83_FR_48659 83 FR 48473 - Proposed Revisions to Standard Review Plan Section 14.3.3, Piping Systems and Components-Inspections, Tests, Analyses, and Acceptance Criteria

83 FR 48473 - Proposed Revisions to Standard Review Plan Section 14.3.3, Piping Systems and Components-Inspections, Tests, Analyses, and Acceptance Criteria

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 186 (September 25, 2018)

Page Range48473-48474
FR Document2018-20826

The U.S. Nuclear Regulatory Commission (NRC) is re-noticing the solicitation for public comment published in the Federal Register on September 11, 2017, on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' SRP Section 14.3.3, ``Piping Systems and Components-- Inspections, Tests, Analyses, and Acceptance Criteria.''

Federal Register, Volume 83 Issue 186 (Tuesday, September 25, 2018)
[Federal Register Volume 83, Number 186 (Tuesday, September 25, 2018)]
[Notices]
[Pages 48473-48474]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20826]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0187]


Proposed Revisions to Standard Review Plan Section 14.3.3, Piping 
Systems and Components--Inspections, Tests, Analyses, and Acceptance 
Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-draft section revision; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is re-noticing 
the solicitation for public comment published in the Federal Register 
on September 11, 2017, on NUREG-0800, ``Standard Review Plan for the 
Review of Safety Analysis Reports for Nuclear Power Plants: LWR 
Edition,'' SRP Section 14.3.3, ``Piping Systems and Components--
Inspections, Tests, Analyses, and Acceptance Criteria.''

DATES: Comments must be filed no later than November 26, 2018. Comments 
received after this date will be considered, if it is practical to do 
so, but the Commission is able to ensure consideration only for 
comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0187. Address 
questions about docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: Jennifer.Borges@nrc.gov. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Mark D. Notich, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-3053, email: Mark.Notich@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0187 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0187.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to pdr.resource@nrc.gov. The draft revision and current 
revision to NUREG-0800, Section 14.3.3, ``Piping Systems and 
Components--Inspections, Tests, Analyses, and Acceptance Criteria,'' is 
available in ADAMS under Accession No. ML18088A069 and ML070660622. The 
redline-strikeout version comparing the draft revision 1 and the 
current version of revision 0 is available in ADAMS under Accession No. 
ML18092A046.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2017-0187 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment

[[Page 48474]]

submissions available to the public or entering the comment into ADAMS.

II. Further Information

    The NRC seeks public comment on the proposed SRP-draft section 
revision of Section 14.3.3, ``Piping Systems and Components--
Inspections, Tests, Analyses, and Acceptance Criteria.'' This re-notice 
includes revisions initiated by the staff to address editorial issues 
and provide further clarification on particular issues. This revision 
supersedes the previous revision issued on September 11, 2017, and the 
staff will not be addressing previously submitted comments. Following 
NRC staff evaluation of public comments, the NRC intends to finalize 
SRP Section 14.3.3, Revision 1 in ADAMS and post it on the NRC's public 
website at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/. The SRP is guidance for the NRC staff. The SRP is not a 
substitute for the NRC regulations, and compliance with the SRP is not 
required.

III. Backfitting and Issue Finality

    Issuance of this draft SRP, if finalized, would not constitute 
backfitting as defined in 10 CFR 50.109 (the Backfit Rule), or 
otherwise be inconsistent with the issue finality provisions in 10 CFR 
part 52. The staff's position is based upon the following 
considerations.
    1. The draft SRP positions, if finalized, do not constitute 
backfitting, inasmuch as the SRP is guidance directed to the NRC staff 
with respect to its regulatory responsibilities.
    The SRP provides interim guidance to the staff on how to review an 
application for NRC regulatory approval in the form of licensing. 
Changes in staff guidance intended for use by only the staff are not 
matters that constitute backfitting as that term is defined in 10 CFR 
50.109(a)(1) or involve the issue finality provisions of 10 CFR part 
52.
    2. Backfitting and issue finality--with certain exceptions 
discussed below--do not apply to current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, the subject of either the Backfit Rule or any issue 
finality provisions under 10 CFR part 52. This is because neither the 
Backfit Rule nor the issue finality provisions under 10 CFR part 52 
were intended to apply to every NRC action which substantially changes 
the expectations of current and future applicants.
    The exceptions to this general principle are applicable whenever a 
10 CFR part 50 operating license applicant references a construction 
permit or a 10 CFR part 52 combined license applicant references a 
license (e.g., an early site permit) and/or an NRC regulatory approval 
(e.g., a design certification rule) for which specified issue finality 
provisions apply.
    The NRC staff does not currently intend to impose the positions 
represented in the draft SRP section in a manner that constitutes 
backfitting or is inconsistent with any issue finality provision in 10 
CFR part 52. If in the future the NRC staff seeks to impose a position 
stated in this draft SRP section in a manner that would constitute 
backfitting or be inconsistent with these issue finality provisions, 
the NRC staff must make the showing as set forth in the Backfit Rule or 
address the regulatory criteria for set forth in the applicable issue 
finality provision, as applicable, that would allow the staff to impose 
the position.
    3. The staff has no intention to impose the draft SRP positions on 
existing nuclear power plant licenses either now or in the future 
(absent a voluntary request for a change from the licensee, holder of a 
regulatory approval, or a design certification applicant).
    The NRC staff does not intend to impose or apply the positions 
described in this draft SRP section to existing (already issued) 
licenses (e.g., operating licenses and combined licenses) and 
regulatory approvals. Hence, this draft SRP guidance--even if 
considered guidance subject to the Backfit rule or the issue finality 
provisions in 10 CFR part 52--need not be evaluated as if it were a 
backfit or as being inconsistent with these issue finality provisions. 
If, in the future, the NRC staff seeks to impose a position in this 
draft SRP section on holders of already issued licenses in a manner 
that would constitute backfitting or does not provide issue finality as 
described in the applicable issue finality provision, then the staff 
must make the showing as set forth in the Backfit Rule or address the 
criteria set forth in the applicable issue finality provision, as 
applicable, that would allow the staff to impose the position.

    Dated at Rockville, Maryland, this 20th day of September 2018.

    For the Nuclear Regulatory Commission.
Jennivine K. Rankin,
Acting Chief, Licensing Branch 3, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-20826 Filed 9-24-18; 8:45 am]
BILLING CODE 7590-01-P



                                                                         Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices                                         48473

                                               cycle facilities, NRC material licensees,               NUCLEAR REGULATORY                                    I. Obtaining Information and
                                               and non-power reactors.                                 COMMISSION                                            Submitting Comments
                                                  7. The estimated number of annual                                                                          A. Obtaining Information
                                               responses: 537.                                         [NRC–2017–0187]
                                                                                                                                                                Please refer to Docket ID NRC–2017–
                                                  8. The estimated number of annual                                                                          0187 when contacting the NRC about
                                                                                                       Proposed Revisions to Standard
                                               respondents: 200.                                                                                             the availability of information for this
                                                                                                       Review Plan Section 14.3.3, Piping
                                                  9. The estimated number of hours                     Systems and Components—                               action. You may obtain publicly-
                                               needed annually to comply with the                      Inspections, Tests, Analyses, and                     available information related to this
                                               information collection requirement or                   Acceptance Criteria                                   action by any of the following methods:
                                               request: 268.5 hours.                                                                                            • Federal Rulemaking Website: Go to
                                                                                                       AGENCY:Nuclear Regulatory                             http://www.regulations.gov and search
                                                  10. Abstract: The NRC requires its
                                                                                                       Commission.                                           for Docket ID NRC–2017–0187.
                                               licensees to report by telephone certain
                                                                                                                                                                • NRC’s Agencywide Documents
                                               reactor events and emergencies that                     ACTION: Standard review plan-draft                    Access and Management System
                                               have potential impact to public health                  section revision; request for comment.                (ADAMS): You may obtain publicly-
                                               and safety. In order to efficiently                                                                           available documents online in the
                                               process the information received                        SUMMARY:   The U.S. Nuclear Regulatory                ADAMS Public Documents collection at
                                               through such reports for reactors, the                  Commission (NRC) is re-noticing the                   http://www.nrc.gov/reading-rm/
                                               NRC created Forms 361 to provide a                      solicitation for public comment                       adams.html. To begin the search, select
                                               templated worksheet for recording the                   published in the Federal Register on                  ‘‘Begin Web-based ADAMS Search.’’ For
                                               information. NRC licensees are not                      September 11, 2017, on NUREG–0800,                    problems with ADAMS, please contact
                                               required to fill out or submit the                      ‘‘Standard Review Plan for the Review                 the NRC’s Public Document Room (PDR)
                                               worksheet, but the form provides the                    of Safety Analysis Reports for Nuclear                reference staff at 1–800–397–4209, 301–
                                               usual order of questions and discussion                 Power Plants: LWR Edition,’’ SRP                      415–4737, or by email to pdr.resource@
                                               to enable a licensee to prepare answers                 Section 14.3.3, ‘‘Piping Systems and                  nrc.gov. The draft revision and current
                                               for a more clear and complete                           Components—Inspections, Tests,                        revision to NUREG–0800, Section
                                               telephonic notification. Without the                    Analyses, and Acceptance Criteria.’’                  14.3.3, ‘‘Piping Systems and
                                               templated format of the NRC Forms 361,                  DATES: Comments must be filed no later                Components—Inspections, Tests,
                                               the information exchange between                        than November 26, 2018. Comments                      Analyses, and Acceptance Criteria,’’ is
                                               licensees and NRC Headquarters                          received after this date will be                      available in ADAMS under Accession
                                               Operations Officers via telephone could                 considered, if it is practical to do so, but          No. ML18088A069 and ML070660622.
                                               result in delays as well as unnecessary                 the Commission is able to ensure                      The redline-strikeout version comparing
                                               transposition errors.                                   consideration only for comments                       the draft revision 1 and the current
                                                                                                       received on or before this date.                      version of revision 0 is available in
                                               III. Specific Requests for Comments                                                                           ADAMS under Accession No.
                                                                                                       ADDRESSES:   You may submit comments                  ML18092A046.
                                                 The NRC is seeking comments that                      by any of the following methods:                         • NRC’s PDR: You may examine and
                                               address the following questions:
                                                                                                          • Federal Rulemaking Website: Go to                purchase copies of public documents at
                                                 1. Is the proposed collection of                      http://www.regulations.gov and search                 the NRC’s PDR, Room O1–F21, One
                                               information necessary for the NRC to                    for Docket ID NRC–2017–0187. Address                  White Flint North, 11555 Rockville
                                               properly perform its functions? Does the                questions about docket IDs in                         Pike, Rockville, Maryland 20852.
                                               information have practical utility?                     Regulations.gov to Jennifer Borges;                   B. Submitting Comments
                                                 2. Is the estimate of the burden of the               telephone: 301–287–9127; email:
                                               information collection accurate?                        Jennifer.Borges@nrc.gov. For technical                  Please include Docket ID NRC–2017–
                                                                                                       questions, contact the individual listed              0187 in your comment submission.
                                                 3. Is there a way to enhance the                                                                              The NRC cautions you not to include
                                                                                                       in the FOR FURTHER INFORMATION
                                               quality, utility, and clarity of the                                                                          identifying or contact information that
                                                                                                       CONTACT section of this document.
                                               information to be collected?                                                                                  you do not want to be publicly
                                                                                                         • Mail comments to: May Ma, Office
                                                 4. How can the burden of the                                                                                disclosed in your comment submission.
                                                                                                       of Administration, Mail Stop: TWFN–7–
                                               information collection on respondents                                                                         The NRC will post all comment
                                                                                                       A60M, U.S. Nuclear Regulatory
                                               be minimized, including the use of                                                                            submissions at http://
                                                                                                       Commission, Washington, DC 20555–
                                               automated collection techniques or                                                                            www.regulations.gov as well as enter the
                                                                                                       0001.
                                               other forms of information technology?                                                                        comment submissions into ADAMS.
                                                                                                         For additional direction on obtaining               The NRC does not routinely edit
                                                 Dated at Rockville, Maryland, this 20th day           information and submitting comments,                  comment submissions to remove
                                               of September, 2018.                                     see ‘‘Obtaining Information and                       identifying or contact information.
                                                 For the Nuclear Regulatory Commission.                Submitting Comments’’ in the                            If you are requesting or aggregating
                                               David C. Cullison,                                      SUPPLEMENTARY INFORMATION section of                  comments from other persons for
                                               NRC Clearance Officer, Office of the Chief              this document.                                        submission to the NRC, then you should
                                               Information Officer.                                    FOR FURTHER INFORMATION CONTACT:                      inform those persons not to include
daltland on DSKBBV9HB2PROD with NOTICES




                                               [FR Doc. 2018–20792 Filed 9–24–18; 8:45 am]             Mark D. Notich, Office of New Reactors,               identifying or contact information that
                                               BILLING CODE 7590–01–P                                  U.S. Nuclear Regulatory Commission,                   they do not want to be publicly
                                                                                                       Washington, DC 20555–0001; telephone:                 disclosed in their comment submission.
                                                                                                       301–415–3053, email: Mark.Notich@                     Your request should state that the NRC
                                                                                                       nrc.gov.                                              does not routinely edit comment
                                                                                                                                                             submissions to remove such information
                                                                                                       SUPPLEMENTARY INFORMATION:                            before making the comment


                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00065   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1


                                               48474                     Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices

                                               submissions available to the public or                  CFR part 52 combined license applicant                SECURITIES AND EXCHANGE
                                               entering the comment into ADAMS.                        references a license (e.g., an early site             COMMISSION
                                               II. Further Information                                 permit) and/or an NRC regulatory
                                                                                                       approval (e.g., a design certification                [Release No. 34–84195; File No. SR–
                                                  The NRC seeks public comment on                      rule) for which specified issue finality              NYSEArca–2018–54]
                                               the proposed SRP-draft section revision                 provisions apply.
                                               of Section 14.3.3, ‘‘Piping Systems and                                                                       Self-Regulatory Organizations; NYSE
                                               Components—Inspections, Tests,                             The NRC staff does not currently
                                                                                                                                                             Arca, Inc.; Notice of Designation of a
                                               Analyses, and Acceptance Criteria.’’                    intend to impose the positions
                                                                                                                                                             Longer Period for Commission Action
                                               This re-notice includes revisions                       represented in the draft SRP section in
                                                                                                                                                             on a Proposed Rule Change To Amend
                                               initiated by the staff to address editorial             a manner that constitutes backfitting or              Commentary .01 to NYSE Arca Rule
                                               issues and provide further clarification                is inconsistent with any issue finality               8.600–E Relating to Certain Generic
                                               on particular issues. This revision                     provision in 10 CFR part 52. If in the                Listing Standards for Managed Fund
                                               supersedes the previous revision issued                 future the NRC staff seeks to impose a                Shares
                                               on September 11, 2017, and the staff                    position stated in this draft SRP section
                                               will not be addressing previously                       in a manner that would constitute                     September 19, 2018.
                                               submitted comments. Following NRC                       backfitting or be inconsistent with these                On July 18, 2018, NYSE Arca, Inc.
                                               staff evaluation of public comments, the                issue finality provisions, the NRC staff              (‘‘NYSE Arca’’ or ‘‘Exchange’’) filed
                                               NRC intends to finalize SRP Section                     must make the showing as set forth in                 with the Securities and Exchange
                                               14.3.3, Revision 1 in ADAMS and post                    the Backfit Rule or address the                       Commission (‘‘Commission’’), pursuant
                                               it on the NRC’s public website at http://               regulatory criteria for set forth in the              to Section 19(b)(1) of the Securities
                                               www.nrc.gov/reading-rm/doc-                             applicable issue finality provision, as               Exchange Act of 1934 (‘‘Act’’) 1 and Rule
                                               collections/nuregs/staff/sr0800/. The                   applicable, that would allow the staff to             19b–4 thereunder,2 a proposed rule
                                               SRP is guidance for the NRC staff. The                  impose the position.                                  change to amend Commentary .01 to
                                               SRP is not a substitute for the NRC                                                                           NYSE Arca Rule 8.600–E relating to
                                                                                                          3. The staff has no intention to
                                               regulations, and compliance with the                                                                          certain generic listing standards for
                                                                                                       impose the draft SRP positions on
                                               SRP is not required.                                                                                          Managed Fund Shares. The proposed
                                                                                                       existing nuclear power plant licenses                 rule change was published for comment
                                               III. Backfitting and Issue Finality                     either now or in the future (absent a                 in the Federal Register on August 7,
                                                  Issuance of this draft SRP, if finalized,            voluntary request for a change from the               2018.3 The Commission has received no
                                               would not constitute backfitting as                     licensee, holder of a regulatory                      comments on the proposed rule change.
                                               defined in 10 CFR 50.109 (the Backfit                   approval, or a design certification                      Section 19(b)(2) of the Act 4 provides
                                               Rule), or otherwise be inconsistent with                applicant).                                           that, within 45 days of the publication
                                               the issue finality provisions in 10 CFR                    The NRC staff does not intend to                   of notice of the filing of a proposed rule
                                               part 52. The staff’s position is based                  impose or apply the positions described               change, or within such longer period up
                                               upon the following considerations.                      in this draft SRP section to existing                 to 90 days as the Commission may
                                                  1. The draft SRP positions, if                       (already issued) licenses (e.g., operating            designate if it finds such longer period
                                               finalized, do not constitute backfitting,               licenses and combined licenses) and                   to be appropriate and publishes its
                                               inasmuch as the SRP is guidance                         regulatory approvals. Hence, this draft               reasons for so finding or as to which the
                                               directed to the NRC staff with respect to               SRP guidance—even if considered                       self-regulatory organization consents,
                                               its regulatory responsibilities.                        guidance subject to the Backfit rule or               the Commission shall either approve the
                                                  The SRP provides interim guidance to                 the issue finality provisions in 10 CFR               proposed rule change, disapprove the
                                               the staff on how to review an                           part 52—need not be evaluated as if it                proposed rule change, or institute
                                               application for NRC regulatory approval                 were a backfit or as being inconsistent               proceedings to determine whether the
                                               in the form of licensing. Changes in staff                                                                    proposed rule change should be
                                                                                                       with these issue finality provisions. If,
                                               guidance intended for use by only the                                                                         disapproved. The 45th day after
                                                                                                       in the future, the NRC staff seeks to
                                               staff are not matters that constitute                                                                         publication of the notice for this
                                                                                                       impose a position in this draft SRP
                                               backfitting as that term is defined in 10                                                                     proposed rule change is September 21,
                                                                                                       section on holders of already issued
                                               CFR 50.109(a)(1) or involve the issue                                                                         2018. The Commission is extending this
                                                                                                       licenses in a manner that would
                                               finality provisions of 10 CFR part 52.                                                                        45-day time period.
                                                  2. Backfitting and issue finality—with               constitute backfitting or does not
                                                                                                       provide issue finality as described in the               The Commission finds that it is
                                               certain exceptions discussed below—do                                                                         appropriate to designate a longer period
                                               not apply to current or future                          applicable issue finality provision, then
                                                                                                       the staff must make the showing as set                within which to take action on the
                                               applicants.                                                                                                   proposed rule change so that it has
                                                  Applicants and potential applicants                  forth in the Backfit Rule or address the
                                                                                                       criteria set forth in the applicable issue            sufficient time to consider the proposed
                                               are not, with certain exceptions, the                                                                         rule change. Accordingly, the
                                               subject of either the Backfit Rule or any               finality provision, as applicable, that
                                                                                                       would allow the staff to impose the                   Commission, pursuant to Section
                                               issue finality provisions under 10 CFR                                                                        19(b)(2) of the Act,5 designates
                                               part 52. This is because neither the                    position.
                                                                                                                                                             November 5, 2018, as the date by which
                                               Backfit Rule nor the issue finality                        Dated at Rockville, Maryland, this 20th day        the Commission shall either approve or
                                               provisions under 10 CFR part 52 were                    of September 2018.                                    disapprove, or institute proceedings to
                                               intended to apply to every NRC action
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                          For the Nuclear Regulatory Commission.             determine whether to disapprove, the
                                               which substantially changes the
                                               expectations of current and future                      Jennivine K. Rankin,
                                                                                                                                                               1 15  U.S.C. 78s(b)(1).
                                               applicants.                                             Acting Chief, Licensing Branch 3, Division
                                                                                                                                                               2 17  CFR 240.19b–4.
                                                  The exceptions to this general                       of Licensing, Siting, and Environmental
                                                                                                                                                               3 See Securities Exchange Act Release No. 83759
                                               principle are applicable whenever a 10                  Analysis, Office of New Reactors.
                                                                                                                                                             (August 1, 2018), 83 FR 38753.
                                               CFR part 50 operating license applicant                 [FR Doc. 2018–20826 Filed 9–24–18; 8:45 am]             4 15 U.S.C. 78s(b)(2).

                                               references a construction permit or a 10                BILLING CODE 7590–01–P                                  5 Id.




                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00066   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1



Document Created: 2018-09-25 00:22:02
Document Modified: 2018-09-25 00:22:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard review plan-draft section revision; request for comment.
DatesComments must be filed no later than November 26, 2018. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ContactMark D. Notich, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-3053, email: [email protected]
FR Citation83 FR 48473 