83_FR_58465 83 FR 58242 - Marine Renewable Energy Collaborative of New England; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a Hydrokinetic Pilot Project License Application, and Soliciting Comments

83 FR 58242 - Marine Renewable Energy Collaborative of New England; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a Hydrokinetic Pilot Project License Application, and Soliciting Comments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 223 (November 19, 2018)

Page Range58242-58242
FR Document2018-25175

Federal Register, Volume 83 Issue 223 (Monday, November 19, 2018)
[Federal Register Volume 83, Number 223 (Monday, November 19, 2018)]
[Notices]
[Page 58242]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25175]



[[Page 58242]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14775-001]


Marine Renewable Energy Collaborative of New England; Notice of 
Intent To File License Application, Filing of Draft Application, 
Request for Waivers of Integrated Licensing Process Regulations 
Necessary for Expedited Processing of a Hydrokinetic Pilot Project 
License Application, and Soliciting Comments

    a. Type of Filing: Notice of Intent to File a License Application 
for an Original License for a Hydrokinetic Pilot Project.
    b. Project No.: 14775-001.
    c. Date Filed: November 6, 2018.
    d. Submitted By: Marine Renewable Energy Collaborative of New 
England (MRECo).
    e. Name of Project: Bourne Tidal Test Site.
    f. Location: On the Cape Cod Canal near the Town of Bourne, in 
Barnstable County, MA.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Applicant Contact: John Miller, Director, Marine Renewable 
Energy Collaborative of New England, P.O. Box 479, Marion, MA 02738; 
(508) 728-5825.
    i. FERC Contact: John Ramer at (202) 502-8969 or email at 
[email protected].
    j. MRECo has filed the following pre-filing materials with the 
Commission: (1) A notice of intent (NOI) to file an application for an 
original license for a hydrokinetic pilot project and a draft license 
application with monitoring plans; (2) a request for waivers of the 
integrated licensing process regulations necessary for expedited 
processing of a hydrokinetic pilot project license application; (3) a 
proposed process plan and schedule; (4) a request to be designated as 
the non-federal representative for section 7 of the Endangered Species 
Act (ESA) consultation; and (5) a request to be designated as the non-
federal representative for section 106 consultation under the National 
Historic Preservation Act.
    k. With this notice, we are soliciting comments on the pre-filing 
materials listed in paragraph j above, including the draft license 
application and monitoring plans. All comments should also be sent to 
the address above in paragraph h. In addition, all comments may be 
filed electronically via the internet. See 18 CFR 385.2001(a)(1)(iii) 
and the instructions on the Commission's website http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. Although the Commission strongly encourages electronic 
filing, documents may also be paper-filed. To paper-file, mail an 
original and seven copies to: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426. Any individual or entity interested in submitting comments on 
the pre-filing materials must do so by December 20, 2018.
    l. With this notice, we are approving MRECo's request to be 
designated as the non-federal representative for section 7 of the ESA 
and its request to initiate consultation under section 106 of the 
National Historic Preservation Act; and recommending that it begin 
informal consultation with: (a) The U.S. Fish and Wildlife Service and 
the National Marine Fisheries Service as required by section 7 of ESA; 
and (b) the Massachusetts State Historic Preservation Officer, as 
required by section 106, National Historical Preservation Act, and the 
implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    m. With this notice, we are also asking federal, state, local, and 
tribal agencies with jurisdiction and/or expertise with respect to 
environmental issues to cooperate with us in the preparation of the 
environmental document. Agencies who would like to request cooperating 
status should follow the instructions for filing comments described in 
paragraph ``k'' above.
    n. This notice does not constitute the Commission's approval of 
MRECo's request to use the Pilot Project Licensing Procedures. Upon its 
review of the project's overall characteristics relative to the pilot 
project criteria, the draft license application contents, and any 
comments filed, the Commission will determine whether there is adequate 
information to conclude the pre-filing process.
    o. The proposed Bourne Tidal Test Site Project would consist of: 
(1) An existing turbine support platform mounted on two primary pilings 
that are spaced approximately 23 feet apart and embedded to a depth of 
50 feet below the seabed, and that rise approximately 45-feet above the 
seabed; (2) a proposed horizontal, axial, open-bladed turbine having a 
3-meter-diameter sweep area and an installed capacity of 100 kilowatts 
(other in-stream turbine-generators would also be tested at the site); 
(3) two proposed 500-foot-long, 13.2kilovolt transmission lines 
connecting the project turbine to a battery storage cabinet and to an 
interconnection with the regional grid; and (4) appurtenant facilities. 
The hydrokinetic project would have an estimated average annual 
generation of 100-megawatt hours.
    p. A copy of the draft license application and all pre-filing 
materials are available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's website (http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket number (P-
14775), excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected] or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659.
    q. Pre-filing process schedule. The pre-filing process will be 
conducted pursuant to the following tentative schedule. Revisions to 
the schedule below may be made based on staff's review of the draft 
application and any comments received.

------------------------------------------------------------------------
              Milestone                              Date
------------------------------------------------------------------------
Comments on pre-filing materials due  December 20, 2018.
Issuance of meeting notice (if        January 5, 2019.
 needed).
Public meeting/technical conference   February 5, 2019.
 (if needed).
------------------------------------------------------------------------

    r. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: November 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25175 Filed 11-16-18; 8:45 am]
BILLING CODE 6717-01-P



                                               58242                      Federal Register / Vol. 83, No. 223 / Monday, November 19, 2018 / Notices

                                               DEPARTMENT OF ENERGY                                    may be filed electronically via the                   mounted on two primary pilings that are
                                                                                                       internet. See 18 CFR 385.2001(a)(1)(iii)              spaced approximately 23 feet apart and
                                               Federal Energy Regulatory                               and the instructions on the                           embedded to a depth of 50 feet below
                                               Commission                                              Commission’s website http://                          the seabed, and that rise approximately
                                                                                                       www.ferc.gov/docs-filing/efiling.asp.                 45-feet above the seabed; (2) a proposed
                                               [Project No. 14775–001]
                                                                                                       Commenters can submit brief comments                  horizontal, axial, open-bladed turbine
                                               Marine Renewable Energy                                 up to 6,000 characters, without prior                 having a 3-meter-diameter sweep area
                                               Collaborative of New England; Notice                    registration, using the eComment system               and an installed capacity of 100
                                               of Intent To File License Application,                  at http://www.ferc.gov/docs-filing/                   kilowatts (other in-stream turbine-
                                               Filing of Draft Application, Request for                ecomment.asp. You must include your                   generators would also be tested at the
                                               Waivers of Integrated Licensing                         name and contact information at the end
                                                                                                                                                             site); (3) two proposed 500-foot-long,
                                               Process Regulations Necessary for                       of your comments. For assistance,
                                                                                                                                                             13.2kilovolt transmission lines
                                               Expedited Processing of a                               please contact FERC Online Support at
                                                                                                       FERCOnlineSupport@ferc.gov or toll                    connecting the project turbine to a
                                               Hydrokinetic Pilot Project License                                                                            battery storage cabinet and to an
                                               Application, and Soliciting Comments                    free at 1–866–208–3676, or for TTY,
                                                                                                       (202) 502–8659. Although the                          interconnection with the regional grid;
                                                  a. Type of Filing: Notice of Intent to               Commission strongly encourages                        and (4) appurtenant facilities. The
                                               File a License Application for an                       electronic filing, documents may also be              hydrokinetic project would have an
                                               Original License for a Hydrokinetic Pilot               paper-filed. To paper-file, mail an                   estimated average annual generation of
                                               Project.                                                original and seven copies to: Kimberly                100-megawatt hours.
                                                  b. Project No.: 14775–001.                           D. Bose, Secretary, Federal Energy                       p. A copy of the draft license
                                                  c. Date Filed: November 6, 2018.                     Regulatory Commission, 888 First Street               application and all pre-filing materials
                                                  d. Submitted By: Marine Renewable                    NE, Washington, DC 20426. Any                         are available for review at the
                                               Energy Collaborative of New England                     individual or entity interested in                    Commission in the Public Reference
                                               (MRECo).                                                submitting comments on the pre-filing
                                                                                                                                                             Room or may be viewed on the
                                                  e. Name of Project: Bourne Tidal Test                materials must do so by December 20,
                                                                                                       2018.                                                 Commission’s website (http://
                                               Site.                                                                                                         www.ferc.gov), using the ‘‘eLibrary’’
                                                                                                          l. With this notice, we are approving
                                                  f. Location: On the Cape Cod Canal                                                                         link. Enter the docket number (P–
                                                                                                       MRECo’s request to be designated as the
                                               near the Town of Bourne, in Barnstable                                                                        14775), excluding the last three digits in
                                                                                                       non-federal representative for section 7
                                               County, MA.                                                                                                   the docket number field to access the
                                                                                                       of the ESA and its request to initiate
                                                  g. Filed Pursuant to: 18 CFR 5.3 of the              consultation under section 106 of the                 document. For assistance, contact FERC
                                               Commission’s regulations.                               National Historic Preservation Act; and               Online Support at
                                                  h. Applicant Contact: John Miller,                   recommending that it begin informal                   FERCONlineSupport@ferc.gov or toll
                                               Director, Marine Renewable Energy                       consultation with: (a) The U.S. Fish and              free at 1–866–208–3676, or for TTY,
                                               Collaborative of New England, P.O. Box                  Wildlife Service and the National                     (202) 502–8659.
                                               479, Marion, MA 02738; (508) 728–                       Marine Fisheries Service as required by
                                               5825.                                                                                                           q. Pre-filing process schedule. The
                                                                                                       section 7 of ESA; and (b) the
                                                  i. FERC Contact: John Ramer at (202)                                                                       pre-filing process will be conducted
                                                                                                       Massachusetts State Historic
                                               502–8969 or email at john.ramer@                                                                              pursuant to the following tentative
                                                                                                       Preservation Officer, as required by
                                               ferc.gov.                                               section 106, National Historical                      schedule. Revisions to the schedule
                                                  j. MRECo has filed the following pre-                Preservation Act, and the implementing                below may be made based on staff’s
                                               filing materials with the Commission:                   regulations of the Advisory Council on                review of the draft application and any
                                               (1) A notice of intent (NOI) to file an                 Historic Preservation at 36 CFR 800.2.                comments received.
                                               application for an original license for a                  m. With this notice, we are also
                                               hydrokinetic pilot project and a draft                  asking federal, state, local, and tribal                       Milestone                Date
                                               license application with monitoring                     agencies with jurisdiction and/or
                                                                                                                                                             Comments on pre-fil-     December 20, 2018.
                                               plans; (2) a request for waivers of the                 expertise with respect to environmental                 ing materials due.
                                               integrated licensing process regulations                issues to cooperate with us in the                    Issuance of meeting      January 5, 2019.
                                               necessary for expedited processing of a                 preparation of the environmental                        notice (if needed).
                                               hydrokinetic pilot project license                      document. Agencies who would like to                  Public meeting/tech-     February 5, 2019.
                                               application; (3) a proposed process plan                request cooperating status should follow                nical conference (if
                                               and schedule; (4) a request to be                       the instructions for filing comments                    needed).
                                               designated as the non-federal                           described in paragraph ‘‘k’’ above.
                                               representative for section 7 of the                        n. This notice does not constitute the               r. Register online at http://
                                               Endangered Species Act (ESA)                            Commission’s approval of MRECo’s
                                                                                                                                                             www.ferc.gov/docs-filing/
                                               consultation; and (5) a request to be                   request to use the Pilot Project Licensing
                                                                                                                                                             esubscription.asp to be notified via
                                               designated as the non-federal                           Procedures. Upon its review of the
                                               representative for section 106                                                                                email of new filing and issuances
                                                                                                       project’s overall characteristics relative
                                               consultation under the National Historic                to the pilot project criteria, the draft              related to this or other pending projects.
                                               Preservation Act.                                       license application contents, and any                 For assistance, contact FERC Online
khammond on DSK30JT082PROD with NOTICES




                                                  k. With this notice, we are soliciting               comments filed, the Commission will                   Support.
                                               comments on the pre-filing materials                    determine whether there is adequate                     Dated: November 13, 2018.
                                               listed in paragraph j above, including                  information to conclude the pre-filing                Kimberly D. Bose,
                                               the draft license application and                       process.                                              Secretary.
                                               monitoring plans. All comments should                      o. The proposed Bourne Tidal Test
                                                                                                                                                             [FR Doc. 2018–25175 Filed 11–16–18; 8:45 am]
                                               also be sent to the address above in                    Site Project would consist of: (1) An
                                                                                                                                                             BILLING CODE 6717–01–P
                                               paragraph h. In addition, all comments                  existing turbine support platform


                                          VerDate Sep<11>2014   17:20 Nov 16, 2018   Jkt 247001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\19NON1.SGM    19NON1



Document Created: 2018-11-17 02:47:08
Document Modified: 2018-11-17 02:47:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 58242 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR