DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 221 (November 15, 2018)

Page Range57472-57473
FR Document2018-24886

Federal Register, Volume 83 Issue 221 (Thursday, November 15, 2018)
[Federal Register Volume 83, Number 221 (Thursday, November 15, 2018)]
[Notices]
[Pages 57472-57473]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-24886]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2804-035]


Notice of Application Ready for Environmental Analysis and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions; Goose River Hydro, Inc.

    Take notice that the following hydroelectric applications have been 
filed with the Commission and are available for public inspection.
    a. Type of Application: New Minor License.
    b. Project No: 2804-035.
    c. Date filed: February 2, 2018.
    d. Applicant: Goose River Hydro, Inc.
    e. Name of Project: Goose River Hydroelectric Project.
    f. Location: On the Goose River, in Waldo County, Maine. No federal 
lands are occupied by the project works or located within the project 
boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Nicholas Cabral, Goose River Hydro, Inc., 41 
Sedgewood Drive, Kennebunk, ME 04043; (207) 604-4394; or email at 
[email protected].
    i. FERC Contact: Julia Kolberg at (202) 502-8261; or email at 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include the 
relevant docket number P-2804-035.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The project consists of the following existing facilities:

Swan Lake Dam

    (1) A 14-foot-high, 250-foot-long rock masonry gravity dam 
impounding Swan Lake with a surface area of approximately 1,364 acres 
at an elevation of 201 feet above sea level; (2) a concrete inlet 
structure; (3) three 3.5-foot-high, 4-foot-wide manually operated 
butterfly gates that regulate flow through the inlet structure; (4) two 
culverts that convey flow under Route 141; and (5) appurtenant 
facilities.

[[Page 57473]]

Mason's Dam

    (1) A 15-foot-high, 86-foot-long rock masonry dam impounding a 
reservoir with a storage capacity of approximately 1,621 acre-feet at 
an elevation of 188 feet above sea level; (2) a concrete inlet 
structure; (3) a manually operated butterfly gate regulating flow from 
the inlet structure to the penstock; (4) a 3-foot-diameter, 350-foot-
long steel penstock; (5) a 266-square-foot concrete powerhouse 
containing two Kaplan turbines and generating units with a licensed 
capacity of 100 kW; (6) a 300-foot-long, 12-kilovolt (kV) transmission 
line; and (7) appurtenant facilities. Mason's Development generates 
when flows in excess of 5 cfs are available and when an operator is 
present.

Kelly Dam

    (1) A 15-foot-high, 135-foot-long masonry gravity dam impounding a 
reservoir with a storage capacity of approximately 200 acre-feet at an 
elevation of approximately 159 feet above sea level; and (2) three 3-
foot-high, 2.5-foot-wide manually operated butterfly gates.

Mill Dam

    (1) A 6-foot-tall, 70-foot-wide masonry dam impounding a reservoir 
with a storage capacity of approximately 7 acre-feet at an elevation of 
approximately 128 feet above sea level; (2) a concrete inlet structure; 
(3) a trash sluice with wooden stop logs; (4) a powerhouse containing a 
Francis-type turbine and generator unit with a licensed capacity of 75 
kW; (5) a 60-foot-wide concrete spillway; and (6) an approximately 100-
foot-long, 12-kV transmission line. The penstock used to deliver water 
to the powerhouse has been removed due to deterioration and subsequent 
leakage; thus, the powerhouse is not operating.

CMP Dam

    (1) A 21-foot-high, 231-foot-long buttress dam impounding a 
reservoir with a storage capacity of approximately 72 acre-feet at an 
elevation of approximately 109 feet above sea level; (2) a manually 
operated low-level water release lift gate; (3) a manually operated 
lift gate regulating flow to the penstock; (4) a 5-foot-diameter, 
1,200-foot-long steel penstock; (5) a 300-square-foot concrete and 
timber powerhouse with a Kaplan-type turbine and generator unit with a 
licensed capacity of 200 kW; (6) a 42-foot-long spillway; and (7) an 
approximately 500-foot-long, 12-kV transmission line. The penstock used 
to deliver water to the powerhouse is currently out of service due to 
damage, deterioration, and subsequent leakage; thus, the powerhouse is 
not operating.
    m. Copies of the applications are available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. Copies are also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or 
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant 
and the project number of the application to which the filing responds; 
(3) furnish the name, address, and telephone number of the person 
submitting the filing; and (4) otherwise comply with the requirements 
of 18 CFR 385.2001 through 385.2005. All comments, recommendations, 
terms and conditions or prescriptions must set forth their evidentiary 
basis and otherwise comply with the requirements of 18 CFR 4.34(b). 
Agencies may obtain copies of the applications directly from the 
applicant. Each filing must be accompanied by proof of service on all 
persons listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b), and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The applications will be processed 
according to the following schedule. Revisions to the schedule will be 
made as appropriate.

Commission issues EA--June 2019
Comments on EA due--July 2019

    Dated: November 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24886 Filed 11-14-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               57472                     Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices

                                                 Persons unable to file electronically                    The Commission encourages                             g. Filed Pursuant to: Federal Power
                                               should submit an original and 5 copies                  electronic submission of protests and                 Act, 16 U.S.C. 791(a)–825(r).
                                               of the intervention or protest to the                   interventions in lieu of paper, using the                h. Applicant Contact: Nicholas
                                               Federal Energy Regulatory Commission,                   FERC Online links at http://                          Cabral, Goose River Hydro, Inc., 41
                                               888 First Street NE, Washington, DC                     www.ferc.gov. To facilitate electronic                Sedgewood Drive, Kennebunk, ME
                                               20426.                                                  service, persons with internet access                 04043; (207) 604–4394; or email at
                                                 The filings in the above proceeding                   who will eFile a document and/or be                   gooseriverhydro@gmail.com.
                                               are accessible in the Commission’s                      listed as a contact for an intervenor                    i. FERC Contact: Julia Kolberg at (202)
                                               eLibrary system by clicking on the                      must create and validate an                           502–8261; or email at julia.kolberg@
                                               appropriate link in the above list. They                eRegistration account using the                       ferc.gov.
                                               are also available for review in the                    eRegistration link. Select the eFiling                   j. Deadline for filing comments,
                                               Commission’s Public Reference Room in                   link to log on and submit the                         recommendations, terms and
                                               Washington, DC. There is an                             intervention or protests.                             conditions, and prescriptions: 60 days
                                               eSubscription link on the website that                     Persons unable to file electronically              from the issuance date of this notice;
                                               enables subscribers to receive email                    should submit an original and 5 copies                reply comments are due 105 days from
                                               notification when a document is added                   of the intervention or protest to the                 the issuance date of this notice.
                                               to a subscribed docket(s). For assistance               Federal Energy Regulatory Commission,                    The Commission strongly encourages
                                               with any FERC Online service, please                    888 First Street NE, Washington, DC                   electronic filing. Please file comments,
                                               email FERCOnlineSupport@ferc.gov or                     20426.                                                recommendations, terms and
                                               call (866) 208–3676 (toll free). For TTY,                  The filings in the above-referenced                conditions, and prescriptions using the
                                               call (202) 502–8659.                                    proceeding are accessible in the                      Commission’s eFiling system at http://
                                                 Comment Date: 5:00 p.m. Eastern time                  Commission’s eLibrary system by                       www.ferc.gov/docs-filing/efiling.asp.
                                               on December 7, 2018.                                    clicking on the appropriate link in the               Commenters can submit brief comments
                                                                                                       above list. They are also available for               up to 6,000 characters, without prior
                                                 Dated: November 8, 2018.                                                                                    registration, using the eComment system
                                                                                                       electronic review in the Commission’s
                                               Kimberly D. Bose,                                       Public Reference Room in Washington,                  at http://www.ferc.gov/docs-filing/
                                               Secretary.                                              DC. There is an eSubscription link on                 ecomment.asp. You must include your
                                               [FR Doc. 2018–24884 Filed 11–14–18; 8:45 am]            the website that enables subscribers to               name and contact information at the end
                                               BILLING CODE 6717–01–P                                  receive email notification when a                     of your comments. For assistance,
                                                                                                       document is added to a subscribed                     please contact FERC Online Support at
                                                                                                       docket(s). For assistance with any FERC               FERCOnlineSupport@ferc.gov, (866)
                                               DEPARTMENT OF ENERGY                                    Online service, please email                          208–3676 (toll free), or (202) 502–8659
                                                                                                       FERCOnlineSupport@ferc.gov, or call                   (TTY). In lieu of electronic filing, please
                                               Federal Energy Regulatory                               (866) 208–3676 (toll free). For TTY, call             send a paper copy to: Secretary, Federal
                                               Commission                                              (202) 502–8659.                                       Energy Regulatory Commission, 888
                                               [Docket No. ER19–302–000]                                 Dated: November 8, 2018.                            First Street NE, Washington, DC 20426.
                                                                                                                                                             The first page of any filing should
                                                                                                       Nathaniel J. Davis, Sr.,
                                               Supplemental Notice That Initial                                                                              include the relevant docket number P–
                                                                                                       Deputy Secretary.
                                               Market-Based Rate Filing Includes                                                                             2804–035.
                                               Request for Blanket Section 204                         [FR Doc. 2018–24883 Filed 11–14–18; 8:45 am]             The Commission’s Rules of Practice
                                               Authorization; NTE Southeast Electric                   BILLING CODE 6717–01–P                                require all intervenors filing documents
                                               Company, LLC                                                                                                  with the Commission to serve a copy of
                                                                                                                                                             that document on each person on the
                                                 This is a supplemental notice in the                  DEPARTMENT OF ENERGY                                  official service list for the project.
                                               above-referenced NTE Southeast                                                                                Further, if an intervenor files comments
                                               Electric Company, LLC’s application for                 Federal Energy Regulatory
                                                                                                       Commission                                            or documents with the Commission
                                               market-based rate authority, with an                                                                          relating to the merits of an issue that
                                               accompanying rate tariff, noting that                   [Project No. 2804–035]                                may affect the responsibilities of a
                                               such application includes a request for                                                                       particular resource agency, they must
                                               blanket authorization, under 18 CFR                     Notice of Application Ready for                       also serve a copy of the document on
                                               part 34, of future issuances of securities              Environmental Analysis and Soliciting                 that resource agency.
                                               and assumptions of liability.                           Comments, Recommendations, Terms                         k. This application has been accepted
                                                 Any person desiring to intervene or to                and Conditions, and Prescriptions;                    and is now ready for environmental
                                               protest should file with the Federal                    Goose River Hydro, Inc.                               analysis.
                                               Energy Regulatory Commission, 888                                                                                l. The project consists of the following
                                                                                                          Take notice that the following
                                               First Street NE, Washington, DC 20426,                                                                        existing facilities:
                                                                                                       hydroelectric applications have been
                                               in accordance with Rules 211 and 214
                                                                                                       filed with the Commission and are                     Swan Lake Dam
                                               of the Commission’s Rules of Practice
                                                                                                       available for public inspection.
                                               and Procedure (18 CFR 385.211 and                          a. Type of Application: New Minor                     (1) A 14-foot-high, 250-foot-long rock
                                               385.214). Anyone filing a motion to                     License.                                              masonry gravity dam impounding Swan
                                               intervene or protest must serve a copy                     b. Project No: 2804–035.                           Lake with a surface area of
                                               of that document on the Applicant.                                                                            approximately 1,364 acres at an
khammond on DSK30JT082PROD with NOTICES




                                                                                                          c. Date filed: February 2, 2018.
                                                 Notice is hereby given that the                          d. Applicant: Goose River Hydro, Inc.              elevation of 201 feet above sea level; (2)
                                               deadline for filing protests with regard                   e. Name of Project: Goose River                    a concrete inlet structure; (3) three 3.5-
                                               to the applicant’s request for blanket                  Hydroelectric Project.                                foot-high, 4-foot-wide manually
                                               authorization, under 18 CFR part 34, of                    f. Location: On the Goose River, in                operated butterfly gates that regulate
                                               future issuances of securities and                      Waldo County, Maine. No federal lands                 flow through the inlet structure; (4) two
                                               assumptions of liability, is November                   are occupied by the project works or                  culverts that convey flow under Route
                                               28, 2018.                                               located within the project boundary.                  141; and (5) appurtenant facilities.


                                          VerDate Sep<11>2014   16:53 Nov 14, 2018   Jkt 247001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\15NON1.SGM   15NON1


                                                                         Federal Register / Vol. 83, No. 221 / Thursday, November 15, 2018 / Notices                                          57473

                                               Mason’s Dam                                             deterioration, and subsequent leakage;                ENVIRONMENTAL PROTECTION
                                                  (1) A 15-foot-high, 86-foot-long rock                thus, the powerhouse is not operating.                AGENCY
                                               masonry dam impounding a reservoir                         m. Copies of the applications are
                                               with a storage capacity of approximately                available for review at the Commission                [EPA–HQ–OPPT–2018–0604; FRL–9986–45]
                                               1,621 acre-feet at an elevation of 188                  in the Public Reference Room or may be
                                               feet above sea level; (2) a concrete inlet              viewed on the Commission’s website at                 Draft TSCA Risk Evaluation for Colour
                                               structure; (3) a manually operated                      http://www.ferc.gov using the eLibrary                Index (C. I.) Pigment Violet 29 (PV29);
                                               butterfly gate regulating flow from the                 link. Enter the docket number excluding               Notice of Availability
                                               inlet structure to the penstock; (4) a 3-               the last three digits in the docket
                                                                                                       number field to access the document.                  AGENCY: Environmental Protection
                                               foot-diameter, 350-foot-long steel                                                                            Agency (EPA).
                                               penstock; (5) a 266-square-foot concrete                For assistance, contact FERC Online
                                                                                                       Support. Copies are also available for                ACTION: Notice.
                                               powerhouse containing two Kaplan
                                               turbines and generating units with a                    inspection and reproduction at the
                                                                                                       address in item h above.                              SUMMARY:   EPA is announcing the
                                               licensed capacity of 100 kW; (6) a 300-                                                                       availability of and seeking public
                                               foot-long, 12-kilovolt (kV) transmission                   All filings must (1) bear in all capital
                                                                                                                                                             comment on the draft Risk Evaluation
                                               line; and (7) appurtenant facilities.                   letters the title COMMENTS, REPLY
                                                                                                                                                             for Colour Index (C. I.) Pigment Violet
                                               Mason’s Development generates when                      COMMENTS, RECOMMENDATIONS,
                                                                                                                                                             29 (PV29) and associated documents
                                               flows in excess of 5 cfs are available and              TERMS AND CONDITIONS, or
                                                                                                                                                             developed under EPA’s existing
                                               when an operator is present.                            PRESCRIPTIONS; (2) set forth in the
                                                                                                                                                             chemical substance process under the
                                                                                                       heading the name of the applicant and
                                               Kelly Dam                                                                                                     Toxic Substances Control Act (TSCA).
                                                                                                       the project number of the application to
                                                                                                                                                             The purpose of the risk evaluation is to
                                                 (1) A 15-foot-high, 135-foot-long                     which the filing responds; (3) furnish
                                                                                                                                                             determine whether a chemical
                                               masonry gravity dam impounding a                        the name, address, and telephone
                                                                                                                                                             substance presents an unreasonable risk
                                               reservoir with a storage capacity of                    number of the person submitting the
                                                                                                                                                             to health or the environment under the
                                               approximately 200 acre-feet at an                       filing; and (4) otherwise comply with
                                                                                                                                                             conditions of use, including an
                                               elevation of approximately 159 feet                     the requirements of 18 CFR 385.2001
                                                                                                                                                             unreasonable risk to a relevant
                                               above sea level; and (2) three 3-foot-                  through 385.2005. All comments,
                                                                                                                                                             potentially exposed or susceptible
                                               high, 2.5-foot-wide manually operated                   recommendations, terms and conditions
                                                                                                                                                             subpopulation. EPA is also submitting
                                               butterfly gates.                                        or prescriptions must set forth their
                                                                                                                                                             these same documents to the TSCA
                                                                                                       evidentiary basis and otherwise comply
                                               Mill Dam                                                                                                      Science Advisory Committee on
                                                                                                       with the requirements of 18 CFR 4.34(b).
                                                                                                                                                             Chemicals (SACC) which will peer
                                                  (1) A 6-foot-tall, 70-foot-wide masonry              Agencies may obtain copies of the
                                                                                                                                                             review the draft risk evaluation, and
                                               dam impounding a reservoir with a                       applications directly from the applicant.
                                                                                                                                                             EPA will provide the peer review
                                               storage capacity of approximately 7                     Each filing must be accompanied by
                                                                                                                                                             meeting details in a separate Federal
                                               acre-feet at an elevation of                            proof of service on all persons listed on
                                                                                                                                                             Register notice. All comments
                                               approximately 128 feet above sea level;                 the service list prepared by the
                                                                                                                                                             submitted on the draft risk evaluation in
                                               (2) a concrete inlet structure; (3) a trash             Commission in this proceeding, in
                                                                                                                                                             response to this Notice of Availability
                                               sluice with wooden stop logs; (4) a                     accordance with 18 CFR 4.34(b), and
                                                                                                                                                             will be provided to the TSCA SACC
                                               powerhouse containing a Francis-type                    385.2010.
                                                                                                                                                             peer review panel, which will have the
                                               turbine and generator unit with a                          You may also register online at http://
                                                                                                                                                             opportunity to consider the comments
                                               licensed capacity of 75 kW; (5) a 60-                   www.ferc.gov/docs-filing/
                                                                                                                                                             during its discussions. In addition, the
                                               foot-wide concrete spillway; and (6) an                 esubscription.asp to be notified via
                                                                                                                                                             subsequent Federal Register notice
                                               approximately 100-foot-long, 12-kV                      email of new filings and issuances
                                                                                                                                                             providing details on the peer review
                                               transmission line. The penstock used to                 related to this or other pending projects.
                                                                                                                                                             meeting will explain the process for
                                               deliver water to the powerhouse has                     For assistance, contact FERC Online
                                                                                                                                                             submitting information and views to the
                                               been removed due to deterioration and                   Support.
                                                                                                                                                             peer review panel. EPA will consider
                                               subsequent leakage; thus, the                              n. A license applicant must file no                the public comments on the draft risk
                                               powerhouse is not operating.                            later than 60 days following the date of              evaluation submitted in response to this
                                                                                                       issuance of this notice: (1) A copy of the            Notice of Availability, along with peer
                                               CMP Dam                                                 water quality certification; (2) a copy of            reviewer comments and
                                                  (1) A 21-foot-high, 231-foot-long                    the request for certification, including              recommendations, to finalize the risk
                                               buttress dam impounding a reservoir                     proof of the date on which the certifying             evaluation.
                                               with a storage capacity of approximately                agency received the request; or (3)
                                               72 acre-feet at an elevation of                         evidence of waiver of water quality                   DATES:  Comments must be received on
                                               approximately 109 feet above sea level;                 certification.                                        or before January 14, 2019.
                                               (2) a manually operated low-level water                    o. Procedural schedule: The                        ADDRESSES: Submit your written
                                               release lift gate; (3) a manually operated              applications will be processed                        comments, identified by docket
                                               lift gate regulating flow to the penstock;              according to the following schedule.                  identification (ID) number EPA–HQ–
                                               (4) a 5-foot-diameter, 1,200-foot-long                  Revisions to the schedule will be made                OPPT–2018–0604, by one of the
                                               steel penstock; (5) a 300-square-foot                   as appropriate.                                       following methods:
                                               concrete and timber powerhouse with a                                                                           • Federal eRulemaking Portal: http://
khammond on DSK30JT082PROD with NOTICES




                                                                                                       Commission issues EA—June 2019
                                               Kaplan-type turbine and generator unit                  Comments on EA due—July 2019                          www.regulations.gov. Follow the online
                                               with a licensed capacity of 200 kW; (6)                                                                       instructions for submitting comments.
                                               a 42-foot-long spillway; and (7) an                       Dated: November 8, 2018.                            Do not submit electronically any
                                               approximately 500-foot-long, 12-kV                      Kimberly D. Bose,                                     information you consider to be
                                               transmission line. The penstock used to                 Secretary.                                            Confidential Business Information (CBI)
                                               deliver water to the powerhouse is                      [FR Doc. 2018–24886 Filed 11–14–18; 8:45 am]          or other information whose disclosure is
                                               currently out of service due to damage,                 BILLING CODE 6717–01–P                                restricted by statute.


                                          VerDate Sep<11>2014   16:53 Nov 14, 2018   Jkt 247001   PO 00000   Frm 00075   Fmt 4703   Sfmt 4703   E:\FR\FM\15NON1.SGM   15NON1



Document Created: 2018-11-15 04:00:33
Document Modified: 2018-11-15 04:00:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 57472 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR