. You are not                       related facilities, in Harrison and
                                               environmental assessment (EA) that will                 required to enter into an agreement.                  Marion Counties, Texas. Specifically,
                                               discuss the environmental impacts of                    However, if the Commission approves                   Texas Eastern is requesting approval to
                                               the Line 1–N Abandonment Project                        the project, that approval conveys with               abandon in place and by removal a total
                                               involving construction and operation of                 it the right of eminent domain.                       of approximately 30 miles of 8-inch, 10-
                                               facilities by Texas Eastern                             Therefore, if you and the company do                  inch, and 12-inch-diameter lateral
                                               Transmission, LP (Texas Eastern) in                     not reach an easement agreement, the                  pipeline; abandon by removal all of the
                                               Harrison and Marion Counties, Texas.                    pipeline company could initiate                       facilities at Metering and Regulating
                                               The Commission will use this EA in its                  condemnation proceedings in court. In                 (M&R) Station 70191; and abandon by
                                               decision-making process to determine                    such instances, compensation would be                 removal all aboveground appurtenances
                                               whether to authorize the project.                       determined by a judge in accordance
                                                  This notice announces the opening of                                                                       on each of the 8-inch, 10-inch and 12-
                                                                                                       with state law.                                       inch-diameter pipeline segments.
                                               the scoping process the Commission                         Texas Eastern provided landowners
                                               will use to gather input from the public                                                                        According to Texas Eastern, the
                                                                                                       with a fact sheet prepared by the FERC                project would eliminate the need for
                                               and interested agencies about issues                    entitled ‘‘An Interstate Natural Gas
                                               regarding the project. The National                                                                           operating and maintenance
                                                                                                       Facility On My Land? What Do I Need                   expenditures on facilities that have not
                                               Environmental Policy Act (NEPA)                         To Know?’’ This fact sheet addresses a
                                               requires the Commission to take into                                                                          been used to provide service for over a
                                                                                                       number of typically asked questions,                  year and are not necessary to meet
                                               account the environmental impacts that                  including the use of eminent domain
                                               could result from its action whenever it                                                                      Texas Eastern’s firm service obligations.
                                                                                                       and how to participate in the                         The project would not impact the daily
                                               considers the issuance of an                            Commission’s proceedings. It is also
                                               authorization. NEPA also requires the                                                                         design capacity of, or the operating
                                                                                                       available for viewing on the FERC                     conditions on, Texas Eastern’s system,
                                               Commission to discover concerns the                     website (www.ferc.gov).
                                               public may have about proposals. This                                                                         and it would not impact service for
                                               process is referred to as ‘‘scoping.’’ The              Public Participation                                  Texas Eastern’s existing shippers.
                                               main goal of the scoping process is to                                                                          The general location of the project
                                                                                                         For your convenience, there are three
                                               focus the analysis in the EA on the                                                                           facilities is shown in appendix 1.1
                                                                                                       methods you can use to submit your
                                               important environmental issues. By this                 comments to the Commission. The                       Land Requirements for Construction
                                               notice, the Commission requests public                  Commission encourages electronic filing                 The project would temporarily affect
                                               comments on the scope of the issues to                  of comments and has staff available to                approximately 6 acres of land within the
                                               address in the EA. To ensure that your                  assist you at (866) 208–3676 or                       existing right-of-way. Following
                                               comments are timely and properly                        FercOnlineSupport@ferc.gov. Please                    abandonment, Texas Eastern would
                                               recorded, please submit your comments                   carefully follow these instructions so                revegetate temporary work areas in
                                               so that the Commission receives them in                 that your comments are properly                       accordance with its Erosion and
                                               Washington, DC on or before 5 p.m.                      recorded.                                             Sedimentation Control Plan. Texas
                                               Eastern Time on October 6, 2018.                          (1) You can file your comments
                                                  You can make a difference by                                                                               Eastern would retain and continue to
                                                                                                       electronically using the eComment
                                               submitting your specific comments or                                                                          maintain the pipeline right-of-way
                                                                                                       feature, which is located on the
                                               concerns about the project. Your                                                                              following abandonment activities.
                                                                                                       Commission’s website (www.ferc.gov)
                                               comments should focus on the potential                  under the link to Documents and
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                                                                               1 The appendices referenced in this notice will
                                               environmental effects, reasonable                       Filings. Using eComment is an easy                    not appear in the Federal Register. Copies of
                                               alternatives, and measures to avoid or                  method for submitting brief, text-only                appendices were sent to all those receiving this
                                               lessen environmental impacts. Your                      comments on a project;                                notice in the mail and are available at www.ferc.gov
                                               input will help the Commission staff                      (2) You can file your comments                      using the link called ‘‘eLibrary’’ or from the
                                                                                                                                                             Commission’s Public Reference Room, 888 First
                                               determine what issues they need to                      electronically by using the eFiling                   Street NE, Washington, DC 20426, or call (202) 502–
                                               evaluate in the EA. Commission staff                    feature, which is located on the                      8371. For instructions on connecting to eLibrary,
                                               will consider and address all filed                     Commission’s website (www.ferc.gov)                   refer to the last page of this notice.



                                          VerDate Sep<11>2014   18:41 Sep 11, 2018   Jkt 244001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\12SEN1.SGM   12SEN1



Document Created: 2018-09-12 02:06:34
Document Modified: 2018-09-12 02:06:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 46154 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR