83_FR_50854 83 FR 50659 - Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests: Georgia Power Company

83 FR 50659 - Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests: Georgia Power Company

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 195 (October 9, 2018)

Page Range50659-50659
FR Document2018-21779

Federal Register, Volume 83 Issue 195 (Tuesday, October 9, 2018)
[Federal Register Volume 83, Number 195 (Tuesday, October 9, 2018)]
[Notices]
[Page 50659]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-21779]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2413-125]


Notice of Application Accepted for Filing, Soliciting Comments, 
Motions To Intervene, and Protests: Georgia Power Company

    Take notice that the following hydroelectric application has been 
filed with the Federal Energy Regulatory Commission and is available 
for public inspection:
    a. Type of Application: Non-Project Use of Project Lands and 
Waters--Sand Mine.
    b. Project No.: 2413-125.
    c. Date Filed: August 20, 2018.
    d. Applicant: Georgia Power Company (licensee).
    e. Name of Project: Wallace Pumped Storage Hydroelectric Project.
    f. Location: The proposed non-project sand mine is located in the 
northern part of Lake Oconee, the project reservoir, in Greene County, 
Georgia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Herbie Johnston, Hydro General Manager, 600 
North 18th Street, Bin 16N-8180, Birmingham, AL 35203.
    i. FERC Contact: Michael Calloway at 202-502-8041, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, and comments using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. The first page of any filing should 
include docket number P-2413-125.
    k. Description of Request: The license filed a request to permit a 
non-project use of project lands and waters to allow Greenbriar Sand 
Company to dredge a 334 acre area of the upper project reservoir in 
Greene County, Georgia for the purposes of commercial sand mining. The 
mine operator expects the year round operation of the sand mine will 
extract approximately 1.1 million tons of sediment per year for 25 
years.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling 202-502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 866-208-3676 or email 
[email protected], for TTY, call 202-502-8659. A copy is also 
available for inspection and reproduction at the address in item (h) 
above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS''; ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the non-project use application. Agencies may obtain copies of plans 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: October 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21779 Filed 10-5-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices                                                 50659

                                              date of the notice of ready for                         Energy Regulatory Commission, 888                     number of the person protesting or
                                              environmental analysis.                                 First Street NE, Washington, DC 20426.                intervening; and (4) otherwise comply
                                                Dated: September 28, 2018.                            The first page of any filing should                   with the requirements of 18 CFR
                                              Kimberly D. Bose,
                                                                                                      include docket number P–2413–125.                     385.2001 through 385.2005. All
                                                                                                         k. Description of Request: The license             comments, motions to intervene, or
                                              Secretary.                                              filed a request to permit a non-project               protests must set forth their evidentiary
                                              [FR Doc. 2018–21775 Filed 10–5–18; 8:45 am]             use of project lands and waters to allow              basis and otherwise comply with the
                                              BILLING CODE 6717–01–P                                  Greenbriar Sand Company to dredge a                   requirements of 18 CFR 4.34(b). All
                                                                                                      334 acre area of the upper project                    comments, motions to intervene, or
                                                                                                      reservoir in Greene County, Georgia for               protests should relate to the non-project
                                              DEPARTMENT OF ENERGY                                    the purposes of commercial sand                       use application. Agencies may obtain
                                                                                                      mining. The mine operator expects the                 copies of plans directly from the
                                              Federal Energy Regulatory
                                                                                                      year round operation of the sand mine                 applicant. A copy of any protest or
                                              Commission
                                                                                                      will extract approximately 1.1 million                motion to intervene must be served
                                              [Project No. 2413–125]                                  tons of sediment per year for 25 years.               upon each representative of the
                                                                                                         l. Locations of the Application: A                 applicant specified in the particular
                                              Notice of Application Accepted for                      copy of the application is available for              application. If an intervener files
                                              Filing, Soliciting Comments, Motions                    inspection and reproduction at the                    comments or documents with the
                                              To Intervene, and Protests: Georgia                     Commission’s Public Reference Room,                   Commission relating to the merits of an
                                              Power Company                                           located at 888 First Street NE, Room 2A,              issue that may affect the responsibilities
                                                                                                      Washington, DC 20426, or by calling                   of a particular resource agency, they
                                                 Take notice that the following                       202–502–8371. This filing may also be
                                              hydroelectric application has been filed                                                                      must also serve a copy of the document
                                                                                                      viewed on the Commission’s website at                 on that resource agency. A copy of all
                                              with the Federal Energy Regulatory                      http://www.ferc.gov using the
                                              Commission and is available for public                                                                        other filings in reference to this
                                                                                                      ‘‘eLibrary’’ link. Enter the docket                   application must be accompanied by
                                              inspection:                                             number excluding the last three digits in
                                                 a. Type of Application: Non-Project                                                                        proof of service on all persons listed in
                                                                                                      the docket number field to access the                 the service list prepared by the
                                              Use of Project Lands and Waters—Sand                    document. You may also register online
                                              Mine.                                                                                                         Commission in this proceeding, in
                                                                                                      at http://www.ferc.gov/docs-filing/                   accordance with 18 CFR 4.34(b) and
                                                 b. Project No.: 2413–125.                            esubscription.asp to be notified via
                                                 c. Date Filed: August 20, 2018.                                                                            385.2010.
                                                                                                      email of new filings and issuances
                                                 d. Applicant: Georgia Power Company                  related to this or other pending projects.              Dated: October 1, 2018.
                                              (licensee).                                             For assistance, call 866–208–3676 or                  Kimberly D. Bose,
                                                 e. Name of Project: Wallace Pumped                   email FERCOnlineSupport@ferc.gov, for                 Secretary.
                                              Storage Hydroelectric Project.                          TTY, call 202–502–8659. A copy is also                [FR Doc. 2018–21779 Filed 10–5–18; 8:45 am]
                                                 f. Location: The proposed non-project                available for inspection and                          BILLING CODE 6717–01–P
                                              sand mine is located in the northern                    reproduction at the address in item (h)
                                              part of Lake Oconee, the project                        above.
                                              reservoir, in Greene County, Georgia.                      m. Individuals desiring to be included             DEPARTMENT OF ENERGY
                                                 g. Filed Pursuant to: Federal Power                  on the Commission’s mailing list should
                                              Act, 16 U.S.C. 791a–825r.                               so indicate by writing to the Secretary               Federal Energy Regulatory
                                                 h. Applicant Contact: Herbie                         of the Commission.                                    Commission
                                              Johnston, Hydro General Manager, 600                       n. Comments, Protests, or Motions To
                                              North 18th Street, Bin 16N–8180,                                                                              [Docket No. CD18–14–000]
                                                                                                      Intervene: Anyone may submit
                                              Birmingham, AL 35203.                                   comments, a protest, or a motion to                   Wallowa Resources Community
                                                 i. FERC Contact: Michael Calloway at                 intervene in accordance with the                      Solutions Inc.; Notice of Preliminary
                                              202–502–8041, or michael.calloway@                      requirements of Rules of Practice and                 Determination of a Qualifying Conduit
                                              ferc.gov.                                               Procedure, 18 CFR 385.210, .211, .214.                Hydropower Facility and Soliciting
                                                 j. Deadline for filing comments,                     In determining the appropriate action to              Comments and Motions To Intervene
                                              motions to intervene, and protests is 30                take, the Commission will consider all
                                              days from the issuance of this notice by                protests or other comments filed, but                    On September 26, 2018, the Wallowa
                                              the Commission. The Commission                          only those who file a motion to                       Resources Community Solutions Inc.,
                                              strongly encourages electronic filing.                  intervene in accordance with the                      filed a notice of intent to construct a
                                              Please file motions to intervene,                       Commission’s Rules may become a                       qualifying conduit hydropower facility,
                                              protests, and comments using the                        party to the proceeding. Any comments,                pursuant to section 30 of the Federal
                                              Commission’s eFiling system at http://                  protests, or motions to intervene must                Power Act (FPA), as amended by section
                                              www.ferc.gov/docs-filing/efiling.asp.                   be received on or before the specified                4 of the Hydropower Regulatory
                                              Commenters can submit brief comments                    comment date for the particular                       Efficiency Act of 2013 (HREA). The
                                              up to 6,000 characters, without prior                   application.                                          proposed Arrowhead Pipeline Hydro
                                              registration, using the eComment system                    o. Filing and Service of Responsive                Station Project would have an installed
                                              at http://www.ferc.gov/docs-filing/                     Documents: Any filing must (1) bear in                capacity of 61 kilowatts (kW), and
                                              ecomment.asp. You must include your                     all capital letters the title                         would be located on the existing
amozie on DSK3GDR082PROD with NOTICES1




                                              name and contact information at the end                 ‘‘COMMENTS’’; ‘‘PROTEST’’, or                         Arrowhead Irrigation Pipeline. The
                                              of your comments. For assistance,                       ‘‘MOTION TO INTERVENE’’ as                            project would be located near the
                                              please contact FERC Online Support at                   applicable; (2) set forth in the heading              Township of Joseph in Wallowa County,
                                              FERCOnlineSupport@ferc.gov, (866)                       the name of the applicant and the                     Oregon.
                                              208–3676 (toll free), or (202) 502–8659                 project number of the application to                     Applicant Contact: Kyle Petrocine,
                                              (TTY). In lieu of electronic filing, please             which the filing responds; (3) furnish                Wallowa Resources Community
                                              send a paper copy to: Secretary, Federal                the name, address, and telephone                      Solutions Inc., 401 NE 1st Street,


                                         VerDate Sep<11>2014   19:13 Oct 05, 2018   Jkt 247001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1



Document Created: 2018-10-06 00:59:17
Document Modified: 2018-10-06 00:59:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 50659 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR