83_FR_60645 83 FR 60418 - Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions: Erie Boulevard Hydropower, L.P.

83 FR 60418 - Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions: Erie Boulevard Hydropower, L.P.

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 227 (November 26, 2018)

Page Range60418-60419
FR Document2018-25580

Federal Register, Volume 83 Issue 227 (Monday, November 26, 2018)
[Federal Register Volume 83, Number 227 (Monday, November 26, 2018)]
[Notices]
[Pages 60418-60419]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25580]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2837-033]


Notice of Application Ready for Environmental Analysis and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions: Erie Boulevard Hydropower, L.P.

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2837-033.
    c. Date filed: March 29, 2018.
    d. Applicant: Erie Boulevard Hydropower, L.P. (Erie).
    e. Name of Project: Granby Hydroelectric Project.
    f. Location: On the Oswego River in the town of Fulton in Oswego 
County, New York. The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Steven P. Murphy, Director, U.S. Licensing, 
Erie Boulevard Hydropower, L.P., 33 West 1st Street South, Fulton, NY 
13069; (315) 598-6130.
    i. FERC Contact: Allyson Conner, (202) 502-6082 or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2837-033.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, and is ready for 
environmental analysis at this time.
    l. The existing Granby Hydroelectric Project (Granby Project) 
consists of: (1) An 88-foot-wide reinforced concrete intake structure 
that includes two bays containing trashracks and fixed-roller, 
vertical-lift type gates; (2) a 17-foot-wide sluice opening adjacent to 
the intake structure; (3) a 112-foot-long, 88-foot-wide powerhouse 
containing two 5.04-megawatt (MW) turbine-generator units, with a total 
capacity of 10.08 MW; (4) a 3,000-foot-long, 100-foot-wide tailrace; 
(5) two 4.16-kilovolt, 120-foot-long underground generator leads; (6) a 
60-foot-long by 48-foot-wide electrical switchyard; and (7) appurtenant 
facilities.
    The Granby Project is operated in a modified run-of-river mode. The 
Granby Project and the Fulton Development at Erie's Oswego River 
Hydroelectric Project (FERC Project No. 2474) are located at opposite 
ends of the same dam and share a single bypassed reach and reservoir. 
The flow and impoundment elevation requirements in the Oswego Project 
license,\1\ which were based on a 2004 Offer of Settlement, affect the 
Granby Project. The average annual generation at the Granby Project is 
estimated to be 44,181 megawatt-hours.
---------------------------------------------------------------------------

    \1\ 109 FERC ] 62, 141 (2004).
---------------------------------------------------------------------------

    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the

[[Page 60419]]

filing; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions, or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. Each 
filing must be accompanied by proof of service on all persons listed on 
the service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                Milestone                           Target date
------------------------------------------------------------------------
Deadline for Filing Comments,              January 2019.
 Recommendations and Agency Terms and
 Conditions/Prescriptions.
Deadline for Filing Reply Comments.......  March 2019.
Commission issues EA.....................  July 2019.
Comments on EA Due.......................  August 2019.
------------------------------------------------------------------------


    Dated: November 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25580 Filed 11-23-18; 8:45 am]
 BILLING CODE 6717-01-P



     60418                      Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices

     filed, but only those who file a motion                 DEPARTMENT OF ENERGY                                  that document on each person on the
     to intervene in accordance with the                                                                           official service list for the project.
     Commission’s Rules may become a                         Federal Energy Regulatory                             Further, if an intervenor files comments
     party to the proceeding. Any comments,                  Commission                                            or documents with the Commission
     protests, or motions to intervene must                  [Project No. 2837–033]                                relating to the merits of an issue that
     be received on or before the specified                                                                        may affect the responsibilities of a
     comment date for the particular                         Notice of Application Ready for                       particular resource agency, they must
     application.                                            Environmental Analysis and Soliciting                 also serve a copy of the document on
                                                             Comments, Recommendations, Terms                      that resource agency.
        n. Filing and Service of Responsive                                                                           k. This application has been accepted,
                                                             and Conditions, and Prescriptions:
     Documents: Any filing must (1) bear in                                                                        and is ready for environmental analysis
                                                             Erie Boulevard Hydropower, L.P.
     all capital letters the title                                                                                 at this time.
     ‘‘COMMENTS’’, ‘‘PROTEST’’, or                              Take notice that the following                        l. The existing Granby Hydroelectric
     ‘‘MOTION TO INTERVENE’’ as                              hydroelectric application has been filed              Project (Granby Project) consists of: (1)
     applicable; (2) set forth in the heading                with the Commission and is available                  An 88-foot-wide reinforced concrete
     the name of the applicant and the                       for public inspection.                                intake structure that includes two bays
     project number of the application to                       a. Type of Application: New Major                  containing trashracks and fixed-roller,
     which the filing responds; (3) furnish                  License.                                              vertical-lift type gates; (2) a 17-foot-wide
     the name, address, and telephone                           b. Project No.: 2837–033.                          sluice opening adjacent to the intake
     number of the person protesting or                         c. Date filed: March 29, 2018.                     structure; (3) a 112-foot-long, 88-foot-
                                                                d. Applicant: Erie Boulevard                       wide powerhouse containing two 5.04-
     intervening; and (4) otherwise comply
                                                             Hydropower, L.P. (Erie).                              megawatt (MW) turbine-generator units,
     with the requirements of 18 CFR                            e. Name of Project: Granby                         with a total capacity of 10.08 MW; (4)
     385.2001 through 385.2005. All                          Hydroelectric Project.                                a 3,000-foot-long, 100-foot-wide tailrace;
     comments, motions to intervene, or                         f. Location: On the Oswego River in                (5) two 4.16-kilovolt, 120-foot-long
     protests must set forth their evidentiary               the town of Fulton in Oswego County,                  underground generator leads; (6) a 60-
     basis and otherwise comply with the                     New York. The project does not affect                 foot-long by 48-foot-wide electrical
     requirements of 18 CFR 4.34(b). All                     federal lands.                                        switchyard; and (7) appurtenant
     comments, motions to intervene, or                         g. Filed Pursuant to: Federal Power                facilities.
     protests should relate to the request to                Act, 16 U.S.C. 791 (a)–825(r).                           The Granby Project is operated in a
     extend the license term. Agencies may                      h. Applicant Contact: Steven P.                    modified run-of-river mode. The Granby
     obtain copies of the application directly               Murphy, Director, U.S. Licensing, Erie                Project and the Fulton Development at
     from the applicant. A copy of any                       Boulevard Hydropower, L.P., 33 West                   Erie’s Oswego River Hydroelectric
     protest or motion to intervene must be                  1st Street South, Fulton, NY 13069;                   Project (FERC Project No. 2474) are
     served upon each representative of the                  (315) 598–6130.                                       located at opposite ends of the same
     applicant specified in the particular                      i. FERC Contact: Allyson Conner,                   dam and share a single bypassed reach
     application. If an intervener files                     (202) 502–6082 or allyson.conner@                     and reservoir. The flow and
     comments or documents with the                          ferc.gov.                                             impoundment elevation requirements in
                                                                j. Deadline for filing comments,                   the Oswego Project license,1 which were
     Commission relating to the merits of an
                                                             recommendations, terms and                            based on a 2004 Offer of Settlement,
     issue that may affect the responsibilities
                                                             conditions, and prescriptions: 60 days                affect the Granby Project. The average
     of a particular resource agency, they
                                                             from the issuance date of this notice;                annual generation at the Granby Project
     must also serve a copy of the document                  reply comments are due 105 days from                  is estimated to be 44,181 megawatt-
     on that resource agency. A copy of all                  the issuance date of this notice.                     hours.
     other filings in reference to this                         The Commission strongly encourages                    m. A copy of the application is
     application must be accompanied by                      electronic filing. Please file comments,              available for review at the Commission
     proof of service on all persons listed in               recommendations, terms and                            in the Public Reference Room or may be
     the service list prepared by the                        conditions, and prescriptions using the               viewed on the Commission’s website at
     Commission in this proceeding, in                       Commission’s eFiling system at http://                http://www.ferc.gov using the
     accordance with 18 CFR 4.34(b) and                      www.ferc.gov/docs-filing/efiling.asp.                 ‘‘eLibrary’’ link. Enter the docket
     385.2010.                                               Commenters can submit brief comments                  number excluding the last three digits in
       Dated: November 19, 2018.                             up to 6,000 characters, without prior                 the docket number field to access the
                                                             registration, using the eComment system               document. For assistance, contact FERC
     Kimberly D. Bose,
                                                             at http://www.ferc.gov/docs-filing/                   Online Support. A copy is also available
     Secretary.                                              ecomment.asp. You must include your                   for inspection and reproduction at the
     [FR Doc. 2018–25638 Filed 11–23–18; 8:45 am]            name and contact information at the end               address in item h above.
     BILLING CODE 6717–01–P                                  of your comments. For assistance,                        All filings must (1) bear in all capital
                                                             please contact FERC Online Support at                 letters the title ‘‘COMMENTS,’’ ‘‘REPLY
                                                             FERCOnlineSupport@ferc.gov, (866)                     COMMENTS,’’
                                                             208–3676 (toll free), or (202) 502–8659               ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
                                                             (TTY). In lieu of electronic filing, please           AND CONDITIONS,’’ or
                                                             send a paper copy to: Secretary, Federal              ‘‘PRESCRIPTIONS;’’ (2) set forth in the
                                                             Energy Regulatory Commission, 888                     heading the name of the applicant and
                                                             First Street NE, Washington, DC 20426.                the project number of the application to
                                                             The first page of any filing should                   which the filing responds; (3) furnish
                                                             include docket number P–2837–033.                     the name, address, and telephone
                                                                The Commission’s Rules of Practice                 number of the person submitting the
                                                             require all intervenors filing documents
                                                             with the Commission to serve a copy of                  1 109   FERC ¶ 62, 141 (2004).



VerDate Sep<11>2014   17:28 Nov 23, 2018   Jkt 247001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\26NON1.SGM     26NON1


                                Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices                                                 60419

     filing; and (4) otherwise comply with                   Federal Energy Regulatory                             Commission’s Public Reference Room in
     the requirements of 18 CFR 385.2001                     Commission’s (Commission) Rules of                    Washington, DC. There is an
     through 385.2005. All comments,                         Practice and Procedure, 18 CFR                        eSubscription link on the website that
     recommendations, terms and                              385.207(a)(2), Southern Company                       enables subscribers to receive email
     conditions, or prescriptions must set                   Services, Inc., acting as agent for                   notification when a document is added
     forth their evidentiary basis and                       Alabama Power Company, Georgia                        to a subscribed docket(s). For assistance
     otherwise comply with the requirements                  Power Company, Gulf Power Company,                    with any FERC Online service, please
     of 18 CFR 4.34(b). Agencies may obtain                  and Mississippi Power Company                         email FERCOnlineSupport@ferc.gov.or
     copies of the application directly from                 (collectively, Southern Companies),                   call (866) 208–3676 (toll free). For TTY,
     the applicant. Each filing must be                      submitted an amendment to its petition                call (202) 502–8659.
     accompanied by proof of service on all                  for declaratory order and request to hold               Comment Date: 5:00 p.m. Eastern time
     persons listed on the service list                      proceedings in abeyance, filed on                     on December 6, 2018.
     prepared by the Commission in this                      November 28, 2017. In the amendment,                    Dated: November 16, 2018.
     proceeding, in accordance with 18 CFR                   Southern Companies requests that the
                                                                                                                   Kimberly D. Bose,
     4.34(b) and 385.2010.                                   Commission lift the abeyance in this
                                                             proceeding and seeks declarations that:               Secretary.
        You may also register online at http://
                                                             (1) Those certain audit                               [FR Doc. 2018–25583 Filed 11–23–18; 8:45 am]
     www.ferc.gov/docs-filing/
     esubscription.asp to be notified via                    recommendations be set aside, and (2)                 BILLING CODE 6717–01–P

     email of new filings and issuances                      Southern Companies’ formula rate in its
     related to this or other pending projects.              Open Access Transmission Tariff
                                                             provide the requisite flexibility to make             DEPARTMENT OF ENERGY
     For assistance, contact FERC Online
     Support.                                                the ratemaking adjustment necessary to
                                                             allow Southern Companies to avoid                     Federal Energy Regulatory
        n. A license applicant must file no                                                                        Commission
     later than 60 days following the date of                normalization violation, as more fully
     issuance of this notice: (1) A copy of the              explained in the amended petition for                 [Docket No. NJ19–2–000]
     water quality certification; (2) a copy of              declaratory order.
     the request for certification, including                   Any person desiring to intervene or to             Oncor Electric Delivery Company LLC;
     proof of the date on which the certifying               protest in this proceeding must file in               Notice of Filing
     agency received the request; or (3)                     accordance with Rules 211 and 214 of
                                                             the Commission’s Rules of Practice and                   Take notice that on November 7,
     evidence of waiver of water quality                                                                           2018, Oncor Electric Delivery Company
     certification.                                          Procedure (18 CFR 385.211 and
                                                             385.214) on or before 5:00 p.m. Eastern               LLC submitted its tariff filing: Oncor
        o. Procedural schedule: The                                                                                Tex-La Tariff Rate Changes to be
     application will be processed according                 time on the specified comment date.
                                                             Protests will be considered by the                    effective 10/10/2018.
     to the following schedule. Revisions to                                                                          Any person desiring to intervene or to
     the schedule will be made as                            Commission in determining the
                                                             appropriate action to be taken, but will              protest this filing must file in
     appropriate.                                                                                                  accordance with Rules 211 and 214 of
                                                             not serve to make protestants parties to
                                                             the proceeding. Any person wishing to                 the Commission’s Rules of Practice and
                Milestone                   Target date                                                            Procedure (18 CFR 385.211, 385.214).
                                                             become a party must file a notice of
     Deadline for Filing Com-              January 2019.     intervention or motion to intervene, as               Protests will be considered by the
       ments, Recommendations                                appropriate. Such notices, motions, or                Commission in determining the
       and Agency Terms and                                  protests must be filed on or before the               appropriate action to be taken, but will
       Conditions/Prescriptions.                             comment date. Anyone filing a motion                  not serve to make protestants parties to
     Deadline for Filing Reply             March 2019.       to intervene or protest must serve a copy             the proceeding. Any person wishing to
       Comments.                                             of that document on the Petitioners.                  become a party must file a notice of
     Commission issues EA .........        July 2019.           The Commission encourages                          intervention or motion to intervene, as
     Comments on EA Due ..........         August 2019.                                                            appropriate. Such notices, motions, or
                                                             electronic submission of protests and
                                                             interventions in lieu of paper, using the             protests must be filed on or before the
       Dated: November 16, 2018.                             FERC Online links at http://                          comment date. On or before the
     Kimberly D. Bose,                                       www.ferc.gov. To facilitate electronic                comment date, it is not necessary to
     Secretary.                                              service, persons with internet access                 serve motions to intervene or protests
     [FR Doc. 2018–25580 Filed 11–23–18; 8:45 am]            who will eFile a document and/or be                   on persons other than the Applicant.
     BILLING CODE 6717–01–P                                  listed as a contact for an intervenor                    The Commission encourages
                                                             must create and validate an                           electronic submission of protests and
                                                             eRegistration account using the                       interventions in lieu of paper using the
     DEPARTMENT OF ENERGY                                    eRegistration link. Select the eFiling                ‘‘eFiling’’ link at http://www.ferc.gov.
                                                             link to log on and submit the                         Persons unable to file electronically
     Federal Energy Regulatory                               intervention or protests.                             should submit an original and 5 copies
     Commission                                                 Persons unable to file electronically              of the protest or intervention to the
                                                             should submit an original and 5 copies                Federal Energy Regulatory Commission,
     [Docket No. EL18–43–000]
                                                             of the intervention or protest to the                 888 First Street NE, Washington, DC
     Alabama Power Company, Georgia                          Federal Energy Regulatory Commission,                 20426.
     Power Company, Gulf Power                               888 First Street NE, Washington, DC                      This filing is accessible on-line at
     Company, Mississippi Power                              20426.                                                http://www.ferc.gov, using the
     Company; Notice of Amended Petition                        The filings in the above proceeding                ‘‘eLibrary’’ link and is available for
     for Declaratory Order                                   are accessible in the Commission’s                    review in the Commission’s Public
                                                             eLibrary system by clicking on the                    Reference Room in Washington, DC.
       Take notice that on November 15,                      appropriate link in the above list. They              There is an ‘‘eSubscription’’ link on the
     2018, pursuant to Rule 207(a)(2) of the                 are also available for review in the                  website that enables subscribers to


VerDate Sep<11>2014   17:28 Nov 23, 2018   Jkt 247001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\26NON1.SGM   26NON1



Document Created: 2018-11-24 00:51:07
Document Modified: 2018-11-24 00:51:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 60418 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR