NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 195 (October 9, 2018)

Page Range50700-50702
FR Document2018-21912

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 143 and 142 to Combined Licenses (COLs), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 195 (Tuesday, October 9, 2018)
[Federal Register Volume 83, Number 195 (Tuesday, October 9, 2018)]
[Notices]
[Pages 50700-50702]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-21912]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and Updates to Tier 1 Table 2.5.2-3

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment Nos. 143 and 142 to Combined Licenses (COLs), NPF-91 
and NPF-92, respectively. The COLs were issued to Southern Nuclear 
Operating Company, Inc., and Georgia Power Company, Oglethorpe Power 
Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power 
SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for 
construction and operation of the Vogtle Electric Generating Plant 
(VEGP) Units 3 and 4, located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on September 25, 2018.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search

[[Page 50701]]

for Docket ID NRC-2008-0252. Address questions about NRC dockets to 
Jennifer Borges telephone: 301-287-9127; email: 
Jennifer.Borges@nrc.gov. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to pdr.resource@nrc.gov. The ADAMS accession number for each 
document referenced (if it is available in ADAMS) is provided the first 
time that it is mentioned in this document. The request for the 
amendment and exemption was submitted by letter dated April 20, 2018, 
and available in ADAMS under Accession No. ML18110A113.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: Chandu.Patel@nrc.gov.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 143 and 142 to COLs, NPF-
91 and NPF-92, respectively, to SNC. The exemption is required by 
paragraph A.4 of section VIII, ``Processes for Changes and 
Departures,'' appendix D, to 10 CFR part 52 to allow SNC to depart from 
Tier 1 information. With the requested amendment, SNC sought proposed 
changes that would revise the Updated Final Safety Analysis Report in 
the form of departures from the plant-specific Design Control Document 
(DCD) Tier 2 information and involves changes to plant-specific Tier 1 
information with corresponding changes to the associated COL Appendix C 
information. Specifically, the amendment proposes changes to plant-
specific Tier 1 (and COL Appendix C) Table 2.5.2-3, ``PMS Automatically 
Actuated Engineered Safety Features,'' to revise the nomenclature for 
``Auxiliary Spray and Letdown Purification Line Isolation'' and to 
include ``Component Cooling System Containment Isolation Valve 
Closure'' in Table 2.5.2-3.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in Sec. Sec.  50.12, 52.7, and section VIII.A.4 of appendix D to 
10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML18232A535.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to SNC for VEGP Units 3 and 4 (COL 
Nos. NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 4 
can be found in ADAMS under Accession Nos. ML18232A528 and ML18232A529, 
respectively. The exemption is reproduced (with the exception of 
abbreviated titles and additional citations) in Section II of this 
document. The amendment documents for COL Nos. NPF-91 and NPF-92 are 
available in ADAMS under Accession Nos. ML18232A530 and ML18232A532, 
respectively. A summary of the amendment documents is provided in 
Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated April 20, 2018, SNC requested from the 
Commission an exemption to allow departures from Tier 1 information in 
the certified DCD incorporated by reference in 10 CFR part 52, appendix 
D, as part of license amendment request 18-010, ``Updates to Tier 1 
Table 2.5.2-3.''
    For the reasons set forth in Section 3.2 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML18232A535, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, SNC is granted an exemption from the certified DCD 
Tier 1 information, with corresponding changes to Appendix C of the 
facility Combined License, as described in the licensee's request dated 
April 20, 2018. This exemption is related to, and necessary for the 
granting of License Amendment No. 143 (Unit 3) and No. 142 (Unit 4), 
which is being issued concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML18232A535), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated April 20, 2018 (ADAMS Accession No. ML18110A113), 
SNC requested that the NRC amend the COLs for VEGP, Units 3 and 4, COLs 
NPF-91 and NPF-92. The proposed amendment is described in Section I of 
this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR Chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
May 22, 2018 (83 FR 23738). No comments were received during the 30-day 
comment period.

[[Page 50702]]

    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemptions and issued the amendments that SNC 
requested on April 20, 2018. The exemption and amendment were issued on 
September 25, 2018, as part of a combined package to SNC (ADAMS 
Accession No. ML18232A526).

    Dated at Rockville, Maryland, this 3rd day of October 2018.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-21912 Filed 10-5-18; 8:45 am]
 BILLING CODE 7590-01-P



                                              50700                        Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices

                                                 Date of issuance: September 19, 2018.                the application as originally noticed,                Safety Evaluation dated September 11,
                                                 Effective date: As of the date of                    and did not change the NRC staff’s                    2018.
                                              issuance and shall be implemented                       original proposed no significant hazards                No significant hazards consideration
                                              prior to startup from the fall 2018                     consideration determination as                        comments received: No.
                                              refueling outage.                                       published in the Federal Register.                      Dated at Rockville, Maryland, this 1st day
                                                 Amendment No.: 322. A publicly-                        The Commission’s related evaluation                 of October, 2018.
                                              available version is in ADAMS under                     of the amendments is contained in a                     For the Nuclear Regulatory Commission.
                                              Accession No. ML18214A706;                              Safety Evaluation dated September 11,                 Gregory F. Suber,
                                              documents related to this amendment                     2018.
                                                                                                                                                            Acting Director, Division of Operating Reactor
                                              are listed in the Safety Evaluation                       No significant hazards consideration
                                                                                                                                                            Licensing, Office of Nuclear Reactor
                                              enclosed with the amendment.                            comments received: No.                                Regulation.
                                                 Renewed Facility Operating License
                                                                                                      Wolf Creek Nuclear Operating                          [FR Doc. 2018–21669 Filed 10–5–18; 8:45 am]
                                              No. DPR–59: The amendment revised
                                                                                                      Corporation, Docket No. 50–482, Wolf                  BILLING CODE 7590–01–P
                                              the Renewed Facility Operating License
                                                                                                      Creek Generating Station, Unit 1
                                              and TS.
                                                 Date of initial notice in Federal                    (WCGS), Coffey County, Kansas
                                                                                                         Date of amendment request: June 28,                NUCLEAR REGULATORY
                                              Register: July 13, 2018 (83 FR 32692).
                                                 The Commission’s related evaluation                  2017, as supplemented by letters dated                COMMISSION
                                              of the amendment is contained in a                      February 15, May 29, June 20, and                     [Docket Nos. 52–025 and 52–026; NRC–
                                              Safety Evaluation dated September 19,                   August 30, 2018.                                      2008–0252]
                                              2018.                                                      Brief description of amendment: The
                                                 No significant hazards consideration                 amendment added new Technical                         Southern Nuclear Operating Company,
                                              comments received: No.                                  Specification (TS) 3.7.20, ‘‘Class 1E                 Inc., Vogtle Electric Generating Plant,
                                                                                                      Electrical Equipment Air Conditioning                 Units 3 and Updates to Tier 1 Table
                                              Florida Power & Light Company, Docket                                                                         2.5.2–3
                                                                                                      (A/C) System,’’ to the WCGS TSs. New
                                              Nos. 50–250 and 50–251, Turkey Point
                                                                                                      TS 3.7.20 includes (1) a limiting                     AGENCY:  Nuclear Regulatory
                                              Nuclear Generating Unit Nos. 3 and 4,
                                                                                                      condition for operation (LCO) statement,              Commission.
                                              Miami-Dade County, Florida
                                                                                                      (2) an Applicability statement, during
                                                                                                                                                            ACTION: Exemption and combined
                                                 Date of amendment request: August                    which the LCO must be met, (3)
                                              23, 2017, as supplemented by letters                                                                          license amendment; issuance.
                                                                                                      ACTIONS to be applied when the LCO
                                              dated October 19, 2017, and March 27,                   is not met, including Conditions,                     SUMMARY:    The U.S. Nuclear Regulatory
                                              2018.                                                   Required Actions, and Completion                      Commission (NRC) is granting an
                                                 Brief description of amendments: The                 Times, and (4) Surveillance                           exemption to allow a departure from the
                                              amendments revised the Technical                        Requirements with a specified                         certification information of Tier 1 of the
                                              Specifications by relocating the                        Frequency to demonstrate that the LCO                 generic design control document (DCD)
                                              explosive gas monitoring                                is met for the Class 1E Electrical                    and is issuing License Amendment Nos.
                                              instrumentation, explosive gas mixture,                 Equipment A/C System trains at WCGS.                  143 and 142 to Combined Licenses
                                              and gas decay tanks system                              Additionally, the Table of Contents is                (COLs), NPF–91 and NPF–92,
                                              requirements to licensee-controlled                     also revised to reflect the incorporation             respectively. The COLs were issued to
                                              documents and establishing a gas decay                  of new TS 3.7.20.                                     Southern Nuclear Operating Company,
                                              tank explosive gas and radioactivity                       Date of issuance: September 11, 2018.              Inc., and Georgia Power Company,
                                              monitoring program. The amendments                         Effective date: As of the date of                  Oglethorpe Power Corporation, MEAG
                                              also relocated the standby feedwater                    issuance and shall be implemented                     Power SPVM, LLC, MEAG Power SPVJ,
                                              system requirements to licensee-                        within 90 days from the date of                       LLC, MEAG Power SPVP, LLC, and the
                                              controlled documents and modified                       issuance.                                             City of Dalton, Georgia (collectively
                                              related auxiliary feedwater system                         Amendment No.: 219. A publicly-                    SNC); for construction and operation of
                                              requirements.                                           available version is in ADAMS under                   the Vogtle Electric Generating Plant
                                                 Date of issuance: September 11, 2018.                Accession No. ML18219A564;                            (VEGP) Units 3 and 4, located in Burke
                                                 Effective date: As of the date of                    documents related to this amendment                   County, Georgia.
                                              issuance and shall be implemented                       are listed in the Safety Evaluation                     The granting of the exemption allows
                                              within 90 days of issuance.                             enclosed with the amendment.                          the changes to Tier 1 information asked
                                                 Amendment Nos.: 282 (Unit No. 3)                        Renewed Facility Operating License                 for in the amendment. Because the
                                              and 276 (Unit No. 4). A publicly-                       No. NPF–42: The amendment revised                     acceptability of the exemption was
                                              available version is in ADAMS under                     the Renewed Facility Operating License                determined in part by the acceptability
                                              Accession No. ML18214A125;                              and Technical Specifications.                         of the amendment, the exemption and
                                              documents related to these amendments                      Date of initial notice in Federal
                                                                                                                                                            amendment are being issued
                                              are listed in the Safety Evaluation                     Register: October 3, 2017 (82 FR
                                                                                                                                                            concurrently.
                                              enclosed with the amendments.                           46099). The supplemental letters dated
                                                 Renewed Facility Operating License                   February 15, May 29, June 20, and                     DATES: The exemption and amendment
                                              Nos. DPR–31 and DPR–41: The                             August 30, 2018, provided additional                  were issued on September 25, 2018.
                                              amendments revised the Renewed                          information that clarified the                        ADDRESSES: Please refer to Docket ID
                                              Facility Operating Licenses and                         application, did not expand the scope of              NRC–2008–0252 when contacting the
amozie on DSK3GDR082PROD with NOTICES1




                                              Technical Specifications.                               the application as originally noticed,                NRC about the availability of
                                                 Date of initial notice in Federal                    and did not change the NRC staff’s                    information regarding this document.
                                              Register: November 21, 2017 (82 FR                      original proposed no significant hazards              You may obtain publicly-available
                                              55406). The supplemental letter dated                   consideration determination as                        information related to this document
                                              March 27, 2018, provided additional                     published in the Federal Register.                    using any of the following methods:
                                              information that clarified the                             The Commission’s related evaluation                  • Federal Rulemaking Website: Go to
                                              application, did not expand the scope of                of the amendment is contained in a                    http://www.regulations.gov and search


                                         VerDate Sep<11>2014   19:13 Oct 05, 2018   Jkt 247001   PO 00000   Frm 00070   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1


                                                                           Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices                                            50701

                                              for Docket ID NRC–2008–0252. Address                    Automatically Actuated Engineered                        B. the exemption presents no undue
                                              questions about NRC dockets to Jennifer                 Safety Features,’’ to revise the                      risk to public health and safety;
                                              Borges telephone: 301–287–9127; email:                  nomenclature for ‘‘Auxiliary Spray and                   C. the exemption is consistent with
                                              Jennifer.Borges@nrc.gov. For technical                  Letdown Purification Line Isolation’’                 the common defense and security;
                                              questions, contact the individual listed                and to include ‘‘Component Cooling                       D. special circumstances are present
                                              in the FOR FURTHER INFORMATION                          System Containment Isolation Valve                    in that the application of the rule in this
                                              CONTACT section of this document.                       Closure’’ in Table 2.5.2–3.                           circumstance is not necessary to serve
                                                 • NRC’s Agencywide Documents                            Part of the justification for granting             the underlying purpose of the rule;
                                              Access and Management System                            the exemption was provided by the                        E. the special circumstances outweigh
                                              (ADAMS): You may obtain publicly-                       review of the amendment. Because the                  any decrease in safety that may result
                                              available documents online in the                       exemption is necessary in order to issue              from the reduction in standardization
                                              ADAMS Public Documents collection at                    the requested license amendment, the                  caused by the exemption; and
                                              http://www.nrc.gov/reading-rm/                          NRC granted the exemption and issued                     F. the exemption will not result in a
                                              adams.html. To begin the search, select                 the amendment concurrently, rather                    significant decrease in the level of safety
                                              ‘‘Begin Web-based ADAMS Search.’’ For                   than in sequence. This included issuing               otherwise provided by the design.
                                              problems with ADAMS, please contact                     a combined safety evaluation containing                  2. Accordingly, SNC is granted an
                                              the NRC’s Public Document Room (PDR)                    the NRC staff’s review of both the                    exemption from the certified DCD Tier
                                              reference staff at 1–800–397–4209, 301–                 exemption request and the license                     1 information, with corresponding
                                              415–4737, or by email to pdr.resource@                  amendment. The exemption met all                      changes to Appendix C of the facility
                                              nrc.gov. The ADAMS accession number                     applicable regulatory criteria set forth in           Combined License, as described in the
                                              for each document referenced (if it is                  §§ 50.12, 52.7, and section VIII.A.4 of               licensee’s request dated April 20, 2018.
                                              available in ADAMS) is provided the                     appendix D to 10 CFR part 52. The                     This exemption is related to, and
                                              first time that it is mentioned in this                 license amendment was found to be                     necessary for the granting of License
                                              document. The request for the                           acceptable as well. The combined safety               Amendment No. 143 (Unit 3) and No.
                                              amendment and exemption was                             evaluation is available in ADAMS under                142 (Unit 4), which is being issued
                                              submitted by letter dated April 20, 2018,               Accession No. ML18232A535.                            concurrently with this exemption.
                                              and available in ADAMS under                               Identical exemption documents                         3. As explained in Section 5.0 of the
                                              Accession No. ML18110A113.                              (except for referenced unit numbers and               NRC staff’s Safety Evaluation (ADAMS
                                                 • NRC’s PDR: You may examine and                     license numbers) were issued to SNC for               Accession No. ML18232A535), this
                                              purchase copies of public documents at                  VEGP Units 3 and 4 (COL Nos. NPF–91                   exemption meets the eligibility criteria
                                              the NRC’s PDR, Room O1–F21, One                         and NPF–92). The exemption                            for categorical exclusion set forth in 10
                                              White Flint North, 11555 Rockville                      documents for VEGP Units 3 and 4 can                  CFR 51.22(c)(9). Therefore, pursuant to
                                              Pike, Rockville, Maryland 20852.                        be found in ADAMS under Accession                     10 CFR 51.22(b), no environmental
                                                                                                      Nos. ML18232A528 and ML18232A529,                     impact statement or environmental
                                              FOR FURTHER INFORMATION CONTACT:
                                                                                                      respectively. The exemption is                        assessment needs to be prepared in
                                              Chandu Patel, Office of New Reactors,
                                                                                                      reproduced (with the exception of                     connection with the issuance of the
                                              U.S. Nuclear Regulatory Commission,
                                                                                                      abbreviated titles and additional                     exemption.
                                              Washington, DC 20555–0001; telephone:
                                                                                                      citations) in Section II of this document.               4. This exemption is effective as of the
                                              301–415–3025; email: Chandu.Patel@
                                                                                                      The amendment documents for COL                       date of its issuance.
                                              nrc.gov.
                                                                                                      Nos. NPF–91 and NPF–92 are available                  III. License Amendment Request
                                              SUPPLEMENTARY INFORMATION:                              in ADAMS under Accession Nos.
                                                                                                      ML18232A530 and ML18232A532,                             By letter dated April 20, 2018
                                              I. Introduction
                                                                                                      respectively. A summary of the                        (ADAMS Accession No. ML18110A113),
                                                 The NRC is granting an exemption                     amendment documents is provided in                    SNC requested that the NRC amend the
                                              from paragraph B of section III, ‘‘Scope                Section III of this document.                         COLs for VEGP, Units 3 and 4, COLs
                                              and Contents,’’ of appendix D, ‘‘Design                                                                       NPF–91 and NPF–92. The proposed
                                              Certification Rule for the AP1000,’’ to                 II. Exemption                                         amendment is described in Section I of
                                              part 52 of title 10 of the Code of Federal                 Reproduced below is the exemption                  this Federal Register notice.
                                              Regulations (10 CFR), and issuing                       document issued to VEGP Units 3 and                      The Commission has determined for
                                              License Amendment Nos. 143 and 142                      4. It makes reference to the combined                 these amendments that the application
                                              to COLs, NPF–91 and NPF–92,                             safety evaluation that provides the                   complies with the standards and
                                              respectively, to SNC. The exemption is                  reasoning for the findings made by the                requirements of the Atomic Energy Act
                                              required by paragraph A.4 of section                    NRC (and listed under Item 1) in order                of 1954, as amended (the Act), and the
                                              VIII, ‘‘Processes for Changes and                       to grant the exemption:                               Commission’s rules and regulations.
                                              Departures,’’ appendix D, to 10 CFR part                   1. In a letter dated April 20, 2018,               The Commission has made appropriate
                                              52 to allow SNC to depart from Tier 1                   SNC requested from the Commission an                  findings as required by the Act and the
                                              information. With the requested                         exemption to allow departures from Tier               Commission’s rules and regulations in
                                              amendment, SNC sought proposed                          1 information in the certified DCD                    10 CFR Chapter I, which are set forth in
                                              changes that would revise the Updated                   incorporated by reference in 10 CFR                   the license amendment.
                                              Final Safety Analysis Report in the form                part 52, appendix D, as part of license                  A notice of consideration of issuance
                                              of departures from the plant-specific                   amendment request 18–010, ‘‘Updates                   of amendment to facility operating
                                              Design Control Document (DCD) Tier 2                    to Tier 1 Table 2.5.2–3.’’                            license or COL, as applicable, proposed
amozie on DSK3GDR082PROD with NOTICES1




                                              information and involves changes to                        For the reasons set forth in Section 3.2           no significant hazards consideration
                                              plant-specific Tier 1 information with                  of the NRC staff’s Safety Evaluation,                 determination, and opportunity for a
                                              corresponding changes to the associated                 which can be found in ADAMS under                     hearing in connection with these
                                              COL Appendix C information.                             Accession No. ML18232A535, the                        actions, was published in the Federal
                                              Specifically, the amendment proposes                    Commission finds that:                                Register on May 22, 2018 (83 FR 23738).
                                              changes to plant-specific Tier 1 (and                      A. The exemption is authorized by                  No comments were received during the
                                              COL Appendix C) Table 2.5.2–3, ‘‘PMS                    law;                                                  30-day comment period.


                                         VerDate Sep<11>2014   19:13 Oct 05, 2018   Jkt 247001   PO 00000   Frm 00071   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1


                                              50702                        Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices

                                                The Commission has determined that                    this notice is to advise interested                   obligation under one or more but fewer
                                              these amendments satisfy the criteria for               persons of the request and to solicit                 than all collective bargaining
                                              categorical exclusion in accordance                     their views on it.                                    agreements under which the employer
                                              with 10 CFR 51.22. Therefore, pursuant                  DATES: Comments must be submitted on                  has been obligated to contribute under
                                              to 10 CFR 51.22(b), no environmental                    or before November 23, 2018.                          the plan, while continuing to perform
                                              impact statement or environmental                       ADDRESSES: Comments may be                            work in the jurisdiction of the collective
                                              assessment need be prepared for these                   submitted by any of the following                     bargaining agreement of the type for
                                              amendments.                                             methods:                                              which contributions were previously
                                                                                                        • Federal eRulemaking Portal: http://               required or transfers such work to
                                              IV. Conclusion
                                                                                                      www.regulations.gov. Follow the                       another location or to an entity or
                                                Using the reasons set forth in the                                                                          entities owned or controlled by the
                                                                                                      instructions for submitting comments.
                                              combined safety evaluation, the staff                     • Email: reg.comments@pbgc.gov.                     employer; or (3) permanently ceases to
                                              granted the exemptions and issued the                   Refer to the UFCW Industry Plan in the                have an obligation to contribute under
                                              amendments that SNC requested on                                                                              the plan for work performed at one or
                                                                                                      subject line.
                                              April 20, 2018. The exemption and                         • Mail or Hand Delivery: Regulatory                 more but fewer than all of its facilities,
                                              amendment were issued on September                      Affairs Division, Office of the General               while continuing to perform work at the
                                              25, 2018, as part of a combined package                 Counsel, Pension Benefit Guaranty                     facility of the type for which the
                                              to SNC (ADAMS Accession No.                             Corporation, 1200 K Street NW,                        obligation to contribute ceased.
                                              ML18232A526).                                           Washington, DC 20005–4026.                              Although the general rules on
                                                Dated at Rockville, Maryland, this 3rd day              All submissions received must                       complete and partial withdrawal
                                              of October 2018.                                        include the agency’s name (Pension                    identify events that normally result in a
                                                For the Nuclear Regulatory Commission.                Benefit Guaranty Corporation, or PBGC)                diminution of the plan’s contribution
                                              Jennifer L. Dixon-Herrity,                              and refer to the UFCW Industry Plan.                  base, Congress recognized that, in
                                              Chief, Licensing Branch 4, Division of                  All comments received will be posted                  certain industries and under certain
                                              Licensing, Siting, and Environmental                    without change to PBGC’s website,                     circumstances, a complete or partial
                                              Analysis, Office of New Reactors.                       http://www.pbgc.gov, including any                    cessation of the obligation to contribute
                                              [FR Doc. 2018–21912 Filed 10–5–18; 8:45 am]             personal information provided. Copies                 normally does not weaken the plan’s
                                              BILLING CODE 7590–01–P                                  of comments may also be obtained by                   contribution base. For that reason,
                                                                                                      writing to Disclosure Division, Office of             Congress established special withdrawal
                                                                                                      the General Counsel, Pension Benefit                  rules for the construction and
                                                                                                      Guaranty Corporation, 1200 K Street                   entertainment industries.
                                              PENSION BENEFIT GUARANTY                                                                                        For construction industry plans and
                                              CORPORATION                                             NW, Washington, DC 20005–4026 or
                                                                                                                                                            employers, section 4203(b)(2) of ERISA
                                                                                                      calling 202–326–4040 during normal
                                              Pendency for Request for Approval of                                                                          provides that a complete withdrawal
                                                                                                      business hours. (TTY users may call the
                                              Special Withdrawal Liability Rules:                                                                           occurs only if an employer ceases to
                                                                                                      Federal relay service toll-free at 1–800–
                                              United Food and Commercial Workers                                                                            have an obligation to contribute under
                                                                                                      877–8339 and ask to be connected to
                                              International Union—Industry Pension                                                                          a plan and the employer either
                                                                                                      202–326–4040.)                                        continues to perform previously covered
                                              Fund                                                    FOR FURTHER INFORMATION CONTACT:                      work in the jurisdiction of the collective
                                              AGENCY: Pension Benefit Guaranty                        Bruce Perlin (Perlin.Bruce@PBGC.gov),                 bargaining agreement or resumes such
                                              Corporation.                                            202–326–4020, ext. 6818, or Elizabeth                 work within 5 years without renewing
                                              ACTION: Notice of pendency of request.                  Coleman (Coleman.Elizabeth@                           the obligation to contribute at the time
                                                                                                      PBGC.gov), ext. 3661, Office of the                   of resumption. In the case of a plan
                                              SUMMARY:    This notice advises interested              General Counsel, Suite 340, 1200 K                    terminated by mass withdrawal (within
                                              persons that the Pension Benefit                        Street NW, Washington, DC 20005–                      the meaning of section 4041(A)(2) of
                                              Guaranty Corporation (‘‘PBGC’’) has                     4026; (TTY users may call the Federal                 ERISA), section 4203(b)(3) provides that
                                              received a request from the United Food                 relay service toll-free at 1–800–877–                 the 5-year restriction on an employer’s
                                              and Commercial Workers International                    8339 and ask to be connected to 202–                  resuming covered work is reduced to 3
                                              Union—Industry Pension Fund for                         326–4020.)                                            years. Section 4203(c)(1) of ERISA
                                              approval of a plan amendment                            SUPPLEMENTARY INFORMATION:                            applies the same special definition of
                                              providing for special withdrawal                                                                              complete withdrawal to the
                                              liability rules. Under PBGC’s regulation                Background
                                                                                                                                                            entertainment industry, except that the
                                              on Extension of Special Withdrawal                        Section 4203(a) of the Employee                     pertinent jurisdiction is the jurisdiction
                                              Liability Rules, a multiemployer                        Retirement Income Security Act of 1974,               of the plan rather than the jurisdiction
                                              pension plan may, with PBGC approval,                   as amended by the Multiemployer                       of the collective bargaining agreement.
                                              be amended to provide for special                       Pension Plan Amendments Act of 1980                   In contrast, the general definition of
                                              withdrawal liability rules similar to                   (ERISA), provides that a complete                     complete withdrawal in section 4203(a)
                                              those that apply to the construction and                withdrawal from a multiemployer plan                  of ERISA includes the permanent
                                              entertainment industries. Such approval                 generally occurs when an employer                     cessation of the obligation to contribute
                                              is granted only if PBGC determines that                 permanently ceases to have an                         regardless of the continued activities of
                                              the rules apply to an industry with                     obligation to contribute under the plan               the withdrawn employer.
                                              characteristics that make use of the                    or permanently ceases all covered                       Congress also established special
amozie on DSK3GDR082PROD with NOTICES1




                                              special rules appropriate and that the                  operations under the plan. Under                      partial withdrawal liability rules for the
                                              rules will not pose a significant risk to               section 4205 of ERISA, a partial                      construction and entertainment
                                              the pension insurance system. Before                    withdrawal generally occurs when an                   industries. Under section 4208(d)(1) of
                                              granting an approval, PBGC’s                            employer: (1) Reduces its contribution                ERISA, ‘‘[a]n employer to whom section
                                              regulations require PBGC to give                        base units by seventy percent in each of              4203(b) (relating to the building and
                                              interested persons an opportunity to                    three consecutive years; or (2)                       construction industry) applies is liable
                                              comment on the request. The purpose of                  permanently ceases to have an                         for a partial withdrawal only if the


                                         VerDate Sep<11>2014   19:13 Oct 05, 2018   Jkt 247001   PO 00000   Frm 00072   Fmt 4703   Sfmt 4703   E:\FR\FM\09OCN1.SGM   09OCN1



Document Created: 2018-10-06 00:59:08
Document Modified: 2018-10-06 00:59:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on September 25, 2018.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation83 FR 50700 