83_FR_48846 83 FR 48659 - Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

83 FR 48659 - Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 187 (September 26, 2018)

Page Range48659-48660
FR Document2018-20864

The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 4 to Regulatory Guide (RG) 1.160, ``Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.'' Regulatory Guide 1.160, Revision 4, has been revised to address new issues identified since Revision 3 of RG 1.160 was issued. This RG endorses, with clarifications, NUMARC 93-01, ``Industry Guidelines for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants,'' Revision 4F. The proposed revision describes methods that are acceptable to the NRC staff for compliance with the requirements for monitoring the effectiveness of maintenance at nuclear power plants.

Federal Register, Volume 83 Issue 187 (Wednesday, September 26, 2018)
[Federal Register Volume 83, Number 187 (Wednesday, September 26, 2018)]
[Notices]
[Pages 48659-48660]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20864]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2018-0131]


Monitoring the Effectiveness of Maintenance at Nuclear Power 
Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory guide; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Revision 4 to Regulatory Guide (RG) 1.160, ``Monitoring the 
Effectiveness of Maintenance at Nuclear Power Plants.'' Regulatory 
Guide 1.160, Revision 4, has been revised to address new issues 
identified since Revision 3 of RG 1.160 was issued. This RG endorses, 
with clarifications, NUMARC 93-01, ``Industry Guidelines for Monitoring 
the Effectiveness of Maintenance at Nuclear Power Plants,'' Revision 
4F. The proposed revision describes methods that are acceptable to the 
NRC staff for compliance with the requirements for monitoring the 
effectiveness of maintenance at nuclear power plants.

DATES: Revision 4 to RG 1.160 is available on September 26, 2018.

ADDRESSES: Please refer to Docket ID NRC-2018-0131 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0131. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to pdr.resource@nrc.gov. Revision 4 to RG 1.160 and the 
regulatory analysis may be found in ADAMS under Accession Nos. 
ML18220B281 and ML18129A085 respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
    Regulatory guides are not copyrighted, and NRC approval is not 
required to reproduce them.

FOR FURTHER INFORMATION CONTACT: Stephen Campbell, Office of Nuclear 
Reactor Regulation, telephone: 301-415-3353, email: 
Stephen.Campbell@nrc.gov and Stephen Burton, telephone: 301-415-7000, 
email: Stephen.Burton@nrc.gov. Both are staff of the U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Discussion

    The NRC is issuing a revision to an existing guide in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
agency's regulations, techniques that the NRC staff uses in evaluating 
specific issues or postulated events, and data that the NRC staff needs 
in its review of applications for permits and licenses.
    Revision 4 of RG 1.160 was issued with a temporary identification 
of Draft Regulatory Guide, DG-1336. This revision of the guide 
addresses new issues identified since the guide was previously issued 
and updates the guidance by endorsing Revision 4F of NUMARC 93-01, 
``Industry Guideline for Monitoring the Effectiveness of Maintenance at 
Nuclear Power Plants.'' NUMARC 93-01, Revision 4F addresses the 
application of the Maintenance Rule (title 10 of the Code of Federal 
Regulations (CFR) section 50.65) to address the use of diverse and 
flexible coping strategies.

II. Additional Information

    The NRC published a notice of the availability of DG-1336 in the 
Federal Register on June 28, 2018 (83 FR 30469) for a 30-day public 
comment period. The public comment period closed on July 30, 2018. 
Public comments on DG-1336 and the staff responses to the public 
comments are available under ADAMS under Accession No. ML18220B279.

III. Congressional Review Act

    This RG is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

IV. Backfitting and Issue Finality

    This RG describes methods acceptable to the staff of the NRC for 
demonstrating compliance with the provisions of 10 CFR 50.65, 
``Requirements for Monitoring the Effectiveness of Maintenance at 
Nuclear Power Plants,'' of 10 CFR part 50, ``Domestic Licensing of 
Production and Utilization Facilities.'' Issuance of this RG does not 
constitute backfitting as defined in 10 CFR 50.109 (the Backfit Rule) 
and is not otherwise inconsistent with the issue finality provisions in 
10 CFR part 52. As discussed in the ``Implementation'' section of this 
RG, the NRC has no current intention to impose this guidance on holders 
of current operating licenses or combined licenses.
    This RG may be applied to applications for amendments to operating 
licenses or combined licenses

[[Page 48660]]

docketed by the NRC as of the date of issuance, as well as future 
applications submitted after the issuance of this regulatory guide. 
Such action would not constitute backfitting as defined in the Backfit 
Rule or be otherwise inconsistent with the applicable issue finality 
provision in 10 CFR part 52, inasmuch as such applicants or potential 
applicants, with certain exceptions described below, are not within the 
scope of entities that are the subject of the Backfit Rule or the 
relevant issue finality provisions in 10 CFR part 52. This RG may be 
used by existing holders of combined licenses and operating licenses in 
accordance with their existing licensing basis and applicable 
regulatory requirements.
    The exceptions to the general principle are applicable whenever a 
combined license applicant references a 10 CFR part 52 license (i.e., 
an early site permit or a manufacturing license) and/or 10 CFR part 52 
regulatory approval (i.e., a design certification rule or design 
approval). However, the matters addressed in this RG (monitoring the 
effectiveness of maintenance at nuclear power plants) have not 
previously been proposed for resolution in a 10 CFR part 52 license or 
regulatory approval. The NRC staff does not, at this time, intend to 
impose the positions represented in the RG in a manner that is 
inconsistent with any issue finality provisions in these 10 CFR part 52 
licenses and regulatory approvals. If, in the future, the NRC staff 
seeks to impose a position in this RG in a manner that does not provide 
issue finality as described in the applicable issue finality provision, 
then the NRC staff must address the criteria for avoiding issue 
finality as described in the applicable issue finality provision.
    Further information on the staff's use of the RG is contained in 
the RG under Section D, ``Implementation.''

    Dated at Rockville, Maryland, this 20th day of September, 2018.

    For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2018-20864 Filed 9-25-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                                        Federal Register / Vol. 83, No. 187 / Wednesday, September 26, 2018 / Notices                                          48659

                                               FR 6462; February 25, 1992), has been                   clarifications, NUMARC 93–01,                         developed to describe and make
                                               amenable to accommodating States’ and                   ‘‘Industry Guidelines for Monitoring the              available to the public information
                                               Tribes’ needs in this regard. The NRC                   Effectiveness of Maintenance at Nuclear               regarding methods that are acceptable to
                                               uses the information collected under                    Power Plants,’’ Revision 4F. The                      the NRC staff for implementing specific
                                               this information collection requirement                 proposed revision describes methods                   parts of the agency’s regulations,
                                               to allow States and federally recognized                that are acceptable to the NRC staff for              techniques that the NRC staff uses in
                                               Indian Tribes to participate in or                      compliance with the requirements for                  evaluating specific issues or postulated
                                               observe inspections at NRC-licensed                     monitoring the effectiveness of                       events, and data that the NRC staff
                                               facilities. The types of information                    maintenance at nuclear power plants.                  needs in its review of applications for
                                               collected include written requests                      DATES: Revision 4 to RG 1.160 is                      permits and licenses.
                                               identifying specific inspections States                 available on September 26, 2018.                         Revision 4 of RG 1.160 was issued
                                               and Tribes wish to observe;                             ADDRESSES: Please refer to Docket ID
                                                                                                                                                             with a temporary identification of Draft
                                               identification-related information                      NRC–2018–0131 when contacting the                     Regulatory Guide, DG–1336. This
                                               required for site access to NRC-licensed                NRC about the availability of                         revision of the guide addresses new
                                               facilities; training and qualifications of              information regarding this document.                  issues identified since the guide was
                                               State and Tribal personnel participating                You may obtain publicly-available                     previously issued and updates the
                                               in inspections; information required to                 information related to this document                  guidance by endorsing Revision 4F of
                                               define inspection roles for States and                  using any of the following methods:                   NUMARC 93–01, ‘‘Industry Guideline
                                               Tribes; and information to coordinate                      • Federal Rulemaking Website: Go to                for Monitoring the Effectiveness of
                                               NRC and State and Tribal inspections.                   http://www.regulations.gov and search                 Maintenance at Nuclear Power Plants.’’
                                                                                                       for Docket ID NRC–2018–0131. Address                  NUMARC 93–01, Revision 4F addresses
                                               III. Specific Requests for Comments                                                                           the application of the Maintenance Rule
                                                                                                       questions about NRC dockets to Jennifer
                                                 The NRC is seeking comments that                      Borges; telephone: 301–287–9127;                      (title 10 of the Code of Federal
                                               address the following questions:                        email: Jennifer.Borges@nrc.gov. For                   Regulations (CFR) section 50.65) to
                                                 1. Is the proposed collection of                      technical questions, contact the                      address the use of diverse and flexible
                                               information necessary for the NRC to                    individuals listed in the FOR FURTHER                 coping strategies.
                                               properly perform its functions? Does the                INFORMATION CONTACT section of this                   II. Additional Information
                                               information have practical utility?                     document.
                                                 2. Is the estimate of the burden of the                                                                        The NRC published a notice of the
                                                                                                          • NRC’s Agencywide Documents
                                               information collection accurate?                                                                              availability of DG–1336 in the Federal
                                                                                                       Access and Management System
                                                 3. Is there a way to enhance the                                                                            Register on June 28, 2018 (83 FR 30469)
                                                                                                       (ADAMS): You may obtain publicly-
                                               quality, utility, and clarity of the                                                                          for a 30-day public comment period.
                                                                                                       available documents online in the
                                               information to be collected?                                                                                  The public comment period closed on
                                                                                                       ADAMS Public Documents collection at
                                                 4. How can the burden of the                                                                                July 30, 2018. Public comments on DG–
                                                                                                       http://www.nrc.gov/reading-rm/
                                               information collection on respondents                                                                         1336 and the staff responses to the
                                                                                                       adams.html. To begin the search, select
                                               be minimized, including the use of                                                                            public comments are available under
                                                                                                       ‘‘Begin Web-based ADAMS Search.’’ For
                                               automated collection techniques or                                                                            ADAMS under Accession No.
                                                                                                       problems with ADAMS, please contact
                                               other forms of information technology?                                                                        ML18220B279.
                                                                                                       the NRC’s Public Document Room (PDR)
                                                 Dated at Rockville, Maryland, this 21th day           reference staff at 1–800–397–4209, 301–               III. Congressional Review Act
                                               of September, 2018.                                     415–4737, or by email to pdr.resource@                   This RG is a rule as defined in the
                                                 For the Nuclear Regulatory Commission.                nrc.gov. Revision 4 to RG 1.160 and the               Congressional Review Act (5 U.S.C.
                                               David Cullison,                                         regulatory analysis may be found in                   801–808). However, the Office of
                                               NRC Clearance Officer, Office of the Chief              ADAMS under Accession Nos.                            Management and Budget has not found
                                               Information Officer.                                    ML18220B281 and ML18129A085                           it to be a major rule as defined in the
                                               [FR Doc. 2018–20934 Filed 9–25–18; 8:45 am]
                                                                                                       respectively.                                         Congressional Review Act.
                                                                                                          • NRC’s PDR: You may examine and
                                               BILLING CODE 7590–01–P
                                                                                                       purchase copies of public documents at                IV. Backfitting and Issue Finality
                                                                                                       the NRC’s PDR, Room O1–F21, One                          This RG describes methods acceptable
                                               NUCLEAR REGULATORY                                      White Flint North, 11555 Rockville                    to the staff of the NRC for demonstrating
                                               COMMISSION                                              Pike, Rockville, Maryland 20852.                      compliance with the provisions of 10
                                                                                                          Regulatory guides are not                          CFR 50.65, ‘‘Requirements for
                                               [NRC–2018–0131]                                         copyrighted, and NRC approval is not                  Monitoring the Effectiveness of
                                                                                                       required to reproduce them.                           Maintenance at Nuclear Power Plants,’’
                                               Monitoring the Effectiveness of
                                                                                                       FOR FURTHER INFORMATION CONTACT:                      of 10 CFR part 50, ‘‘Domestic Licensing
                                               Maintenance at Nuclear Power Plants
                                                                                                       Stephen Campbell, Office of Nuclear                   of Production and Utilization
                                               AGENCY:  Nuclear Regulatory                             Reactor Regulation, telephone: 301–                   Facilities.’’ Issuance of this RG does not
                                               Commission.                                             415–3353, email: Stephen.Campbell@                    constitute backfitting as defined in 10
                                               ACTION: Regulatory guide; issuance.                     nrc.gov and Stephen Burton, telephone:                CFR 50.109 (the Backfit Rule) and is not
                                                                                                       301–415–7000, email: Stephen.Burton@                  otherwise inconsistent with the issue
                                               SUMMARY:   The U.S. Nuclear Regulatory                  nrc.gov. Both are staff of the U.S.                   finality provisions in 10 CFR part 52. As
                                               Commission (NRC) is issuing Revision 4                  Nuclear Regulatory Commission,                        discussed in the ‘‘Implementation’’
daltland on DSKBBV9HB2PROD with NOTICES




                                               to Regulatory Guide (RG) 1.160,                         Washington, DC 20555–0001.                            section of this RG, the NRC has no
                                               ‘‘Monitoring the Effectiveness of                       SUPPLEMENTARY INFORMATION:                            current intention to impose this
                                               Maintenance at Nuclear Power Plants.’’                                                                        guidance on holders of current
                                               Regulatory Guide 1.160, Revision 4, has                 I. Discussion                                         operating licenses or combined licenses.
                                               been revised to address new issues                         The NRC is issuing a revision to an                   This RG may be applied to
                                               identified since Revision 3 of RG 1.160                 existing guide in the NRC’s ‘‘Regulatory              applications for amendments to
                                               was issued. This RG endorses, with                      Guide’’ series. This series was                       operating licenses or combined licenses


                                          VerDate Sep<11>2014   19:21 Sep 25, 2018   Jkt 244001   PO 00000   Frm 00075   Fmt 4703   Sfmt 4703   E:\FR\FM\26SEN1.SGM   26SEN1


                                               48660                    Federal Register / Vol. 83, No. 187 / Wednesday, September 26, 2018 / Notices

                                               docketed by the NRC as of the date of                   SUMMARY:   The Commission is noticing a               with the policies of title 39. For
                                               issuance, as well as future applications                recent Postal Service filing for the                  request(s) that the Postal Service states
                                               submitted after the issuance of this                    Commission’s consideration concerning                 concern market dominant product(s),
                                               regulatory guide. Such action would not                 negotiated service agreements. This                   applicable statutory and regulatory
                                               constitute backfitting as defined in the                notice informs the public of the filing,              requirements include 39 U.S.C. 3622, 39
                                               Backfit Rule or be otherwise                            invites public comment, and takes other               U.S.C. 3642, 39 CFR part 3010, and 39
                                               inconsistent with the applicable issue                  administrative steps.                                 CFR part 3020, subpart B. For request(s)
                                               finality provision in 10 CFR part 52,                   DATES: Comments are due: September                    that the Postal Service states concern
                                               inasmuch as such applicants or                          28, 2018.                                             competitive product(s), applicable
                                               potential applicants, with certain                      ADDRESSES: Submit comments                            statutory and regulatory requirements
                                               exceptions described below, are not                     electronically via the Commission’s                   include 39 U.S.C. 3632, 39 U.S.C. 3633,
                                               within the scope of entities that are the               Filing Online system at http://                       39 U.S.C. 3642, 39 CFR part 3015, and
                                               subject of the Backfit Rule or the                      www.prc.gov. Those who cannot submit                  39 CFR part 3020, subpart B. Comment
                                               relevant issue finality provisions in 10                comments electronically should contact                deadline(s) for each request appear in
                                               CFR part 52. This RG may be used by                     the person identified in the FOR FURTHER
                                               existing holders of combined licenses                                                                         section II.
                                                                                                       INFORMATION CONTACT section by
                                               and operating licenses in accordance                    telephone for advice on filing                        II. Docketed Proceeding(s)
                                               with their existing licensing basis and                 alternatives.
                                               applicable regulatory requirements.                                                                             1. Docket No(s).: CP2017–254; Filing
                                                                                                       FOR FURTHER INFORMATION CONTACT:
                                                  The exceptions to the general                                                                              Title: Notice of the United States Postal
                                                                                                       David A. Trissell, General Counsel, at
                                               principle are applicable whenever a                                                                           Service of Filing Modification Two to a
                                                                                                       202–789–6820.
                                               combined license applicant references a                                                                       Global Plus 1D Negotiated Service
                                                                                                       SUPPLEMENTARY INFORMATION:
                                               10 CFR part 52 license (i.e., an early site                                                                   Agreement; Filing Acceptance Date:
                                               permit or a manufacturing license) and/                 Table of Contents                                     September 20, 2018; Filing Authority: 39
                                               or 10 CFR part 52 regulatory approval                   I. Introduction                                       CFR 3015.5; Public Representative:
                                               (i.e., a design certification rule or design            II. Docketed Proceeding(s)                            Christopher C. Mohr; Comments Due:
                                               approval). However, the matters                                                                               September 28, 2018.
                                               addressed in this RG (monitoring the                    I. Introduction
                                                                                                                                                               This Notice will be published in the
                                               effectiveness of maintenance at nuclear                    The Commission gives notice that the               Federal Register.
                                               power plants) have not previously been                  Postal Service filed request(s) for the
                                               proposed for resolution in a 10 CFR part                Commission to consider matters related                Stacy L. Ruble,
                                               52 license or regulatory approval. The                  to negotiated service agreement(s). The               Secretary.
                                               NRC staff does not, at this time, intend                request(s) may propose the addition or                [FR Doc. 2018–20964 Filed 9–25–18; 8:45 am]
                                               to impose the positions represented in                  removal of a negotiated service                       BILLING CODE 7710–FW–P
                                               the RG in a manner that is inconsistent                 agreement from the market dominant or
                                               with any issue finality provisions in                   the competitive product list, or the
                                               these 10 CFR part 52 licenses and                       modification of an existing product
                                               regulatory approvals. If, in the future,                currently appearing on the market                     SECURITIES AND EXCHANGE
                                               the NRC staff seeks to impose a position                dominant or the competitive product                   COMMISSION
                                               in this RG in a manner that does not                    list.
                                               provide issue finality as described in the                 Section II identifies the docket
                                               applicable issue finality provision, then               number(s) associated with each Postal                 [Release No. 34–84237; File No. SR–ISE–
                                               the NRC staff must address the criteria                 Service request, the title of each Postal             2018–80]
                                               for avoiding issue finality as described                Service request, the request’s acceptance
                                               in the applicable issue finality                        date, and the authority cited by the                  Self-Regulatory Organizations; Nasdaq
                                               provision.                                              Postal Service for each request. For each             ISE, LLC; Notice of Filing and
                                                  Further information on the staff’s use               request, the Commission appoints an                   Immediate Effectiveness of Proposed
                                               of the RG is contained in the RG under                  officer of the Commission to represent                Rule Change Relating to Risk
                                               Section D, ‘‘Implementation.’’                          the interests of the general public in the            Protections
                                                  Dated at Rockville, Maryland, this 20th day          proceeding, pursuant to 39 U.S.C. 505                 September 20, 2018.
                                               of September, 2018.                                     (Public Representative). Section II also
                                                                                                       establishes comment deadline(s)                          Pursuant to Section 19(b)(1) of the
                                                  For the Nuclear Regulatory Commission.
                                                                                                       pertaining to each request.                           Securities Exchange Act of 1934
                                               Thomas H. Boyce,
                                                                                                          The public portions of the Postal                  (‘‘Act’’),1 and Rule 19b–4 thereunder,2
                                               Chief, Regulatory Guidance and Generic                                                                        notice is hereby given that on
                                                                                                       Service’s request(s) can be accessed via
                                               Issues Branch, Division of Engineering, Office
                                               of Nuclear Regulatory Research.                         the Commission’s website (http://                     September 11, 2018, Nasdaq ISE, LLC
                                                                                                       www.prc.gov). Non-public portions of                  (‘‘ISE’’ or ‘‘Exchange’’) filed with the
                                               [FR Doc. 2018–20864 Filed 9–25–18; 8:45 am]
                                                                                                       the Postal Service’s request(s), if any,              Securities and Exchange Commission
                                               BILLING CODE 7590–01–P
                                                                                                       can be accessed through compliance                    (‘‘Commission’’) the proposed rule
                                                                                                       with the requirements of 39 CFR                       change as described in Items I and II
                                                                                                       3007.301.1                                            below, which Items have been prepared
                                               POSTAL REGULATORY COMMISSION
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                          The Commission invites comments on                 by the Exchange. The Commission is
                                               [Docket No. CP2017–254]                                 whether the Postal Service’s request(s)               publishing this notice to solicit
                                                                                                       in the captioned docket(s) are consistent             comments on the proposed rule change
                                               New Postal Products                                                                                           from interested persons.
                                                                                                         1 See Docket No. RM2018–3, Order Adopting
                                               AGENCY: Postal Regulatory Commission.                   Final Rules Relating to Non-Public Information,
                                                                                                                                                               1 15   U.S.C. 78s(b)(1).
                                               ACTION: Notice.                                         June 27, 2018, Attachment A at 19–22 (Order No.
                                                                                                       4679).                                                  2 17   CFR 240.19b–4.



                                          VerDate Sep<11>2014   19:21 Sep 25, 2018   Jkt 244001   PO 00000   Frm 00076   Fmt 4703   Sfmt 4703   E:\FR\FM\26SEN1.SGM     26SEN1



Document Created: 2018-09-26 00:47:33
Document Modified: 2018-09-26 00:47:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRegulatory guide; issuance.
DatesRevision 4 to RG 1.160 is available on September 26, 2018.
ContactStephen Campbell, Office of Nuclear Reactor Regulation, telephone: 301-415-3353, email: [email protected] and Stephen Burton, telephone: 301-415-7000, email: [email protected] Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation83 FR 48659 