83_FR_54958 83 FR 54747 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Hot Mix Asphalt Facilities (Renewal)

83 FR 54747 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Hot Mix Asphalt Facilities (Renewal)

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 83, Issue 211 (October 31, 2018)

Page Range54747-54748
FR Document2018-23752

The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NSPS for Hot Mix Asphalt Facilities (EPA ICR Number 1127.12, OMB Control Number 2060-0083), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. Public comments were previously requested, via the Federal Register, on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Federal Register, Volume 83 Issue 211 (Wednesday, October 31, 2018)
[Federal Register Volume 83, Number 211 (Wednesday, October 31, 2018)]
[Notices]
[Pages 54747-54748]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-23752]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2014-0040; FRL-9985-53-OEI]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NSPS for Hot Mix Asphalt Facilities 
(Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR), NSPS for Hot Mix Asphalt 
Facilities (EPA ICR Number 1127.12, OMB Control Number 2060-0083), to 
the Office of Management and Budget (OMB) for review and approval in 
accordance with the Paperwork Reduction Act. This is a proposed 
extension of the ICR, which is currently approved through November 30, 
2018. Public comments were previously requested, via the Federal 
Register, on June 29, 2017 during a 60-day comment period. This notice 
allows for an additional 30 days for public comments. A fuller 
description of the ICR is given below, including its estimated burden 
and cost to the public. An agency may neither conduct nor sponsor, and 
a person is not required to respond to, a collection of information 
unless it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before November 30, 
2018.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2014-0040, to: (1) EPA online using www.regulations.gov (our 
preferred method), or by email to docket.oeca@epa.gov, or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email 
to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer 
for EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI), or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460; telephone number: (202) 564-2970; fax number: 
(202) 564-0050; email address: yellin.patrick@epa.gov.

SUPPLEMENTARY INFORMATION: Supporting documents, which explain in 
detail the information that the EPA will be collecting, are available 
in the public docket for this ICR. The docket can be viewed online at 
www.regulations.gov, or in person at the EPA Docket Center, WJC West, 
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: http://www.epa.gov/dockets.
    Abstract: The New Source Performance Standards (NSPS) for Hot Mix 
Asphalt Facilities (40 CFR part 60, subpart I) apply to hot mix asphalt 
facilities that commenced construction or modification after June 11, 
1973. A hot mix asphalt facility is comprised only of any combination 
of the following: Dryers; systems for screening, handling, storing, and 
weighing hot aggregate; systems for loading, transferring, and storing 
mineral filler; systems for mixing hot mix asphalt; and the loading, 
transfer, and storage systems associated with emission control systems. 
In general, all NSPS standards require initial notifications, 
performance tests, and periodic reports by the owners/operators of the 
affected facilities. They are also required to maintain records of the 
occurrence and duration of any startup, shutdown, or malfunction in the 
operation of an affected facility, or any period during which the 
monitoring system is inoperative. These notifications, reports, and 
records are essential in determining compliance with 40 CFR part 60, 
subpart I.
    Form Numbers: None.
    Respondents/affected entities: Hot mix asphalt facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart I).
    Estimated number of respondents: 4,955 (total).
    Frequency of response: Initially.
    Total estimated burden: 25,000 hours (per year). Burden is defined 
at 5 CFR 1320.3(b).
    Total estimated cost: $2,620,000 (per year), which includes $0 
annualized capital/startup and/or operation & maintenance costs.
    Changes in the estimates: There is an adjustment increase in the 
estimated burden and number of responses as currently identified in the 
OMB

[[Page 54748]]

Inventory of Approved Burdens. The change in burden occurred because 
the number of respondents, subject to these standards, has increased 
since the last ICR renewal period. In addition, this ICR assumes all 
existing respondents will have to familiarize with the regulatory 
requirements each year.

Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2018-23752 Filed 10-30-18; 8:45 am]
 BILLING CODE 6560-50-P



                                                                        Federal Register / Vol. 83, No. 211 / Wednesday, October 31, 2018 / Notices                                           54747

                                              material or adhesives in the                            ENVIRONMENTAL PROTECTION                              Compliance, Mail Code 2227A,
                                              manufacture of wood furniture or wood                   AGENCY                                                Environmental Protection Agency, 1200
                                              furniture components. An ‘‘area source’’                                                                      Pennsylvania Ave. NW, Washington, DC
                                                                                                      [EPA–HQ–OECA–2014–0040; FRL–9985–
                                              is any stationary source that is not a                  53–OEI]
                                                                                                                                                            20460; telephone number: (202) 564–
                                              major source.’’                                                                                               2970; fax number: (202) 564–0050;
                                                                                                      Information Collection Request                        email address: yellin.patrick@epa.gov.
                                                 In general, all NESHAP standards
                                              require initial notifications,                          Submitted to OMB for Review and                       SUPPLEMENTARY INFORMATION:
                                              performance tests, and periodic reports                 Approval; Comment Request; NSPS                       Supporting documents, which explain
                                              by the owners/operators of the affected                 for Hot Mix Asphalt Facilities                        in detail the information that the EPA
                                              facilities. They are also required to                   (Renewal)                                             will be collecting, are available in the
                                                                                                                                                            public docket for this ICR. The docket
                                              maintain records of the occurrence and                  AGENCY: Environmental Protection                      can be viewed online at
                                              duration of any startup, shutdown, or                   Agency (EPA).                                         www.regulations.gov, or in person at the
                                              malfunction in the operation of an                      ACTION: Notice.                                       EPA Docket Center, WJC West, Room
                                              affected facility, or any period during                                                                       3334, 1301 Constitution Ave. NW,
                                              which the monitoring system is                          SUMMARY:   The Environmental Protection
                                                                                                      Agency (EPA) has submitted an                         Washington, DC. The telephone number
                                              inoperative. These notifications, reports,                                                                    for the Docket Center is 202–566–1744.
                                              and records are essential in determining                information collection request (ICR),
                                                                                                      NSPS for Hot Mix Asphalt Facilities                   For additional information about EPA’s
                                              compliance with 40 CFR part 63,                                                                               public docket, visit: http://
                                              subpart JJ.                                             (EPA ICR Number 1127.12, OMB
                                                                                                      Control Number 2060–0083), to the                     www.epa.gov/dockets.
                                                 Form Numbers: None.                                  Office of Management and Budget                          Abstract: The New Source
                                                 Respondents/affected entities: Wood                  (OMB) for review and approval in                      Performance Standards (NSPS) for Hot
                                                                                                      accordance with the Paperwork                         Mix Asphalt Facilities (40 CFR part 60,
                                              furniture manufacturing facilities.
                                                                                                      Reduction Act. This is a proposed                     subpart I) apply to hot mix asphalt
                                                 Respondent’s obligation to respond:                                                                        facilities that commenced construction
                                              Mandatory (40 CFR part 63, subpart JJ).                 extension of the ICR, which is currently
                                                                                                      approved through November 30, 2018.                   or modification after June 11, 1973. A
                                                 Estimated number of respondents:                     Public comments were previously                       hot mix asphalt facility is comprised
                                              856 (total).                                            requested, via the Federal Register, on               only of any combination of the
                                                                                                      June 29, 2017 during a 60-day comment                 following: Dryers; systems for screening,
                                                 Frequency of response: Initially,
                                                                                                      period. This notice allows for an                     handling, storing, and weighing hot
                                              occasionally, quarterly, semiannually,                                                                        aggregate; systems for loading,
                                              and annually.                                           additional 30 days for public comments.
                                                                                                      A fuller description of the ICR is given              transferring, and storing mineral filler;
                                                 Total estimated burden: 70,800 hours                                                                       systems for mixing hot mix asphalt; and
                                                                                                      below, including its estimated burden
                                              (per year). Burden is defined at 5 CFR                  and cost to the public. An agency may                 the loading, transfer, and storage
                                              1320.3(b).                                              neither conduct nor sponsor, and a                    systems associated with emission
                                                 Total estimated cost: $7,780,000 (per                person is not required to respond to, a               control systems. In general, all NSPS
                                              year), which includes $24,600 in                        collection of information unless it                   standards require initial notifications,
                                              annualized capital/startup and/or                       displays a currently valid OMB control                performance tests, and periodic reports
                                                                                                      number.                                               by the owners/operators of the affected
                                              operation & maintenance costs.
                                                                                                                                                            facilities. They are also required to
                                                 Changes in the estimates: The                        DATES: Additional comments may be
                                                                                                                                                            maintain records of the occurrence and
                                              increase in burden hours and the                        submitted on or before November 30,                   duration of any startup, shutdown, or
                                              number of responses from the most-                      2018.                                                 malfunction in the operation of an
                                              recently approved ICR is due to several                 ADDRESSES:   Submit your comments,                    affected facility, or any period during
                                              adjustments: (1) This ICR accounts for                  referencing Docket ID Number EPA–                     which the monitoring system is
                                              the time for each source to refamiliarize               HQ–OECA–2014–0040, to: (1) EPA                        inoperative. These notifications, reports,
                                              themselves with the regulatory                          online using www.regulations.gov (our                 and records are essential in determining
                                              requirements each year; and (2) this ICR                preferred method), or by email to                     compliance with 40 CFR part 60,
                                              added in one-time requirements for                      docket.oeca@epa.gov, or by mail to: EPA               subpart I.
                                              reconstructed and modified sources that                 Docket Center, Environmental                             Form Numbers: None.
                                              were missing from the previous renewal                  Protection Agency, Mail Code 28221T,                     Respondents/affected entities: Hot
                                              and edited the frequency of records to                  1200 Pennsylvania Ave. NW,                            mix asphalt facilities.
                                              better match regulatory requirements.                   Washington, DC 20460; and (2) OMB via                    Respondent’s obligation to respond:
                                              Overall, these changes resulted in an                   email to oira_submission@omb.eop.gov.                 Mandatory (40 CFR part 60, subpart I).
                                              increase of 4,565 hours.                                Address comments to OMB Desk Officer                     Estimated number of respondents:
                                                                                                      for EPA.                                              4,955 (total).
                                              Courtney Kerwin,                                          EPA’s policy is that all comments                      Frequency of response: Initially.
                                              Director, Regulatory Support Division.                  received will be included in the public                  Total estimated burden: 25,000 hours
                                              [FR Doc. 2018–23756 Filed 10–30–18; 8:45 am]            docket without change including any                   (per year). Burden is defined at 5 CFR
                                                                                                      personal information provided, unless                 1320.3(b).
                                              BILLING CODE 6560–50–P
                                                                                                      the comment includes profanity, threats,                 Total estimated cost: $2,620,000 (per
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                      information claimed to be Confidential                year), which includes $0 annualized
                                                                                                      Business Information (CBI), or other                  capital/startup and/or operation &
                                                                                                      information whose disclosure is                       maintenance costs.
                                                                                                      restricted by statute.                                   Changes in the estimates: There is an
                                                                                                      FOR FURTHER INFORMATION CONTACT:                      adjustment increase in the estimated
                                                                                                      Patrick Yellin, Monitoring, Assistance,               burden and number of responses as
                                                                                                      and Media Programs Division, Office of                currently identified in the OMB


                                         VerDate Sep<11>2014   18:06 Oct 30, 2018   Jkt 247001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\31OCN1.SGM   31OCN1


                                              54748                     Federal Register / Vol. 83, No. 211 / Wednesday, October 31, 2018 / Notices

                                              Inventory of Approved Burdens. The                         EPA’s policy is that all comments                    Total estimated burden: 3,820 hours
                                              change in burden occurred because the                   received will be included in the public               (per year). Burden is defined at 5 CFR
                                              number of respondents, subject to these                 docket without change including any                   1320.3(b).
                                              standards, has increased since the last                 personal information provided, unless                   Total estimated cost: $463,000 (per
                                              ICR renewal period. In addition, this                   the comment includes profanity, threats,              year), which includes $61,500 in
                                              ICR assumes all existing respondents                    information claimed to be Confidential                annualized capital/startup and/or
                                              will have to familiarize with the                       Business Information (CBI), or other                  operation & maintenance costs.
                                              regulatory requirements each year.                      information whose disclosure is                         Changes in the estimates: There is an
                                                                                                      restricted by statute.                                adjustment increase in the respondent
                                              Courtney Kerwin,
                                                                                                                                                            labor hours and costs as currently
                                              Director, Regulatory Support Division.                  FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                            identified in the OMB Inventory of
                                              [FR Doc. 2018–23752 Filed 10–30–18; 8:45 am]            Patrick Yellin, Monitoring, Assistance,
                                                                                                                                                            Approved Burdens. This increase is not
                                                                                                      and Media Programs Division, Office of
                                              BILLING CODE 6560–50–P                                                                                        due to any program changes. The
                                                                                                      Compliance, Mail Code 2227A,
                                                                                                                                                            change in the burden and cost estimates
                                                                                                      Environmental Protection Agency, 1200
                                                                                                                                                            occurred due to a change in assumption.
                                              ENVIRONMENTAL PROTECTION                                Pennsylvania Ave. NW, Washington, DC
                                                                                                                                                            This ICR assumes all existing
                                              AGENCY                                                  20460; telephone number: (202) 564–
                                                                                                                                                            respondents will have to familiarize
                                                                                                      2970; fax number: (202) 564–0050;
                                              [EPA–HQ–OECA–2014–0042; FRL–9985–                                                                             with the regulatory requirements each
                                                                                                      email address: yellin.patrick@epa.gov.
                                              01–OEI]                                                                                                       year.
                                                                                                      SUPPLEMENTARY INFORMATION:
                                              Information Collection Request                          Supporting documents, which explain                   Courtney Kerwin,
                                              Submitted to OMB for Review and                         in detail the information that the EPA                Director, Regulatory Support Division.
                                              Approval; Comment Request; NSPS                         will be collecting, are available in the              [FR Doc. 2018–23746 Filed 10–30–18; 8:45 am]
                                              for Lime Manufacturing (Renewal)                        public docket for this ICR. The docket                BILLING CODE 6560–50–P
                                                                                                      can be viewed online at
                                              AGENCY: Environmental Protection
                                                                                                      www.regulations.gov or in person at the
                                              Agency (EPA).                                                                                                 ENVIRONMENTAL PROTECTION
                                                                                                      EPA Docket Center, EPA West, Room
                                              ACTION: Notice.                                                                                               AGENCY
                                                                                                      3334, 1301 Constitution Ave. NW,
                                              SUMMARY:   The Environmental Protection                 Washington, DC. The telephone number                  [EPA–HQ–OECA–2017–0200; FRL–9984–
                                              Agency (EPA) has submitted an                           for the Docket Center is 202–566–1744.                86–OEI]
                                              information collection request (ICR),                   For additional information about EPA’s
                                              NSPS for Lime Manufacturing (EPA ICR                    public docket, visit: http://                         Information Collection Request
                                              No. 1167.12, OMB Control No. 2060–                      www.epa.gov/dockets.                                  Submitted to OMB for Review and
                                              0063), to the Office of Management and                     Abstract: The New Source                           Approval; Comment Request; NESHAP
                                              Budget (OMB) for review and approval                    Performance Standards (NSPS) for Lime                 for Rubber Tire Manufacturing
                                              in accordance with the Paperwork                        Manufacturing (40 CFR part 60, subpart                (Reinstatement)
                                              Reduction Act. This is a proposed                       HH) apply to each existing and new                    AGENCY: Environmental Protection
                                              extension of the ICR, which is currently                rotary lime kiln used in the                          Agency (EPA).
                                              approved through November 30, 2018.                     manufacturing of lime. These standards                ACTION: Notice.
                                              Public comments were previously                         do not apply to facilities used in the
                                              requested, via the Federal Register, on                 manufacture of lime at kraft pulp mills.              SUMMARY:  The Environmental Protection
                                              June 29, 2017 during a 60-day comment                   New facilities include those that                     Agency (EPA) has submitted an
                                              period. This notice allows for an                       commenced construction, modification                  information collection request (ICR),
                                              additional 30 days for public comments.                 or reconstruction after the date of                   NESHAP for Rubber Tire Manufacturing
                                              A fuller description of the ICR is given                proposal. In general, all NSPS standards              (EPA ICR No. 1982.02), to the Office of
                                              below, including its estimated burden                   require initial notifications,                        Management and Budget (OMB) for
                                              and cost to the public. An agency may                   performance tests, and periodic reports               review and approval in accordance with
                                              neither conduct nor sponsor, and a                      by the owners/operators of the affected               the Paperwork Reduction Act. Public
                                              person is not required to respond to, a                 facilities. They are also required to                 comments were requested previously,
                                              collection of information unless it                     maintain records of the occurrence and                via the Federal Register, on June 29,
                                              displays a currently valid OMB control                  duration of any startup, shutdown, or                 2017 during a 60-day comment period.
                                              number.                                                 malfunction in the operation of an                    This notice allows for an additional 30
                                              DATES: Additional comments may be                       affected facility, or any period during               days for public comments. A fuller
                                              submitted on or before November 30,                     which the monitoring system is                        description of the ICR is given below,
                                              2018.                                                   inoperative. These notifications, reports,            including its estimated burden and cost
                                                                                                      and records are essential in determining              to the public. An agency may neither
                                              ADDRESSES: Submit your comments,
                                                                                                      compliance with 40 CFR part 60,                       conduct nor sponsor, and a person is
                                              referencing Docket ID Number EPA–
                                                                                                      subpart HH.                                           not required to respond to a collection
                                              HQ–OECA–2014–0042, to: (1) EPA
                                              online using www.regulations.gov (our                      Form Numbers: None.                                of information unless it displays a
                                              preferred method), or by email to                          Respondents/affected entities: Lime                currently valid OMB control number.
                                              docket.oeca@epa.gov, or by mail to: EPA                 manufacturing plants.                                 DATES: Additional comments may be
amozie on DSK3GDR082PROD with NOTICES1




                                              Docket Center, Environmental                               Respondent’s obligation to respond:                submitted on or before November 30,
                                              Protection Agency, Mail Code 28221T,                    Mandatory (40 CFR part 60, subpart                    2018.
                                              1200 Pennsylvania Ave. NW,                              HH).                                                  ADDRESSES: Submit your comments,
                                              Washington, DC 20460; and (2) OMB via                      Estimated number of respondents: 41                referencing Docket ID Number EPA–
                                              email to oira_submission@omb.eop.gov.                   (total).                                              HQ–OECA–2017–0200, to: (1) EPA
                                              Address comments to OMB Desk Officer                       Frequency of response: Initially and               online using www.regulations.gov (our
                                              for EPA.                                                semiannually.                                         preferred method), or by email to


                                         VerDate Sep<11>2014   18:06 Oct 30, 2018   Jkt 247001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\31OCN1.SGM   31OCN1



Document Created: 2018-10-31 00:33:19
Document Modified: 2018-10-31 00:33:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesAdditional comments may be submitted on or before November 30, 2018.
ContactPatrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564-2970; fax number:
FR Citation83 FR 54747 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR