83_FR_61855 83 FR 61624 - KEI (Maine) Power Management (II) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

83 FR 61624 - KEI (Maine) Power Management (II) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 231 (November 30, 2018)

Page Range61624-61624
FR Document2018-25986

Federal Register, Volume 83 Issue 231 (Friday, November 30, 2018)
[Federal Register Volume 83, Number 231 (Friday, November 30, 2018)]
[Notices]
[Page 61624]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25986]



[[Page 61624]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4202-024]


KEI (Maine) Power Management (II) LLC; Notice of Intent To File 
License Application, Filing of Pre-Application Document, and Approving 
Use of the Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 4202-024.
    c. Date Filed: September 26, 2018.
    d. Submitted By: KEI (Maine) Power Management (II) LLC (KEI Power).
    e. Name of Project: Lowell Tannery Hydroelectric Project.
    f. Location: On the Passadumkeag River, in Penobscot County, Maine. 
No federal lands are occupied by the project works or located within 
the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's 
regulations.
    h. Potential Applicant Contact: Lewis C. Loon, KEI (USA) Power 
Management Inc., 423 Brunswick Avenue, Gardiner, Maine 04345; (207) 
203-3027; [email protected].
    i. FERC Contact: Dr. Nicholas Palso at (202) 502-8854; or email at 
[email protected].
    j. KEI Power filed its request to use the Traditional Licensing 
Process on September 26, 2018. KEI Power provided public notice of its 
request on September 24, 2018. In a letter dated November 23, 2018, the 
Director of the Division of Hydropower Licensing approved KEI Power's 
request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the Maine State Historic Preservation Officer, as 
required by section 106 of the National Historic Preservation Act, and 
the implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. With this notice, we are designating KEI Power as the 
Commission's non-federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act and 
section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act; and consultation pursuant to section 106 of the 
National Historic Preservation Act.
    m. KEI Power filed a Pre-Application Document (PAD; including a 
proposed process plan and schedule) with the Commission, pursuant to 18 
CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a subsequent license for Project No. 4202. Pursuant to 
18 CFR 16.20, each application for a subsequent license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by September 
30, 2021.
    p. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: November 23, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25986 Filed 11-29-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              61624                       Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices

                                              DEPARTMENT OF ENERGY                                    Stevens Fishery Conservation and                      Commission. AGL requests a service
                                                                                                      Management Act; and consultation                      area determination with respect to its
                                              Federal Energy Regulatory                               pursuant to section 106 of the National               entire Georgia local distribution
                                              Commission                                              Historic Preservation Act.                            company (LDC) service area as well as
                                              [Project No. 4202–024]                                     m. KEI Power filed a Pre-Application               a few small geographic areas in
                                                                                                      Document (PAD; including a proposed                   Tennessee into which AGL’s mainline
                                              KEI (Maine) Power Management (II)                       process plan and schedule) with the                   and service lines extend. AGL also
                                              LLC; Notice of Intent To File License                   Commission, pursuant to 18 CFR 5.6 of                 requests: (i) A finding that AGL qualifies
                                              Application, Filing of Pre-Application                  the Commission’s regulations.                         as an LDC for the purposes of section
                                              Document, and Approving Use of the                         n. A copy of the PAD is available for              311 of the Natural Gas Policy Act of
                                              Traditional Licensing Process                           review at the Commission in the Public                1978 (NGPA); (ii) a waiver of the
                                                                                                      Reference Room or may be viewed on                    Commission’s accounting and reporting
                                                a. Type of Filing: Notice of Intent to                the Commission’s website (http://                     requirements and other regulatory
                                              File License Application and Request to                 www.ferc.gov), using the ‘‘eLibrary’’                 requirements ordinarily applicable to
                                              Use the Traditional Licensing Process.                  link. Enter the docket number,                        natural gas companies under the NGA
                                                b. Project No.: 4202–024.                             excluding the last three digits in the                and the NGPA; and (iii) such further
                                                c. Date Filed: September 26, 2018.                    docket number field to access the                     relief as the Commission may deem
                                                d. Submitted By: KEI (Maine) Power                                                                          appropriate, all as more fully described
                                                                                                      document. For assistance, contact FERC
                                              Management (II) LLC (KEI Power).                                                                              in the application which is on file with
                                                                                                      Online Support at
                                                e. Name of Project: Lowell Tannery                                                                          the Commission and open to public
                                                                                                      FERCOnlineSupport@ferc.gov, (866)
                                              Hydroelectric Project.                                                                                        inspection. The filing may also be
                                                f. Location: On the Passadumkeag                      208–3676 (toll free), or (202) 502–8659
                                                                                                      (TTY). A copy is also available for                   viewed on the web at http://
                                              River, in Penobscot County, Maine. No                                                                         www.ferc.gov using the ‘‘eLibrary’’ link.
                                              federal lands are occupied by the project               inspection and reproduction at the
                                                                                                      address in paragraph h.                               Enter the docket number excluding the
                                              works or located within the project                                                                           last three digits in the docket number
                                              boundary.                                                  o. The licensee states its unequivocal
                                                                                                      intent to submit an application for a                 field to access the document. For
                                                g. Filed Pursuant to: 18 CFR 5.3 and                                                                        assistance, contact FERC at
                                              5.5 of the Commission’s regulations.                    subsequent license for Project No. 4202.
                                                                                                      Pursuant to 18 CFR 16.20, each                        FERCOnlineSupport@ferc.gov or call
                                                h. Potential Applicant Contact: Lewis                                                                       toll-free, (866) 208–3676 or TTY, (202)
                                              C. Loon, KEI (USA) Power Management                     application for a subsequent license and
                                                                                                      any competing license applications                    502–8659.
                                              Inc., 423 Brunswick Avenue, Gardiner,                                                                            Any questions regarding this
                                              Maine 04345; (207) 203–3027; email—                     must be filed with the Commission at
                                                                                                      least 24 months prior to the expiration               application should be directed to
                                              Lewis.Loon@kruger.com.                                                                                        Elizabeth Wade, Senior Counsel, AGL
                                                i. FERC Contact: Dr. Nicholas Palso at                of the existing license. All applications
                                                                                                      for license for this project must be filed            Resources Inc., Ten Peachtree Place NE,
                                              (202) 502–8854; or email at                                                                                   Atlanta, GA 30309, by telephone at
                                              nicholas.palso@ferc.gov.                                by September 30, 2021.
                                                                                                         p. Register online at http://                      (404) 584–3160 or by email at ewade@
                                                j. KEI Power filed its request to use                                                                       southernco.com or Daniel P. Archuleta,
                                              the Traditional Licensing Process on                    www.ferc.gov/docs-filing/
                                                                                                      esubscription.asp to be notified via                  Troutman Sanders LLP, 401 Ninth
                                              September 26, 2018. KEI Power                                                                                 Street NW, Suite 1000, Washington, DC
                                              provided public notice of its request on                email of new filings and issuances
                                                                                                                                                            20004, by telephone at (202) 274–2926
                                              September 24, 2018. In a letter dated                   related to this or other pending projects.
                                                                                                                                                            or by email at daniel.archuleta@
                                              November 23, 2018, the Director of the                  For assistance, contact FERC Online
                                                                                                                                                            troutman.com.
                                              Division of Hydropower Licensing                        Support.                                                 Pursuant to section 157.9 of the
                                              approved KEI Power’s request to use the                   Dated: November 23, 2018.                           Commission’s rules, 18 CFR 157.9,
                                              Traditional Licensing Process.                          Kimberly D. Bose,                                     within 90 days of this Notice the
                                                k. With this notice, we are initiating                Secretary.                                            Commission staff will either: Complete
                                              informal consultation with the U.S. Fish                [FR Doc. 2018–25986 Filed 11–29–18; 8:45 am]          its environmental assessment (EA) and
                                              and Wildlife Service and/or NOAA                                                                              place it into the Commission’s public
                                                                                                      BILLING CODE 6717–01–P
                                              Fisheries under section 7 of the                                                                              record (eLibrary) for this proceeding; or
                                              Endangered Species Act and the joint                                                                          issue a Notice of Schedule for
                                              agency regulations thereunder at 50 CFR                 DEPARTMENT OF ENERGY                                  Environmental Review. If a Notice of
                                              part 402; and NOAA Fisheries under                                                                            Schedule for Environmental Review is
                                              section 305(b) of the Magnuson-Stevens                  Federal Energy Regulatory                             issued, it will indicate, among other
                                              Fishery Conservation and Management                     Commission                                            milestones, the anticipated date for the
                                              Act and implementing regulations at 50                                                                        Commission staff’s issuance of the EA
                                                                                                      [Docket No. CP19–15–000]
                                              CFR 600.920. We are also initiating                                                                           for this proposal. The filing of the EA
                                              consultation with the Maine State                       Atlanta Gas Light Company; Notice of                  in the Commission’s public record for
                                              Historic Preservation Officer, as                       Application                                           this proceeding or the issuance of a
                                              required by section 106 of the National                                                                       Notice of Schedule for Environmental
                                              Historic Preservation Act, and the                         Take notice that on November 9,                    Review will serve to notify federal and
                                              implementing regulations of the                         2018, Atlanta Gas Light Company                       state agencies of the timing for the
                                              Advisory Council on Historic                            (AGL), Ten Peachtree Place NE, Atlanta,               completion of all necessary reviews, and
amozie on DSK3GDR082PROD with NOTICES1




                                              Preservation at 36 CFR 800.2.                           GA 30309, filed in Docket No. CP19–15–                the subsequent need to complete all
                                                l. With this notice, we are designating               000, an application pursuant to section               federal authorizations within 90 days of
                                              KEI Power as the Commission’s non-                      7(f) of the Natural Gas Act (NGA) and                 the date of issuance of the Commission
                                              federal representative for carrying out                 the Commission’s regulations requesting               staff’s EA.
                                              informal consultation pursuant to                       a service area determination allowing                    There are two ways to become
                                              section 7 of the Endangered Species Act                 AGL to expand or enlarge its facilities,              involved in the Commission’s review of
                                              and section 305(b) of the Magnuson-                     without further authorization from the                this project. First, any person wishing to


                                         VerDate Sep<11>2014   17:00 Nov 29, 2018   Jkt 247001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\30NON1.SGM   30NON1



Document Created: 2018-11-30 04:35:18
Document Modified: 2018-11-30 04:35:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 61624 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR