83_FR_47557 83 FR 47375 - Vogtle Electric Generating Plant, Units 3 and 4

83 FR 47375 - Vogtle Electric Generating Plant, Units 3 and 4

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 182 (September 19, 2018)

Page Range47375-47379
FR Document2018-20324

The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment and exemption to Combined Licenses (NPF-91 and NPF-92), issued to Southern Nuclear Operating Company, Inc. (SNC), Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (collectively, SNC), for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia.

Federal Register, Volume 83 Issue 182 (Wednesday, September 19, 2018)
[Federal Register Volume 83, Number 182 (Wednesday, September 19, 2018)]
[Notices]
[Pages 47375-47379]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20324]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 052-00025 and 052-00026; NRC-2008-0252]


Vogtle Electric Generating Plant, Units 3 and 4

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request 
a hearing, and petition for leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an amendment and exemption to Combined Licenses (NPF-91 and 
NPF-92), issued to Southern Nuclear Operating Company, Inc. (SNC), 
Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, 
LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, 
and the City of Dalton, Georgia (collectively, SNC), for construction 
and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 
and 4, located in Burke County, Georgia.

DATES: Comments must be filed by October 19, 2018. A request for a 
hearing must be filed by November 19, 2018.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: William (Billy) Gleaves, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION: 

[[Page 47376]]

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2008-0252 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
application for amendment is dated August 10, 2018, is available in 
ADAMS under Accession No. ML18222A599.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2008-0252 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to facility 
Combined License Nos. NPF-91 and NPF-92, issued to SNC for operation of 
the VEGP Units 3 and 4, located in Burke County, Georgia.
    The proposed changes would revise the Combined Licenses to relocate 
the power operated relief valve (PORV) branch lines upstream of the 
main steam safety valves in Inspections, Tests, Analyses, and 
Acceptance Criteria (ITAAC) Figure 2.2.4-1 (Sheets 1 of 2) of the COL 
Appendix C. In addition to the relocation of the PORV branch lines, the 
PORV block valves would be changed from gate valves to globe valves in 
the VEGP Updated Final Safety Analysis Report (UFSAR). The requested 
amendment proposes changes to the UFSAR in the form of departures from 
the incorporated plant-specific Design Control Document (DCD) Tier 2 
information in the UFSAR and involves changes to COL Appendix C, and 
corresponding changes to plant-specific Tier 1 information. Because, 
these proposed changes require a departure from Tier 1 information in 
the Westinghouse Electric Company's AP1000 Design Control Document 
(DCD), the licensee also requested an exemption from the requirements 
of the Generic DCD Tier 1 in accordance with section 52.63(b)(1) of 
title 10 of the Code of Federal Regulations (10 CFR).
    Before any issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in 10 CFR 50.92, this means that operation of the 
facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated; or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated; 
or (3) involve a significant reduction in a margin of safety. As 
required by 10 CFR 50.91(a), the licensee has provided its analysis of 
the issue of no significant hazards consideration, which is presented 
below:

    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed changes do not affect the operation or reliability 
of any system, structure or component (SSC) required to maintain a 
normal power operating condition or to mitigate anticipated 
transients without safety-related systems.
    With the proposed changes, the PORV block valves are still able 
to perform the safety-related functions of containment isolation, 
steam generator isolation, and steam generator relief isolation. 
There is no change to the PORV block valves safety class or safety-
related functions.
    The relocation of the branch line in which the PORV block valves 
are installed in allows the PORV block valves to be closer to the 
containment penetration and maintain compliance with General Design 
Criterion (GDC) 57 for locating containment isolation valves as 
close to the containment as practical.
    There is no impact to Chapter 15 evaluations. Changes to the 
PORV block valve and line size do not impact the mass releases to 
the atmosphere during a Steam Generator Tube Rupture accident. The 
mass release is limited by the PORV which is more restrictive than 
the PORV block valve and line size.
    There is no impact to any assumed leakage through the PORV line. 
The existing 12-inch PORV has a design function to limit leakage 
through the PORV line. Increasing the PORV block valve to 12 inches 
will increase the leakage through the PORV block valve however it 
will be that same leakage rate as the 12-inch PORV. Therefore, the 
leakage rate through the PORV line does not increase and there is no 
impact to radiation doses.
    There is no impact to the assumptions or analysis in the 
completed safety analysis for radiation doses as a result of the 
change.
    There is no impact to the conclusions of the Pipe Rupture Hazard 
Analysis (PRHA) because the PORV line is Break Exclusion Zone (BEZ) 
piping. The proposed changes do not result in any new postulated 
break locations. Updated analyses confirm that the integrity of the 
wall adjacent to the [main control room] MCR is unaffected by a 
postulated main steam line break that causes the PORV line to impact 
the wall.
    There is no change to the valve motor operator. The current 
motor operator is sufficient to operate the new 12-inch globe valve. 
Therefore, there is no impact to the Class 1E dc and UPS System 
(IDS) battery sizing. There is no change to the valve stroke time, 
therefore there is no impact to valve open/closure times.
    Therefore, the proposed amendment does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed amendment create the possibility of a new 
or different kind of accident from any accident previously 
evaluated?
    Response: No.
    The proposed changes do not affect the operation of systems or 
equipment that could initiate a new or different kind of accident, 
or alter any SSC such that a new accident initiator or initiating 
sequence of events is created. With the proposed changes, the PORV 
block valves are still able to perform the safety related functions 
of containment isolation, steam generator isolation, and steam 
generator relief isolation. There is no change to the PORV block 
valves safety class or safety-related functions.
    The relocation of the branch line in which the PORV block valves 
are installed in allows the PORV block valves to be closer to the

[[Page 47377]]

containment penetration and maintain compliance with General Design 
Criterion (GDC) 57 for locating containment isolation valves as 
close to the containment as practical.
    There is no impact to Chapter 15 evaluations. Changes to the 
PORV block valve and line size do not impact the mass releases to 
the atmosphere during a Steam Generator Tube Rupture accident. The 
mass release is limited by the PORV which is more restrictive than 
the PORV block valve and line size.
    There is no impact to any assumed leakage through the PORV line. 
The existing 12-inch PORV has a design function to limit leakage 
through the PORV line. Increasing the PORV block valve to 12 inches 
will increase the leakage through the PORV block valve however it 
will be that same leakage rate as the 12-inch PORV. Therefore, the 
leakage rate through the PORV line does not increase and there is no 
impact to radiation doses.
    There is no impact to the assumptions or analysis in the 
completed safety analysis for radiation doses as a result of the 
change.
    There is no impact to the conclusions of the Pipe Rupture Hazard 
Analysis (PRHA) because the PORV line is Break Exclusion Zone (BEZ) 
piping. The proposed changes do not result in any new postulated 
break locations. Updated analyses confirm that the integrity of the 
wall adjacent to the MCR is unaffected by a postulated main steam 
line break that causes the PORV line to impact the wall.
    There is no change to the valve motor operator. The current 
motor operator is sufficient to operate the new 12-inch globe valve. 
Therefore, there is no impact to the Class 1E dc and UPS System 
(IDS) battery sizing. There is no change to the valve stroke time, 
therefore there is no impact to valve open/closure times.
    Therefore, the proposed amendment does not create the 
possibility of a new or different kind of accident from any accident 
previously evaluated.
    3. Does the proposed amendment involve a significant reduction 
in a margin of safety?
    Response: No.
    The proposed changes do not affect existing safety margins. With 
the proposed changes, the PORV block valves are still able to 
perform the safety-related functions of containment isolation, steam 
generator isolation, and steam generator relief isolation. There is 
no change to the PORV block valves safety class or safety-related 
functions.
    The relocation of the branch line in which the PORV block valves 
are installed in allows the PORV block valves to be closer to the 
containment penetration and maintain compliance with General Design 
Criterion (GDC) 57 for locating containment isolation valves as 
close to the containment as practical.
    There is no impact to Chapter 15 evaluations. Changes to the 
PORV block valve and line size do not impact the mass releases to 
the atmosphere during a Steam Generator Tube Rupture accident. The 
mass release is limited by the PORV which is more restrictive than 
the PORV block valve and line size.
    There is no impact to any assumed leakage through the PORV line. 
The existing 12-inch PORV has a design function to limit leakage 
through the PORV line. Increasing the PORV block valve to 12 inches 
will increase the leakage through the PORV block valve however it 
will be that same leakage rate as the 12-inch PORV. Therefore, the 
leakage rate through the PORV line does not increase and there is no 
impact to radiation doses.
    There is no impact to the assumptions or analysis in the 
completed safety analysis for radiation doses as a result of the 
change.
    There is no impact to the conclusions of the Pipe Rupture Hazard 
Analysis (PRHA) because the PORV line is Break Exclusion Zone (BEZ) 
piping. The proposed changes do not result in any new postulated 
break locations. Updated analyses confirm that the integrity of the 
wall adjacent to the MCR is unaffected by a postulated main steam 
line break that causes the PORV line to impact the wall.
    There is no change to the valve motor operator. The current 
motor operator is sufficient to operate the new 12-inch globe valve. 
Therefore, there is no impact to the Class 1E dc and UPS System 
(IDS) battery sizing. There is no change to the valve stroke time, 
therefore there is no impact to valve open/closure times.
    Therefore, the proposed amendment does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves no significant hazards 
consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no 
significant hazards consideration. In addition, the Commission may 
issue the amendment prior to the expiration of the 30-day comment 
period should circumstances change during the 30-day comment period 
such that failure to act in a timely way would result, for example, in 
derating or shutdown of the facility. Should the Commission take action 
prior to the expiration of either the comment period or the notice 
period, the Commission will publish a notice of issuance in the Federal 
Register. Should the Commission make a final no significant hazards 
consideration determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by this action may 
file a request for a hearing and a petition to intervene (petition) 
with respect to the action. Petitions shall be filed in accordance with 
the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR 
part 2. Interested persons should consult a current copy of 10 CFR 
2.309, which is available at the NRC's PDR, located at One White Flint 
North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville, 
Maryland 20852. The NRC's regulations are accessible electronically 
from the NRC Library on the NRC's website at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed within 60 days, 
the Commission or a presiding officer designated by the Commission or 
by the Chief Administrative Judge of the Atomic Safety and Licensing 
Board Panel, will rule on the petition; and the Secretary or the Chief 
Administrative Judge of the Atomic Safety and Licensing Board Panel 
will issue a notice of a hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition shall set forth with 
particularity the interest of the petitioner in the proceeding, and how 
that interest may be affected by the results of the proceeding. The 
petition should specifically explain the reasons why intervention 
should be permitted with particular reference to the following general 
requirements: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right under the Act to 
be made a party to the proceeding; (3) the nature and extent of the 
petitioner's property, financial, or other interest in the proceeding; 
and (4) the possible effect of any decision or order which may be 
entered in the proceeding on the petitioner's interest. The petition 
must also set forth the specific contentions which the petitioner seeks 
to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner shall provide a brief explanation of the bases for the 
contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on

[[Page 47378]]

which the petitioner intends to rely in proving the contention at the 
hearing. The petitioner must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
petitioner intends to rely to establish those facts or expert opinion 
to support its position on the issue. The petition must include 
sufficient information to show that a genuine dispute exists with the 
applicant on a material issue of law or fact. Contentions shall be 
limited to matters within the scope of the proceeding. The contention 
must be one which, if proven, would entitle the petitioner to relief. A 
petitioner who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions consistent with the NRC's regulations, policies, and 
procedures.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Requests for hearing, 
petitions for leave to intervene, and motions for leave to file new or 
amended contentions that are filed after the 60-day deadline will not 
be entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to decide when the hearing is held. If the final determination is that 
the amendment request involves no significant hazards consideration, 
the Commission may issue the amendment and make it immediately 
effective, notwithstanding the request for a hearing. Any hearing held 
would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of any amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1).
    The petition should state the nature and extent of the petitioner's 
interest in the proceeding. The petition should be submitted to the 
Commission by November 19, 2018. The petition must be filed in 
accordance with the filing instructions in the ``Electronic Submissions 
(E-Filing)'' section of this document, and should meet the requirements 
for petitions set forth in this section, except that under 10 CFR 
2.309(h)(2) a State, local governmental body, or Federally-recognized 
Indian Tribe, or agency thereof does not need to address the standing 
requirements in 10 CFR 2.309(d) if the facility is located within its 
boundaries. A State, local governmental body, Federally-recognized 
Indian Tribe, or agency thereof may also have the opportunity to 
participate under 10 CFR 2.315(c).
    If a hearing is granted, any person who does not wish, or is not 
qualified, to become a party to the proceeding may, in the discretion 
of the presiding officer, be permitted to make a limited appearance 
pursuant to the provisions of 10 CFR 2.315(a). A person making a 
limited appearance may make an oral or written statement of position on 
the issues, but may not otherwise participate in the proceeding. A 
limited appearance may be made at any session of the hearing or at any 
prehearing conference, subject to the limits and conditions as may be 
imposed by the presiding officer. Details regarding the opportunity to 
make a limited appearance will be provided by the presiding officer if 
such sessions are scheduled.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene (hereinafter 
``petition''), and documents filed by interested governmental entities 
participating under 10 CFR 2.315(c), must be filed in accordance with 
the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562, August 3, 2012). The E-Filing process requires participants 
to submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Participants may 
not submit paper copies of their filings unless they seek an exemption 
in accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to request (1) a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition (even 
in instances in which the participant, or its counsel or 
representative, already holds an NRC-issued digital ID certificate). 
Based upon this information, the Secretary will establish an electronic 
docket for the hearing in this proceeding if the Secretary has not 
already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing 
the E-Submittal server are available on the NRC's public website at 
http://www.nrc.gov/site-help/e-submittals/adjudicatory-sub.html. 
Participants may attempt to use other software not listed on the 
website, but should note that the NRC's E-Filing system does not 
support unlisted software, and the NRC Electronic Filing Help Desk will 
not be able to offer assistance in using unlisted software.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a petition. 
Submissions should be in Portable Document Format (PDF). Additional 
guidance on PDF submissions is available on the NRC's public website at 
http://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is 
considered complete at the time the documents are submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. Eastern Time 
on the due date. Upon receipt of a transmission, the E-Filing system 
time-stamps the document and sends the submitter an email notice 
confirming receipt of the document. The E-Filing system also 
distributes an email notice that provides access to the document to the 
NRC's Office of the General Counsel and any others who have advised the 
Office of the Secretary that they wish to participate in the 
proceeding, so that the filer need not serve the documents on those

[[Page 47379]]

participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before a hearing petition to intervene is filed 
so that they can obtain access to the document via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at http://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 7 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing a document in this manner are 
responsible for serving the document on all other participants. Filing 
is considered complete by first-class mail as of the time of deposit in 
the mail, or by courier, express mail, or expedited delivery service 
upon depositing the document with the provider of the service. A 
presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the 
presiding officer subsequently determines that the reason for granting 
the exemption from use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. 
However, in some instances, a request to intervene will require 
including information on local residence in order to demonstrate a 
proximity assertion of interest in the proceeding. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    For further details with respect to this action, see the 
application for license amendment dated August 10, 2018.
    Attorney for licensee: Mr. M. Stanford Blanton, Balch & Bingham 
LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2015.
    NRC Branch Chief: Jennifer Dixon-Herrity.

    Dated at Rockville, Maryland, this 14th day of September 2018.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-20324 Filed 9-18-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                                      Federal Register / Vol. 83, No. 182 / Wednesday, September 19, 2018 / Notices                                          47375

                                                 Once a participant has obtained a                    Participants filing a document in this                NUCLEAR REGULATORY
                                              digital ID certificate and a docket has                 manner are responsible for serving the                COMMISSION
                                              been created, the participant can then                  document on all other participants.
                                              submit a petition. Submissions should                   Filing is considered complete by first-               [Docket Nos. 052–00025 and 052–00026;
                                              be in Portable Document Format (PDF).                   class mail as of the time of deposit in               NRC–2008–0252]
                                              Additional guidance on PDF                              the mail, or by courier, express mail, or
                                              submissions is available on the NRC’s                   expedited delivery service upon                       Vogtle Electric Generating Plant, Units
                                              public website at http://www.nrc.gov/                   depositing the document with the                      3 and 4
                                              site-help/electronic-sub-ref-mat.html. A                provider of the service. A presiding
                                              filing is considered complete at the time                                                                     AGENCY:Nuclear Regulatory
                                                                                                      officer, having granted an exemption
                                              the documents are submitted through                                                                           Commission.
                                                                                                      request from using E-Filing, may require
                                              the NRC’s E-Filing system. To be timely,
                                                                                                      a participant or party to use E-Filing if             ACTION: License amendment application;
                                              an electronic filing must be submitted to
                                                                                                      the presiding officer subsequently                    opportunity to comment, request a
                                              the E-Filing system no later than 11:59
                                              p.m. Eastern Time on the due date.                      determines that the reason for granting               hearing, and petition for leave to
                                              Upon receipt of a transmission, the E-                  the exemption from use of E-Filing no                 intervene.
                                              Filing system time-stamps the document                  longer exists.
                                              and sends the submitter an email notice                                                                       SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                         Documents submitted in adjudicatory
                                              confirming receipt of the document. The                                                                       Commission (NRC) is considering
                                                                                                      proceedings will appear in the NRC’s
                                              E-Filing system also distributes an email                                                                     issuance of an amendment and
                                                                                                      electronic hearing docket which is                    exemption to Combined Licenses (NPF–
                                              notice that provides access to the                      available to the public at https://
                                              document to the NRC’s Office of the                                                                           91 and NPF–92), issued to Southern
                                                                                                      adams.nrc.gov/ehd/, unless excluded                   Nuclear Operating Company, Inc. (SNC),
                                              General Counsel and any others who                      pursuant to an order of the Commission,
                                              have advised the Office of the Secretary                                                                      Georgia Power Company, Oglethorpe
                                                                                                      or the presiding officer. Participants are            Power Corporation, MEAG Power
                                              that they wish to participate in the                    requested not to include personal
                                              proceeding, so that the filer need not                                                                        SPVM, LLC, MEAG Power SPVJ, LLC,
                                                                                                      privacy information, such as social                   MEAG Power SPVP, LLC, Authority of
                                              serve the documents on those
                                              participants separately. Therefore,                     security numbers, home addresses, or                  Georgia, and the City of Dalton, Georgia
                                              applicants and other participants (or                   home phone numbers in their filings,                  (collectively, SNC), for construction and
                                              their counsel or representative) must                   unless an NRC regulation or other law                 operation of the Vogtle Electric
                                              apply for and receive a digital ID                      requires submission of such                           Generating Plant (VEGP), Units 3 and 4,
                                              certificate before a hearing petition to                information. However, in some                         located in Burke County, Georgia.
                                              intervene is filed so that they can obtain              instances, a request to intervene will                DATES: Comments must be filed by
                                              access to the document via the E-Filing                 require including information on local                October 19, 2018. A request for a
                                              system.                                                 residence in order to demonstrate a                   hearing must be filed by November 19,
                                                 A person filing electronically using                 proximity assertion of interest in the                2018.
                                              the NRC’s adjudicatory E-Filing system                  proceeding. With respect to copyrighted
                                              may seek assistance by contacting the                   works, except for limited excerpts that               ADDRESSES:   You may submit comments
                                              NRC Electronic Filing Help Desk                         serve the purpose of the adjudicatory                 by any of the following methods:
                                              through the ‘‘Contact Us’’ link located                 filings and would constitute a Fair Use                  • Federal Rulemaking Website: Go to
                                              on the NRC’s public website at http://                  application, participants are requested               http://www.regulations.gov and search
                                              www.nrc.gov/site-help/e-                                not to include copyrighted materials in               for Docket ID NRC–2008–0252. Address
                                              submittals.html, by email to                            their submission.                                     questions about Docket IDs in
                                              MSHD.Resource@nrc.gov, or by a toll-                                                                          Regulations.gov to Jennifer Borges;
                                              free call at 1–866–672–7640. The NRC                       For further details with respect to this
                                                                                                                                                            telephone: 301–287–9127; email:
                                              Electronic Filing Help Desk is available                action, see the application for license               Jennifer.Borges@nrc.gov. For technical
                                              between 9 a.m. and 7 p.m., Eastern                      amendment dated August 30, 2018.                      questions, contact the individual listed
                                              Time, Monday through Friday,                               Attorney for licensee: Mr. M. Stanford             in the FOR FURTHER INFORMATION
                                              excluding government holidays.                          Blanton, Balch & Bingham LLP, 1710                    CONTACT section of this document.
                                                 Participants who believe that they                   Sixth Avenue North, Birmingham, AL
                                              have a good cause for not submitting                                                                            • Mail comments to: May Ma, Office
                                                                                                      35203–2015.                                           of Administration, Mail Stop: TWFN–7–
                                              documents electronically must file an
                                              exemption request, in accordance with                      NRC Branch Chief: Jennifer Dixon-                  A60, U.S. Nuclear Regulatory
                                              10 CFR 2.302(g), with their initial paper               Herrity.                                              Commission, Washington, DC 20555–
                                              filing stating why there is good cause for                                                                    0001.
                                                                                                        Dated at Rockville, Maryland, this 14th day
                                              not filing electronically and requesting                of September 2018.                                      For additional direction on obtaining
                                              authorization to continue to submit                       For the Nuclear Regulatory Commission.              information and submitting comments,
                                              documents in paper format. Such filings                                                                       see ‘‘Obtaining Information and
                                                                                                      Jennifer Dixon-Herrity,
                                              must be submitted by: (1) First class                                                                         Submitting Comments’’ in the
                                              mail addressed to the Office of the                     Chief, Licensing Branch 4, Division of                SUPPLEMENTARY INFORMATION section of
                                              Secretary of the Commission, U.S.                       Licensing, Siting, and Environmental                  this document.
                                              Nuclear Regulatory Commission,                          Analysis, Office of New Reactors.
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                      [FR Doc. 2018–20322 Filed 9–18–18; 8:45 am]           FOR FURTHER INFORMATION CONTACT:
                                              Washington, DC 20555–0001, Attention:
                                                                                                                                                            William (Billy) Gleaves, Office of New
                                              Rulemaking and Adjudications Staff; or                  BILLING CODE 7590–01–P
                                                                                                                                                            Reactors, U.S. Nuclear Regulatory
                                              (2) courier, express mail, or expedited
                                                                                                                                                            Commission, Washington, DC 20555–
                                              delivery service to the Office of the
                                                                                                                                                            0001; telephone: 301–415–5848; email:
                                              Secretary, 11555 Rockville Pike,
                                                                                                                                                            Bill.Gleaves@nrc.gov.
                                              Rockville, Maryland, 20852, Attention:
                                              Rulemaking and Adjudications Staff.                                                                           SUPPLEMENTARY INFORMATION:



