83_FR_49001 83 FR 48813 - Lake Upchurch Power, Inc., Lake Upchurch Dam Preservation Association, Inc.; Notice of Transfer of Exemption

83 FR 48813 - Lake Upchurch Power, Inc., Lake Upchurch Dam Preservation Association, Inc.; Notice of Transfer of Exemption

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 188 (September 27, 2018)

Page Range48813-48813
FR Document2018-21063

Federal Register, Volume 83 Issue 188 (Thursday, September 27, 2018)
[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Page 48813]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-21063]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6619-022]


Lake Upchurch Power, Inc., Lake Upchurch Dam Preservation 
Association, Inc.; Notice of Transfer of Exemption

    1. By letter filed August 1, 2018 and supplemented on August 17 and 
September 4, 2018, Lake Upchurch Dam Preservation Association, Inc., 
informed the Commission that the exemption from licensing for the 
Raeford Dam Hydroelectric Project No. 6619, originally issued October 
22, 1982 \1\ has been transferred to Lake Upchurch Dam Preservation 
Association, Inc. The project is located on Rockfish Creek in 
Cumberland County, North Carolina. The transfer of an exemption does 
not require Commission approval.
---------------------------------------------------------------------------

    \1\ Notice of Exemption From Licensing. Raeford Hydropower 
Corporation, 21 FERC ] 62,114 (1982).
---------------------------------------------------------------------------

    2. Lake Upchurch Dam Preservation Association, Inc. is now the 
exemptee of the Raeford Dam Hydroelectric Project No. 6619. All 
correspondence should be forwarded to: Ms. Melissa Melvin, Secretary, 
Lake Upchurch Dam Preservation Association, Inc., 127 Bayshore Drive, 
Parkton, NC 28371, Phone: 910-864-3191, email: [email protected].

    Dated: September 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21063 Filed 9-26-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices                                                   48813

                                               Participants must notify Courtenay                           forwarded to: Ms. Melissa Melvin,                     at DataClearance@FERC.gov, telephone
                                               O’Mara at g2jacksonrel@                                      Secretary, Lake Upchurch Dam                          at (202) 502–8663, and fax at (202) 273–
                                               southernco.com, or (404) 506–7219, on                        Preservation Association, Inc., 127                   0873.
                                               or before October 3, 2018, if they plan                      Bayshore Drive, Parkton, NC 28371,                    SUPPLEMENTARY INFORMATION:
                                               to attend the environmental site review.                     Phone: 910–864–3191, email:                              Title: FERC–725, Certification of
                                                 k. Procedural Schedule: The                                Hmelvin1@nc.rr.com.                                   Electric Reliability Organization;
                                               application will be processed according                        Dated: September 20, 2018.                          Procedures for Electric Reliability
                                               to the following schedule. Revisions to                                                                            Standards.
                                                                                                            Kimberly D. Bose,
                                               the schedule may be made as                                                                                           OMB Control No.: 1902–0225.
                                                                                                            Secretary.
                                               appropriate. If a date falls on a weekend                                                                             Type of Request: Three-year extension
                                               or holiday, the due date will be the                         [FR Doc. 2018–21063 Filed 9–26–18; 8:45 am]
                                                                                                                                                                  of the FERC–725 information collection
                                               following business day.                                      BILLING CODE 6717–01–P
                                                                                                                                                                  requirements with no changes to the
                                                                                                                                                                  current reporting and recordkeeping
                                                           Milestone                     Target date
                                                                                                                                                                  requirements.1
                                                                                                            DEPARTMENT OF ENERGY
                                               Public Scoping Meetings and           October 9, 2018 &                                                               Abstract: The FERC–725 contains the
                                                 Environmental Site Review.            October 10,                                                                following information collection
                                                                                       2018.                Federal Energy Regulatory
                                               File Comments on PAD, SD1,            November 5, 2018.      Commission                                            elements:
                                                  and Study Requests.                                                                                                Self Assessment and ERO (Electric
                                               Commission Issues SD2, if             December 20,           [Docket No. IC18–19–000]                              Reliability Organization) Application:
                                                  necessary.                           2018.                                                                      The Commission requires the ERO to
                                               File Proposed Study Plan .......      December 20,           Commission Information Collection
                                                                                       2018.
                                                                                                                                                                  submit to FERC a performance
                                                                                                            Activities (FERC–725); Comment
                                               Study Plan Meetings ...............   January 22, 2019.                                                            assessment report every five years. The
                                                                                                            Request; Extension September 21,
                                               File Comments on Proposed             March 20, 2019.                                                              next assessment is due in 2019. Each
                                                  Study Plan.                                               2018
                                                                                                                                                                  Regional Entity submits a performance
                                               File Revised Proposed Study           April 19, 2019.
                                                  Plan.                                                     AGENCY: Federal Energy Regulatory                     assessment report to the ERO.
                                               File Comments on Revised              May 6, 2019.           Commission, DOE.                                         Submitting an application to become
                                                  Proposed Study Plan.                                      ACTION: Notice of information collection              the ERO is also part of this collection.2
                                               Commission Issues Study               May 20, 2019.                                                                   Reliability Assessments: 18 CFR 39.11
                                                  Plan Determination.                                       and request for comments.
                                                                                                                                                                  requires the ERO to assess the reliability
                                                                                                            SUMMARY:    In compliance with the                    and adequacy of the Bulk-Power System
                                                 Dated: September 20, 2018.                                 requirements of the Paperwork                         in North America. Subsequently, the
                                               Kimberly D. Bose,                                            Reduction Act of 1995, the Federal                    ERO must report to the Commission on
                                               Secretary.                                                   Energy Regulatory Commission                          its findings. Regional entities perform
                                               [FR Doc. 2018–21054 Filed 9–26–18; 8:45 am]                  (Commission or FERC) is soliciting                    similar assessments within individual
                                               BILLING CODE 6717–01–P                                       public comment on the currently                       regions. Currently the ERO submits to
                                                                                                            approved information collection, FERC–                FERC three assessments each year: Long
                                                                                                            725 (Certification of Electric Reliability            term, winter, and summer. In addition,
                                               DEPARTMENT OF ENERGY                                         Organization; Procedures for Electric                 the North American Electric Reliability
                                                                                                            Reliability Standards).                               Corporation (NERC, the Commission-
                                               Federal Energy Regulatory                                    DATES: Comments on the collection of                  approved ERO) also submits various
                                               Commission                                                   information are due November 26, 2018.                other assessments as needed.
                                               [Project No. 6619–022]                                       ADDRESSES: You may submit comments                       Reliability Standards Development:
                                                                                                            (identified by Docket No. IC18–19–000)                Under section 215 of the FPA, the ERO
                                               Lake Upchurch Power, Inc., Lake                              by either of the following methods:                   is charged with developing Reliability
                                               Upchurch Dam Preservation                                       • eFiling at Commission’s Website:                 Standards. Regional Entities may also
                                               Association, Inc.; Notice of Transfer of                     http://www.ferc.gov/docs-filing/                      develop regional specific standards.
                                               Exemption                                                    efiling.asp.                                             Reliability Compliance: Reliability
                                                  1. By letter filed August 1, 2018 and                        • Mail/Hand Delivery/Courier:                      Standards are mandatory and
                                                                                                            Federal Energy Regulatory Commission,                 enforceable upon approval by the
                                               supplemented on August 17 and
                                                                                                            Secretary of the Commission, 888 First                Commission. In addition to the specific
                                               September 4, 2018, Lake Upchurch Dam
                                                                                                            Street NE, Washington, DC 20426.                      information collection requirements
                                               Preservation Association, Inc., informed
                                                                                                               Instructions: All submissions must be              contained in each standard (cleared
                                               the Commission that the exemption
                                                                                                            formatted and filed in accordance with                under other information collections),
                                               from licensing for the Raeford Dam
                                                                                                            submission guidelines at: http://                     there are general compliance,
                                               Hydroelectric Project No. 6619,
                                                                                                            www.ferc.gov/help/submission-                         monitoring and enforcement
                                               originally issued October 22, 1982 1 has
                                               been transferred to Lake Upchurch Dam                        guide.asp. For user assistance, contact
                                                                                                                                                                    1 As of 9/19/2018, a package for the ‘‘non-
                                               Preservation Association, Inc. The                           FERC Online Support by email at
                                                                                                                                                                  substantive’’ changes to FERC–725, implemented in
                                               project is located on Rockfish Creek in                      ferconlinesupport@ferc.gov, or by phone               the Final Rule in Docket No. RM18–2–000, is
                                               Cumberland County, North Carolina.                           at: (866) 208–3676 (toll-free), or (202)              pending review at the Office of Management and
                                               The transfer of an exemption does not                        502–8659 for TTY.                                     Budget (OMB). The burden estimates provided in
                                                                                                               Docket: Users interested in receiving              this Notice use those same burden estimates.
                                               require Commission approval.
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                                                                                    2 The Commission does not expect any new ERO
                                                 2. Lake Upchurch Dam Preservation                          automatic notification of activity in this
                                                                                                                                                                  applications to be submitted in the next five years
                                               Association, Inc. is now the exemptee of                     docket or in viewing/downloading                      and is not including any burden for this
                                               the Raeford Dam Hydroelectric Project                        comments and issuances in this docket                 requirement in the burden estimate. FERC still
                                               No. 6619. All correspondence should be                       may do so at http://www.ferc.gov/docs-                seeks to renew the regulations pertaining to a new
                                                                                                            filing/docs-filing.asp.                               ERO application under this renewal but is
                                                                                                                                                                  expecting the burden to be zero for the foreseeable
                                                1 Notice of Exemption From Licensing. Raeford               FOR FURTHER INFORMATION CONTACT:                      future. 18 CFR 39.3 contains the regulation
                                               Hydropower Corporation, 21 FERC ¶ 62,114 (1982).             Ellen Brown may be reached by email                   pertaining to ERO applications.



                                          VerDate Sep<11>2014     17:20 Sep 26, 2018     Jkt 244001    PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\27SEN1.SGM   27SEN1



Document Created: 2018-09-27 01:05:01
Document Modified: 2018-09-27 01:05:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 48813 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR