83_FR_51737 83 FR 51540 - David L. Durbano-Continuance in Control Exemption-Washington Eastern Railroad, LLC

83 FR 51540 - David L. Durbano-Continuance in Control Exemption-Washington Eastern Railroad, LLC

SURFACE TRANSPORTATION BOARD

Federal Register Volume 83, Issue 197 (October 11, 2018)

Page Range51540-51541
FR Document2018-22171

Federal Register, Volume 83 Issue 197 (Thursday, October 11, 2018)
[Federal Register Volume 83, Number 197 (Thursday, October 11, 2018)]
[Notices]
[Pages 51540-51541]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-22171]


=======================================================================
-----------------------------------------------------------------------

SURFACE TRANSPORTATION BOARD

[Docket No. FD 36227]


David L. Durbano--Continuance in Control Exemption--Washington 
Eastern Railroad, LLC

    David L. Durbano (Durbano), a noncarrier, has filed a verified 
notice of exemption pursuant to 49 CFR 1180.2(d)(2) to continue in 
control of Washington Eastern Railroad, LLC (WERR), upon WERR's 
becoming a Class III rail carrier.
    This transaction is related to a concurrently filed verified notice 
of exemption in Washington Eastern Railroad, LLC--Change in Operator 
Exemption--Eastern Washington Gateway Railroad Company, Docket No. FD 
36226. In that proceeding, WERR seeks an exemption under 49 CFR 1150.31 
to assume operations over approximately 107.8 miles of track extending 
between milepost 1.0 near Cheney, Wash., and the end of the track at 
milepost 108.8 in Coulee City, Wash. (CW Branch), and over 
approximately 5.9 miles of track that connects with the CW Branch at 
Geiger Junction near Medical Lake, Wash. (Geiger Spur).
    The earliest this transaction may be consummated is October 25, 
2018, the effective date of the exemption (30 days after the verified 
notice was filed). Durbano states that he intends to consummate the 
transaction on or after the effective date of the transaction 
established by the Board in Docket No. FD 36226, which is also October 
25, 2018.
    Durbano will continue in control of WERR upon WERR's becoming a 
Class III rail carrier, while remaining in control of six other Class 
III carriers: Texas & Eastern Railroad, LLC, Wyoming and Colorado 
Railroad Company, Inc., Southwestern Railroad, Inc., Cimarron Valley 
Railroad, L.C., Clarkdale Arizona Central Railroad, L.C., and Saratoga 
Railroad, LLC.
    Durbano certifies that: (1) The rail lines to be operated by WERR 
do not

[[Page 51541]]

connect with any other railroads in the Durbano corporate family; (2) 
the continuance in control is not part of a series of anticipated 
transactions that would connect these rail lines with each other or 
with any other railroad in the Durbano corporate family; and (3) the 
transaction does not involve a Class I rail carrier. Therefore, the 
transaction is exempt from the prior approval requirements of 49 U.S.C. 
11323. See 49 CFR 1180.2(d)(2).
    Under 49 U.S.C. 10502(g), the Board may not use its exemption 
authority to relieve a rail carrier of its statutory obligation to 
protect the interests of its employees. Section 11326(c), however, does 
not provide for labor protection for transactions under sections 11324 
and 11325 that involve only Class III rail carriers. Accordingly, the 
Board may not impose labor protective conditions here because all of 
the carriers involved are Class III carriers.
    If the notice contains false or misleading information, the 
exemption is void ab initio. Petitions to revoke the exemption under 49 
U.S.C. 10502(d) may be filed at any time. The filing of a petition to 
revoke will not automatically stay the effectiveness of the exemption. 
Stay petitions must be filed no later than October 18, 2018 (at least 
seven days before the exemption becomes effective).
    An original and 10 copies of all pleadings, referring to Docket No. 
FD 36227, must be filed with the Surface Transportation Board, 395 E 
Street SW, Washington, DC 20423-0001. In addition, one copy of each 
pleading must be served on William A. Mullins, Baker & Miller PLLC, 
2401 Pennsylvania Ave. NW, Suite 300, Washington, DC 20037.
    Board decisions and notices are available on our website at 
www.stb.gov.

    Decided: October 5, 2018.

    By the Board, Scott M. Zimmerman, Acting Director, Office of 
Proceedings.
Jeffrey Herzig,
Clearance Clerk.
[FR Doc. 2018-22171 Filed 10-10-18; 8:45 am]
 BILLING CODE 4915-01-P



                                               51540                             Federal Register / Vol. 83, No. 197 / Thursday, October 11, 2018 / Notices

                                                                                                  Percent     (Catalog of Federal Domestic Assistance               HISTORY:
                                                                                                              Number 59008)                                           71 FR 1801 (Jan. 11, 2006), Optical
                                                  Non-Profit Organizations with-                              James Rivera,                                         System for Correspondence Analysis
                                                    out Credit Available Else-                                                                                      and Response.
                                                    where .....................................      2.500    Associate Administrator for Disaster
                                                                                                              Assistance.                                             72 FR 69723 (Dec. 10, 2007), Optical
                                                                                                              [FR Doc. 2018–22109 Filed 10–10–18; 8:45 am]
                                                                                                                                                                    System for Correspondence Analysis
                                                 The number assigned to this disaster                         BILLING CODE 8025–01–P
                                                                                                                                                                    and Response.
                                               for physical damage is 157128 and for                                                                                  Dated: October 2, 2018.
                                               economic injury is 157130.                                                                                           Mary Ann Zimmerman,
                                               (Catalog of Federal Domestic Assistance                        SOCIAL SECURITY ADMINISTRATION                        Acting Executive Director, Office of Privacy
                                               Number 59008)                                                                                                        and Disclosure, Office of the General Counsel.
                                                                                                              [Docket No. SSA–2018–0052]
                                                                                                                                                                    [FR Doc. 2018–22035 Filed 10–10–18; 8:45 am]
                                               James Rivera,
                                                                                                              Privacy Act of 1974; System of                        BILLING CODE P
                                               Associate Administrator for Disaster
                                               Assistance.
                                                                                                              Records
                                               [FR Doc. 2018–22119 Filed 10–10–18; 8:45 am]                   AGENCY:  Deputy Commissioner for                      SURFACE TRANSPORTATION BOARD
                                               BILLING CODE 8025–01–P                                         Communications, Social Security
                                                                                                              Administration (SSA).                                 [Docket No. FD 36227]
                                                                                                              ACTION: Rescindment of a system of
                                               SMALL BUSINESS ADMINISTRATION                                  records notice.                                       David L. Durbano—Continuance in
                                                                                                                                                                    Control Exemption—Washington
                                                                                                              SUMMARY:   In accordance with the                     Eastern Railroad, LLC
                                               [Disaster Declaration #15622 and #15623;                       Privacy Act, we are issuing public
                                               California Disaster Number CA–00288]                                                                                    David L. Durbano (Durbano), a
                                                                                                              notice of our intent to discontinue an
                                                                                                                                                                    noncarrier, has filed a verified notice of
                                                                                                              existing system of records notice
                                               Presidential Declaration Amendment of                                                                                exemption pursuant to 49 CFR
                                                                                                              entitled, Optical System for
                                               a Major Disaster for the State of                                                                                    1180.2(d)(2) to continue in control of
                                                                                                              Correspondence Analysis and Response,
                                               California                                                                                                           Washington Eastern Railroad, LLC
                                                                                                              last published on January 11, 2006.
                                                                                                                                                                    (WERR), upon WERR’s becoming a Class
                                               AGENCY:U.S. Small Business                                     DATES: Comments must be received no
                                                                                                                                                                    III rail carrier.
                                               Administration.                                                later than November 13, 2018. This                       This transaction is related to a
                                                                                                              rescindment will be effective upon                    concurrently filed verified notice of
                                               ACTION:     Amendment 2.                                       publication in today’s Federal Register.              exemption in Washington Eastern
                                                                                                              FOR FURTHER INFORMATION CONTACT:                      Railroad, LLC—Change in Operator
                                               SUMMARY:   This is an amendment of the                         Tristin Dorsey, Government Information                Exemption—Eastern Washington
                                               Presidential declaration of a major                            Specialist, Privacy Implementation                    Gateway Railroad Company, Docket No.
                                               disaster for the State of California                           Division, Office of Privacy and                       FD 36226. In that proceeding, WERR
                                               (FEMA–4382–DR), dated 08/04/2018.                              Disclosure, Office of the General                     seeks an exemption under 49 CFR
                                                 Incident: Wildfires and High Winds.                          Counsel, Social Security                              1150.31 to assume operations over
                                                                                                              Administration, Room G–401 West High                  approximately 107.8 miles of track
                                                 Incident Period: 07/23/2018 through                          Rise, 6401 Security Boulevard,
                                               09/19/2018.                                                                                                          extending between milepost 1.0 near
                                                                                                              Baltimore, Maryland 21235–6401,                       Cheney, Wash., and the end of the track
                                               DATES: Issued on 10/01/2018.                                   telephone: (410) 965–2950, email:                     at milepost 108.8 in Coulee City, Wash.
                                                 Physical Loan Application Deadline                           tristin.dorsey@ssa.gov.                               (CW Branch), and over approximately
                                               Date: 10/03/2018.                                              SUPPLEMENTARY INFORMATION: SSA is                     5.9 miles of track that connects with the
                                                                                                              discontinuing the system of records 60–               CW Branch at Geiger Junction near
                                                 Economic Injury (EIDL) Loan                                  0002, entitled OSCAR, which was                       Medical Lake, Wash. (Geiger Spur).
                                               Application Deadline Date: 05/06/2019.                         created to aid in the control of internal                The earliest this transaction may be
                                               ADDRESS:  Submit completed loan                                and external correspondence received in               consummated is October 25, 2018, the
                                               applications to: U.S. Small Business                           agency offices through various                        effective date of the exemption (30 days
                                               Administration, Processing and                                 processing steps and management                       after the verified notice was filed).
                                               Disbursement Center, 14925 Kingsport                           information regarding the                             Durbano states that he intends to
                                               Road, Fort Worth, TX 76155.                                    correspondence process. The records                   consummate the transaction on or after
                                                                                                              will be combined and managed through                  the effective date of the transaction
                                               FOR FURTHER INFORMATION CONTACT:     A.                        an existing system of records currently               established by the Board in Docket No.
                                               Escobar, Office of Disaster Assistance,                        titled, Assignment and Correspondence                 FD 36226, which is also October 25,
                                               U.S. Small Business Administration,                            Tracking (ACT) System (60–0001), last                 2018.
                                               409 3rd Street SW, Suite 6050,                                 published in full at 71 FR 1800 (January                 Durbano will continue in control of
                                               Washington, DC 20416, (202) 205–6734.                          11, 2006). SSA will rely upon the ACT                 WERR upon WERR’s becoming a Class
                                               SUPPLEMENTARY INFORMATION:     The notice                      system to manage internal and external                III rail carrier, while remaining in
                                                                                                              correspondence and assignments                        control of six other Class III carriers:
                                               of the President’s major disaster
                                                                                                                                                                    Texas & Eastern Railroad, LLC,
khammond on DSK30JT082PROD with NOTICES




                                               declaration for the State of California,                       received from members of the public,
                                                                                                              media, White House, Congress, and                     Wyoming and Colorado Railroad
                                               dated 08/04/2018, is hereby amended to
                                                                                                              other federal agencies.                               Company, Inc., Southwestern Railroad,
                                               establish the incident period for this
                                                                                                                                                                    Inc., Cimarron Valley Railroad, L.C.,
                                               disaster as beginning 07/23/2018 and                           SYSTEM NAME AND NUMBER                                Clarkdale Arizona Central Railroad,
                                               continuing through 09/19/2018.                                   Optical System for Correspondence                   L.C., and Saratoga Railroad, LLC.
                                                 All other information in the original                        Analysis and Response (OSCAR), 60–                       Durbano certifies that: (1) The rail
                                               declaration remains unchanged.                                 0002.                                                 lines to be operated by WERR do not


                                          VerDate Sep<11>2014       20:54 Oct 10, 2018      Jkt 247001   PO 00000   Frm 00106   Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM   11OCN1


                                                                           Federal Register / Vol. 83, No. 197 / Thursday, October 11, 2018 / Notices                                                          51541

                                               connect with any other railroads in the                 exemption pursuant to 49 CFR                              Ohio, and milepost 72.2 at or near
                                               Durbano corporate family; (2) the                       1180.2(d)(2) for the benefit of Brightline                Hannibal, Ohio.
                                               continuance in control is not part of a                 Holdings LLC (Brightline) and Fortress                       Fortress represents that: (1) None of
                                               series of anticipated transactions that                 Transportation and Infrastructure                         the rail lines of CMQR, ORPS, or DXE
                                               would connect these rail lines with each                Investors LLC, which are managed by                       connect with the lines of any other
                                               other or with any other railroad in the                 affiliates of Fortress, to continue in                    United States railroad that is owned or
                                               Durbano corporate family; and (3) the                   control of DesertXpress Enterprises, LLC                  controlled by Fortress; (2) the
                                               transaction does not involve a Class I                  (DXE) 1 following the acquisition of DXE                  transaction is not part of a series of
                                               rail carrier. Therefore, the transaction is             by Brightline.                                            anticipated transactions that would
                                               exempt from the prior approval                             According to Fortress, on September                    connect the DXE Line with the lines of
                                               requirements of 49 U.S.C. 11323. See 49                 17, 2018, Brightline, DXE, and Benny’s                    any other rail carrier owned or
                                               CFR 1180.2(d)(2).                                       HoldCo, LLC, entered into a                               controlled by Fortress, any affiliate of
                                                  Under 49 U.S.C. 10502(g), the Board                  Membership Interest Purchase                              Fortress, or any investment fund or
                                               may not use its exemption authority to                  Agreement (Purchase Agreement) 2                          entity managed by an affiliate of
                                               relieve a rail carrier of its statutory                 pursuant to which Brightline will                         Fortress; and (3) CMQR, ORPS, and DXE
                                               obligation to protect the interests of its              acquire 100% of the member interests of                   are not Class I carriers.4 Therefore, the
                                               employees. Section 11326(c), however,                   DXE. Upon consummation of the                             transaction is exempt from the prior
                                               does not provide for labor protection for               transaction contemplated by the                           approval requirements of 49 U.S.C.
                                               transactions under sections 11324 and                   Purchase Agreement, Brightline, a                         11323. See 49 CFR 1180.2(d)(2).
                                               11325 that involve only Class III rail                  noncarrier, will control DXE. Brightline                     Under 49 U.S.C. 10502(g), the Board
                                               carriers. Accordingly, the Board may not                currently controls Brightline Trains LLC                  may not use its exemption authority to
                                               impose labor protective conditions here                 (Brightline Trains) which operates                        relieve a rail carrier of its statutory
                                               because all of the carriers involved are                express passenger rail service between                    obligation to protect the interests of its
                                               Class III carriers.                                     Miami, Fla., and West Palm Beach, Fla.3                   employees. Section 11326(c), however,
                                                  If the notice contains false or                      Fortress asserts that Brightline can assist               does not provide for labor protection for
                                               misleading information, the exemption                   DXE in bringing its planned high-speed                    transactions under sections 11324 and
                                               is void ab initio. Petitions to revoke the              passenger rail system between Las Vegas                   11325 that involve only Class III rail
                                               exemption under 49 U.S.C. 10502(d)                      and Victorville to fruition.                              carriers. Accordingly, the Board may not
                                               may be filed at any time. The filing of                    The parties intend to consummate the                   impose labor protective conditions here
                                               a petition to revoke will not                           proposed control transaction as soon as                   because all the carriers involved are
                                               automatically stay the effectiveness of                 practicable after the exemption becomes                   Class III carriers.5
                                               the exemption. Stay petitions must be                   effective (30 days after the verified
                                               filed no later than October 18, 2018 (at                                                                             If the notice contains false or
                                                                                                       notice was filed) and the satisfaction of                 misleading information, the exemption
                                               least seven days before the exemption                   all other conditions precedent to closing
                                               becomes effective).                                                                                               is void ab initio. Petitions to revoke the
                                                                                                       set forth in the Purchase Agreement.                      exemption under 49 U.S.C. 10502(d)
                                                  An original and 10 copies of all
                                               pleadings, referring to Docket No. FD                      Fortress states that two other rail                    may be filed at any time. The filing of
                                               36227, must be filed with the Surface                   carriers subject to the Board’s                           a petition to revoke will not
                                               Transportation Board, 395 E Street SW,                  jurisdiction, Central Maine & Quebec                      automatically stay the effectiveness of
                                               Washington, DC 20423–0001. In                           Railway US Inc. (CMQR) and Ohio River                     the exemption. Petitions for stay must
                                               addition, one copy of each pleading                     Partners Shareholder LLC (ORPS), are                      be filed no later than October 18, 2018
                                               must be served on William A. Mullins,                   currently managed by affiliates of                        (at least seven days before the
                                               Baker & Miller PLLC, 2401 Pennsylvania                  Fortress. CMQR, a Class III carrier,                      exemption becomes effective).
                                               Ave. NW, Suite 300, Washington, DC                      operates approximately 244 miles of rail                     An original and 10 copies of all
                                               20037.                                                  lines in the States of Maine and                          pleadings, referring to Docket No. FD
                                                  Board decisions and notices are                      Vermont. ORPS, a Class III carrier,                       36225, must be filed with the Surface
                                               available on our website at www.stb.gov.                operates a 12.2-mile rail line between                    Transportation Board, 395 E Street SW,
                                                                                                       milepost 60.5 at or near Powhatan Point,                  Washington, DC 20423–0001. In
                                                 Decided: October 5, 2018.
                                                                                                                                                                 addition, one copy of each pleading
                                                 By the Board, Scott M. Zimmerman, Acting                 1 In DesertXpress Enterprises—Construction &
                                               Director, Office of Proceedings.
                                                                                                                                                                 must be served on Terence M. Hynes,
                                                                                                       Operation Exemption—in Victorville, Cal. & Las            Sidley Austin LLP, 1501 K Street NW,
                                               Jeffrey Herzig,                                         Vegas, Nev. (DesertXpress), FD 35544 (STB served
                                                                                                       Oct. 25, 2011), the Board authorized DXE to               Washington, DC 20005.
                                               Clearance Clerk.
                                                                                                       construct and operate a high-speed passenger rail            According to Fortress, this action is
                                               [FR Doc. 2018–22171 Filed 10–10–18; 8:45 am]            line between Victorville, Cal., and Las Vegas, Nev.       categorically excluded from
                                               BILLING CODE 4915–01–P                                  (DXE Line). Fortress states that DXE has been
                                                                                                       engaged in development and planning for the DXE           environmental review under 49 CFR
                                                                                                       Line, including obtaining certain federal and state       1105.6(c) and from historic reporting
                                                                                                       permits, acquiring rights-of-way, and pursuing            under 49 CFR 1105.8(b).
                                               SURFACE TRANSPORTATION BOARD                            financing for the project.
                                                                                                          2 Fortress submitted a redacted copy of the               Board decisions and notices are
                                               [Docket No. FD 36225]                                                                                             available on our website at www.stb.gov.
                                                                                                       Purchase Agreement with its verified notice of
                                                                                                       exemption. It also submitted an unredacted copy             Decided: October 5, 2018.
                                               Fortress Investment Group LLC—                          under seal along with a motion for protective order
khammond on DSK30JT082PROD with NOTICES




                                               Continuance in Control Exemption—                       pursuant to 49 CFR 1104.14(b). That motion will be
                                               Central Maine & Quebec Railway US                       addressed in a separate decision.                            4 Fortress states that CMQR and ORPS are Class

                                               Inc., Ohio River Partners Shareholder                      3 Brightline Trains formerly was known as All          III carriers. In DesertXpress, slip op. at 2, the Board
                                                                                                       Aboard Florida-Operations LLC. Citing All Aboard          noted that DXE anticipated that its operating
                                               LLC, and DesertXpress Enterprises,                      Florida-Operations LLC—Construction & Operation           revenues would qualify it as a Class I carrier;
                                               LLC                                                     Exemption—in Miami, Fla., & Orlando, Fla., FD             presently, however, according to Fortress, DXE has
                                                                                                       35680 (STB served Dec. 21, 2012), Fortress states         not commenced operations and does not have any
                                                 Fortress Investment Group LLC                         that Brightline Trains is not a rail carrier subject to   operating employees or revenues. See Notice 6.
                                               (Fortress) has filed a verified notice of               the Board’s jurisdiction.                                    5 See n. 4, above.




                                          VerDate Sep<11>2014   20:54 Oct 10, 2018   Jkt 247001   PO 00000   Frm 00107   Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM      11OCN1



Document Created: 2018-10-11 15:36:30
Document Modified: 2018-10-11 15:36:30
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 51540 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR