83_FR_52643 83 FR 52442 - Commission Information Collection Activities (FERC-725G); Comment Request; Extension

83 FR 52442 - Commission Information Collection Activities (FERC-725G); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 201 (October 17, 2018)

Page Range52442-52443
FR Document2018-22611

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725G (Reliability Standards for the Bulk Power System: PRC Reliability Standards, OMB Control No. 1902-0252). As part of this extension request, FERC will transfer the information collection requirements and burden of the FERC-725G1 (OMB Control No. 1902-0284) and FERC-725G4 (OMB Control No. 1902-0282) into FERC-725G. FERC-725G1 and FERC-725G4 information collections will eventually be discontinued.

Federal Register, Volume 83 Issue 201 (Wednesday, October 17, 2018)
[Federal Register Volume 83, Number 201 (Wednesday, October 17, 2018)]
[Notices]
[Pages 52442-52443]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-22611]



[[Page 52442]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-21-000]


Commission Information Collection Activities (FERC-725G); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-725G (Reliability Standards for the Bulk 
Power System: PRC Reliability Standards, OMB Control No. 1902-0252).
    As part of this extension request, FERC will transfer the 
information collection requirements and burden of the FERC-725G1 (OMB 
Control No. 1902-0284) and FERC-725G4 (OMB Control No. 1902-0282) into 
FERC-725G. FERC-725G1 and FERC-725G4 information collections will 
eventually be discontinued.

DATES: Comments on the collection of information are due December 17, 
2018.

ADDRESSES: You may submit comments (identified by Docket No. IC18-21-
000) by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725G (Reliability Standards for the Bulk Power System: 
PRC Reliability Standards).\1\
---------------------------------------------------------------------------

    \1\ The current information collection requirements of the FERC-
725G1 (OMB Control No. 1902-0284) and FERC-725G4 (OMB Control No. 
1902-0282) are being transferred into the FERC-725G.
---------------------------------------------------------------------------

    OMB Control No.: 1902-0252.
    Type of Request: Request a three-year extension of the FERC-725G 
information collection requirements (including the information 
collection requirements transferred from the FERC-725G1 and FERC-725G4) 
with no changes to the current reporting requirements.
    Abstract: The information collected by the FERC-725G is required to 
implement the statutory provisions of section 215 of the Federal Power 
Act (FPA).\2\ Section 215 of the FPA buttresses the Commission's 
efforts to strengthen the reliability of the interstate bulk power 
grid.
---------------------------------------------------------------------------

    \2\ 16 U.S.C. 824o.
---------------------------------------------------------------------------

    The FERC-725G information collection currently contains the 
reporting and recordkeeping requirements for the following Reliability 
Standards:

 PRC-002-2 (Disturbance Monitoring and Reporting Requirements)
 PRC-006-2 (Automatic Underfrequency Load Shedding)
 PRC-012-2 (Remedial Action Schemes)
 PRC-019-1 (Coordination of Generating Unit or Plant 
Capabilities, Voltage Regulating Controls, and Protection)
 PRC-023-4 (Transmission Relay Loadability)
 PRC-024-1 (Generator Frequency and Voltage Protective Relay 
Settings)
 PRC-025-1 (Generator Relay Loadability)
 PRC-026-1 (Relay Performance During Stable Power Swings)
 PRC-027-1 (Coordination of Protection Systems for Performance 
During Faults)

    Additionally, the information collection requirements of the 
following Reliability Standards will be incorporated into FERC-725G:

 PRC-004-5(i) \3\ (Protection System Misoperation 
Identification and Correction) and
---------------------------------------------------------------------------

    \3\ This standard is currently contained in the FERC-725G1 
information collection. FERC-725G1 will eventually be discontinued.
---------------------------------------------------------------------------

 PRC-010-2 \4\ (Undervoltage Load Shedding)
---------------------------------------------------------------------------

    \4\ This standard is currently contained in the FERC-725G4 
information collection. FERC-725G4 will eventually be discontinued.

    Each of these Reliability Standards has three components that 
---------------------------------------------------------------------------
impose burden upon affected industry:

 Requirements (e.g., denoted in each Reliability Standard as 
R1, R2. . .)
 Measures (e.g., denoted in each Reliability Standard as M1, 
M2. . .)
 Evidence Retention

    These three components can be reviewed for the Reliability 
Standards in NERC petitions in FERC's eLibrary system (http://www.ferc.gov/docs-filing/elibrary.asp) or on NERC's own website 
(www.nerc.com).
    Type of Respondents: Transmission owners, generator owners, 
distribution providers, planning coordinators and transmission 
planners.
    Estimate of Annual Burden: \5\ The Commission estimates the annual 
public reporting burden and cost \6\ for the information collection as:
---------------------------------------------------------------------------

    \5\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, reference 5 Code of Federal Regulations 1320.3.
    \6\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics, May 2017. Unless otherwise 
specified, this figure includes salary (https://www.bls.gov/oes/current/naics2_22.htm) and benefits http://www.bls.gov/news.release/ecec.nr0.htm) for an Electrical Engineer (Occupation Code: 17-2071, 
$66.90/hour) and an Information and Record Clerk (Occupation Code: 
43-4199, $39.68/hour). All of the reporting requirements use the 
electrical engineer rate for cost calculation. Similarly, all of the 
record-keeping requirements use the information and record clerk 
rate for cost calculation.

[[Page 52443]]



                                          FERC-725G--Mandatory Reliability Standards: PRC Reliability Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             Annual number                  Average burden & cost   Total annual burden      Cost per
       Reliability standards         Number of respondents   of responses    Total number     ($) (rounded) per     hours & total annual    respondent
                                              \7\           per respondent   of responses          response          cost ($) (rounded)    (rounded) ($)
                                     (1)..................             (2)     (1)*(2)=(3)  (4) \8\..............  (3)*(4)=(5)..........         (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                 Reporting Requirements
--------------------------------------------------------------------------------------------------------------------------------------------------------
PRC-023-4..........................  741 (TO, GO, DP, PC).               1             741  42.445 hrs.; $2,840..  31,452 hrs.;                   $2,840
                                                                                                                    $2,104,139.
PRC-002-2..........................  521 (TO, GO).........               1             521  73.729 hrs.; $4,932..  38,413 hrs.;                    4,932
                                                                                                                    $2,569,830.
PRC-006-2..........................  80 (TO, DP)..........               1              80  47 hrs.; $3,144......  3,760 hrs.; $251,544.           3,144
PRC-012-2..........................  3,291 (RC, PC, TO,                  1           3,291  23.746 hrs.; $1,589..  78,147 hrs.;                    1,589
                                      GO, DP).                                                                      $5,228,034.
PRC-019-1..........................  738 (GO, TO).........               1             738  17 hrs.; $1,137......  12,546 hrs.; $839,327           1,137
PRC-024-1..........................  738 (GO).............               1             738  17 hrs.; $1,137......  12,546 hrs.; $839,327           1,137
PRC-025-1..........................  1,019 (GO, TO, DP)...               1           1,019  6.622 hrs.; $443.....  6,748 hrs.; $451,441.             443
PRC-026-1..........................  1,092 (GO, PC, TO)...               1           1,092  7.868 hrs.; $1,092...  8,592 hrs.; $574,805.           1.092
PRC-027-1..........................  1,727 (TO, GO, DP)...               1           1,727  19.757 hrs.; $1,322..  34,120 hrs.;                    1,322
                                                                                                                    $2,282,628.
PRC-004-5(i) \9\ (formerly in FERC-  648 (TO, GO, DP).....               1             648  8 hrs.\10\; $535.....  5,184 hrs.; $346,810.             535
 725G1).
PRC-010-2 (formerly in FERC-725G4).  26 (PC, TP, DP)......               1              26  36 hrs.; $2,408......  936 hrs.; $62,618....           2,408
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    Record-Keeping (Evidence Retention) Requirements
--------------------------------------------------------------------------------------------------------------------------------------------------------
PRC-023-4..........................  741 (TO, GO, DP, PC).               1             741  513.858 hrs.; $20,390  380,769 hrs.;                  20,390
                                                                                                                    $15,108,914.
PRC-002-2..........................  521 (TO, GO).........               1             521  31.599 hrs.; $1,254..  16,463 hrs.; $653,252           1,254
PRC-006-2..........................  80 (TO, DP)..........               1              80  5 hrs.; $198.........  400 hrs.; $15,872....             198
PRC-012-2..........................  3,291 (RC, PC, TO,                  1           3,291  11.754 hrs.; $466....  38,684 hrs.;                      466
                                      GO, DP).                                                                      $1,543,981.
PRC-019-2..........................  738 (GO, TO).........               1             738  0 hrs.; $0...........  0 hrs.; $0...........               0
PRC-024-1..........................  738 (GO).............               1             738  0 hrs.; $0...........  0 hrs.; $0...........               0
PRC-025-1..........................  1,019 (GO, TO, DP)...               1           1,019  2.044 hrs.; $81......  2,083 hrs.; $82,653..              81
PRC-026-1..........................  1,092 (GO, PC, TO)...               1           1,092  12 hrs.; $476........  13,104 hrs.; $519,967             476
PRC-027-1..........................  1,727 (TO, GO, DP)...               1           1,727  15.854 hrs.; $629....  27,380 hrs.;                      629
                                                                                                                    $1,086,438.
PRC-004-5(i) (formerly in FERC-      648 (TO, GO, DP).....               1             648  12 hrs.; $476........  7,776 hrs.; $308,552.             476
 725G1).
PRC-010-2 (formerly in FERC-725G4).  26 (PC, TP, DP)......               1              26  12 hrs.; $476........  312 hrs.; $12,380....             476
                                    --------------------------------------------------------------------------------------------------------------------
    Subtotal for Reporting           .....................  ..............  ..............  .....................  232,444 hrs.;          ..............
     Requirements.                                                                                                  $15,550,504.
    Subtotal for Record-keeping      .....................  ..............  ..............  .....................  486,971 hrs.;          ..............
     Requirements.                                                                                                  $19,323,009.
        Total......................  .....................  ..............  ..............  .....................  719,415 hrs.;          ..............
                                                                                                                    $34,873,513.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \7\ GO = generator owner, TO = transmission owner, DP = 
distribution planner; PC = planning coordinator and TP = 
transmission planners, RC = Reliability Coordinator.
    \8\ The average costs per response are rounded to the nearest 
dollar.
    \9\ Reliability Standard PRC-004-5(i) is an updated standard 
that neither added nor removed reporting and record keeping 
requirements (and corresponding burden) as compared to Reliability 
Standards PRC-004-3 and PRC-004-4.
    \10\ The reporting requirements for Reliability Standards PRC-
004-5(i) are reduced by 2 hours/response (annually) due to 
completion of a one-time requirement imposed by the Order in Docket 
No. RD14-14-000).

     Dated: October 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-22611 Filed 10-16-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               52442                     Federal Register / Vol. 83, No. 201 / Wednesday, October 17, 2018 / Notices

                                               DEPARTMENT OF ENERGY                                    docket or in viewing/downloading                      • PRC–027–1 (Coordination of
                                                                                                       comments and issuances in this docket                      Protection Systems for Performance
                                               Federal Energy Regulatory                               may do so at http://www.ferc.gov/docs-                     During Faults)
                                               Commission                                              filing/docs-filing.asp.                                  Additionally, the information
                                               [Docket No. IC18–21–000]                                FOR FURTHER INFORMATION CONTACT:                      collection requirements of the following
                                                                                                       Ellen Brown may be reached by email                   Reliability Standards will be
                                               Commission Information Collection                       at DataClearance@FERC.gov, telephone                  incorporated into FERC–725G:
                                               Activities (FERC–725G); Comment                         at (202) 502–8663, and fax at (202) 273–              • PRC–004–5(i) 3 (Protection System
                                               Request; Extension                                      0873.                                                      Misoperation Identification and
                                                                                                       SUPPLEMENTARY INFORMATION:                                 Correction) and
                                               AGENCY: Federal Energy Regulatory
                                                                                                          Title: FERC–725G (Reliability                      • PRC–010–2 4 (Undervoltage Load
                                               Commission, DOE.
                                                                                                       Standards for the Bulk Power System:                       Shedding)
                                               ACTION: Notice of information collection                PRC Reliability Standards).1
                                               and request for comments.                                  OMB Control No.: 1902–0252.                           Each of these Reliability Standards
                                                                                                          Type of Request: Request a three-year              has three components that impose
                                               SUMMARY:    In compliance with the                                                                            burden upon affected industry:
                                                                                                       extension of the FERC–725G
                                               requirements of the Paperwork
                                                                                                       information collection requirements                   • Requirements (e.g., denoted in each
                                               Reduction Act of 1995, the Federal
                                                                                                       (including the information collection                      Reliability Standard as R1, R2. . .)
                                               Energy Regulatory Commission
                                                                                                       requirements transferred from the                     • Measures (e.g., denoted in each
                                               (Commission or FERC) is soliciting
                                                                                                       FERC–725G1 and FERC–725G4) with no                         Reliability Standard as M1, M2. . .)
                                               public comment on the currently
                                               approved information collection, FERC–
                                                                                                       changes to the current reporting                      • Evidence Retention
                                                                                                       requirements.                                            These three components can be
                                               725G (Reliability Standards for the Bulk                   Abstract: The information collected
                                               Power System: PRC Reliability                                                                                 reviewed for the Reliability Standards in
                                                                                                       by the FERC–725G is required to
                                               Standards, OMB Control No. 1902–                                                                              NERC petitions in FERC’s eLibrary
                                                                                                       implement the statutory provisions of
                                               0252).                                                                                                        system (http://www.ferc.gov/docs-filing/
                                                                                                       section 215 of the Federal Power Act
                                                  As part of this extension request,                                                                         elibrary.asp) or on NERC’s own website
                                                                                                       (FPA).2 Section 215 of the FPA
                                               FERC will transfer the information                                                                            (www.nerc.com).
                                                                                                       buttresses the Commission’s efforts to
                                               collection requirements and burden of                                                                            Type of Respondents: Transmission
                                                                                                       strengthen the reliability of the
                                               the FERC–725G1 (OMB Control No.                                                                               owners, generator owners, distribution
                                                                                                       interstate bulk power grid.
                                               1902–0284) and FERC–725G4 (OMB                             The FERC–725G information                          providers, planning coordinators and
                                               Control No. 1902–0282) into FERC–                       collection currently contains the                     transmission planners.
                                               725G. FERC–725G1 and FERC–725G4                         reporting and recordkeeping                              Estimate of Annual Burden: 5 The
                                               information collections will eventually                 requirements for the following                        Commission estimates the annual public
                                               be discontinued.                                        Reliability Standards:                                reporting burden and cost 6 for the
                                               DATES: Comments on the collection of                                                                          information collection as:
                                                                                                       • PRC–002–2 (Disturbance Monitoring
                                               information are due December 17, 2018.                       and Reporting Requirements)
                                                                                                       • PRC–006–2 (Automatic
                                                                                                                                                                3 This standard is currently contained in the
                                               ADDRESSES: You may submit comments
                                                                                                                                                             FERC–725G1 information collection. FERC–725G1
                                               (identified by Docket No. IC18–21–000)                       Underfrequency Load Shedding)                    will eventually be discontinued.
                                               by either of the following methods:                     • PRC–012–2 (Remedial Action                             4 This standard is currently contained in the

                                                  • eFiling at Commission’s website:                        Schemes)                                         FERC–725G4 information collection. FERC–725G4
                                               http://www.ferc.gov/docs-filing/                        • PRC–019–1 (Coordination of                          will eventually be discontinued.
                                                                                                                                                                5 Burden is defined as the total time, effort, or
                                               efiling.asp.                                                 Generating Unit or Plant
                                                                                                                                                             financial resources expended by persons to
                                                  • Mail/Hand Delivery/Courier:                             Capabilities, Voltage Regulating                 generate, maintain, retain, or disclose or provide
                                               Federal Energy Regulatory Commission,                        Controls, and Protection)                        information to or for a Federal agency. For further
                                               Secretary of the Commission, 888 First                  • PRC–023–4 (Transmission Relay                       explanation of what is included in the information
                                               Street NE, Washington, DC 20426.                             Loadability)                                     collection burden, reference 5 Code of Federal
                                                  Instructions: All submissions must be                • PRC–024–1 (Generator Frequency and                  Regulations 1320.3.
                                                                                                                                                                6 The hourly cost (for salary plus benefits) uses
                                               formatted and filed in accordance with                       Voltage Protective Relay Settings)               the figures from the Bureau of Labor Statistics, May
                                               submission guidelines at: http://                       • PRC–025–1 (Generator Relay                          2017. Unless otherwise specified, this figure
                                               www.ferc.gov/help/submission-                                Loadability)                                     includes salary (https://www.bls.gov/oes/current/
                                               guide.asp. For user assistance contact                  • PRC–026–1 (Relay Performance                        naics2_22.htm) and benefits http://www.bls.gov/
                                                                                                                                                             news.release/ecec.nr0.htm) for an Electrical
                                               FERC Online Support by email at                              During Stable Power Swings)                      Engineer (Occupation Code: 17–2071, $66.90/hour)
                                               ferconlinesupport@ferc.gov, or by phone                                                                       and an Information and Record Clerk (Occupation
                                                                                                         1 The current information collection requirements
                                               at: (866) 208–3676 (toll-free), or (202)                                                                      Code: 43–4199, $39.68/hour). All of the reporting
                                                                                                       of the FERC–725G1 (OMB Control No. 1902–0284)         requirements use the electrical engineer rate for cost
                                               502–8659 for TTY.                                       and FERC–725G4 (OMB Control No. 1902–0282) are        calculation. Similarly, all of the record-keeping
                                                  Docket: Users interested in receiving                being transferred into the FERC–725G.                 requirements use the information and record clerk
                                               automatic notification of activity in this                2 16 U.S.C. 824o.                                   rate for cost calculation.
daltland on DSKBBV9HB2PROD with NOTICES




                                          VerDate Sep<11>2014   19:46 Oct 16, 2018   Jkt 247001   PO 00000   Frm 00067   Fmt 4703   Sfmt 4703   E:\FR\FM\17OCN1.SGM   17OCN1


                                                                                      Federal Register / Vol. 83, No. 201 / Wednesday, October 17, 2018 / Notices                                                                                                                         52443

                                                                                   FERC–725G—MANDATORY RELIABILITY STANDARDS: PRC RELIABILITY STANDARDS
                                                                                                                                                                    Annual                                            Average burden                Total annual burden               Cost per
                                                                                                                                                                   number of                Total number                 & cost ($)
                                                        Reliability standards                                Number of respondents 7                                                                                                                hours & total annual            respondent
                                                                                                                                                                responses per               of responses               (rounded) per                 cost ($) (rounded)            (rounded) ($)
                                                                                                                                                                  respondent                                              response

                                                                                                                               (1)                                       (2)                  (1)*(2)=(3)                      (4) 8                      (3)*(4)=(5)                   (5)÷(1)

                                                                                                                                                          Reporting Requirements

                                               PRC–023–4 ...................................          741 (TO, GO, DP, PC) .................                                          1                      741      42.445 hrs.;                  31,452 hrs.;                               $2,840
                                                                                                                                                                                                                        $2,840.                       $2,104,139.
                                               PRC–002–2 ...................................          521 (TO, GO) ...............................                                    1                      521      73.729 hrs.;                  38,413 hrs.;                                 4,932
                                                                                                                                                                                                                        $4,932.                       $2,569,830.
                                               PRC–006–2 ...................................          80 (TO, DP) ..................................                                  1                        80     47 hrs.; $3,144 ..            3,760 hrs.;                                  3,144
                                                                                                                                                                                                                                                      $251,544.
                                               PRC–012–2 ...................................          3,291 (RC, PC, TO, GO, DP) ......                                               1                   3,291       23.746 hrs.;                  78,147 hrs.;                                 1,589
                                                                                                                                                                                                                        $1,589.                       $5,228,034.
                                               PRC–019–1 ...................................          738 (GO, TO) ...............................                                    1                      738      17 hrs.; $1,137 ..            12,546 hrs.;                                 1,137
                                                                                                                                                                                                                                                      $839,327.
                                               PRC–024–1 ...................................          738 (GO) ......................................                                 1                      738      17 hrs.; $1,137 ..            12,546 hrs.;                                 1,137
                                                                                                                                                                                                                                                      $839,327.
                                               PRC–025–1 ...................................          1,019 (GO, TO, DP) .....................                                        1                   1,019       6.622 hrs.; $443              6,748 hrs.;                                     443
                                                                                                                                                                                                                                                      $451,441.
                                               PRC–026–1 ...................................          1,092 (GO, PC, TO) .....................                                        1                   1,092       7.868 hrs.;                   8,592 hrs.;                                  1.092
                                                                                                                                                                                                                        $1,092.                       $574,805.
                                               PRC–027–1 ...................................          1,727 (TO, GO, DP) .....................                                        1                   1,727       19.757 hrs.;                  34,120 hrs.;                                 1,322
                                                                                                                                                                                                                        $1,322.                       $2,282,628.
                                               PRC–004–5(i) 9  (formerly  in                          648 (TO, GO, DP) ........................                                       1                      648      8 hrs.10; $535 ....           5,184 hrs.;                                     535
                                                FERC–725G1).                                                                                                                                                                                          $346,810.
                                               PRC–010–2 (formerly in FERC–                           26 (PC, TP, DP) ...........................                                     1                        26     36 hrs.; $2,408 ..            936 hrs.; $62,618 ...                        2,408
                                                725G4).

                                                                                                                                  Record-Keeping (Evidence Retention) Requirements

                                               PRC–023–4 ...................................          741 (TO, GO, DP, PC) .................                                          1                      741      513.858 hrs.;                 380,769 hrs.;                              20,390
                                                                                                                                                                                                                        $20,390.                      $15,108,914.
                                               PRC–002–2 ...................................          521 (TO, GO) ...............................                                    1                      521      31.599 hrs.;                  16,463 hrs.;                                 1,254
                                                                                                                                                                                                                        $1,254.                       $653,252.
                                               PRC–006–2 ...................................          80 (TO, DP) ..................................                                  1                      80       5 hrs.; $198 .......          400 hrs.; $15,872 ...                           198
                                               PRC–012–2 ...................................          3,291 (RC, PC, TO, GO, DP) ......                                               1                   3,291       11.754 hrs.;                  38,684 hrs.;                                    466
                                                                                                                                                                                                                        $466.                         $1,543,981.
                                               PRC–019–2        ...................................   738 (GO, TO) ...............................                                    1                     738       0 hrs.; $0 ...........        0 hrs.; $0 ................                       0
                                               PRC–024–1        ...................................   738 (GO) ......................................                                 1                     738       0 hrs.; $0 ...........        0 hrs.; $0 ................                       0
                                               PRC–025–1        ...................................   1,019 (GO, TO, DP) .....................                                        1                   1,019       2.044 hrs.; $81 ..            2,083 hrs.; $82,653                              81
                                               PRC–026–1        ...................................   1,092 (GO, PC, TO) .....................                                        1                   1,092       12 hrs.; $476 .....           13,104 hrs.;                                    476
                                                                                                                                                                                                                                                      $519,967.
                                               PRC–027–1 ...................................          1,727 (TO, GO, DP) .....................                                        1                   1,727       15.854 hrs.;                  27,380 hrs.;                                    629
                                                                                                                                                                                                                        $629.                         $1,086,438.
                                               PRC–004–5(i) (formerly in FERC–                        648 (TO, GO, DP) ........................                                       1                      648      12 hrs.; $476 .....           7,776 hrs.;                                     476
                                                725G1).                                                                                                                                                                                               $308,552.
                                               PRC–010–2 (formerly in FERC–                           26 (PC, TP, DP) ...........................                                     1                        26     12 hrs.; $476 .....           312 hrs.; $12,380 ...                           476
                                                725G4).

                                                    Subtotal for Reporting Re-                        .......................................................   ........................   ........................   ...........................   232,444 hrs.;                 ........................
                                                      quirements.                                                                                                                                                                                     $15,550,504.
                                                    Subtotal for Record-keeping                       .......................................................   ........................   ........................   ...........................   486,971 hrs.;                 ........................
                                                      Requirements.                                                                                                                                                                                   $19,323,009.
                                                        Total ................................        .......................................................   ........................   ........................   ...........................   719,415 hrs.;                 ........................
                                                                                                                                                                                                                                                      $34,873,513.



                                                 Comments: Comments are invited on:                                                  performance of the functions of the                                                     Dated: October 12, 2018.
                                               (1) Whether the collection of                                                         Commission, including whether the                                                     Kimberly D. Bose,
                                               information is necessary for the proper                                               information will have practical utility;                                              Secretary.
                                                                                                                                     (2) the accuracy of the agency’s estimate                                             [FR Doc. 2018–22611 Filed 10–16–18; 8:45 am]
                                                 7 GO  = generator owner, TO = transmission                                          of the burden and cost of the collection                                              BILLING CODE 6717–01–P
                                               owner, DP = distribution planner; PC = planning                                       of information, including the validity of
                                               coordinator and TP = transmission planners, RC =
                                               Reliability Coordinator.
                                                                                                                                     the methodology and assumptions used;
                                                 8 The average costs per response are rounded to                                     (3) ways to enhance the quality, utility
                                               the nearest dollar.                                                                   and clarity of the information collection;
                                                 9 Reliability Standard PRC–004–5(i) is an updated
                                                                                                                                     and (4) ways to minimize the burden of
daltland on DSKBBV9HB2PROD with NOTICES




                                               standard that neither added nor removed reporting
                                               and record keeping requirements (and
                                                                                                                                     the collection of information on those
                                               corresponding burden) as compared to Reliability                                      who are to respond, including the use
                                               Standards PRC–004–3 and PRC–004–4.                                                    of automated collection techniques or
                                                 10 The reporting requirements for Reliability
                                                                                                                                     other forms of information technology.
                                               Standards PRC–004–5(i) are reduced by 2 hours/
                                               response (annually) due to completion of a one-time
                                               requirement imposed by the Order in Docket No.
                                               RD14–14–000).



                                          VerDate Sep<11>2014         19:46 Oct 16, 2018              Jkt 247001         PO 00000           Frm 00068           Fmt 4703        Sfmt 9990         E:\FR\FM\17OCN1.SGM                    17OCN1



Document Created: 2018-10-17 01:46:50
Document Modified: 2018-10-17 01:46:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due December 17, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 52442 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR