83_FR_48488 83 FR 48303 - Combined Notice of Filings

83 FR 48303 - Combined Notice of Filings

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 185 (September 24, 2018)

Page Range48303-48303
FR Document2018-20735

Federal Register, Volume 83 Issue 185 (Monday, September 24, 2018)
[Federal Register Volume 83, Number 185 (Monday, September 24, 2018)]
[Notices]
[Page 48303]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20735]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP18-1179-000.
    Applicants: BP Energy Company, Riverbend Oil & Gas VIII, L.L.C.
    Description: Joint Petition for Temporary Waivers of Capacity 
Release Policies and Regulations, et al. of BP Energy Company, et al.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5082.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: RP18-1180-000.
    Applicants: Columbia Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: TCO Essential Power Neg Rate 
Agmt to be effective 9/14/2018.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5083.
    Comments Due: 5 p.m. ET 9/26/18.

    Docket Numbers: RP18-1181-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Sec.  4(d) Rate Filing: 091418 Negotiated Rates--
Mercuria Energy America, Inc. H-7540-89 to be effective 11/1/2018.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5108.
    Comments Due: 5 p.m. ET 9/26/18.

    Docket Numbers: RP18-1182-000.
    Applicants: Tallgrass Interstate Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2018-09-14 Valero to 
be effective 9/14/2018.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5182.
    Comments Due: 5 p.m. ET 9/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-20735 Filed 9-21-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                        Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices                                                  48303

                                                Dated: September 18, 2018.                              Dated: September 12, 2018.                          intervention is necessary to become a
                                              Kimberly D. Bose,                                       Kimberly D. Bose,                                     party to the proceeding.
                                              Secretary.                                              Secretary.                                               eFiling is encouraged. More detailed
                                              [FR Doc. 2018–20688 Filed 9–21–18; 8:45 am]             [FR Doc. 2018–20685 Filed 9–21–18; 8:45 am]           information relating to filing
                                              BILLING CODE 6717–01–P                                  BILLING CODE 6717–01–P
                                                                                                                                                            requirements, interventions, protests,
                                                                                                                                                            service, and qualifying facilities filings
                                                                                                                                                            can be found at: http://www.ferc.gov/
                                              DEPARTMENT OF ENERGY                                    DEPARTMENT OF ENERGY                                  docs-filing/efiling/filing-req.pdf. For
                                                                                                                                                            other information, call (866) 208–3676
                                              Federal Energy Regulatory                               Federal Energy Regulatory                             (toll free). For TTY, call (202) 502–8659.
                                              Commission                                              Commission                                              Dated: September 17, 2018.
                                              [Project No. 2336–094]                                  Combined Notice of Filings                            Nathaniel J. Davis, Sr.,
                                                                                                                                                            Deputy Secretary.
                                              Georgia Power Company; Notice of                          Take notice that the Commission has                 [FR Doc. 2018–20735 Filed 9–21–18; 8:45 am]
                                              Cancellation of Scoping and Site                        received the following Natural Gas                    BILLING CODE 6717–01–P
                                              Review                                                  Pipeline Rate and Refund Report filings:
                                                 Take notice that the scoping meetings                Filings Instituting Proceedings
                                              and site review for the following                                                                             DEPARTMENT OF ENERGY
                                                                                                         Docket Numbers: RP18–1179–000.
                                              hydroelectric application are cancelled                    Applicants: BP Energy Company,
                                              and will be rescheduled for a future                                                                          Federal Energy Regulatory
                                                                                                      Riverbend Oil & Gas VIII, L.L.C.                      Commission
                                              date.                                                      Description: Joint Petition for
                                                 a. Type of Application: Notice of                    Temporary Waivers of Capacity Release                 Combined Notice of Filings #1
                                              Intent to File License Application for a                Policies and Regulations, et al. of BP
                                              New License and Commencing Pre-                         Energy Company, et al.                                   Take notice that the Commission
                                              filing Process.                                            Filed Date: 9/14/18.                               received the following electric corporate
                                                 b. Project No.: 2336–094.                               Accession Number: 20180914–5082.                   filings:
                                                 c. Dated Filed: July 3, 2018.                                                                                 Docket Numbers: EC18–156–000.
                                                                                                         Comments Due: 5 p.m. ET 9/21/18.
                                                 d. Applicant: Georgia Power Company                                                                           Applicants: American Transmission
                                              (Georgia Power).                                           Docket Numbers: RP18–1180–000.
                                                                                                         Applicants: Columbia Gas                           Systems, Incorporated.
                                                 e. Name of Project: Lloyd Shoals                                                                              Description: Application for
                                              Hydroelectric Project (Lloyd Shoals                     Transmission, LLC.
                                                                                                         Description: § 4(d) Rate Filing: TCO               Authorization of Transaction under
                                              Project, or project).                                                                                         Section 203 of the Federal Power Act, et
                                                 f. Location: The project is located on               Essential Power Neg Rate Agmt to be
                                                                                                      effective 9/14/2018.                                  al. of American Transmission Systems,
                                              the Ocmulgee River in Butts, Henry,                                                                           Incorporated.
                                              Jasper, and Newton Counties, Georgia.                      Filed Date: 9/14/18.
                                                                                                         Accession Number: 20180914–5083.                      Filed Date: 9/14/18.
                                              No federal lands have been identified                                                                            Accession Number: 20180914–5186.
                                              within the project boundary.                               Comments Due: 5 p.m. ET 9/26/18.
                                                                                                                                                               Comments Due: 5 p.m. ET 10/5/18.
                                                 g. Filed Pursuant to: 18 CFR part 5 of                  Docket Numbers: RP18–1181–000.
                                                                                                         Applicants: Iroquois Gas                              Docket Numbers: EC18–157–000.
                                              the Commission’s Regulations.
                                                 h. Potential Applicant Contact:                      Transmission System, L.P.                                Applicants: Wisconsin Public Service
                                              Courtenay R. O’Mara, P.E., Hydro                           Description: § 4(d) Rate Filing: 091418            Corporation, Wisconsin Power and
                                              Licensing and Compliance Supervisor,                    Negotiated Rates—Mercuria Energy                      Light Company, Wisconsin River Power
                                              Southern Company Generation, 241                        America, Inc. H–7540–89 to be effective               Company.
                                              Ralph McGill Boulevard NE, BIN 10193,                   11/1/2018.                                               Description: Joint Application for
                                              Atlanta, GA 30308–3374; (404) 506–                         Filed Date: 9/14/18.                               Authorization under Section 203 of the
                                              7219, or g2jacksonrel@southernco.com.                      Accession Number: 20180914–5108.                   Federal Power Act of Wisconsin Public
                                                 i. FERC Contact: Navreet Deo at (202)                   Comments Due: 5 p.m. ET 9/26/18.                   Service Corporation, et al.
                                              502–6304, or by email at navreet.deo@                      Docket Numbers: RP18–1182–000.                        Filed Date: 9/14/18.
                                              ferc.gov.                                                  Applicants: Tallgrass Interstate Gas                  Accession Number: 20180914–5197.
                                                 j. Scoping Meetings: The                             Transmission, LLC.                                       Comments Due: 5 p.m. ET 10/5/18.
                                              Commission’s August 20, 2018, Notice                       Description: § 4(d) Rate Filing: Neg                  Take notice that the Commission
                                              of Commencement of Proceedings, and                     Rate 2018–09–14 Valero to be effective                received the following exempt
                                              Commission staff’s Scoping Document                     9/14/2018.                                            wholesale generator filings:
                                              1, established September 13, 2018, as                      Filed Date: 9/14/18.                                  Docket Numbers: EG18–125–000.
                                              the date for the project scoping                           Accession Number: 20180914–5182.                      Applicants: MC Project Company
                                              meetings, and September 14, 2018, as                       Comments Due: 5 p.m. ET 9/26/18.                   LLC.
                                              the date for the environmental site                        The filings are accessible in the                     Description: Notice of Self-
                                              review. Due to Hurricane Florence, the                  Commission’s eLibrary system by                       Certification of Exempt Wholesale
                                              Commission is postponing the scoping                    clicking on the links or querying the                 Generator Status of MC Project
                                              meetings and site review until further                  docket number.                                        Company LLC.
                                              notice. As soon as new plans can be                        Any person desiring to intervene or                   Filed Date: 9/17/18.
amozie on DSK3GDR082PROD with NOTICES1




                                              established, the Commission will issue                  protest in any of the above proceedings                  Accession Number: 20180917–5103.
                                              a new notice of scoping, along with a                   must file in accordance with Rules 211                   Comments Due: 5 p.m. ET 10/9/18.
                                              modification to the procedural                          and 214 of the Commission’s                              Docket Numbers: EG18–126–000.
                                              schedule, including revised dates for the               Regulations (18 CFR 385.211 and                          Applicants: LMBE Project Company
                                              scoping meetings and site review. The                   385.214) on or before 5:00 p.m. Eastern               LLC.
                                              application will be processed according                 time on the specified comment date.                      Description: Notice of Self-
                                              to the revised schedule.                                Protests may be considered, but                       Certification of Exempt Wholesale


                                         VerDate Sep<11>2014   17:40 Sep 21, 2018   Jkt 244001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1



Document Created: 2018-09-22 00:33:43
Document Modified: 2018-09-22 00:33:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates9/14/18.
FR Citation83 FR 48303 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR