83_FR_61384 83 FR 61155 - Combined Notice of Filings

83 FR 61155 - Combined Notice of Filings

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 229 (November 28, 2018)

Page Range61155-61155
FR Document2018-25924

Federal Register, Volume 83 Issue 229 (Wednesday, November 28, 2018)
[Federal Register Volume 83, Number 229 (Wednesday, November 28, 2018)]
[Notices]
[Page 61155]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25924]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP19-304-000.
    Applicants: Alliance Pipeline L.P.
    Description: Sec.  4(d) Rate Filing: APL Waiver and Future Default 
Filing to be effective 12/20/2018.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5083.
    Comments Due: 5 p.m. ET 12/3/18.

    Docket Numbers: RP19-305-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2018-11-20 BP 553076 
to be effective 11/21/2018.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5092.
    Comments Due: 5 p.m. ET 12/3/18.

    Docket Numbers: RP19-306-000.
    Applicants: Greylock Pipeline, LLC.
    Description: eTariff filing per 1430: 501 G filing.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5102.
    Comments Due: 5 p.m. ET 11/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-25924 Filed 11-27-18; 8:45 am]
 BILLING CODE 6717-01-P



                              Federal Register / Vol. 83, No. 229 / Wednesday, November 28, 2018 / Notices                                          61155

     888 First Street NE, Washington, DC                       Dated: November 21, 2018.                           Rochester Project
     20426.                                                  Nathaniel J. Davis, Sr.,                                • Approximately 12.6 miles of new
     Comment Date: December 12, 2018.                        Deputy Secretary.                                     16-inch-diameter pipeline in Olmsted
       Dated: November 21, 2018.                             [FR Doc. 2018–25924 Filed 11–27–18; 8:45 am]          County;
     Nathaniel J. Davis, Sr.,                                BILLING CODE 6717–01–P                                  • Increase of MAOP on an existing 8-
     Deputy Secretary.                                                                                             mile-long segment of 16-inch-diameter
     [FR Doc. 2018–25919 Filed 11–27–18; 8:45 am]
                                                                                                                   pipeline in Freeborn and Mower
                                                             DEPARTMENT OF ENERGY                                  Counties;
                                                                                                                     • A new town border station with
     BILLING CODE 6717–01–P

                                                             Federal Energy Regulatory                             receiver in Olmsted County;
     DEPARTMENT OF ENERGY                                    Commission                                              • Relocation of a regulator from
                                                                                                                   Freeborn to Mower County; and
     Federal Energy Regulatory                               [Docket No. CP18–534–000]                               • Appurtenant facilities including
     Commission                                                                                                    two valves and a pig launcher at
                                                             Notice of Availability of the                         milepost 0.0 of the Rochester Greenfield
     Combined Notice of Filings                              Environmental Assessment for the                      Lateral.
       Take notice that the Commission has                   Proposed Northern Natural Gas                         Northern Lights 2019 Project
     received the following Natural Gas                      Company Northern Lights 2019
                                                             Expansion and Rochester Projects                        • Approximately 10.0 miles of new
     Pipeline Rate and Refund Report filings:                                                                      24-inch-diameter pipeline in Hennepin
     Filings Instituting Proceedings                           The staff of the Federal Energy                     and Wright Counties;
                                                             Regulatory Commission (FERC or                          • Approximately 4.3 miles of new 8-
        Docket Numbers: RP19–304–000.                                                                              inch-diameter pipeline loop extension
        Applicants: Alliance Pipeline L.P.                   Commission) has prepared an
                                                             environmental assessment (EA) for the                 in Morrison County;
        Description: § 4(d) Rate Filing: APL                                                                         • Approximately 1.6 miles of new 6-
     Waiver and Future Default Filing to be                  Northern Lights 2019 Expansion Project
                                                             and the Rochester Project, proposed by                inch-diameter pipeline looping in Le
     effective 12/20/2018.                                                                                         Sueur County;
        Filed Date: 11/20/18.                                Northern Natural Gas Company
                                                             (Northern) in the above-referenced                      • Approximately 3.1 miles of new 24-
        Accession Number: 20181120–5083.                                                                           inch-diameter pipeline extension in
        Comments Due: 5 p.m. ET 12/3/18.                     docket. Considering both projects,
                                                                                                                   Carver County;
        Docket Numbers: RP19–305–000.                        Northern requests authorization to
                                                                                                                     • Aa new 11,153-horsepower (hp)
        Applicants: Rockies Express Pipeline                 construct, operate, and maintain new
                                                                                                                   compressor station in Carver County;
     LLC.                                                    natural gas facilities in Carver, Freeborn,
                                                                                                                     • Aan additional 15,900 hp of
        Description: § 4(d) Rate Filing: Neg                 Hennepin, Le Sueur, Morrison, Mower,
                                                                                                                   compression at the existing Faribault
     Rate 2018–11–20 BP 553076 to be                         Olmsted, Rice, Steele, and Wright
                                                                                                                   Compressor Station in Rice County;
     effective 11/21/2018.                                   Counties, Minnesota, and to uprate the                  • An additional 15,900 hp of
        Filed Date: 11/20/18.                                maximum allowable operating pressure                  compression at the existing Owatonna
        Accession Number: 20181120–5092.                     (MAOP) of a line segment. The projects                Compressor Station in Steele County;
        Comments Due: 5 p.m. ET 12/3/18.                     would allow Northern to provide                       and
        Docket Numbers: RP19–306–000.                        138,504 dekatherms per day of new firm                  • Appurtenant facilities including
        Applicants: Greylock Pipeline, LLC.                  natural gas transportation service to                 valves, pig launchers, and pig receivers.
        Description: eTariff filing per 1430:                serve increased markets for industrial,                 The Commission mailed a copy of the
     501 G filing.                                           commercial, and residential uses.                     Notice of Availability to federal, state,
        Filed Date: 11/20/18.                                  The EA assesses the potential                       and local government representatives
        Accession Number: 20181120–5102.                     environmental effects of the                          and agencies; elected officials;
        Comments Due: 5 p.m. ET 11/26/18.                    construction and operation of the                     environmental and public interest
        The filings are accessible in the                    Northern Lights 2019 Expansion Project                groups; Native American tribes;
     Commission’s eLibrary system by                         and the Rochester Project in accordance               potentially affected landowners and
     clicking on the links or querying the                   with the requirements of the National                 other interested individuals and groups;
     docket number.                                          Environmental Policy Act (NEPA). The                  and newspapers and libraries in the
        Any person desiring to intervene or                  FERC staff concludes that approval of                 project areas. The EA is only available
     protest in any of the above proceedings                 the proposed projects, with appropriate               in electronic format. It may be viewed
     must file in accordance with Rules 211                  mitigating measures, would not                        and downloaded from the FERC’s
     and 214 of the Commission’s                             constitute a major federal action                     website (www.ferc.gov), on the
     Regulations (18 CFR 385.211 and                         significantly affecting the quality of the            Environmental Documents page (https://
     385.214) on or before 5:00 p.m. Eastern                 human environment.                                    www.ferc.gov/industries/gas/enviro/
     time on the specified comment date.                                                                           eis.asp). In addition, the EA may be
     Protests may be considered, but                           The Minnesota Pollution Control                     accessed by using the eLibrary link on
     intervention is necessary to become a                   Agency participated as a cooperating                  the FERC’s website. Click on the
     party to the proceeding.                                agency in the preparation of the EA. A                eLibrary link (https://www.ferc.gov/
        eFiling is encouraged. More detailed                 cooperating agency has jurisdiction by                docs-filing/elibrary.asp), click on
     information relating to filing                          law or special expertise regarding                    General Search, and enter the docket
     requirements, interventions, protests,                  environmental impacts involved with                   number in the Docket Number field,
     service, and qualifying facilities filings              the proposal, and is involved in the                  excluding the last three digits (i.e.
     can be found at: http://www.ferc.gov/                   NEPA analysis.                                        CP18–534). Be sure you have selected
     docs-filing/efiling/filing-req.pdf. For                   The proposed projects includes the                  an appropriate date range. For
     other information, call (866) 208–3676                  following facilities (all located in                  assistance, please contact FERC Online
     (toll free). For TTY, call (202) 502–8659.              Minnesota):                                           Support at FercOnlineSupport@ferc.gov


VerDate Sep<11>2014   16:19 Nov 27, 2018   Jkt 247001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\28NON1.SGM   28NON1



Document Created: 2018-11-27 23:48:59
Document Modified: 2018-11-27 23:48:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates11/20/18.
FR Citation83 FR 61155 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR