83_FR_55373 83 FR 55160 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications: FreedomWorks, LLC

83 FR 55160 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications: FreedomWorks, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 213 (November 2, 2018)

Page Range55160-55160
FR Document2018-24000

Federal Register, Volume 83 Issue 213 (Friday, November 2, 2018)
[Federal Register Volume 83, Number 213 (Friday, November 2, 2018)]
[Notices]
[Page 55160]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-24000]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14889-000]


Notice of Preliminary Permit Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Competing Applications: 
FreedomWorks, LLC

    On August 24, 2018, FreedomWorks, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Big Run Pump Storage 
Hydro Project to be located near Parsons in Tucker County, West 
Virginia. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A new 
upper reservoir with a surface area of 1,213 acres and a storage 
capacity of 119,387 acre-feet at a surface elevation of approximately 
3,350 feet above mean sea level (msl) created through construction of a 
circular dam and/or dike; (2) a new lower reservoir with a surface area 
of 1,061 acres and a storage capacity of 113,398 acre-feet at a surface 
elevation of 2,250 feet msl created through construction of a semi-
circular dam; (3) as many as four new 7,000-foot-long, 12-foot-diameter 
penstocks connecting the upper reservoir and lower reservoir; (4) a new 
600-foot-long, 50-foot-wide, 25-foot-high powerhouse containing four 
turbine-generator units with a total rated capacity of 1,000 megawatts; 
(5) a new transmission line connecting the powerhouse to a nearby 
electric grid interconnection point with options to evaluate multiple 
grid interconnection locations; and (6) appurtenant facilities. The 
proposed project would have an annual generation of 4,380,000 megawatt-
hours.
    Applicant Contact: Tim Williamson, FreedomWorks, LLC, 525 Wren 
Lane, Harpers Ferry, WV 25425; phone: 267-254-6107.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14889-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14889) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: October 29, 2018.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-24000 Filed 11-1-18; 8:45 am]
 BILLING CODE 6717-01-P



     55160                        Federal Register / Vol. 83, No. 213 / Friday, November 2, 2018 / Notices

     approved Watson Associates’ request to                    Dated: October 26, 2018.                               FERC Contact: Woohee Choi; phone:
     use the Traditional Licensing Process.                  Kimberly D. Bose,                                     (202) 502–6336.
        k. With this notice, we are initiating               Secretary.                                               Deadline for filing comments, motions
     informal consultation with the U.S. Fish                [FR Doc. 2018–23996 Filed 11–1–18; 8:45 am]           to intervene, competing applications
     and Wildlife Service and NOAA                           BILLING CODE 6717–01–P
                                                                                                                   (without notices of intent), or notices of
     Fisheries under section 7 of the                                                                              intent to file competing applications: 60
     Endangered Species Act and the joint                                                                          days from the issuance of this notice.
     agency regulations thereunder at 50 CFR                 DEPARTMENT OF ENERGY                                  Competing applications and notices of
     part 402; and NOAA Fisheries under                                                                            intent must meet the requirements of 18
     section 305(b) of the Magnuson-Stevens                  Federal Energy Regulatory                             CFR 4.36.
     Fishery Conservation and Management                     Commission                                               The Commission strongly encourages
     Act and implementing regulations at 50                                                                        electronic filing. Please file comments,
     CFR 600.920. We are also initiating                     [Project No. 14889–000]                               motions to intervene, notices of intent,
     consultation with the New Hampshire                                                                           and competing applications using the
     State Historic Preservation Officer, as                 Notice of Preliminary Permit                          Commission’s eFiling system at http://
     required by section 106 of the National                 Application Accepted for Filing and                   www.ferc.gov/docs-filing/efiling.asp.
     Historic Preservation Act, and the                      Soliciting Comments, Motions To                       Commenters can submit brief comments
     implementing regulations of the                         Intervene, and Competing                              up to 6,000 characters, without prior
     Advisory Council on Historic                            Applications: FreedomWorks, LLC                       registration, using the eComment system
     Preservation at 36 CFR 800.2.                                                                                 at http://www.ferc.gov/docs-filing/
                                                                On August 24, 2018, FreedomWorks,
        l. With this notice, we are designating                                                                    ecomment.asp. You must include your
     Watson Associates as the Commission’s                   LLC, filed an application for a
                                                             preliminary permit, pursuant to section               name and contact information at the end
     non-federal representative for carrying                                                                       of your comments. For assistance,
     out informal consultation pursuant to                   4(f) of the Federal Power Act (FPA),
                                                             proposing to study the feasibility of the             please contact FERC Online Support at
     section 7 of the Endangered Species Act;                                                                      FERCOnlineSupport@ferc.gov, (866)
     and consultation pursuant to section                    Big Run Pump Storage Hydro Project to
                                                             be located near Parsons in Tucker                     208–3676 (toll free), or (202) 502–8659
     106 of the National Historic                                                                                  (TTY). In lieu of electronic filing, please
     Preservation Act.                                       County, West Virginia. The sole purpose
                                                             of a preliminary permit, if issued, is to             send a paper copy to: Secretary, Federal
        m. Watson Associates filed a Pre-
                                                             grant the permit holder priority to file              Energy Regulatory Commission, 888
     Application Document (PAD; including
                                                             a license application during the permit               First Street NE, Washington, DC 20426.
     a proposed process plan and schedule)
                                                             term. A preliminary permit does not                   The first page of any filing should
     with the Commission on August 27,
                                                             authorize the permit holder to perform                include docket number P–14889–000.
     2018, pursuant to 18 CFR 5.6 of the
                                                             any land-disturbing activities or                        More information about this project,
     Commission’s regulations. Watson
                                                             otherwise enter upon lands or waters                  including a copy of the application, can
     Associates filed a revised PAD with the
     Commission on October 11, 2018.                         owned by others without the owners’                   be viewed or printed on the ‘‘eLibrary’’
        n. A copy of the PAD is available for                express permission.                                   link of the Commission’s website at
     review at the Commission in the Public                     The proposed project would consist of              http://www.ferc.gov/docs-filing/
     Reference Room or may be viewed on                      the following: (1) A new upper reservoir              elibrary.asp. Enter the docket number
     the Commission’s website (http://                       with a surface area of 1,213 acres and                (P–14889) in the docket number field to
     www.ferc.gov), using the ‘‘eLibrary’’                   a storage capacity of 119,387 acre-feet at            access the document. For assistance,
     link. Enter the docket number,                          a surface elevation of approximately                  contact FERC Online Support.
     excluding the last three digits in the                  3,350 feet above mean sea level (msl)                   Dated: October 29, 2018.
     docket number field to access the                       created through construction of a                     Kimberly D. Bose,
     document. For assistance, contact FERC                  circular dam and/or dike; (2) a new                   Secretary.
     Online Support at                                       lower reservoir with a surface area of                [FR Doc. 2018–24000 Filed 11–1–18; 8:45 am]
     FERCOnlineSupport@ferc.gov, (866)                       1,061 acres and a storage capacity of
                                                                                                                   BILLING CODE 6717–01–P
     208–3676 (toll free), or (202) 502–8659                 113,398 acre-feet at a surface elevation
     (TTY). A copy is also available for                     of 2,250 feet msl created through
     inspection and reproduction at the                      construction of a semi-circular dam; (3)              DEPARTMENT OF ENERGY
     address in paragraph h.                                 as many as four new 7,000-foot-long, 12-
        o. The licensee states its unequivocal               foot-diameter penstocks connecting the                Federal Energy Regulatory
     intent to submit an application for a                   upper reservoir and lower reservoir; (4)              Commission
     subsequent license for Project No. 6240.                a new 600-foot-long, 50-foot-wide, 25-
                                                             foot-high powerhouse containing four                  [Project No. 2100–188]
     Pursuant to 18 CFR 16.20, each
     application for a subsequent license and                turbine-generator units with a total rated            California Department of Water
     any competing license applications                      capacity of 1,000 megawatts; (5) a new                Resources; Notice of Application
     must be filed with the Commission at                    transmission line connecting the                      Accepted for Filing, Soliciting
     least 24 months prior to the expiration                 powerhouse to a nearby electric grid                  Comments, Motions To Intervene, and
     of the existing license. All applications               interconnection point with options to                 Protests
     for license for this project must be filed              evaluate multiple grid interconnection
     by August 31, 2021.                                     locations; and (6) appurtenant facilities.               Take notice that the following
        p. Register online at http://                        The proposed project would have an                    hydroelectric application has been filed
     www.ferc.gov/docs-filing/                               annual generation of 4,380,000                        with the Commission and is available
     esubscription.asp to be notified via                    megawatt-hours.                                       for public inspection:
     email of new filings and issuances                         Applicant Contact: Tim Williamson,                    a. Type of Application: Amendment
     related to this or other pending projects.              FreedomWorks, LLC, 525 Wren Lane,                     of Recreation Plan to realign a recreation
     For assistance, contact FERC Online                     Harpers Ferry, WV 25425; phone: 267–                  trail.
     Support.                                                254–6107.                                                b. Project No.: 2100–188.


VerDate Sep<11>2014   17:57 Nov 01, 2018   Jkt 247001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\02NON1.SGM   02NON1



Document Created: 2018-11-02 01:10:32
Document Modified: 2018-11-02 01:10:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 55160 

2025 Federal Register | Disclaimer | Privacy Policy