                                         VerDate Sep<11>2014   17:09 Sep 18, 2018   Jkt 244001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\19SEN1.SGM   19SEN1


                                              47376                   Federal Register / Vol. 83, No. 182 / Wednesday, September 19, 2018 / Notices

                                              I. Obtaining Information and                            issued to SNC for operation of the VEGP               safety-related functions of containment
                                              Submitting Comments                                     Units 3 and 4, located in Burke County,               isolation, steam generator isolation, and
                                                                                                      Georgia.                                              steam generator relief isolation. There is no
                                              A. Obtaining Information                                   The proposed changes would revise                  change to the PORV block valves safety class
                                                 Please refer to Docket ID NRC–2008–                                                                        or safety-related functions.
                                                                                                      the Combined Licenses to relocate the
                                                                                                                                                               The relocation of the branch line in which
                                              0252 when contacting the NRC about                      power operated relief valve (PORV)                    the PORV block valves are installed in allows
                                              the availability of information for this                branch lines upstream of the main steam               the PORV block valves to be closer to the
                                              action. You may obtain publicly-                        safety valves in Inspections, Tests,                  containment penetration and maintain
                                              available information related to this                   Analyses, and Acceptance Criteria                     compliance with General Design Criterion
                                              action by any of the following methods:                 (ITAAC) Figure 2.2.4–1 (Sheets 1 of 2)                (GDC) 57 for locating containment isolation
                                                 • Federal Rulemaking Website: Go to                  of the COL Appendix C. In addition to                 valves as close to the containment as
                                              http://www.regulations.gov and search                   the relocation of the PORV branch lines,              practical.
                                              for Docket ID NRC–2008–0252.                            the PORV block valves would be                           There is no impact to Chapter 15
                                                 • NRC’s Agencywide Documents                                                                               evaluations. Changes to the PORV block
                                                                                                      changed from gate valves to globe valves
                                                                                                                                                            valve and line size do not impact the mass
                                              Access and Management System                            in the VEGP Updated Final Safety                      releases to the atmosphere during a Steam
                                              (ADAMS): You may obtain publicly-                       Analysis Report (UFSAR). The                          Generator Tube Rupture accident. The mass
                                              available documents online in the                       requested amendment proposes changes                  release is limited by the PORV which is more
                                              ADAMS Public Documents collection at                    to the UFSAR in the form of departures                restrictive than the PORV block valve and
                                              http://www.nrc.gov/reading-rm/                          from the incorporated plant-specific                  line size.
                                              adams.html. To begin the search, select                 Design Control Document (DCD) Tier 2                     There is no impact to any assumed leakage
                                              ‘‘ADAMS Public Documents’’ and then                     information in the UFSAR and involves                 through the PORV line. The existing 12-inch
                                              select ‘‘Begin Web-based ADAMS                          changes to COL Appendix C, and                        PORV has a design function to limit leakage
                                                                                                                                                            through the PORV line. Increasing the PORV
                                              Search.’’ For problems with ADAMS,                      corresponding changes to plant-specific
                                                                                                                                                            block valve to 12 inches will increase the
                                              please contact the NRC’s Public                         Tier 1 information. Because, these                    leakage through the PORV block valve
                                              Document Room (PDR) reference staff at                  proposed changes require a departure                  however it will be that same leakage rate as
                                              1–800–397–4209, 301–415–4737, or by                     from Tier 1 information in the                        the 12-inch PORV. Therefore, the leakage rate
                                              email to pdr.resource@nrc.gov. The                      Westinghouse Electric Company’s                       through the PORV line does not increase and
                                              application for amendment is dated                      AP1000 Design Control Document                        there is no impact to radiation doses.
                                              August 10, 2018, is available in ADAMS                  (DCD), the licensee also requested an                    There is no impact to the assumptions or
                                              under Accession No. ML18222A599.                        exemption from the requirements of the                analysis in the completed safety analysis for
                                                 • NRC’s PDR: You may examine and                     Generic DCD Tier 1 in accordance with                 radiation doses as a result of the change.
                                              purchase copies of public documents at                  section 52.63(b)(1) of title 10 of the Code              There is no impact to the conclusions of
                                                                                                                                                            the Pipe Rupture Hazard Analysis (PRHA)
                                              the NRC’s PDR, Room O1–F21, One                         of Federal Regulations (10 CFR).
                                                                                                                                                            because the PORV line is Break Exclusion
                                              White Flint North, 11555 Rockville                         Before any issuance of the proposed
                                                                                                                                                            Zone (BEZ) piping. The proposed changes do
                                              Pike, Rockville, Maryland 20852.                        license amendment, the NRC will need                  not result in any new postulated break
                                                                                                      to make the findings required by the                  locations. Updated analyses confirm that the
                                              B. Submitting Comments                                  Atomic Energy Act of 1954, as amended                 integrity of the wall adjacent to the [main
                                                Please include Docket ID NRC–2008–                    (the Act), and NRC’s regulations.                     control room] MCR is unaffected by a
                                              0252 in your comment submission.                           The NRC has made a proposed                        postulated main steam line break that causes
                                                The NRC cautions you not to include                   determination that the license                        the PORV line to impact the wall.
                                              identifying or contact information that                 amendment request involves no                            There is no change to the valve motor
                                              you do not want to be publicly                          significant hazards consideration. Under              operator. The current motor operator is
                                              disclosed in your comment submission.                   the NRC’s regulations in 10 CFR 50.92,                sufficient to operate the new 12-inch globe
                                                                                                      this means that operation of the facility             valve. Therefore, there is no impact to the
                                              The NRC posts all comment
                                                                                                                                                            Class 1E dc and UPS System (IDS) battery
                                              submissions at http://                                  in accordance with the proposed                       sizing. There is no change to the valve stroke
                                              www.regulations.gov as well as entering                 amendment would not (1) involve a                     time, therefore there is no impact to valve
                                              the comment submissions into ADAMS.                     significant increase in the probability or            open/closure times.
                                              The NRC does not routinely edit                         consequences of an accident previously                   Therefore, the proposed amendment does
                                              comment submissions to remove                           evaluated; or (2) create the possibility of           not involve a significant increase in the
                                              identifying or contact information.                     a new or different kind of accident from              probability or consequences of an accident
                                                If you are requesting or aggregating                  any accident previously evaluated; or                 previously evaluated.
                                              comments from other persons for                         (3) involve a significant reduction in a                 2. Does the proposed amendment create
                                              submission to the NRC, then you should                  margin of safety. As required by 10 CFR               the possibility of a new or different kind of
                                                                                                                                                            accident from any accident previously
                                              inform those persons not to include                     50.91(a), the licensee has provided its               evaluated?
                                              identifying or contact information that                 analysis of the issue of no significant                  Response: No.
                                              they do not want to be publicly                         hazards consideration, which is                          The proposed changes do not affect the
                                              disclosed in their comment submission.                  presented below:                                      operation of systems or equipment that could
                                              Your request should state that the NRC                     1. Does the proposed amendment involve             initiate a new or different kind of accident,
                                              does not routinely edit comment                         a significant increase in the probability or          or alter any SSC such that a new accident
                                              submissions to remove such information                  consequences of an accident previously                initiator or initiating sequence of events is
                                              before making the comment                               evaluated?                                            created. With the proposed changes, the
                                              submissions available to the public or                     Response: No.                                      PORV block valves are still able to perform
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                         The proposed changes do not affect the             the safety related functions of containment
                                              entering the comment submissions into                                                                         isolation, steam generator isolation, and
                                                                                                      operation or reliability of any system,
                                              ADAMS.                                                  structure or component (SSC) required to              steam generator relief isolation. There is no
                                              II. Introduction                                        maintain a normal power operating condition           change to the PORV block valves safety class
                                                                                                      or to mitigate anticipated transients without         or safety-related functions.
                                                 The NRC is considering issuance of an                safety-related systems.                                  The relocation of the branch line in which
                                              amendment to facility Combined                             With the proposed changes, the PORV                the PORV block valves are installed in allows
                                              License Nos. NPF–91 and NPF–92,                         block valves are still able to perform the            the PORV block valves to be closer to the



                                         VerDate Sep<11>2014   17:09 Sep 18, 2018   Jkt 244001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\19SEN1.SGM   19SEN1


                                                                      Federal Register / Vol. 83, No. 182 / Wednesday, September 19, 2018 / Notices                                            47377

                                              containment penetration and maintain                    PORV has a design function to limit leakage           consideration determination, any
                                              compliance with General Design Criterion                through the PORV line. Increasing the PORV            hearing will take place after issuance.
                                              (GDC) 57 for locating containment isolation             block valve to 12 inches will increase the            The Commission expects that the need
                                              valves as close to the containment as                   leakage through the PORV block valve                  to take this action will occur very
                                              practical.                                              however it will be that same leakage rate as
                                                 There is no impact to Chapter 15                     the 12-inch PORV. Therefore, the leakage rate
                                                                                                                                                            infrequently.
                                              evaluations. Changes to the PORV block                  through the PORV line does not increase and           III. Opportunity To Request a Hearing
                                              valve and line size do not impact the mass              there is no impact to radiation doses.                and Petition for Leave To Intervene
                                              releases to the atmosphere during a Steam                 There is no impact to the assumptions or
                                              Generator Tube Rupture accident. The mass               analysis in the completed safety analysis for            Within 60 days after the date of
                                              release is limited by the PORV which is more            radiation doses as a result of the change.            publication of this notice, any persons
                                              restrictive than the PORV block valve and                 There is no impact to the conclusions of            (petitioner) whose interest may be
                                              line size.                                              the Pipe Rupture Hazard Analysis (PRHA)               affected by this action may file a request
                                                 There is no impact to any assumed leakage            because the PORV line is Break Exclusion              for a hearing and a petition to intervene
                                              through the PORV line. The existing 12-inch             Zone (BEZ) piping. The proposed changes do
                                              PORV has a design function to limit leakage
                                                                                                                                                            (petition) with respect to the action.
                                                                                                      not result in any new postulated break                Petitions shall be filed in accordance
                                              through the PORV line. Increasing the PORV              locations. Updated analyses confirm that the
                                              block valve to 12 inches will increase the                                                                    with the Commission’s ‘‘Agency Rules
                                                                                                      integrity of the wall adjacent to the MCR is
                                              leakage through the PORV block valve                    unaffected by a postulated main steam line
                                                                                                                                                            of Practice and Procedure’’ in 10 CFR
                                              however it will be that same leakage rate as            break that causes the PORV line to impact the         part 2. Interested persons should
                                              the 12-inch PORV. Therefore, the leakage rate           wall.                                                 consult a current copy of 10 CFR 2.309,
                                              through the PORV line does not increase and                                                                   which is available at the NRC’s PDR,
                                                                                                        There is no change to the valve motor
                                              there is no impact to radiation doses.                                                                        located at One White Flint North, Room
                                                                                                      operator. The current motor operator is
                                                 There is no impact to the assumptions or
                                              analysis in the completed safety analysis for
                                                                                                      sufficient to operate the new 12-inch globe           O1–F21, 11555 Rockville Pike (first
                                                                                                      valve. Therefore, there is no impact to the           floor), Rockville, Maryland 20852. The
                                              radiation doses as a result of the change.
                                                 There is no impact to the conclusions of             Class 1E dc and UPS System (IDS) battery              NRC’s regulations are accessible
                                              the Pipe Rupture Hazard Analysis (PRHA)                 sizing. There is no change to the valve stroke        electronically from the NRC Library on
                                              because the PORV line is Break Exclusion                time, therefore there is no impact to valve           the NRC’s website at http://
                                              Zone (BEZ) piping. The proposed changes do              open/closure times.
                                                                                                        Therefore, the proposed amendment does
                                                                                                                                                            www.nrc.gov/reading-rm/doc-
                                              not result in any new postulated break                                                                        collections/cfr/. If a petition is filed
                                              locations. Updated analyses confirm that the            not involve a significant reduction in a
                                                                                                      margin of safety.                                     within 60 days, the Commission or a
                                              integrity of the wall adjacent to the MCR is
                                              unaffected by a postulated main steam line
                                                                                                                                                            presiding officer designated by the
                                                                                                         The NRC staff has reviewed the                     Commission or by the Chief
                                              break that causes the PORV line to impact the           licensee’s analysis and, based on this
                                              wall.                                                                                                         Administrative Judge of the Atomic
                                                 There is no change to the valve motor                review, it appears that the three                     Safety and Licensing Board Panel, will
                                              operator. The current motor operator is                 standards of 10 CFR 50.92(c) are                      rule on the petition; and the Secretary
                                              sufficient to operate the new 12-inch globe             satisfied. Therefore, the NRC staff                   or the Chief Administrative Judge of the
                                              valve. Therefore, there is no impact to the             proposes to determine that the license                Atomic Safety and Licensing Board
                                              Class 1E dc and UPS System (IDS) battery                amendment request involves no                         Panel will issue a notice of a hearing or
                                              sizing. There is no change to the valve stroke          significant hazards consideration.                    an appropriate order.
                                              time, therefore there is no impact to valve                The NRC is seeking public comments                    As required by 10 CFR 2.309, a
                                              open/closure times.                                     on this proposed determination that the
                                                 Therefore, the proposed amendment does                                                                     petition shall set forth with particularity
                                              not create the possibility of a new or different
                                                                                                      license amendment request involves no                 the interest of the petitioner in the
                                              kind of accident from any accident                      significant hazards consideration. Any                proceeding, and how that interest may
                                              previously evaluated.                                   comments received within 30 days after                be affected by the results of the
                                                 3. Does the proposed amendment involve               the date of publication of this notice                proceeding. The petition should
                                              a significant reduction in a margin of safety?          will be considered in making any final                specifically explain the reasons why
                                                 Response: No.                                        determination.                                        intervention should be permitted with
                                                 The proposed changes do not affect                      Normally, the Commission will not                  particular reference to the following
                                              existing safety margins. With the proposed              issue the amendment until the
                                              changes, the PORV block valves are still able
                                                                                                                                                            general requirements: (1) The name,
                                              to perform the safety-related functions of
                                                                                                      expiration of 60 days after the date of               address, and telephone number of the
                                              containment isolation, steam generator                  publication of this notice. The                       petitioner; (2) the nature of the
                                              isolation, and steam generator relief isolation.        Commission may issue the license                      petitioner’s right under the Act to be
                                              There is no change to the PORV block valves             amendment before expiration of the 60-                made a party to the proceeding; (3) the
                                              safety class or safety-related functions.               day notice period if the Commission                   nature and extent of the petitioner’s
                                                 The relocation of the branch line in which           concludes the amendment involves no                   property, financial, or other interest in
                                              the PORV block valves are installed in allows           significant hazards consideration. In                 the proceeding; and (4) the possible
                                              the PORV block valves to be closer to the               addition, the Commission may issue the                effect of any decision or order which
                                              containment penetration and maintain
                                              compliance with General Design Criterion
                                                                                                      amendment prior to the expiration of                  may be entered in the proceeding on the
                                              (GDC) 57 for locating containment isolation             the 30-day comment period should                      petitioner’s interest. The petition must
                                              valves as close to the containment as                   circumstances change during the 30-day                also set forth the specific contentions
                                              practical.                                              comment period such that failure to act               which the petitioner seeks to have
                                                 There is no impact to Chapter 15                     in a timely way would result, for                     litigated at the proceeding.
                                              evaluations. Changes to the PORV block                  example, in derating or shutdown of the                  Each contention must consist of a
amozie on DSK3GDR082PROD with NOTICES1




                                              valve and line size do not impact the mass              facility. Should the Commission take                  specific statement of the issue of law or
                                              releases to the atmosphere during a Steam               action prior to the expiration of either              fact to be raised or controverted. In
                                              Generator Tube Rupture accident. The mass
                                              release is limited by the PORV which is more
                                                                                                      the comment period or the notice                      addition, the petitioner shall provide a
                                              restrictive than the PORV block valve and               period, the Commission will publish a                 brief explanation of the bases for the
                                              line size.                                              notice of issuance in the Federal                     contention and a concise statement of
                                                 There is no impact to any assumed leakage            Register. Should the Commission make                  the alleged facts or expert opinion
                                              through the PORV line. The existing 12-inch             a final no significant hazards                        which support the contention and on


                                         VerDate Sep<11>2014   17:09 Sep 18, 2018   Jkt 244001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\19SEN1.SGM   19SEN1


                                              47378                   Federal Register / Vol. 83, No. 182 / Wednesday, September 19, 2018 / Notices

                                              which the petitioner intends to rely in                    A State, local governmental body,                  an exemption in accordance with the
                                              proving the contention at the hearing.                  Federally-recognized Indian Tribe, or                 procedures described below.
                                              The petitioner must also provide                        agency thereof, may submit a petition to                 To comply with the procedural
                                              references to those specific sources and                the Commission to participate as a party              requirements of E-Filing, at least 10
                                              documents of which the petitioner is                    under 10 CFR 2.309(h)(1).                             days prior to the filing deadline, the
                                              aware and on which the petitioner                          The petition should state the nature               participant should contact the Office of
                                              intends to rely to establish those facts or             and extent of the petitioner’s interest in            the Secretary by email at
                                              expert opinion to support its position on               the proceeding. The petition should be                hearing.docket@nrc.gov, or by telephone
                                              the issue. The petition must include                    submitted to the Commission by                        at 301–415–1677, to request (1) a digital
                                              sufficient information to show that a                   November 19, 2018. The petition must                  identification (ID) certificate, which
                                              genuine dispute exists with the                         be filed in accordance with the filing                allows the participant (or its counsel or
                                              applicant on a material issue of law or                 instructions in the ‘‘Electronic                      representative) to digitally sign
                                              fact. Contentions shall be limited to                   Submissions (E-Filing)’’ section of this              documents and access the E-Submittal
                                              matters within the scope of the                         document, and should meet the                         server for any proceeding in which it is
                                              proceeding. The contention must be one                  requirements for petitions set forth in               participating; and (2) advise the
                                              which, if proven, would entitle the                     this section, except that under 10 CFR                Secretary that the participant will be
                                              petitioner to relief. A petitioner who                  2.309(h)(2) a State, local governmental               submitting a petition (even in instances
                                              fails to satisfy these requirements with                body, or Federally-recognized Indian                  in which the participant, or its counsel
                                              respect to at least one contention will                 Tribe, or agency thereof does not need                or representative, already holds an NRC-
                                              not be permitted to participate as a                    to address the standing requirements in               issued digital ID certificate). Based upon
                                              party.                                                  10 CFR 2.309(d) if the facility is located            this information, the Secretary will
                                                 Those permitted to intervene become                  within its boundaries. A State, local                 establish an electronic docket for the
                                              parties to the proceeding, subject to any               governmental body, Federally-                         hearing in this proceeding if the
                                              limitations in the order granting leave to              recognized Indian Tribe, or agency                    Secretary has not already established an
                                              intervene, and have the opportunity to                  thereof may also have the opportunity to              electronic docket.
                                                                                                                                                               Information about applying for a
                                              participate fully in the conduct of the                 participate under 10 CFR 2.315(c).
                                                                                                                                                            digital ID certificate is available on the
                                              hearing with respect to resolution of                      If a hearing is granted, any person                NRC’s public website at http://
                                              that person’s admitted contentions                      who does not wish, or is not qualified,               www.nrc.gov/site-help/e-submittals/
                                              consistent with the NRC’s regulations,                  to become a party to the proceeding                   getting-started.html. System
                                              policies, and procedures.                               may, in the discretion of the presiding               requirements for accessing the E-
                                                 Petitions for leave to intervene must                officer, be permitted to make a limited               Submittal server are available on the
                                              be filed no later than 60 days from the                 appearance pursuant to the provisions                 NRC’s public website at http://
                                              date of publication of this notice.                     of 10 CFR 2.315(a). A person making a                 www.nrc.gov/site-help/e-submittals/
                                              Requests for hearing, petitions for leave               limited appearance may make an oral or                adjudicatory-sub.html. Participants may
                                              to intervene, and motions for leave to                  written statement of position on the                  attempt to use other software not listed
                                              file new or amended contentions that                    issues, but may not otherwise                         on the website, but should note that the
                                              are filed after the 60-day deadline will                participate in the proceeding. A limited              NRC’s E-Filing system does not support
                                              not be entertained absent a                             appearance may be made at any session                 unlisted software, and the NRC
                                              determination by the presiding officer                  of the hearing or at any prehearing                   Electronic Filing Help Desk will not be
                                              that the filing demonstrates good cause                 conference, subject to the limits and                 able to offer assistance in using unlisted
                                              by satisfying the three factors in 10 CFR               conditions as may be imposed by the                   software.
                                              2.309(c)(1)(i) through (iii).                           presiding officer. Details regarding the                 Once a participant has obtained a
                                                 If a hearing is requested, and the                   opportunity to make a limited                         digital ID certificate and a docket has
                                              Commission has not made a final                         appearance will be provided by the                    been created, the participant can then
                                              determination on the issue of no                        presiding officer if such sessions are                submit a petition. Submissions should
                                              significant hazards consideration, the                  scheduled.                                            be in Portable Document Format (PDF).
                                              Commission will make a final                                                                                  Additional guidance on PDF
                                                                                                      IV. Electronic Submissions (E-Filing)
                                              determination on the issue of no                                                                              submissions is available on the NRC’s
                                              significant hazards consideration. The                     All documents filed in NRC                         public website at http://www.nrc.gov/
                                              final determination will serve to decide                adjudicatory proceedings, including a                 site-help/electronic-sub-ref-mat.html. A
                                              when the hearing is held. If the final                  request for hearing, a petition for leave             filing is considered complete at the time
                                              determination is that the amendment                     to intervene, any motion or other                     the documents are submitted through
                                              request involves no significant hazards                 document filed in the proceeding prior                the NRC’s E-Filing system. To be timely,
                                              consideration, the Commission may                       to the submission of a request for                    an electronic filing must be submitted to
                                              issue the amendment and make it                         hearing or petition to intervene                      the E-Filing system no later than 11:59
                                              immediately effective, notwithstanding                  (hereinafter ‘‘petition’’), and documents             p.m. Eastern Time on the due date.
                                              the request for a hearing. Any hearing                  filed by interested governmental entities             Upon receipt of a transmission, the E-
                                              held would take place after issuance of                 participating under 10 CFR 2.315(c),                  Filing system time-stamps the document
                                              the amendment. If the final                             must be filed in accordance with the                  and sends the submitter an email notice
                                              determination is that the amendment                     NRC’s E-Filing rule (72 FR 49139;                     confirming receipt of the document. The
                                              request involves a significant hazards                  August 28, 2007, as amended at 77 FR                  E-Filing system also distributes an email
amozie on DSK3GDR082PROD with NOTICES1




                                              consideration, then any hearing held                    46562, August 3, 2012). The E-Filing                  notice that provides access to the
                                              would take place before the issuance of                 process requires participants to submit               document to the NRC’s Office of the
                                              any amendment unless the Commission                     and serve all adjudicatory documents                  General Counsel and any others who
                                              finds an imminent danger to the health                  over the internet, or in some cases to                have advised the Office of the Secretary
                                              or safety of the public, in which case it               mail copies on electronic storage media.              that they wish to participate in the
                                              will issue an appropriate order or rule                 Participants may not submit paper                     proceeding, so that the filer need not
                                              under 10 CFR part 2.                                    copies of their filings unless they seek              serve the documents on those


                                         VerDate Sep<11>2014   17:09 Sep 18, 2018   Jkt 244001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\19SEN1.SGM   19SEN1


                                                                      Federal Register / Vol. 83, No. 182 / Wednesday, September 19, 2018 / Notices                                                47379

                                              participants separately. Therefore,                     unless an NRC regulation or other law                 Week of October 8, 2018—Tentative
                                              applicants and other participants (or                   requires submission of such
                                                                                                                                                            Thursday, October 11, 2018
                                              their counsel or representative) must                   information. However, in some
                                              apply for and receive a digital ID                      instances, a request to intervene will                9:00 a.m. Strategic Programmatic
                                              certificate before a hearing petition to                require including information on local                    Overview of the Decommissioning
                                              intervene is filed so that they can obtain              residence in order to demonstrate a                       and Low-Level Waste and Spent
                                              access to the document via the E-Filing                 proximity assertion of interest in the                    Fuel Storage and Transportation
                                              system.                                                 proceeding. With respect to copyrighted                   Business Lines (Public) (Contact:
                                                 A person filing electronically using                 works, except for limited excerpts that                   Matthew Meyer: 301–415–6198)
                                              the NRC’s adjudicatory E-Filing system                  serve the purpose of the adjudicatory                   This meeting will be webcast live at
                                              may seek assistance by contacting the                   filings and would constitute a Fair Use               the Web address—http://www.nrc.gov/.
                                              NRC Electronic Filing Help Desk                         application, participants are requested
                                              through the ‘‘Contact Us’’ link located                                                                       Week of October 15, 2018—Tentative
                                                                                                      not to include copyrighted materials in
                                              on the NRC’s public website at http://                  their submission.                                       There are no meetings scheduled for
                                              www.nrc.gov/site-help/e-                                   For further details with respect to this           the week of October 15, 2018.
                                              submittals.html, by email to                            action, see the application for license
                                              MSHD.Resource@nrc.gov, or by a toll-                                                                          Week of October 22, 2018—Tentative
                                                                                                      amendment dated August 10, 2018.
                                              free call at 1–866–672–7640. The NRC                                                                          Thursday, October 25, 2018
                                              Electronic Filing Help Desk is available                   Attorney for licensee: Mr. M. Stanford
                                                                                                      Blanton, Balch & Bingham LLP, 1710                    9:00 a.m. Briefing on Digital
                                              between 9 a.m. and 7 p.m., Eastern
                                                                                                      Sixth Avenue North, Birmingham, AL                         Instrumentation and Control
                                              Time, Monday through Friday,
                                                                                                      35203–2015.                                                (Public) (Contact: Jason Paige: 301–
                                              excluding government holidays.
                                                 Participants who believe that they                      NRC Branch Chief: Jennifer Dixon-                       415–1474)
                                              have a good cause for not submitting                    Herrity.                                                 This meeting will be webcast live at
                                              documents electronically must file an                     Dated at Rockville, Maryland, this 14th day
                                                                                                                                                            the Web address—http://www.nrc.gov/.
                                              exemption request, in accordance with                   of September 2018.                                    CONTACT PERSON FOR MORE INFORMATION:
                                              10 CFR 2.302(g), with their initial paper                 For the Nuclear Regulatory Commission.              For more information or to verify the
                                              filing stating why there is good cause for              Jennifer Dixon-Herrity,                               status of meetings, contact Denise
                                              not filing electronically and requesting                                                                      McGovern at 301–415–0681 or via email
                                                                                                      Chief, Licensing Branch 4, Division of
                                              authorization to continue to submit                     Licensing, Siting, and Environmental                  at Denise.McGovern@nrc.gov. The
                                              documents in paper format. Such filings                 Analysis, Office of New Reactors.                     schedule for Commission meetings is
                                              must be submitted by: (1) First class                   [FR Doc. 2018–20324 Filed 9–18–18; 8:45 am]
                                                                                                                                                            subject to change on short notice.
                                              mail addressed to the Office of the                                                                              The NRC Commission Meeting
                                                                                                      BILLING CODE 7590–01–P
                                              Secretary of the Commission, U.S.                                                                             Schedule can be found on the internet
                                              Nuclear Regulatory Commission,                                                                                at: http://www.nrc.gov/public-involve/
                                              Washington, DC 20555–0001, Attention:                   NUCLEAR REGULATORY                                    public-meetings/schedule.html.
                                              Rulemaking and Adjudications Staff; or                  COMMISSION                                               The NRC provides reasonable
                                              (2) courier, express mail, or expedited                                                                       accommodation to individuals with
                                              delivery service to the Office of the                                                                         disabilities where appropriate. If you
                                              Secretary, 11555 Rockville Pike,                        [NRC–2018–0001]                                       need a reasonable accommodation to
                                              Rockville, Maryland 20852, Attention:                                                                         participate in these public meetings, or
                                                                                                      Sunshine Act Meetings
                                              Rulemaking and Adjudications Staff.                                                                           need this meeting notice or the
                                              Participants filing a document in this                                                                        transcript or other information from the
                                                                                                      TIME AND DATE:  Weeks of September 17,
                                              manner are responsible for serving the                                                                        public meetings in another format (e.g.,
                                                                                                      24, October 1, 8, 15, 22, 2018.
                                              document on all other participants.                                                                           braille, large print), please notify
                                              Filing is considered complete by first-                 PLACE:Commissioners’ Conference                       Kimberly Meyer-Chambers, NRC
                                              class mail as of the time of deposit in                 Room, 11555 Rockville Pike, Rockville,                Disability Program Manager, at 301–
                                              the mail, or by courier, express mail, or               Maryland.                                             287–0739, by videophone at 240–428–
                                              expedited delivery service upon                         STATUS:   Public and closed.                          3217, or by email at Kimberly.Meyer-
                                              depositing the document with the                                                                              Chambers@nrc.gov. Determinations on
                                              provider of the service. A presiding                    MATTERS TO BE CONSIDERED:
                                                                                                                                                            requests for reasonable accommodation
                                              officer, having granted an exemption                    Week of September 17, 2018                            will be made on a case-by-case basis.
                                              request from using E-Filing, may require                                                                         Members of the public may request to
                                              a participant or party to use E-Filing if                 There are no meetings scheduled for                 receive this information electronically.
                                              the presiding officer subsequently                      the week of September 17, 2018.                       If you would like to be added to the
                                              determines that the reason for granting                 Week of September 24, 2018—Tentative                  distribution, please contact the Nuclear
                                              the exemption from use of E-Filing no                                                                         Regulatory Commission, Office of the
                                              longer exists.                                          Thursday, September 27, 2018                          Secretary, Washington, DC 20555 (301–
                                                 Documents submitted in adjudicatory                                                                        415–1969), or you may email
                                                                                                      10:00 a.m. Strategic Programmatic
                                              proceedings will appear in the NRC’s                                                                          Patricia.Jimenez@nrc.gov or
                                                                                                          Overview of the Operating Reactors
                                              electronic hearing docket which is                                                                            Wendy.Moore@nrc.gov.
                                                                                                          Business Line (Public) (Contact:
                                              available to the public at https://
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                          Trent Wertz: 301–415–1568)                          Dated at Rockville, Maryland, this 14th day
                                              adams.nrc.gov/ehd/, unless excluded
                                                                                                                                                            of September 2018.
                                              pursuant to an order of the Commission,                   This meeting will be webcast live at
                                              or the presiding officer. Participants are              the Web address—http://www.nrc.gov/.                    For the Nuclear Regulatory Commission.
                                              requested not to include personal                                                                             Denise L. McGovern,
                                                                                                      Week of October 1, 2018—Tentative                     Policy Coordinator, Office of the Secretary.
                                              privacy information, such as social
                                              security numbers, home addresses, or                      There are no meetings scheduled for                 [FR Doc. 2018–20439 Filed 9–17–18; 11:15 am]
                                              home phone numbers in their filings,                    the week of October 1, 2018.                          BILLING CODE 7590–01–P




                                         VerDate Sep<11>2014   17:09 Sep 18, 2018   Jkt 244001   PO 00000   Frm 00052   Fmt 4703   Sfmt 9990   E:\FR\FM\19SEN1.SGM   19SEN1



Document Created: 2018-09-19 02:55:58
Document Modified: 2018-09-19 02:55:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionLicense amendment application; opportunity to comment, request a hearing, and petition for leave to intervene.
DatesComments must be filed by October 19, 2018. A request for a hearing must be filed by November 19, 2018.
ContactWilliam (Billy) Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-5848; email: [email protected]
FR Citation83 FR 47375 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR