83_FR_53179 83 FR 52976 - Drawbridge Operation Regulation; Willamette River at Portland, OR

83 FR 52976 - Drawbridge Operation Regulation; Willamette River at Portland, OR

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 83, Issue 203 (October 19, 2018)

Page Range52976-52977
FR Document2018-22801

The Coast Guard has modified a temporary deviation from the operating schedule that governs the Burnside Bridge across the Willamette River, mile 12.4, at Portland, OR. The deviation is necessary to accommodate bridge repairs and upgrades. This modified deviation extends the period the Burnside Bridge is authorized to operate in single leaf mode.

Federal Register, Volume 83 Issue 203 (Friday, October 19, 2018)
[Federal Register Volume 83, Number 203 (Friday, October 19, 2018)]
[Rules and Regulations]
[Pages 52976-52977]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-22801]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2018-0300]


Drawbridge Operation Regulation; Willamette River at Portland, OR

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation; modification.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has modified a temporary deviation from the 
operating schedule that governs the Burnside Bridge across the 
Willamette River, mile 12.4, at Portland, OR. The deviation is 
necessary to accommodate bridge repairs and upgrades. This modified 
deviation extends the period the Burnside Bridge is authorized to 
operate in single leaf mode.

DATES: This deviation is effective without actual notice from October 
19, 2018 to 4 p.m. on November 30, 2018. For purposes of enforcement, 
actual notice will be used from 4 p.m. on October 13, 2018, to October 
19, 2018.

ADDRESSES: The docket for this deviation, USCG-2018-0300 is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected].

SUPPLEMENTARY INFORMATION: On June 7, 2018, we published a temporary 
deviation entitled Drawbridge Operation Regulation; Willamette River at 
Portland, OR, in the Federal Register (83 FR 26364). That temporary 
deviation allowed Multnomah County to operate the subject bridge in 
single leaf, and reduce the vertical clearance from 7 a.m. on July 1, 
2018 to 4 p.m. on October 13, 2018. While performing upgrades and 
repairs, the contracting company informed Multnomah County more time 
will be needed to complete the job. This modification is required to 
extend the authorized time so bridge work crews may complete bridge 
upgrades and repairs. Multnomah County owns and operates the Burnside 
Bridge. Multnomah County requested an extension to the current 
published temporary deviation, and is authorized to operate the 
Burnside Bridge in single leaf, and maintain the east leaf closed to 
marine vessels from 4 p.m. on October 13, 2018 to 4 p.m. on November 
30, 2018.
    The Burnside Bridge provides a vertical clearance of 41 feet in the 
closed-to-navigation position referenced to Columbia River Datum 0.0, 
and the east leaf will be reduced to 31 feet with scaffolding 
installed. The horizontal clearance for the west leaf opening will be 
100 feet. The normal operating schedule is in 33 CFR 117.897. Waterway 
usage on this part of the Willamette River includes vessels ranging 
from commercial tug and barge to small pleasure craft. The Coast Guard 
contacted all known users of the Willamette River for comment, and we 
received no objections for this deviation.
    Vessels able to pass through the bridge in the closed-to-navigation 
position may do so at any time. The bridge will be able to open the 
west side of the span only for emergencies, and there is no immediate 
alternate route for vessels to pass. The Coast Guard will inform the 
users of the waterway, through our Local and Broadcast Notices to 
Mariners, of the change in operating schedule for the bridges so that 
vessels can arrange their transits to minimize any impact caused by the 
temporary deviation.

[[Page 52977]]

    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedules immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: October 15, 2018.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2018-22801 Filed 10-18-18; 8:45 am]
 BILLING CODE 9110-04-P



                                           52976             Federal Register / Vol. 83, No. 203 / Friday, October 19, 2018 / Rules and Regulations

                                           DEPARTMENT OF HOMELAND                                  coordinated with the waterway users.                  Docket Folder on the line associated
                                           SECURITY                                                No objections to the proposed                         with this deviation.
                                                                                                   temporary deviation were raised.                      FOR FURTHER INFORMATION CONTACT:    If
                                           Coast Guard                                                Vessels able to pass through the                   you have questions on this temporary
                                                                                                   bridge in the closed position may do so               deviation, call or email Mr. Steven
                                           33 CFR Part 117                                         at any time. The bridge will be able to               Fischer, Bridge Administrator,
                                           [Docket No. USCG–2018–0153]                             open for emergencies if at least 72-hour              Thirteenth Coast Guard District;
                                                                                                   notice is given to the bridge operator.               telephone 206–220–7282, email d13-pf-
                                           Drawbridge Operation Regulation;                        There is no immediate alternate route                 d13bridges@uscg.mil.
                                           Sacramento River, Sacramento, CA                        for vessels to pass. The Coast Guard will
                                                                                                   also inform the users of the waterway                 SUPPLEMENTARY INFORMATION:      On June 7,
                                           AGENCY: Coast Guard, DHS.                               through our Local and Broadcast                       2018, we published a temporary
                                           ACTION: Notice of deviation from                        Notices to Mariners of the change in                  deviation entitled Drawbridge Operation
                                           drawbridge regulation.                                  operating schedule for the bridge so that             Regulation; Willamette River at
                                                                                                   vessel operators can arrange their                    Portland, OR, in the Federal Register
                                           SUMMARY:   The Coast Guard has issued a                                                                       (83 FR 26364). That temporary deviation
                                                                                                   transits to minimize any impact caused
                                           temporary deviation from the operating                                                                        allowed Multnomah County to operate
                                                                                                   by the temporary deviation.
                                           schedule that governs the Tower                            In accordance with 33 CFR 117.35(e),               the subject bridge in single leaf, and
                                           Drawbridge over the Sacramento River,                   the drawbridge must return to its regular             reduce the vertical clearance from 7 a.m.
                                           mile 59.0, at Sacramento, CA. The                       operating schedule immediately at the                 on July 1, 2018 to 4 p.m. on October 13,
                                           deviation is necessary to allow the                     end of the effective period of this                   2018. While performing upgrades and
                                           bridge owner to conduct mechanical                      temporary deviation. This deviation                   repairs, the contracting company
                                           and electrical rehabilitation work on the               from the operating regulations is                     informed Multnomah County more time
                                           bridge. This deviation allows the bridge                authorized under 33 CFR 117.35.                       will be needed to complete the job. This
                                           to remain in the closed-to-navigation                                                                         modification is required to extend the
                                           position during the deviation period.                     Dated: October 15, 2018.
                                                                                                                                                         authorized time so bridge work crews
                                           DATES: This deviation is effective                      Carl T. Hausner,
                                                                                                                                                         may complete bridge upgrades and
                                           without actual notice from October 19,                  District Bridge Chief, Eleventh Coast Guard           repairs. Multnomah County owns and
                                           2018 through 6 a.m. on December 1,                      District.
                                                                                                                                                         operates the Burnside Bridge.
                                           2018. For the purposes of enforcement,                  [FR Doc. 2018–22746 Filed 10–18–18; 8:45 am]
                                                                                                                                                         Multnomah County requested an
                                           actual notice will be used from 6 a.m.                  BILLING CODE 9110–04–P                                extension to the current published
                                           on October 8, 2018 until October 19,                                                                          temporary deviation, and is authorized
                                           2018.                                                                                                         to operate the Burnside Bridge in single
                                                                                                   DEPARTMENT OF HOMELAND                                leaf, and maintain the east leaf closed to
                                           ADDRESSES: The docket for this
                                                                                                   SECURITY                                              marine vessels from 4 p.m. on October
                                           deviation, USCG–2018–0153, is
                                           available at http://www.regulations.gov.                Coast Guard                                           13, 2018 to 4 p.m. on November 30,
                                           Type the docket number in the                                                                                 2018.
                                           ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                    33 CFR Part 117                                          The Burnside Bridge provides a
                                           Click on Open Docket Folder on the line                                                                       vertical clearance of 41 feet in the
                                           associated with this deviation.                         [Docket No. USCG–2018–0300]                           closed-to-navigation position referenced
                                           FOR FURTHER INFORMATION CONTACT: If                     Drawbridge Operation Regulation;                      to Columbia River Datum 0.0, and the
                                           you have questions on this temporary                    Willamette River at Portland, OR                      east leaf will be reduced to 31 feet with
                                           deviation, call or email Carl T. Hausner,                                                                     scaffolding installed. The horizontal
                                           Chief, Bridge Section, Eleventh Coast                   AGENCY: Coast Guard, DHS.                             clearance for the west leaf opening will
                                           Guard District; telephone 510–437–                      ACTION:Notice of deviation from                       be 100 feet. The normal operating
                                           3516, email Carl.T.Hausner@uscg.mil.                    drawbridge regulation; modification.                  schedule is in 33 CFR 117.897.
                                           SUPPLEMENTARY INFORMATION: The                                                                                Waterway usage on this part of the
                                           California Department of Transportation                 SUMMARY:   The Coast Guard has modified               Willamette River includes vessels
                                           has requested a temporary change to the                 a temporary deviation from the                        ranging from commercial tug and barge
                                           operation of the Tower Drawbridge,                      operating schedule that governs the                   to small pleasure craft. The Coast Guard
                                           mile 59.0, over the Sacramento River, at                Burnside Bridge across the Willamette                 contacted all known users of the
                                           Sacramento, CA. The drawbridge                          River, mile 12.4, at Portland, OR. The                Willamette River for comment, and we
                                           navigation span provides a vertical                     deviation is necessary to accommodate                 received no objections for this
                                           clearance of 30 feet above Mean High                    bridge repairs and upgrades. This                     deviation.
                                           Water in the closed-to-navigation                       modified deviation extends the period                    Vessels able to pass through the
                                           position. The draw operates as required                 the Burnside Bridge is authorized to                  bridge in the closed-to-navigation
                                           by 33 CFR 117.189(a). Navigation on the                 operate in single leaf mode.                          position may do so at any time. The
                                           waterway is commercial and                              DATES: This deviation is effective                    bridge will be able to open the west side
                                           recreational.                                           without actual notice from October 19,                of the span only for emergencies, and
                                              The drawspan will be secured in the                  2018 to 4 p.m. on November 30, 2018.                  there is no immediate alternate route for
                                           closed-to-navigation position from 6                    For purposes of enforcement, actual                   vessels to pass. The Coast Guard will
                                           a.m. on October 8, 2018 through 6 a.m.                  notice will be used from 4 p.m. on                    inform the users of the waterway,
amozie on DSK3GDR082PROD with RULES




                                           on December 1, 2018, to allow the                       October 13, 2018, to October 19, 2018.                through our Local and Broadcast
                                           bridge owner to replace the bridge’s                    ADDRESSES: The docket for this                        Notices to Mariners, of the change in
                                           wire rope and traveler cable and to                     deviation, USCG–2018–0300 is available                operating schedule for the bridges so
                                           conduct chain and trunnion bearing                      at http://www.regulations.gov. Type the               that vessels can arrange their transits to
                                           inspection and servicing. This                          docket number in the ‘‘SEARCH’’ box                   minimize any impact caused by the
                                           temporary deviation has been                            and click ‘‘SEARCH.’’ Click on Open                   temporary deviation.


                                      VerDate Sep<11>2014   16:11 Oct 18, 2018   Jkt 247001   PO 00000   Frm 00034   Fmt 4700   Sfmt 4700   E:\FR\FM\19OCR1.SGM   19OCR1


                                                             Federal Register / Vol. 83, No. 203 / Friday, October 19, 2018 / Rules and Regulations                                        52977

                                              In accordance with 33 CFR 117.35(e),                 COTP Captain of the Port                              date. We made this change to account
                                           the drawbridge must return to its regular               DHS Department of Homeland Security                   for movement of the barge into and out
                                           operating schedules immediately at the                  FR Federal Register                                   of the anchor location.
                                                                                                   NPRM Notice of proposed rulemaking                       This rule establishes a safety zone
                                           end of the effective period of this                     § Section
                                           temporary deviation. This deviation                     U.S.C. United States Code
                                                                                                                                                         from 11 p.m. through 11:59 p.m. on
                                           from the operating regulations is                                                                             October 19, 2018, for the navigable
                                           authorized under 33 CFR 117.35.                         II. Background, Purpose, and Legal                    waters in the vicinity of Penn’s Landing,
                                                                                                   Basis                                                 Philadelphia, PA, during a fireworks
                                             Dated: October 15, 2018.
                                                                                                      On June 18, 2018, a wedding party                  display from a barge. The event is
                                           Steven M. Fischer,
                                                                                                   notified the Coast Guard that it will be              scheduled to take place at
                                           Bridge Administrator, Thirteenth Coast Guard                                                                  approximately 11:15 p.m. on October
                                           District.                                               conducting a fireworks display from
                                                                                                   11:15 p.m. to 11:45 p.m. on October 19,               19, 2018. The safety zone will extend
                                           [FR Doc. 2018–22801 Filed 10–18–18; 8:45 am]                                                                  500 feet around the barge, which will be
                                                                                                   2018. The fireworks are to be launched
                                           BILLING CODE 9110–04–P
                                                                                                   from a barge in the Delaware River                    anchored at approximate position
                                                                                                   adjacent to Penn’s Landing in                         39°57′05.26″ N Latitude 075°08′10.85″
                                                                                                   Philadelphia, PA. In response, on                     W Longitude. Persons or vessels will not
                                           DEPARTMENT OF HOMELAND                                                                                        be permitted to enter, transit through, or
                                           SECURITY                                                September 28, 2018, the Coast Guard
                                                                                                   published a notice of proposed                        remain within the safety zone without
                                                                                                   rulemaking (NPRM) titled Safety Zone;                 obtaining permission from the COTP or
                                           Coast Guard
                                                                                                   Delaware River; Penn’s Landing;                       a designated representative.
                                                                                                   Philadelphia, PA; Fireworks Display; 83                  If authorization to enter, transit
                                           33 CFR Part 165                                                                                               through, or remain within the safety
                                                                                                   FR 49026. There we stated why we
                                           [Docket Number USCG–2018–0711]                          issued the NPRM, and invited                          zone is granted by the COTP or a
                                                                                                   comments on our proposed regulatory                   designated representative, all persons
                                           RIN 1625–AA00
                                                                                                   action related to this fireworks display.             and vessels receiving such authorization
                                           Safety Zone; Delaware River; Penn’s                     During the comment period that ended                  must comply with the instructions of
                                           Landing; Philadelphia, PA; Fireworks                    October 5, 2018, we received one                      the COTP or a designated
                                           Display                                                 comment.                                              representative. The Coast Guard will
                                                                                                      Under 5 U.S.C. 553(d)(3), the Coast                provide public notice of the safety zone
                                           AGENCY:    Coast Guard, DHS.                            Guard finds that good cause exists for                by Broadcast Notice to Mariners and by
                                           ACTION:   Temporary final rule.                         making this rule effective less than 30               on-scene actual notice.
                                                                                                   days after publication in the Federal                 V. Regulatory Analyses
                                           SUMMARY:   The Coast Guard is                           Register. Delaying the effective date of
                                           establishing a temporary safety zone on                 this rule would be impracticable and                    We developed this rule after
                                           a portion of the Delaware River in                      contrary to the public interest because               considering numerous statutes and
                                           Philadelphia, PA. This action is                        immediate action is needed to mitigate                Executive orders related to rulemaking.
                                           necessary to protect the surrounding                    the potential safety hazards associated               Below we summarize our analyses
                                           public and vessels on these navigable                   with a fireworks display in this location.            based on a number of these statutes and
                                           waters adjacent to Penn’s Landing,                                                                            Executive orders, and we discuss First
                                           Philadelphia, PA, during a fireworks                    III. Legal Authority and Need for Rule                Amendment rights of protestors.
                                           display on October 19, 2018. This                          The Coast Guard is issuing this rule               A. Regulatory Planning and Review
                                           regulation prohibits persons and vessels                under authority in 33 U.S.C. 1231. The
                                           from entering, transiting, or remaining                 Captain of the Port Delaware Bay                         Executive Orders 12866 and 13563
                                           within the safety zone unless authorized                (COTP) has determined that potential                  direct agencies to assess the costs and
                                           by the Captain of the Port Delaware Bay                 hazards associated with the fireworks                 benefits of available regulatory
                                           or a designated representative.                         display on October 19, 2018, will be a                alternatives and, if regulation is
                                           DATES: This rule is effective from 11                   safety concern for anyone within 500                  necessary, to select regulatory
                                           p.m. through 11:59 p.m. on October 19,                  feet of a fireworks barge in the Delaware             approaches that maximize net benefits.
                                           2018.                                                   River adjacent to Penn’s Landing in                   Executive Order 13771 directs agencies
                                                                                                   Philadelphia, PA. The barge will be                   to control regulatory costs through a
                                           ADDRESSES: To view documents
                                                                                                   anchored in approximate position                      budgeting process. This rule has not
                                           mentioned in this preamble as being                                                                           been designated a ‘‘significant
                                                                                                   39°57′05.26″ N Latitude 075°08′10.85″
                                           available in the docket, go to http://                                                                        regulatory action,’’ under Executive
                                                                                                   W Longitude. This rule is needed to
                                           www.regulations.gov, type USCG–2018–                                                                          Order 12866. Accordingly, this rule has
                                                                                                   protect persons, vessels and the public
                                           0711 in the ‘‘SEARCH’’ box and click                                                                          not been reviewed by the Office of
                                                                                                   near the fireworks barge during the
                                           ‘‘SEARCH.’’ Click on Open Docket                                                                              Management and Budget (OMB), and
                                                                                                   fireworks display.
                                           Folder on the line associated with this                                                                       pursuant to OMB guidance it is exempt
                                           rule.                                                   IV. Discussion of Comments, Changes,                  from the requirements of Executive
                                           FOR FURTHER INFORMATION CONTACT: If                     and the Rule                                          Order 13771.
                                           you have questions about this rule, call                  As noted above, we received one                        This regulatory action determination
                                           or email Petty Officer Thomas Welker,                   comment on our NPRM published                         is based on the size, location, duration,
                                           U.S. Coast Guard, Sector Delaware Bay,                  September 28, 2018. The comment we                    and time-of-day of the safety zone.
                                           Waterways Management Division;                          received was unrelated to the proposed                Vessel traffic would be able to safely
amozie on DSK3GDR082PROD with RULES




                                           telephone 215–271–4814, email                           regulation. There is one change in the                transit around this safety zone which
                                           Thomas.j.welker@uscg.mil.                               regulatory text of this rule from the                 will impact a small designated area of
                                           SUPPLEMENTARY INFORMATION:                              proposed rule in the NPRM. The                        the Delaware River for one hour during
                                                                                                   enforcement period was changed from                   the evening when vessel traffic is
                                           I. Table of Abbreviations                               11:15 p.m. through 11:45 p.m. to 11                   normally low. Moreover, the Coast
                                           CFR    Code of Federal Regulations                      p.m. through 11:59 p.m. on the same                   Guard would issue a Broadcast Notice to


                                      VerDate Sep<11>2014   16:11 Oct 18, 2018   Jkt 247001   PO 00000   Frm 00035   Fmt 4700   Sfmt 4700   E:\FR\FM\19OCR1.SGM   19OCR1



Document Created: 2018-10-19 01:25:24
Document Modified: 2018-10-19 01:25:24
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation; modification.
DatesThis deviation is effective without actual notice from October 19, 2018 to 4 p.m. on November 30, 2018. For purposes of enforcement, actual notice will be used from 4 p.m. on October 13, 2018, to October 19, 2018.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected]
FR Citation83 FR 52976 