83_FR_52638 83 FR 52437 - Cheyenne Connector, LLC and Rockies Express Pipeline LLC; Notice of Schedule for Environmental Review of the Cheyenne Connector Pipeline and Cheyenne Hub Enhancement Projects

83 FR 52437 - Cheyenne Connector, LLC and Rockies Express Pipeline LLC; Notice of Schedule for Environmental Review of the Cheyenne Connector Pipeline and Cheyenne Hub Enhancement Projects

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 201 (October 17, 2018)

Page Range52437-52438
FR Document2018-22608

Federal Register, Volume 83 Issue 201 (Wednesday, October 17, 2018)
[Federal Register Volume 83, Number 201 (Wednesday, October 17, 2018)]
[Notices]
[Pages 52437-52438]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-22608]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP18-102-000 and CP18-103-000]


Cheyenne Connector, LLC and Rockies Express Pipeline LLC; Notice 
of Schedule for Environmental Review of the Cheyenne Connector Pipeline 
and Cheyenne Hub Enhancement Projects

    On March 5, 2018, Cheyenne Connector, LLC and Rockies Express 
Pipeline LLC (``applicants'') filed an application in Docket Nos. CP18-
102-000 and CP18-103-000 requesting a Certificate of Public Convenience 
and Necessity pursuant to Section 7(c) of the Natural Gas Act to 
construct and operate certain natural gas pipeline facilities. The 
proposed projects are known as the Cheyenne Connector Pipeline and 
Cheyenne Hub Enhancement Projects (Projects), and would include new 
natural gas pipeline, metering, and compression facilities to transport 
about 600 million cubic feet per day.
    On March 19, 2018, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Projects. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA December 18, 2018
90-day Federal Authorization Decision Deadline March 18, 2019

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Projects' progress.

Project Description

    The Projects include approximately 70 miles of 36-inch-diameter 
pipeline, three associated mainline valves, and other ancillary 
facilities; five meter and regulating stations; one new approximately 
32,100 horsepower Cheyenne Hub Booster Compressor Station; and 
enhancements to modify the existing Cheyenne Hub interconnect 
facilities in Weld County, Colorado.

[[Page 52438]]

Background

    On May 3, 2018, the Commission issued a Notice of Intent to Prepare 
an Environmental Assessment for the Proposed Cheyenne Connector 
Pipeline and Cheyenne Hub Enhancement Projects and Request for Comments 
on Environmental Issues (NOI). The NOI was sent to affected landowners; 
federal, state, and local government agencies; elected officials; 
environmental and public interest groups; Native American tribes; other 
interested parties; and local libraries and newspapers. In response to 
the NOI, the Commission received comments from: DCP Midstream, LP, 
Teamsters National Pipeline LMCP, Colorado Interstate Pipeline, L.L.C., 
Anadarko Energy Services Company, Cheyenne Connector, LLC, HLT Farms, 
LLLP, the Town of Kersey, two Native American tribes, and four 
individuals. The primary issues raised by the commentors are 
alternatives, Project construction affecting the Irons Lateral Ditch, 
cultural resources, public health and safety, land values, 
industrialization of agricultural land, and environmental justice. All 
substantive comments will be addressed in the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Projects is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP18-102 or CP18-103), 
and follow the instructions. For assistance with access to eLibrary, 
the helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or 
at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website 
also provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: October 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-22608 Filed 10-16-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 83, No. 201 / Wednesday, October 17, 2018 / Notices                                           52437

                                                  i. FERC Contact: John Ramer, phone:                  concrete powerhouse containing two                    DEPARTMENT OF ENERGY
                                               (202) 502–8969 or email at john.ramer@                  new 24.6-foot-long, 13.5-foot-diameter
                                               ferc.gov.                                               Archimedes Screw turbine-generator                    Federal Energy Regulatory
                                                  j. Cooperating Agencies: Federal,                    units, with a total installed capacity of             Commission
                                               state, local, and tribal agencies with                  420 kilowatts, each contained in a new
                                               jurisdiction and/or special expertise                   15-foot-wide steel trough; (7) a new 50-              [Docket Nos. CP18–102–000 and CP18–103–
                                               with respect to environmental issues                    foot-long concrete tailrace; (8) a new                000]
                                               that wish to cooperate in the                           step-up transformer and 500-foot-long,
                                               preparation of the environmental                                                                              Cheyenne Connector, LLC and
                                                                                                       above-ground transmission line
                                               document should follow the                                                                                    Rockies Express Pipeline LLC; Notice
                                                                                                       connecting the project to the
                                               instructions for filing such requests                                                                         of Schedule for Environmental Review
                                               described in item (l) below. Cooperating                distribution system owned by                          of the Cheyenne Connector Pipeline
                                               agencies should note the Commission’s                   Narragansett Electric Company; (9) a                  and Cheyenne Hub Enhancement
                                               policy that agencies that cooperate in                  new access road; and (10) appurtenant                 Projects
                                               the preparation of the environmental                    facilities. The existing Albion Dam and
                                               document cannot also intervene. See 94                  appurtenant works are owned by the                       On March 5, 2018, Cheyenne
                                               FERC 61,076 (2001).                                     State of Rhode Island.                                Connector, LLC and Rockies Express
                                                  k. Pursuant to section 4.32(b)(7) of the                NEHC proposes to operate the project               Pipeline LLC (‘‘applicants’’) filed an
                                               Commission’s regulations, if any                        in a run-of-river mode with an estimated              application in Docket Nos. CP18–102–
                                               resource agency, Indian Tribe, or person                annual energy production of                           000 and CP18–103–000 requesting a
                                               believes that an additional scientific                                                                        Certificate of Public Convenience and
                                                                                                       approximately 2,034 megawatt-hours.
                                               study should be conducted in order to                                                                         Necessity pursuant to Section 7(c) of the
                                               form an adequate factual basis for a                       o. A copy of the application is                    Natural Gas Act to construct and operate
                                               complete analysis of the application on                 available for review at the Commission                certain natural gas pipeline facilities.
                                               its merit, the resource agency, Indian                  in the Public Reference Room or may be                The proposed projects are known as the
                                               Tribe, or person must file a request for                viewed on the Commission’s website at                 Cheyenne Connector Pipeline and
                                               a study with the Commission not later                   http://www.ferc.gov using the eLibrary                Cheyenne Hub Enhancement Projects
                                               than 60 days from the date of filing of                 link. Enter the docket number excluding               (Projects), and would include new
                                               the application, and serve a copy of the                the last three digits in the docket                   natural gas pipeline, metering, and
                                               request on the applicant.                               number field to access the document.                  compression facilities to transport about
                                                  l. Deadline for filing additional study              For assistance, contact FERC Online                   600 million cubic feet per day.
                                               requests and requests for cooperating                   Support. A copy is also available for                    On March 19, 2018, the Federal
                                               agency status: December 10, 2018.                       inspection and reproduction at the                    Energy Regulatory Commission
                                                  The Commission strongly encourages                   address in item h above.                              (Commission or FERC) issued its Notice
                                               electronic filing. Please file additional                                                                     of Application for the Projects. Among
                                               study requests and requests for                            You may also register online at http://
                                                                                                                                                             other things, that notice alerted agencies
                                               cooperating agency status using the                     www.ferc.gov/docs-filing/
                                                                                                                                                             issuing federal authorizations of the
                                               Commission’s eFiling system at http://                  esubscription.asp to be notified via
                                                                                                                                                             requirement to complete all necessary
                                               www.ferc.gov/docs-filing/efiling.asp. For               email of new filings and issuances                    reviews and to reach a final decision on
                                               assistance, please contact FERC Online                  related to this or other pending projects.            a request for a federal authorization
                                               Support at FERCOnlineSupport@                           For assistance, contact FERC Online                   within 90 days of the date of issuance
                                               ferc.gov, (866) 208–3676 (toll free), or                Support.                                              of the Commission staff’s Environmental
                                               (202) 502–8659 (TTY). In lieu of                           p. Procedural Schedule: The                        Assessment (EA) for the Project. This
                                               electronic filing, please send a paper                  application will be processed according               instant notice identifies the FERC staff’s
                                               copy to: Secretary, Federal Energy                      to the following preliminary schedule.                planned schedule for the completion of
                                               Regulatory Commission, 888 First Street                                                                       the EA for the Project.
                                                                                                       Revisions to the schedule will be made
                                               NE, Washington, DC 20426. The first
                                                                                                       as appropriate (e.g., if there are no                 Schedule for Environmental Review
                                               page of any filing should include docket
                                                                                                       deficiencies and/or scoping is waived,
                                               number P–14633–001.                                                                                           Issuance of EA December 18, 2018
                                                  m. This application is not ready for                 the schedule would be shortened).
                                               environmental analysis at this time.                                                                          90-day Federal Authorization Decision
                                                  n. The proposed Albion Dam                           Issue Deficiency/        January 2019.                   Deadline March 18, 2019
                                               Hydroelectric Project would consist of:                    AIR Letter.                                           If a schedule change becomes
                                               (1) An approximately 266-foot-long                      Issue Notice of Ac-      April 2019.                  necessary, additional notice will be
                                                                                                          ceptance/Ready
                                               existing concrete gravity dam with an                      for Environ-
                                                                                                                                                             provided so that the relevant agencies
                                               ogee spillway; (2) an existing 33.6-acre                   mental Analysis.                                   are kept informed of the Projects’
                                               impoundment with a normal storage                       Issue Notice of the      August 2019.                 progress.
                                               capacity of 235 acre-feet at an operating                  Availability of                                    Project Description
                                               elevation of approximately 87.0 feet                       Environmental
                                               North American Vertical Datum of 1988;                     Assessment.                                          The Projects include approximately
                                               (3) a new 51-foot-long, 45.75-foot-wide                                                                       70 miles of 36-inch-diameter pipeline,
                                               intake canal; (4) two new 14-foot-wide,                   Dated: October 11, 2018.                            three associated mainline valves, and
daltland on DSKBBV9HB2PROD with NOTICES




                                               10.4-foot-high hydraulically-powered                    Kimberly D. Bose,                                     other ancillary facilities; five meter and
                                               sluice gates, equipped with a 29-foot-                  Secretary.                                            regulating stations; one new
                                               wide, 12-foot-high steel trashrack with                 [FR Doc. 2018–22609 Filed 10–16–18; 8:45 am]          approximately 32,100 horsepower
                                               9-inch clear-bar spacing; (5) a new 30-                 BILLING CODE 6717–01–P
                                                                                                                                                             Cheyenne Hub Booster Compressor
                                               foot-long, 32.5-foot-wide, 11.0-foot-high                                                                     Station; and enhancements to modify
                                               concrete penstock; (6) a new 50-foot-                                                                         the existing Cheyenne Hub interconnect
                                               long, 24-foot-wide, 18-foot-high                                                                              facilities in Weld County, Colorado.


                                          VerDate Sep<11>2014   19:46 Oct 16, 2018   Jkt 247001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\17OCN1.SGM   17OCN1


                                               52438                     Federal Register / Vol. 83, No. 201 / Wednesday, October 17, 2018 / Notices

                                               Background                                                Dated: October 11, 2018.                              Dated: October 11, 2018.
                                                                                                       Kimberly D. Bose,                                     Kimberly D. Bose,
                                                  On May 3, 2018, the Commission                       Secretary.                                            Secretary.
                                               issued a Notice of Intent to Prepare an                 [FR Doc. 2018–22608 Filed 10–16–18; 8:45 am]          [FR Doc. 2018–22612 Filed 10–16–18; 8:45 am]
                                               Environmental Assessment for the
                                                                                                       BILLING CODE 6717–01–P                                BILLING CODE 6717–01–P
                                               Proposed Cheyenne Connector Pipeline
                                               and Cheyenne Hub Enhancement
                                               Projects and Request for Comments on                    DEPARTMENT OF ENERGY                                  DEPARTMENT OF ENERGY
                                               Environmental Issues (NOI). The NOI
                                               was sent to affected landowners; federal,               Federal Energy Regulatory                             Federal Energy Regulatory
                                               state, and local government agencies;                   Commission                                            Commission
                                               elected officials; environmental and
                                               public interest groups; Native American                 [Project No. 12790–007]
                                                                                                                                                             Combined Notice of Filings
                                               tribes; other interested parties; and local                                                                     Take notice that the Commission has
                                               libraries and newspapers. In response to                Andrew Peklo, III, Pomperaug Hydro                    received the following Natural Gas
                                               the NOI, the Commission received                        LLC; Notice of Application for Transfer               Pipeline Rate and Refund Report filings:
                                               comments from: DCP Midstream, LP,                       of License and Soliciting Comments,
                                                                                                       Motions To Intervene, and Protests                    Filings Instituting Proceedings
                                               Teamsters National Pipeline LMCP,
                                               Colorado Interstate Pipeline, L.L.C.,                                                                            Docket Numbers: RP19–36–001.
                                                                                                          On September 24, 2018, Andrew                         Applicants: Dominion Energy Questar
                                               Anadarko Energy Services Company,                       Peklo, III (transferor) and Pomperaug                 Pipeline, LLC.
                                               Cheyenne Connector, LLC, HLT Farms,                     Hydro LLC (transferee) filed an                          Description: Tariff Amendment:
                                               LLLP, the Town of Kersey, two Native                    application for the transfer of license of            Withdrawal of Filing to be effective 10/
                                               American tribes, and four individuals.                  the Pomperaug Hydro Project No.                       8/2018.
                                               The primary issues raised by the                        12790. The project is located on the                     Filed Date: 10/9/18.
                                               commentors are alternatives, Project                    Pomperaug River in Litchfield County,                    Accession Number: 20181009–5007.
                                               construction affecting the Irons Lateral                Connecticut. The project does not                        Comments Due: 5 p.m. ET 10/22/18.
                                               Ditch, cultural resources, public health                occupy Federal lands.                                    Docket Numbers: RP19–48–000.
                                               and safety, land values,                                   The applicants seek Commission                        Applicants: Tennessee Gas Pipeline
                                               industrialization of agricultural land,                 approval to transfer the license for the              Company, L.L.C.
                                               and environmental justice. All                          Pomperaug Hydro Project from the                         Description: § 4(d) Rate Filing:
                                               substantive comments will be addressed                  transferor to the transferee.                         Volume No. 2—Neg Rate Agmt—
                                               in the EA.                                                 Applicants Contact: For transferor:                NextEra Energy Marketing, LLC
                                                                                                       Mr. Andrew Peklo, III, 29 Pomperaug                   SP324013 to be effective 11/1/2018.
                                               Additional Information                                                                                           Filed Date: 10/10/18.
                                                                                                       Road, Woodbury, CT 06798, Phone:
                                                                                                                                                                Accession Number: 20181010–5042.
                                                  In order to receive notification of the              203–263–4566, Email: themill@                            Comments Due: 5 p.m. ET 10/22/18.
                                               issuance of the EA and to keep track of                 charter.net.
                                                                                                                                                                Docket Numbers: RP19–49–000.
                                               all formal issuances and submittals in                     For transferee: Mr. Paul V. Nolan,                    Applicants: Iroquois Gas
                                               specific dockets, the Commission offers                 Esq., 5515 17th Street North, Arlington,              Transmission System, L.P.
                                               a free service called eSubscription. This               VA 22205–2722, Phone: (703) 534–5905,                    Description: § 4(d) Rate Filing: 101018
                                               can reduce the amount of time you                       Email: pvnpvndiver@gmail.com.                         Negotiated Rates—Castleton
                                               spend researching proceedings by                           FERC Contact: Patricia W. Gillis, (202)            Commodities Merchant Trading L.P. H–
                                               automatically providing you with                        502–8735, patricia.gillis@ferc.gov.                   4010–89 to be effective 11/1/2018.
                                               notification of these filings, document                    Deadline for filing comments, motions                 Filed Date: 10/10/18.
                                               summaries, and direct links to the                      to intervene, and protests: 30 days from                 Accession Number: 20181010–5083.
                                               documents. Go to www.ferc.gov/docs-                     the date that the Commission issues this                 Comments Due: 5 p.m. ET 10/22/18.
                                               filing/esubscription.asp.                               notice. The Commission strongly                          The filings are accessible in the
                                                                                                       encourages electronic filing. Please file             Commission’s eLibrary system by
                                                  Additional information about the                     comments, motions to intervene, and                   clicking on the links or querying the
                                               Projects is available from the                          protests using the Commission’s eFiling               docket number.
                                               Commission’s Office of External Affairs                 system at http://www.ferc.gov/docs-                      Any person desiring to intervene or
                                               at (866) 208–FERC or on the FERC                        filing/efiling.asp. Commenters can                    protest in any of the above proceedings
                                               website (www.ferc.gov). Using the                       submit brief comments up to 6,000                     must file in accordance with Rules 211
                                               eLibrary link, select General Search                    characters, without prior registration,               and 214 of the Commission’s
                                               from the eLibrary menu, enter the                       using the eComment system at http://                  Regulations (18 CFR 385.211 and
                                               selected date range and Docket Number                   www.ferc.gov/docs-filing/                             385.214) on or before 5:00 p.m. Eastern
                                               excluding the last three digits (i.e.,                  ecomment.asp. You must include your                   time on the specified comment date.
                                               CP18–102 or CP18–103), and follow the                   name and contact information at the end               Protests may be considered, but
                                               instructions. For assistance with access                of your comments. For assistance,                     intervention is necessary to become a
                                               to eLibrary, the helpline can be reached                please contact FERC Online Support at                 party to the proceeding.
                                               at (866) 208–3676, TTY (202) 502–8659,                  FERCOnlineSupport@ferc.gov, (866)                        eFiling is encouraged. More detailed
daltland on DSKBBV9HB2PROD with NOTICES




                                               or at FERCOnlineSupport@ferc.gov. The                   208–3676 (toll free), or (202) 502–8659               information relating to filing
                                               eLibrary link on the FERC website also                  (TTY). In lieu of electronic filing, please           requirements, interventions, protests,
                                               provides access to the texts of formal                  send a paper copy to: Secretary, Federal              service, and qualifying facilities filings
                                               documents issued by the Commission,                     Energy Regulatory Commission, 888                     can be found at: http://www.ferc.gov/
                                               such as orders, notices, and rule                       First Street NE, Washington, DC 20426.                docs-filing/efiling/filing-req.pdf. For
                                                                                                       The first page of any filing should                   other information, call (866) 208–3676
                                               makings.
                                                                                                       include docket number P–12790–007.                    (toll free). For TTY, call (202) 502–8659.


                                          VerDate Sep<11>2014   19:46 Oct 16, 2018   Jkt 247001   PO 00000   Frm 00063   Fmt 4703   Sfmt 4703   E:\FR\FM\17OCN1.SGM   17OCN1



Document Created: 2018-10-17 01:46:50
Document Modified: 2018-10-17 01:46:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 52437 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR