83_FR_57691 83 FR 57470 - Notice of Request Under Blanket Authorization Florida Gas Transmission Company, LLC

83 FR 57470 - Notice of Request Under Blanket Authorization Florida Gas Transmission Company, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 221 (November 15, 2018)

Page Range57470-57470
FR Document2018-24887

Federal Register, Volume 83 Issue 221 (Thursday, November 15, 2018)
[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Page 57470]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-24887]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-12-000]


Notice of Request Under Blanket Authorization Florida Gas 
Transmission Company, LLC

    Take notice that on November 1, 2018, Florida Gas Transmission 
Company, LLC (FGT), 1300 Main St., Houston, Texas 77002, filed in 
Docket No. CP19-12-000 a prior notice request pursuant to sections 
157.205, 157.208, and 157.210 of the Commission's regulations under the 
Natural Gas Act and FGT's blanket certificate issued in Docket No. 
CP82-553-000 for authorization of the East Louisiana Project. FGT 
proposes to construct/modify, own, and operate, certain natural gas 
mainline facilities and appurtenances at an existing compressor station 
site in Perry County, Mississippi. In addition, FGT proposes to install 
a new regulator, valves, Electronic Flow Meter and Supervisory Control 
and Data Acquisition, and appurtenances, in FGT's permanent right of-
way easement at an existing mainline valve site in Washington Parish, 
Louisiana. This project will allow FGT to provide additional capacity 
of up to 75 million cubic feet per day of available firm transportation 
service to Entergy Louisiana, LLC in Washington Parish, Louisiana, all 
as more fully set forth in the request which is on file with the 
Commission and open to public inspection.
    The filing is available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's website web at 
http://www.ferc.gov using the eLibrary link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Blair Lichtenwalter, Senior Director of Certificates, Florida Gas 
Transmission Company, LLC, 1300 Main St., Houston, Texas 77002, or via 
eMail to Blair.Lichtenwalter@energytransfer.com, or call (713) 989-
2605.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commenters will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.

    Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24887 Filed 11-14-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               57470                     Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices

                                                 Dated: November 8, 2018.                                 Any person or the Commission’s staff               of the protest or intervention to the
                                               Kimberly D. Bose,                                       may, within 60 days after issuance of                 Federal Energy regulatory Commission,
                                               Secretary.                                              the instant notice by the Commission,                 888 First Street NE, Washington, DC
                                               [FR Doc. 2018–24885 Filed 11–14–18; 8:45 am]            file pursuant to Rule 214 of the                      20426.
                                               BILLING CODE 6717–01–P                                  Commission’s Procedural Rules (18 CFR                   Dated: November 8, 2018.
                                                                                                       385.214) a motion to intervene or notice
                                                                                                                                                             Kimberly D. Bose,
                                                                                                       of intervention and pursuant to section
                                                                                                                                                             Secretary.
                                               DEPARTMENT OF ENERGY                                    157.205 of the regulations under the
                                                                                                       NGA (18 CFR 157.205), a protest to the                [FR Doc. 2018–24887 Filed 11–14–18; 8:45 am]
                                               Federal Energy Regulatory                               request. If no protest is filed within the            BILLING CODE 6717–01–P
                                               Commission                                              time allowed therefore, the proposed
                                               [Docket No. CP19–12–000]                                activity shall be deemed to be
                                                                                                       authorized effective the day after the                DEPARTMENT OF ENERGY
                                               Notice of Request Under Blanket                         time allowed for filing a protest. If a
                                                                                                                                                             Federal Energy Regulatory
                                               Authorization Florida Gas                               protest is filed and not withdrawn
                                                                                                                                                             Commission
                                               Transmission Company, LLC                               within 30 days after the allowed time
                                                                                                       for filing a protest, the instant request             Combined Notice of Filings #1
                                                  Take notice that on November 1,                      shall be treated as an application for
                                               2018, Florida Gas Transmission                          authorization pursuant to section 7 of                   Take notice that the Commission
                                               Company, LLC (FGT), 1300 Main St.,                      the NGA.                                              received the following electric corporate
                                               Houston, Texas 77002, filed in Docket                      Pursuant to section 157.9 of the                   filings:
                                               No. CP19–12–000 a prior notice request                  Commission’s rules, 18 CFR 157.9,                        Docket Numbers: EC18–122–000.
                                               pursuant to sections 157.205, 157.208,                  within 90 days of this Notice the                        Applicants: GridLiance High Plains
                                               and 157.210 of the Commission’s                         Commission staff will either: Complete                LLC.
                                               regulations under the Natural Gas Act                   its environmental assessment (EA) and                    Description: Response to October 11,
                                               and FGT’s blanket certificate issued in                 place it into the Commission’s public                 2018 Deficiency Letter of GridLiance
                                               Docket No. CP82–553–000 for                             record (eLibrary) for this proceeding; or             High Plains LLC.
                                               authorization of the East Louisiana                     issue a Notice of Schedule for                           Filed Date: 11/7/18.
                                               Project. FGT proposes to construct/                     Environmental Review. If a Notice of                     Accession Number: 20181107–5128.
                                               modify, own, and operate, certain                       Schedule for Environmental Review is                     Comments Due: 5 p.m. ET 11/28/18.
                                               natural gas mainline facilities and                     issued, it will indicate, among other
                                               appurtenances at an existing compressor                                                                          Docket Numbers: EC19–24–000.
                                                                                                       milestones, the anticipated date for the                 Applicants: Northern Iowa
                                               station site in Perry County, Mississippi.              Commission staff’s issuance of the EA
                                               In addition, FGT proposes to install a                                                                        Windpower LLC, Black Hills Electric
                                                                                                       for this proposal. The filing of the EA               Generation, LLC, Black Hills
                                               new regulator, valves, Electronic Flow                  in the Commission’s public record for
                                               Meter and Supervisory Control and Data                                                                        Corporation, Top Deer Wind Ventures,
                                                                                                       this proceeding or the issuance of a                  LLC.
                                               Acquisition, and appurtenances, in                      Notice of Schedule for Environmental
                                               FGT’s permanent right of-way easement                                                                            Description: Joint Application for
                                                                                                       Review will serve to notify federal and               Authorization Under Section 203 of the
                                               at an existing mainline valve site in                   state agencies of the timing for the
                                               Washington Parish, Louisiana. This                                                                            Federal Power Act, et al. of Northern
                                                                                                       completion of all necessary reviews, and              Iowa Windpower LLC, et al.
                                               project will allow FGT to provide                       the subsequent need to complete all
                                               additional capacity of up to 75 million                                                                          Filed Date: 11/7/18.
                                                                                                       federal authorizations within 90 days of                 Accession Number: 20181107–5130.
                                               cubic feet per day of available firm                    the date of issuance of the Commission                   Comments Due: 5 p.m. ET 11/28/18.
                                               transportation service to Entergy                       staff’s EA.
                                               Louisiana, LLC in Washington Parish,                       Persons who wish to comment only                      Take notice that the Commission
                                               Louisiana, all as more fully set forth in               on the environmental review of this                   received the following electric rate
                                               the request which is on file with the                   project should submit an original and                 filings:
                                               Commission and open to public                           two copies of their comments to the                      Docket Numbers: ER19–115–000.
                                               inspection.                                             Secretary of the Commission.                             Applicants: FL Solar 5, LLC.
                                                  The filing is available for review at                Environmental commenters will be                         Description: Supplement to October
                                               the Commission in the Public Reference                  placed on the Commission’s                            16, 2018 FL Solar 5, LLC tariff filing.
                                               Room or may be viewed on the                            environmental mailing list and will be                   Filed Date: 11/7/18.
                                               Commission’s website web at http://                     notified of any meetings associated with                 Accession Number: 20181107–5140.
                                               www.ferc.gov using the eLibrary link.                   the Commission’s environmental review                    Comments Due: 5 p.m. ET 11/21/18.
                                               Enter the docket number excluding the                   process. Environmental commenters                        Docket Numbers: ER19–302–000.
                                               last three digits in the docket number                  will not be required to serve copies of                  Applicants: NTE Southeast Electric
                                               field to access the document. For                       filed documents on all other parties.                 Company, LLC.
                                               assistance, contact FERC at                             However, the non-party commenters                        Description: Baseline eTariff Filing:
                                               FERCOnlineSupport@ferc.gov or call                      will not receive copies of all documents              Baseline new to be effective 1/1/2019.
                                               toll-free, (886) 208–3676 or TYY, (202)                 filed by other parties or issued by the                  Filed Date: 11/7/18.
                                               502–8659.                                               Commission and will not have the right                   Accession Number: 20181107–5114.
                                                  Any questions regarding this                                                                                  Comments Due: 5 p.m. ET 11/28/18.
khammond on DSK30JT082PROD with NOTICES




                                                                                                       to seek court review of the
                                               application should be directed to Blair                 Commission’s final order.                                Docket Numbers: ER19–303–000.
                                               Lichtenwalter, Senior Director of                          The Commission strongly encourages                    Applicants: Duquesne Light
                                               Certificates, Florida Gas Transmission                  electronic filings of comments, protests              Company.
                                               Company, LLC, 1300 Main St., Houston,                   and interventions in lieu of paper using                 Description: Application for Incentive
                                               Texas 77002, or via eMail to                            the eFiling link at http://www.ferc.gov.              Rate Treatment, et al. of Duquesne Light
                                               Blair.Lichtenwalter@energytransfer.com,                 Persons unable to file electronically                 Company.
                                               or call (713) 989–2605.                                 should submit an original and 3 copies                   Filed Date: 11/7/18.


                                          VerDate Sep<11>2014   16:53 Nov 14, 2018   Jkt 247001   PO 00000   Frm 00072   Fmt 4703   Sfmt 4703   E:\FR\FM\15NON1.SGM   15NON1



Document Created: 2018-11-15 04:00:46
Document Modified: 2018-11-15 04:00:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 57470 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR