The Federal Transit Administration (FTA) is soliciting expressions of interest for the Expedited Project Delivery Pilot Program (Pilot Program) authorized by the Fixing America's Surface Transportation Act (FAST). The Pilot Program is aimed at expediting delivery of new fixed guideway capital projects, small starts projects, or core capacity improvement projects that utilize public-private partnerships, are planned to be operated and maintained by employees of an existing public transportation provider, and have a Federal share not exceeding 25 percent of the project cost. It is also aimed at increasing innovation, improving efficiency and timeliness of project implementation, and encouraging new revenue streams. The law specifies that not more than eight projects can be awarded grants under the Pilot Program. FTA intends to work with selected project sponsors to further define the steps that must be completed before a construction grant can be awarded under the Pilot Program, including expedited FTA reviews of technical capacity, local financial commitment, and project justification. This announcement is available on the FTA's website at: www.transit.dot.gov/funding/grants/expedited-project-delivery-capital- investment-grants-pilot-3005b.

Federal Register, Volume 83 Issue 177 (Wednesday, September 12, 2018)
[Federal Register Volume 83, Number 177 (Wednesday, September 12, 2018)]
[Notices]
[Pages 46251-46253]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19860]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration


Pilot Program for Expedited Project Delivery

AGENCY: Federal Transit Administration, DOT.

ACTION: Notice; request for expressions of interest to participate.

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) is soliciting 
expressions of interest for the Expedited Project Delivery Pilot 
Program (Pilot Program) authorized by the Fixing America's Surface 
Transportation Act (FAST). The Pilot Program is aimed at expediting 
delivery of new fixed guideway capital projects, small starts projects, 
or core capacity improvement projects that utilize public-private 
partnerships, are planned to be operated and maintained by employees of 
an existing public transportation provider, and have a Federal share 
not exceeding 25 percent of the project cost. It is also aimed at 
increasing innovation, improving efficiency and timeliness of project 
implementation, and encouraging new revenue streams. The law specifies 
that not more than eight projects can be awarded grants under the Pilot 
Program. FTA intends to work with selected project sponsors to further 
define the steps that must be completed before a construction grant can 
be awarded under the Pilot Program, including expedited FTA reviews of 
technical capacity, local financial commitment, and project 
justification. This announcement is available on the FTA's website at: 
www.transit.dot.gov/funding/grants/expedited-project-delivery-capital-investment-grants-pilot-3005b.

DATES: Expressions of interest to become one of the participants in the 
Pilot Program for Expedited Project Delivery must be submitted to FTA 
by mail, email or facsimile by 11:59 p.m. EDT November 13, 2018.

ADDRESSES: Mail submission must be addressed to the Office of Planning 
and Environment, Federal Transit Administration, 1200 New Jersey Avenue 
SE, Room E45-119, Washington, DC 20590 and postmarked no later than 
November 13, 2018. Email submissions must be sent to 
[email protected] by 11:59 p.m. EDT on November 13, 
2018. Facsimile submissions must be submitted to the attention of 
Expedited Project Delivery Pilot Program at 202-493-2478 by 11:59 p.m. 
EDT ON November 13, 2018. If there are insufficient candidate projects 
that FTA determines meet the requirements of the Pilot Program, FTA may 
conduct additional requests for expressions of interest in the future.

FOR FURTHER INFORMATION CONTACT: Susan Eddy, FTA Office of Planning and 
Environment, telephone (202) 366-5499 or email [email protected].

SUPPLEMENTARY INFORMATION: 

1. Background

    FTA, together with its transit industry partners, invests billions 
of dollars in capital projects designed to improve public 
transportation by reinvesting in existing assets to expand capacity or 
by increasing the extent and quality of public transportation service 
by making new investments. These projects take considerable time to 
plan, develop, design, approve, and deploy. While it is important for 
FTA to ensure that it selects only well-conceived projects that are 
implemented in the most efficient and effective manner, a lengthy 
process delays the delivery of the intended benefits to the riding 
public.

2. Pilot Program

    Section 3005(b) of the FAST Act, Public Law 114-94 (December 4, 
2015), authorizes the Pilot Program for FTA to make not more than eight 
grants for new fixed guideway capital projects, small starts projects, 
or core capacity improvement projects that have not yet entered a 
construction grant agreement with the FTA. The law defines these types 
of eligible projects for the Pilot Program in a manner similar to, but 
not entirely the same as, the CIG program. Thus, FTA encourages project 
sponsors to review closely the definitions found in Section 3005(b) to 
ensure the project's eligibility.
    Eligible applicants to the Pilot Program are state or local 
government authorities. Proposed projects must utilize public-private 
partnerships; be operated and maintained by employees of an existing 
provider of fixed guideway or bus rapid transit public transportation 
in the service area of the project, or if none exists, by employees of 
an existing public transportation provider in the service area; and 
have a Federal share not exceeding 25 percent of the net capital 
project cost. Project sponsors also must have financial advisors 
providing guidance to them on the terms and structure of the project 
that are independent from investors in the project. Sponsors must 
further certify that the existing public transportation system is in a 
state of good repair as defined by law. (See Pub. L. 114-94, 129 STAT. 
1458; 49 U.S.C. 5302; 49 U.S.C. 5326(b)(1); 49 CFR 625.5.)

[[Page 46252]]

    The Pilot Program requires FTA to use an expedited technical 
capacity review process for sponsors that have recently and 
successfully completed at least one new fixed guideway capital project, 
small start project, or core capacity improvement project, if the 
sponsor achieved budget, cost, and ridership outcomes for the project 
that are consistent with or better than projections and the applicant 
demonstrates that it continues to have staff expertise and other 
resources to implement a new project.
    While not all of the following are required with the expression of 
interest submission, project sponsors should understand that prior to 
being considered for a grant agreement, Section 3005(b) requires that 
project sponsors requesting a construction grant under the Pilot 
Program must meet all requirements of Section 3005(B) and submit: (1) 
Information identifying the proposed eligible project; (2) a schedule 
and finance plan for the construction and operation of the project; (3) 
an analysis of the efficiencies of the proposed eligible project 
development and delivery methods and innovative financing arrangement 
for the eligible project. This submission must include documents 
related to the public-private partnership and justification of the 
project based on mobility improvements attributable to the project; 
environmental benefits associated with the project; congestion relief 
associated with the project; economic development effects derived as a 
result of the project; and estimated ridership projections; (4) a 
certification that the project sponsor's existing public transportation 
system is in a state of good repair, or, in the event that the 
applicant does not operate a public transportation system, the public 
transportation system to which the proposed project will be attached, 
is in a state of good repair. Alternatively, with respect to the state 
of good repair certification, for core capacity improvement projects, a 
sponsor may include a description of how the eligible project will 
allow it to make substantial progress in achieving a state of good 
repair. FTA may not award a construction grant agreement until after 
the project sponsor has completed necessary planning and activities 
required under the National Environmental Policy Act, 42 U.S.C. 4321, 
et seq., and the recipient has demonstrated the necessary legal, 
technical, and financial capacity to successfully complete the project. 
Project sponsors must also demonstrate an acceptable degree of local 
financial commitment and show evidence of stable and dependable 
financing sources. Part of FTA's consideration includes, but is not 
limited to, an analysis of the private contributions, management of the 
transfer of project risk, financial partnering, and other strategies 
included in the public-private partnership.
    The law also requires participants in the program to develop a 
Before and After Study Report that describes and analyzes the impacts 
of the project on public transportation services and ridership, 
describes and analyzes the consistency of predicted and actual benefits 
and costs of the innovative project development and delivery or 
innovative financing, and identifies reasons for any differences 
between the predicted and actual outcomes. The law requires the project 
sponsor to submit the Before and After Study Report to FTA not later 
than two years after the initiation of revenue service of the project.
    All projects that receive a grant through the Pilot Program are 
expected to be constructed and enter revenue service. Therefore, 
Section 3005(b) specifies that a sponsor must repay all Federal funds 
plus interest and penalty charges if the project is not completed. This 
provision is intended to ensure that all Federal interest is protected 
if a public-private partnership fails to deliver a project.
    At present, $5 million has been appropriated by Congress in Fiscal 
Year 2016 and $20 million in Fiscal Year 2017 for the Pilot Program. 
The FY 2018 Consolidated Appropriations Act did not provide funding for 
the Pilot Program; and the President's FY 2019 budget proposal to 
Congress did not recommend any funding for the Pilot Program.
    If selected for the Pilot Program, project sponsors will be invited 
to propose alternative ways that FTA might satisfy the requirements 
established by law for Pilot projects. For example, FTA expects that it 
will be necessary to establish the cost, scope, and schedule for Pilot 
projects to a reasonable level of confidence, which could be 
accomplished in a number of ways, in particular to address the 
requirement in law for an expedited technical capacity review process 
for sponsors with successful past performance. Project sponsors 
selected for the Pilot Program may suggest alternate approaches to any 
aspect of the statutory evaluation process that the sponsor believes 
will save time and effort, while still assuring compliance with the 
Pilot Program requirements outlined in law. FTA is particularly 
interested in receiving expressions of interest from project sponsors 
who are considering pursuing Value Capture techniques as part of their 
innovative project financing arrangements.

3. Expression of Interest Submission Process

    Project sponsors must submit the required information by mail, 
email or facsimile by 11:59 p.m. EDT November 13, 2018, as specified in 
the DATES section of this Notice above. FTA reserves the right to 
request additional clarifying information from any and all project 
sponsors before making a selection to participate in the Pilot Program.
    Project sponsors wishing to participate in the Pilot Program must 
submit an expression of interest to FTA no longer than 10 pages in 
length including any supporting documentation. While there is no 
specific format that must be followed for the expression of interest, 
the narrative provided by the project sponsor to FTA should include the 
following information:
    a. A description of the proposed project that provides sufficient 
information to demonstrate its eligibility as a new fixed guideway 
capital project, small starts project, or core capacity improvement 
project as defined in Section 3005(b);
    b. The proposed project schedule and an outline of the proposed 
financing plan for the project, including the total amount of Federal 
funding being sought;
    c. A description of the public-private partnership included in the 
project;
    d. A description of the advisors providing guidance to the project 
sponsor on the terms and structure of the project that are independent 
from investors in the project;
    e. How the project sponsor intends to analyze the predicted and 
actual benefits and costs of the innovative project development and 
delivery methods or innovative financing for the eligible project in 
order to complete the Before and After Study required by Section 
3005(b);
    f. A certification that the project sponsor's existing public 
transportation system is in a state of good repair, or for core 
capacity improvement projects, a description of how the eligible 
project includes elements designed to aid the existing fixed guideway 
system in making substantial progress towards achieving a state of good 
repair;
    g. Documentation that the project has completed the steps required 
by the Metropolitan Planning process or the Statewide and Non-
Metropolitan Planning process, as applicable. Specifically, provide 
evidence that the

[[Page 46253]]

project is included in the approved Metropolitan Transportation Plan 
and Transportation Improvement Program or Statewide Transportation 
Improvement Program, or provide a schedule demonstrating the project 
will complete the process in the foreseeable future;
    h. Documentation that the project has completed the NEPA process or 
a schedule demonstrating the project will complete the NEPA process in 
the foreseeable future.

4. Candidate Project Evaluation and Selection

    FTA will evaluate the proposals to determine which proposed 
projects best meet the intent of Section 3005(b). FTA will work with 
the selected project sponsors to further define the steps in law 
required before a construction grant can be awarded under the program.

K. Jane Williams,
Acting Administrator.
[FR Doc. 2018-19860 Filed 9-11-18; 8:45 am]
 BILLING CODE P



                                                                        Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices                                          46251

                                               https://www.fra.dot.gov/eLib/Details/                   DEPARTMENT OF TRANSPORTATION                          determines meet the requirements of the
                                               L19057.                                                                                                       Pilot Program, FTA may conduct
                                                                                                       Federal Transit Administration                        additional requests for expressions of
                                               3. Reporting
                                                                                                                                                             interest in the future.
                                               a. Progress Reporting on Grant Activity                 Pilot Program for Expedited Project                   FOR FURTHER INFORMATION CONTACT:
                                                                                                       Delivery                                              Susan Eddy, FTA Office of Planning and
                                                  Each applicant selected for a grant
                                               will be required to comply with all                     AGENCY:    Federal Transit Administration,            Environment, telephone (202) 366–5499
                                               standard FRA reporting requirements,                    DOT.                                                  or email Susan.Eddy@dot.gov.
                                               including quarterly progress reports,                   ACTION:  Notice; request for expressions              SUPPLEMENTARY INFORMATION:
                                               quarterly Federal financial reports, and                of interest to participate.                           1. Background
                                               interim and final performance reports,
                                               as well as all applicable auditing,                     SUMMARY:   The Federal Transit                           FTA, together with its transit industry
                                               monitoring and close out requirements.                  Administration (FTA) is soliciting                    partners, invests billions of dollars in
                                               Reports may be submitted                                expressions of interest for the Expedited             capital projects designed to improve
                                               electronically.                                         Project Delivery Pilot Program (Pilot                 public transportation by reinvesting in
                                                                                                       Program) authorized by the Fixing                     existing assets to expand capacity or by
                                               b. Performance Reporting                                America’s Surface Transportation Act                  increasing the extent and quality of
                                                  Each applicant selected for funding                  (FAST). The Pilot Program is aimed at                 public transportation service by making
                                               must collect information and report on                  expediting delivery of new fixed                      new investments. These projects take
                                               the project’s performance using                         guideway capital projects, small starts               considerable time to plan, develop,
                                               measures mutually agreed upon by FRA                    projects, or core capacity improvement                design, approve, and deploy. While it is
                                               and the recipient to assess progress in                 projects that utilize public-private                  important for FTA to ensure that it
                                               achieving strategic goals and objectives.               partnerships, are planned to be operated              selects only well-conceived projects that
                                                                                                       and maintained by employees of an                     are implemented in the most efficient
                                               G. Federal Awarding Agency Contacts                     existing public transportation provider,              and effective manner, a lengthy process
                                                 For further information regarding this                and have a Federal share not exceeding                delays the delivery of the intended
                                               notice and the grants program, please                   25 percent of the project cost. It is also            benefits to the riding public.
                                               contact Ms. Amy Houser, Office of                       aimed at increasing innovation,
                                                                                                                                                             2. Pilot Program
                                               Program Delivery, Federal Railroad                      improving efficiency and timeliness of
                                               Administration, 1200 New Jersey                         project implementation, and                              Section 3005(b) of the FAST Act,
                                               Avenue SE, Room W36–412,                                encouraging new revenue streams. The                  Public Law 114–94 (December 4, 2015),
                                               Washington, DC 20590; email:                            law specifies that not more than eight                authorizes the Pilot Program for FTA to
                                               amy.houser@dot.gov; phone: 202–493–                     projects can be awarded grants under                  make not more than eight grants for new
                                               0303.                                                   the Pilot Program. FTA intends to work                fixed guideway capital projects, small
                                                                                                       with selected project sponsors to further             starts projects, or core capacity
                                               H. Other Information                                    define the steps that must be completed               improvement projects that have not yet
                                                  All information submitted as part of                 before a construction grant can be                    entered a construction grant agreement
                                               or in support of any application shall                  awarded under the Pilot Program,                      with the FTA. The law defines these
                                               use publicly available data or data that                including expedited FTA reviews of                    types of eligible projects for the Pilot
                                               can be made public and methodologies                    technical capacity, local financial                   Program in a manner similar to, but not
                                               that is accepted by industry practice and               commitment, and project justification.                entirely the same as, the CIG program.
                                               standards, to the extent possible. If the               This announcement is available on the                 Thus, FTA encourages project sponsors
                                               application includes information the                    FTA’s website at: www.transit.dot.gov/                to review closely the definitions found
                                               applicant considers to be a trade secret                funding/grants/expedited-project-                     in Section 3005(b) to ensure the
                                               or confidential commercial or financial                 delivery-capital-investment-grants-pilot-             project’s eligibility.
                                               information, the applicant should do the                3005b.                                                   Eligible applicants to the Pilot
                                               following: (1) Note on the front cover                                                                        Program are state or local government
                                                                                                       DATES: Expressions of interest to become              authorities. Proposed projects must
                                               that the submission ‘‘Contains                          one of the participants in the Pilot
                                               Confidential Business Information                                                                             utilize public-private partnerships; be
                                                                                                       Program for Expedited Project Delivery                operated and maintained by employees
                                               (CBI)’’; (2) mark each affected page                    must be submitted to FTA by mail,
                                               ‘‘CBI’’; and (3) highlight or otherwise                                                                       of an existing provider of fixed
                                                                                                       email or facsimile by 11:59 p.m. EDT                  guideway or bus rapid transit public
                                               denote the CBI portions.                                November 13, 2018.
                                                  DOT protects such information from                                                                         transportation in the service area of the
                                                                                                       ADDRESSES: Mail submission must be                    project, or if none exists, by employees
                                               disclosure to the extent allowed under
                                               applicable law. In the event DOT                        addressed to the Office of Planning and               of an existing public transportation
                                               receives a Freedom of Information Act                   Environment, Federal Transit                          provider in the service area; and have a
                                               (FOIA) request for the information, DOT                 Administration, 1200 New Jersey                       Federal share not exceeding 25 percent
                                               will follow the procedures described in                 Avenue SE, Room E45–119,                              of the net capital project cost. Project
                                               its FOIA regulations at 49 CFR 7.17.                    Washington, DC 20590 and postmarked                   sponsors also must have financial
                                               Only information that is ultimately                     no later than November 13, 2018. Email                advisors providing guidance to them on
                                               determined to be confidential under that                submissions must be sent to                           the terms and structure of the project
                                               procedure will be exempt from                           ExpeditedProjectDelivery@dot.gov by                   that are independent from investors in
daltland on DSKBBV9HB2PROD with NOTICES




                                               disclosure under FOIA.                                  11:59 p.m. EDT on November 13, 2018.                  the project. Sponsors must further
                                                                                                       Facsimile submissions must be                         certify that the existing public
                                                 Issued in Washington, DC.                             submitted to the attention of Expedited               transportation system is in a state of
                                               Ronald Louis Batory,                                    Project Delivery Pilot Program at 202–                good repair as defined by law. (See Pub.
                                               Administrator.                                          493–2478 by 11:59 p.m. EDT ON                         L. 114–94, 129 STAT. 1458; 49 U.S.C.
                                               [FR Doc. 2018–19740 Filed 9–11–18; 8:45 am]             November 13, 2018. If there are                       5302; 49 U.S.C. 5326(b)(1); 49 CFR
                                               BILLING CODE 4910–06–P                                  insufficient candidate projects that FTA              625.5.)


                                          VerDate Sep<11>2014   18:41 Sep 11, 2018   Jkt 244001   PO 00000   Frm 00116   Fmt 4703   Sfmt 4703   E:\FR\FM\12SEN1.SGM   12SEN1


                                               46252                   Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices

                                                  The Pilot Program requires FTA to use                stable and dependable financing                       interest from project sponsors who are
                                               an expedited technical capacity review                  sources. Part of FTA’s consideration                  considering pursuing Value Capture
                                               process for sponsors that have recently                 includes, but is not limited to, an                   techniques as part of their innovative
                                               and successfully completed at least one                 analysis of the private contributions,                project financing arrangements.
                                               new fixed guideway capital project,                     management of the transfer of project
                                                                                                                                                             3. Expression of Interest Submission
                                               small start project, or core capacity                   risk, financial partnering, and other
                                                                                                       strategies included in the public-private             Process
                                               improvement project, if the sponsor
                                               achieved budget, cost, and ridership                    partnership.                                             Project sponsors must submit the
                                               outcomes for the project that are                          The law also requires participants in              required information by mail, email or
                                               consistent with or better than                          the program to develop a Before and                   facsimile by 11:59 p.m. EDT November
                                               projections and the applicant                           After Study Report that describes and                 13, 2018, as specified in the DATES
                                               demonstrates that it continues to have                  analyzes the impacts of the project on                section of this Notice above. FTA
                                               staff expertise and other resources to                  public transportation services and                    reserves the right to request additional
                                               implement a new project.                                ridership, describes and analyzes the                 clarifying information from any and all
                                                  While not all of the following are                   consistency of predicted and actual                   project sponsors before making a
                                               required with the expression of interest                benefits and costs of the innovative                  selection to participate in the Pilot
                                               submission, project sponsors should                     project development and delivery or                   Program.
                                                                                                       innovative financing, and identifies                     Project sponsors wishing to
                                               understand that prior to being
                                                                                                       reasons for any differences between the               participate in the Pilot Program must
                                               considered for a grant agreement,
                                                                                                       predicted and actual outcomes. The law                submit an expression of interest to FTA
                                               Section 3005(b) requires that project
                                                                                                       requires the project sponsor to submit                no longer than 10 pages in length
                                               sponsors requesting a construction grant
                                                                                                       the Before and After Study Report to                  including any supporting
                                               under the Pilot Program must meet all
                                                                                                       FTA not later than two years after the                documentation. While there is no
                                               requirements of Section 3005(B) and
                                                                                                       initiation of revenue service of the                  specific format that must be followed for
                                               submit: (1) Information identifying the
                                                                                                       project.                                              the expression of interest, the narrative
                                               proposed eligible project; (2) a schedule                  All projects that receive a grant                  provided by the project sponsor to FTA
                                               and finance plan for the construction                   through the Pilot Program are expected                should include the following
                                               and operation of the project; (3) an                    to be constructed and enter revenue                   information:
                                               analysis of the efficiencies of the                     service. Therefore, Section 3005(b)                      a. A description of the proposed
                                               proposed eligible project development                   specifies that a sponsor must repay all               project that provides sufficient
                                               and delivery methods and innovative                     Federal funds plus interest and penalty               information to demonstrate its eligibility
                                               financing arrangement for the eligible                  charges if the project is not completed.              as a new fixed guideway capital project,
                                               project. This submission must include                   This provision is intended to ensure                  small starts project, or core capacity
                                               documents related to the public-private                 that all Federal interest is protected if a           improvement project as defined in
                                               partnership and justification of the                    public-private partnership fails to                   Section 3005(b);
                                               project based on mobility improvements                  deliver a project.                                       b. The proposed project schedule and
                                               attributable to the project;                               At present, $5 million has been                    an outline of the proposed financing
                                               environmental benefits associated with                  appropriated by Congress in Fiscal Year               plan for the project, including the total
                                               the project; congestion relief associated               2016 and $20 million in Fiscal Year                   amount of Federal funding being sought;
                                               with the project; economic development                  2017 for the Pilot Program. The FY 2018                  c. A description of the public-private
                                               effects derived as a result of the project;             Consolidated Appropriations Act did                   partnership included in the project;
                                               and estimated ridership projections; (4)                not provide funding for the Pilot                        d. A description of the advisors
                                               a certification that the project sponsor’s              Program; and the President’s FY 2019                  providing guidance to the project
                                               existing public transportation system is                budget proposal to Congress did not                   sponsor on the terms and structure of
                                               in a state of good repair, or, in the event             recommend any funding for the Pilot                   the project that are independent from
                                               that the applicant does not operate a                   Program.                                              investors in the project;
                                               public transportation system, the public                   If selected for the Pilot Program,                    e. How the project sponsor intends to
                                               transportation system to which the                      project sponsors will be invited to                   analyze the predicted and actual
                                               proposed project will be attached, is in                propose alternative ways that FTA                     benefits and costs of the innovative
                                               a state of good repair. Alternatively,                  might satisfy the requirements                        project development and delivery
                                               with respect to the state of good repair                established by law for Pilot projects. For            methods or innovative financing for the
                                               certification, for core capacity                        example, FTA expects that it will be                  eligible project in order to complete the
                                               improvement projects, a sponsor may                     necessary to establish the cost, scope,               Before and After Study required by
                                               include a description of how the eligible               and schedule for Pilot projects to a                  Section 3005(b);
                                               project will allow it to make substantial               reasonable level of confidence, which                    f. A certification that the project
                                               progress in achieving a state of good                   could be accomplished in a number of                  sponsor’s existing public transportation
                                               repair. FTA may not award a                             ways, in particular to address the                    system is in a state of good repair, or for
                                               construction grant agreement until after                requirement in law for an expedited                   core capacity improvement projects, a
                                               the project sponsor has completed                       technical capacity review process for                 description of how the eligible project
                                               necessary planning and activities                       sponsors with successful past                         includes elements designed to aid the
                                               required under the National                             performance. Project sponsors selected                existing fixed guideway system in
                                               Environmental Policy Act, 42 U.S.C.                     for the Pilot Program may suggest                     making substantial progress towards
daltland on DSKBBV9HB2PROD with NOTICES




                                               4321, et seq., and the recipient has                    alternate approaches to any aspect of the             achieving a state of good repair;
                                               demonstrated the necessary legal,                       statutory evaluation process that the                    g. Documentation that the project has
                                               technical, and financial capacity to                    sponsor believes will save time and                   completed the steps required by the
                                               successfully complete the project.                      effort, while still assuring compliance               Metropolitan Planning process or the
                                               Project sponsors must also demonstrate                  with the Pilot Program requirements                   Statewide and Non-Metropolitan
                                               an acceptable degree of local financial                 outlined in law. FTA is particularly                  Planning process, as applicable.
                                               commitment and show evidence of                         interested in receiving expressions of                Specifically, provide evidence that the


                                          VerDate Sep<11>2014   18:41 Sep 11, 2018   Jkt 244001   PO 00000   Frm 00117   Fmt 4703   Sfmt 4703   E:\FR\FM\12SEN1.SGM   12SEN1


                                                                       Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices                                          46253

                                               project is included in the approved                        Mail: Docket Management Facility,                     Type of Request: New collection.
                                               Metropolitan Transportation Plan and                    M–30, U.S. Department of                                 OMB Clearance Number: None.
                                               Transportation Improvement Program or                   Transportation, West Building, Ground                    Requested Expiration Date of
                                               Statewide Transportation Improvement                    Floor, 1200 New Jersey Ave. SE, Room                  Approval: Three years from date of
                                               Program, or provide a schedule                          W12–140, Washington, DC 20590.                        approval.
                                               demonstrating the project will complete                    Hand Delivery: West Building Ground                   Summary of the Collection of
                                               the process in the foreseeable future;                  Floor, Room W12–140, 1200 New Jersey                  Information: NHTSA proposes to collect
                                                 h. Documentation that the project has                 Avenue SE, Washington, DC, between 9                  information from the public to support
                                               completed the NEPA process or a                         a.m. and 5 p.m., Monday through                       the development of design criteria for
                                               schedule demonstrating the project will                 Friday, except Federal holidays.                      the mobility of the shoulder of a new
                                               complete the NEPA process in the                           Fax: (202) 493–2251.                               child-size crash test dummy. Minors age
                                               foreseeable future.                                        Instructions: Each submission must                 8–12 will participate after informed
                                                                                                       include the Agency name and the                       consent of the parent/guardian is
                                               4. Candidate Project Evaluation and                     Docket number for this Notice. Note that
                                               Selection                                                                                                     received. After researchers measure the
                                                                                                       all comments received will be posted
                                                                                                                                                             participant’s anthropometry (height,
                                                  FTA will evaluate the proposals to                   without changes to http://
                                                                                                                                                             weight, shoulder landmarks, etc.), the
                                               determine which proposed projects best                  www.regulations.gov including any
                                                                                                                                                             participant will undergo a fun, low-
                                               meet the intent of Section 3005(b). FTA                 personal information provided.
                                                                                                                                                             intensity exercise activity under the
                                               will work with the selected project                     FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                             direction of the researchers while the
                                               sponsors to further define the steps in                 Jason Stammen, Ph.D., Applied                         parent/guardian observes. The activity
                                               law required before a construction grant                Biomechanics Division, Vehicle                        will involve motion of the participant’s
                                               can be awarded under the program.                       Research and Test Center, NHTSA,                      shoulder while resisting forces are
                                                                                                       10820 State Route 347—Bldg. 60, East                  collected. The data from all participants
                                               K. Jane Williams,
                                                                                                       Liberty, Ohio 43319; Telephone (937)                  will then be compiled to develop design
                                               Acting Administrator.                                   666–4511; Facsimile: (937) 666–3590;
                                               [FR Doc. 2018–19860 Filed 9–11–18; 8:45 am]                                                                   criteria for the crash test dummy
                                                                                                       email address: jason.stammen@dot.gov.                 shoulder.
                                               BILLING CODE P                                          SUPPLEMENTARY INFORMATION: Under the                     Description of the Need for the
                                                                                                       Paperwork Reduction Act of 1995 (44                   Information and Proposed Use of the
                                                                                                       U.S.C. 3501–3520), before an agency                   Information: In the early 2000’s, NHTSA
                                               DEPARTMENT OF TRANSPORTATION                            submits a proposed collection of                      evaluated the Hybrid III 10-year-old
                                               National Highway Traffic Safety                         information to OMB for approval, it                   child dummy. While this dummy was
                                               Administration                                          must first publish a document in the                  deemed adequate for the evaluation of
                                                                                                       Federal Register providing a 60-day                   large child restraints and eventually
                                               [Docket No. NHTSA–2018–0078]                            comment period and otherwise consult                  federalized in 2012, one of the
                                                                                                       with members of the public and affected               shortcomings NHTSA identified of the
                                               Reports, Forms, and Recordkeeping                       agencies concerning each proposed
                                               Requirements                                                                                                  child dummy is a shoulder that has very
                                                                                                       collection of information. The OMB has
                                                                                                                                                             little mobility with no interaction with
                                               AGENCY: National Highway Traffic                        promulgated regulations describing
                                                                                                                                                             the ribcage. In 2011, the NHTSA Vehicle
                                               Safety Administration (NHTSA),                          what must be included in such a
                                                                                                                                                             Research & Test Center Applied
                                               Department of Transportation (DOT).                     document. Under OMB’s regulation (at
                                                                                                                                                             Biomechanics Division initiated a
                                                                                                       5 CFR 1320.8(d), an agency must ask for
                                               ACTION: Notice.                                                                                               research program to develop a new
                                                                                                       public comment on the following:
                                                                                                          (i) Whether the proposed collection of             crash dummy representing a large child
                                               SUMMARY:   The National Highway Traffic                                                                       with improved biofidelity called the
                                               Safety Administration (NHTSA) is                        information is necessary for the proper
                                                                                                       performance of the functions of the                   Large Omnidirectional Child (LODC)
                                               announcing an opportunity for public                                                                          dummy. NHTSA used pediatric
                                               comment on the proposed collection of                   agency, including whether the
                                                                                                       information will have practical utility;              biomechanical information from
                                               certain information by the Agency.                                                                            literature to guide the design of the
                                               Under the Paperwork Reduction Act of                       (ii) the accuracy of the agency’s
                                                                                                       estimate of the burden of the proposed                LODC prototype. However, there was
                                               1995 (the PRA), Federal Agencies are                                                                          very little biomechanical information on
                                               required to publish a notice in the                     collection of information, including the
                                                                                                       validity of the methodology and                       the response of the pediatric shoulder.
                                               Federal Register concerning each                                                                              As the shoulder is a very important
                                               proposed collection of information and                  assumptions used;
                                                                                                          (iii) how to enhance the quality,                  structure of the body for managing
                                               to allow 60 days for public comment in                                                                        interaction of the restraint and body in
                                               response to the notice. This notice                     utility, and clarity of the information to
                                                                                                       be collected;                                         a motor vehicle crash, new
                                               solicits comments on an information                                                                           biomechanical data is needed to guide
                                                                                                          (iv) how to minimize the burden of
                                               collection supporting the development                                                                         the design of the LODC shoulder.
                                                                                                       the collection of information on those
                                               of improved child-size crash test                                                                                Historically, child dummy component
                                                                                                       who are to respond, including the use
                                               dummies.                                                                                                      responses have simply been scaled from
                                                                                                       of appropriate automated, electronic,
                                               DATES: Comments must be received on                     mechanical, or other technological                    adult post-mortem surrogate tests.
                                               or before November 13, 2018.                            collection techniques or other forms of               However, there is a large body of
                                               ADDRESSES: You may submit comments                      information technology, e.g. permitting               research that has demonstrated that
daltland on DSKBBV9HB2PROD with NOTICES




                                               using any of the following methods. All                 electronic submission of responses. In                children are not simply small adults
                                               comments must have the applicable                       compliance with these requirements,                   when it comes to behavior in a high-
                                               DOT docket number noted                                 NHTSA asks for public comments on                     speed crash scenario. Developmental
                                               conspicuously on them.                                  the following proposed collection of                  anatomy must be considered in addition
                                                 Electronic submissions: Go to http://                 information:                                          to mass and anthropometry in the
                                               www.regulations.gov. Follow the online                     Title: Pediatric Shoulder Response in              creation of design targets for child
                                               instructions for submitting comments.                   Frontal Loading.                                      dummies.


                                          VerDate Sep<11>2014   18:41 Sep 11, 2018   Jkt 244001   PO 00000   Frm 00118   Fmt 4703   Sfmt 4703   E:\FR\FM\12SEN1.SGM   12SEN1



Document Created: 2018-09-12 02:06:31
Document Modified: 2018-09-12 02:06:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice; request for expressions of interest to participate.
DatesExpressions of interest to become one of the participants in the Pilot Program for Expedited Project Delivery must be submitted to FTA by mail, email or facsimile by 11:59 p.m. EDT November 13, 2018.
ContactSusan Eddy, FTA Office of Planning and Environment, telephone (202) 366-5499 or email [email protected]
FR Citation83 FR 46251 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR