83 FR 50658 - Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 195 (October 9, 2018)

Page Range50658-50659
FR Document2018-21775

Federal Register, Volume 83 Issue 195 (Tuesday, October 9, 2018)
[Federal Register Volume 83, Number 195 (Tuesday, October 9, 2018)]
[Notices]
[Pages 50658-50659]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-21775]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2837-033]


Erie Boulevard Hydropower, L.P.; Notice of Application Accepted 
for Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2837-033.
    c. Date filed: March 29, 2018.
    d. Applicant: Erie Boulevard Hydropower, L.P. (Erie).
    e. Name of Project: Granby Hydroelectric Project.
    f. Location: On the Oswego River in the town of Fulton in Oswego 
County, New York. The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Steven P. Murphy, Director, U.S. Licensing, 
Erie Boulevard Hydropower, L.P., 33 West 1st Street South, Fulton, NY 
13069; (315) 598-6130.
    i. FERC Contact: Allyson Conner, (202) 502-6082 or 
[email protected].
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket number P-2837-033.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, but is not ready for 
environmental analysis at this time.
    l. The existing Granby Hydroelectric Project (Granby Project) 
consists of: (1) An 88-foot-wide reinforced concrete intake structure 
that includes two bays containing trashracks and fixed-roller, 
vertical-lift type gates; (2) a 17-foot-wide sluice opening adjacent to 
the intake structure; (3) a 112-foot-long, 88-foot-wide powerhouse 
containing two 5.04-megawatt (MW) turbine-generator units, with a total 
capacity of 10.08 MW; (4) a 3,000-foot-long, 100-foot-wide tailrace; 
(5) two 4.16-kilovolt, 120-foot-long underground generator leads; (6) a 
60-foot-long by 48-foot-wide electrical switchyard; and (7) appurtenant 
facilities.
    The Granby Project is operated in a modified run-of-river mode. The 
Granby Project and the Fulton Development at Erie's Oswego River 
Hydroelectric Project (FERC Project No. 2474) are located at opposite 
ends of the same dam and share a single bypassed reach and reservoir. 
The flow and impoundment elevation requirements in the Oswego Project 
license,\1\ which were based on a 2004 Offer of Settlement, affect the 
Granby Project. The average annual generation at the Granby Project is 
estimated to be 44,181 megawatt-hours.
---------------------------------------------------------------------------

    \1\ 109 FERC ] 62, 141 (2004).
---------------------------------------------------------------------------

    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    n. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.
    p. Updated procedural schedule and final amendments: The 
application will be processed according to the following preliminary 
Hydro Licensing Schedule. Revisions to the schedule will be made as 
appropriate.

Issue Scoping Document 1--September 2018
Comments on Scoping Document 1 due--October 2018
Issue Scoping Document 2 (if necessary)--December 2018
Issue Notice of Ready for Environmental Analysis--February 2019
Deadline for Filing Comments, Recommendations and Agency Terms and 
Conditions/Prescriptions--April 2019
Commission issues EA--October 2019
Comments on EA--November 2019

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance

[[Page 50659]]

date of the notice of ready for environmental analysis.

    Dated: September 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21775 Filed 10-5-18; 8:45 am]
BILLING CODE 6717-01-P



                                              50658                        Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices

                                              Questions?                                                 The Commission strongly encourages                 ‘‘eLibrary’’ link. Enter the docket
                                                 Additional information about the                     electronic filing. Please file motions to             number excluding the last three digits in
                                              Projects is available from the                          intervene and protests using the                      the docket number field to access the
                                              Commission’s Office of External Affairs,                Commission’s eFiling system at http://                document. For assistance, contact FERC
                                              at (866) 208–FERC, or on the FERC                       www.ferc.gov/docs-filing/efiling.asp. For             Online Support. A copy is also available
                                              website (www.ferc.gov) using the                        assistance, please contact FERC Online                for inspection and reproduction at the
                                              eLibrary link. The eLibrary link also                   Support at FERCOnlineSupport@                         address in item h above.
                                              provides access to the texts of all formal              ferc.gov, (866) 208–3676 (toll free), or                 n. You may also register online at
                                              documents issued by the Commission,                     (202) 502–8659 (TTY). In lieu of                      http://www.ferc.gov/docs-filing/
                                              such as orders, notices, and                            electronic filing, please send a paper                esubscription.asp to be notified via
                                              rulemakings.                                            copy to: Secretary, Federal Energy                    email of new filings and issuances
                                                 In addition, the Commission offers a                 Regulatory Commission, 888 First Street               related to this or other pending projects.
                                              free service called eSubscription that                  NE, Washington, DC 20426. The first                   For assistance, contact FERC Online
                                              allows you to keep track of all formal                  page of any filing should include docket              Support.
                                              issuances and submittals in specific                    number P–2837–033.                                       o. Anyone may submit a protest or a
                                              dockets. This can reduce the amount of                     The Commission’s Rules of Practice                 motion to intervene in accordance with
                                              time you spend researching proceedings                  require all intervenors filing documents              the requirements of Rules of Practice
                                              by automatically providing you with                     with the Commission to serve a copy of                and Procedure, 18 CFR 385.210,
                                              notification of these filings, document                 that document on each person on the                   385.211, and 385.214. In determining
                                              summaries, and direct links to the                      official service list for the project.                the appropriate action to take, the
                                              documents. Go to www.ferc.gov/docs-                     Further, if an intervenor files comments              Commission will consider all protests
                                              filing/esubscription.asp.                               or documents with the Commission                      filed, but only those who file a motion
                                                                                                      relating to the merits of an issue that               to intervene in accordance with the
                                                Dated: September 28, 2018.                            may affect the responsibilities of a                  Commission’s Rules may become a
                                              Kimberly D. Bose,                                       particular resource agency, they must                 party to the proceeding. Any protests or
                                              Secretary.                                              also serve a copy of the document on                  motions to intervene must be received
                                              [FR Doc. 2018–21778 Filed 10–5–18; 8:45 am]             that resource agency.                                 on or before the specified deadline date
                                              BILLING CODE 6717–01–P                                     k. This application has been accepted,             for the particular application.
                                                                                                      but is not ready for environmental                       All filings must (1) bear in all capital
                                                                                                      analysis at this time.                                letters the title ‘‘PROTEST’’ or
                                              DEPARTMENT OF ENERGY                                       l. The existing Granby Hydroelectric
                                                                                                                                                            ‘‘MOTION TO INTERVENE;’’ (2) set
                                                                                                      Project (Granby Project) consists of: (1)
                                              Federal Energy Regulatory                                                                                     forth in the heading the name of the
                                                                                                      An 88-foot-wide reinforced concrete
                                              Commission                                                                                                    applicant and the project number of the
                                                                                                      intake structure that includes two bays
                                                                                                                                                            application to which the filing
                                              [Project No. 2837–033]                                  containing trashracks and fixed-roller,
                                                                                                                                                            responds; (3) furnish the name, address,
                                                                                                      vertical-lift type gates; (2) a 17-foot-wide
                                                                                                                                                            and telephone number of the person
                                              Erie Boulevard Hydropower, L.P.;                        sluice opening adjacent to the intake
                                                                                                                                                            protesting or intervening; and (4)
                                              Notice of Application Accepted for                      structure; (3) a 112-foot-long, 88-foot-
                                                                                                                                                            otherwise comply with the requirements
                                              Filing and Soliciting Motions To                        wide powerhouse containing two 5.04-
                                                                                                                                                            of 18 CFR 385.2001 through 385.2005.
                                              Intervene and Protests                                  megawatt (MW) turbine-generator units,
                                                                                                                                                            Agencies may obtain copies of the
                                                                                                      with a total capacity of 10.08 MW; (4)
                                                Take notice that the following                                                                              application directly from the applicant.
                                                                                                      a 3,000-foot-long, 100-foot-wide tailrace;
                                              hydroelectric application has been filed                                                                      A copy of any protest or motion to
                                                                                                      (5) two 4.16-kilovolt, 120-foot-long
                                              with the Commission and is available                                                                          intervene must be served upon each
                                                                                                      underground generator leads; (6) a 60-
                                              for public inspection.                                                                                        representative of the applicant specified
                                                                                                      foot-long by 48-foot-wide electrical
                                                a. Type of Application: New Major                                                                           in the particular application.
                                                                                                      switchyard; and (7) appurtenant
                                              License.                                                                                                         p. Updated procedural schedule and
                                                b. Project No.: 2837–033.                             facilities.
                                                                                                         The Granby Project is operated in a                final amendments: The application will
                                                c. Date filed: March 29, 2018.                                                                              be processed according to the following
                                                d. Applicant: Erie Boulevard                          modified run-of-river mode. The Granby
                                                                                                      Project and the Fulton Development at                 preliminary Hydro Licensing Schedule.
                                              Hydropower, L.P. (Erie).                                                                                      Revisions to the schedule will be made
                                                e. Name of Project: Granby                            Erie’s Oswego River Hydroelectric
                                                                                                      Project (FERC Project No. 2474) are                   as appropriate.
                                              Hydroelectric Project.
                                                f. Location: On the Oswego River in                   located at opposite ends of the same                  Issue Scoping Document 1—September
                                              the town of Fulton in Oswego County,                    dam and share a single bypassed reach                    2018
                                              New York. The project does not affect                   and reservoir. The flow and                           Comments on Scoping Document 1
                                              federal lands.                                          impoundment elevation requirements in                    due—October 2018
                                                g. Filed Pursuant to: Federal Power                   the Oswego Project license,1 which were               Issue Scoping Document 2 (if
                                              Act, 16 U.S.C. 791(a)–825(r).                           based on a 2004 Offer of Settlement,                     necessary)—December 2018
                                                 h. Applicant Contact: Steven P.                      affect the Granby Project. The average                Issue Notice of Ready for Environmental
                                              Murphy, Director, U.S. Licensing, Erie                  annual generation at the Granby Project                  Analysis—February 2019
                                              Boulevard Hydropower, L.P., 33 West                     is estimated to be 44,181 megawatt-                   Deadline for Filing Comments,
                                              1st Street South, Fulton, NY 13069;                     hours.                                                   Recommendations and Agency Terms
amozie on DSK3GDR082PROD with NOTICES1




                                              (315) 598–6130.                                            m. A copy of the application is                       and Conditions/Prescriptions—April
                                                i. FERC Contact: Allyson Conner,                      available for review at the Commission                   2019
                                              (202) 502–6082 or allyson.conner@                       in the Public Reference Room or may be                Commission issues EA—October 2019
                                              ferc.gov.                                               viewed on the Commission’s website at                 Comments on EA—November 2019
                                                 j. Deadline for filing motions to                    http://www.ferc.gov using the                            Final amendments to the application
                                              intervene and protests: 60 days from the                                                                      must be filed with the Commission no
                                              issuance date of this notice.                             1 109   FERC ¶ 62, 141 (2004).                      later than 30 days from the issuance


                                         VerDate Sep<11>2014   19:13 Oct 05, 2018   Jkt 247001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1


                                                                           Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices                                                 50659

                                              date of the notice of ready for                         Energy Regulatory Commission, 888                     number of the person protesting or
                                              environmental analysis.                                 First Street NE, Washington, DC 20426.                intervening; and (4) otherwise comply
                                                Dated: September 28, 2018.                            The first page of any filing should                   with the requirements of 18 CFR
                                              Kimberly D. Bose,
                                                                                                      include docket number P–2413–125.                     385.2001 through 385.2005. All
                                                                                                         k. Description of Request: The license             comments, motions to intervene, or
                                              Secretary.                                              filed a request to permit a non-project               protests must set forth their evidentiary
                                              [FR Doc. 2018–21775 Filed 10–5–18; 8:45 am]             use of project lands and waters to allow              basis and otherwise comply with the
                                              BILLING CODE 6717–01–P                                  Greenbriar Sand Company to dredge a                   requirements of 18 CFR 4.34(b). All
                                                                                                      334 acre area of the upper project                    comments, motions to intervene, or
                                                                                                      reservoir in Greene County, Georgia for               protests should relate to the non-project
                                              DEPARTMENT OF ENERGY                                    the purposes of commercial sand                       use application. Agencies may obtain
                                                                                                      mining. The mine operator expects the                 copies of plans directly from the
                                              Federal Energy Regulatory
                                                                                                      year round operation of the sand mine                 applicant. A copy of any protest or
                                              Commission
                                                                                                      will extract approximately 1.1 million                motion to intervene must be served
                                              [Project No. 2413–125]                                  tons of sediment per year for 25 years.               upon each representative of the
                                                                                                         l. Locations of the Application: A                 applicant specified in the particular
                                              Notice of Application Accepted for                      copy of the application is available for              application. If an intervener files
                                              Filing, Soliciting Comments, Motions                    inspection and reproduction at the                    comments or documents with the
                                              To Intervene, and Protests: Georgia                     Commission’s Public Reference Room,                   Commission relating to the merits of an
                                              Power Company                                           located at 888 First Street NE, Room 2A,              issue that may affect the responsibilities
                                                                                                      Washington, DC 20426, or by calling                   of a particular resource agency, they
                                                 Take notice that the following                       202–502–8371. This filing may also be
                                              hydroelectric application has been filed                                                                      must also serve a copy of the document
                                                                                                      viewed on the Commission’s website at                 on that resource agency. A copy of all
                                              with the Federal Energy Regulatory                      http://www.ferc.gov using the
                                              Commission and is available for public                                                                        other filings in reference to this
                                                                                                      ‘‘eLibrary’’ link. Enter the docket                   application must be accompanied by
                                              inspection:                                             number excluding the last three digits in
                                                 a. Type of Application: Non-Project                                                                        proof of service on all persons listed in
                                                                                                      the docket number field to access the                 the service list prepared by the
                                              Use of Project Lands and Waters—Sand                    document. You may also register online
                                              Mine.                                                                                                         Commission in this proceeding, in
                                                                                                      at http://www.ferc.gov/docs-filing/                   accordance with 18 CFR 4.34(b) and
                                                 b. Project No.: 2413–125.                            esubscription.asp to be notified via
                                                 c. Date Filed: August 20, 2018.                                                                            385.2010.
                                                                                                      email of new filings and issuances
                                                 d. Applicant: Georgia Power Company                  related to this or other pending projects.              Dated: October 1, 2018.
                                              (licensee).                                             For assistance, call 866–208–3676 or                  Kimberly D. Bose,
                                                 e. Name of Project: Wallace Pumped                   email FERCOnlineSupport@ferc.gov, for                 Secretary.
                                              Storage Hydroelectric Project.                          TTY, call 202–502–8659. A copy is also                [FR Doc. 2018–21779 Filed 10–5–18; 8:45 am]
                                                 f. Location: The proposed non-project                available for inspection and                          BILLING CODE 6717–01–P
                                              sand mine is located in the northern                    reproduction at the address in item (h)
                                              part of Lake Oconee, the project                        above.
                                              reservoir, in Greene County, Georgia.                      m. Individuals desiring to be included             DEPARTMENT OF ENERGY
                                                 g. Filed Pursuant to: Federal Power                  on the Commission’s mailing list should
                                              Act, 16 U.S.C. 791a–825r.                               so indicate by writing to the Secretary               Federal Energy Regulatory
                                                 h. Applicant Contact: Herbie                         of the Commission.                                    Commission
                                              Johnston, Hydro General Manager, 600                       n. Comments, Protests, or Motions To
                                              North 18th Street, Bin 16N–8180,                                                                              [Docket No. CD18–14–000]
                                                                                                      Intervene: Anyone may submit
                                              Birmingham, AL 35203.                                   comments, a protest, or a motion to                   Wallowa Resources Community
                                                 i. FERC Contact: Michael Calloway at                 intervene in accordance with the                      Solutions Inc.; Notice of Preliminary
                                              202–502–8041, or michael.calloway@                      requirements of Rules of Practice and                 Determination of a Qualifying Conduit
                                              ferc.gov.                                               Procedure, 18 CFR 385.210, .211, .214.                Hydropower Facility and Soliciting
                                                 j. Deadline for filing comments,                     In determining the appropriate action to              Comments and Motions To Intervene
                                              motions to intervene, and protests is 30                take, the Commission will consider all
                                              days from the issuance of this notice by                protests or other comments filed, but                    On September 26, 2018, the Wallowa
                                              the Commission. The Commission                          only those who file a motion to                       Resources Community Solutions Inc.,
                                              strongly encourages electronic filing.                  intervene in accordance with the                      filed a notice of intent to construct a
                                              Please file motions to intervene,                       Commission’s Rules may become a                       qualifying conduit hydropower facility,
                                              protests, and comments using the                        party to the proceeding. Any comments,                pursuant to section 30 of the Federal
                                              Commission’s eFiling system at http://                  protests, or motions to intervene must                Power Act (FPA), as amended by section
                                              www.ferc.gov/docs-filing/efiling.asp.                   be received on or before the specified                4 of the Hydropower Regulatory
                                              Commenters can submit brief comments                    comment date for the particular                       Efficiency Act of 2013 (HREA). The
                                              up to 6,000 characters, without prior                   application.                                          proposed Arrowhead Pipeline Hydro
                                              registration, using the eComment system                    o. Filing and Service of Responsive                Station Project would have an installed
                                              at http://www.ferc.gov/docs-filing/                     Documents: Any filing must (1) bear in                capacity of 61 kilowatts (kW), and
                                              ecomment.asp. You must include your                     all capital letters the title                         would be located on the existing
amozie on DSK3GDR082PROD with NOTICES1




                                              name and contact information at the end                 ‘‘COMMENTS’’; ‘‘PROTEST’’, or                         Arrowhead Irrigation Pipeline. The
                                              of your comments. For assistance,                       ‘‘MOTION TO INTERVENE’’ as                            project would be located near the
                                              please contact FERC Online Support at                   applicable; (2) set forth in the heading              Township of Joseph in Wallowa County,
                                              FERCOnlineSupport@ferc.gov, (866)                       the name of the applicant and the                     Oregon.
                                              208–3676 (toll free), or (202) 502–8659                 project number of the application to                     Applicant Contact: Kyle Petrocine,
                                              (TTY). In lieu of electronic filing, please             which the filing responds; (3) furnish                Wallowa Resources Community
                                              send a paper copy to: Secretary, Federal                the name, address, and telephone                      Solutions Inc., 401 NE 1st Street,


                                         VerDate Sep<11>2014   19:13 Oct 05, 2018   Jkt 247001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1



Document Created: 2018-10-06 00:58:19
Document Modified: 2018-10-06 00:58:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 50658 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR